PRACTICA DE CALCULO DE MONTO A FACTURAR

K DEL MES DE JULIO 1.014 0.972

VALORIZACION N°1 DEL MES DE AGOSTO S/. 2,451,412.320 S/. 2,451,412.320


REAJUSTE(K-1) S/. 34,319.772 -S/. 68,639.545
DEDUCCION
DEDUCCION POR ADELANTO DE MATERIALES S/. 0.000 S/. 0.000 K
DEDUCCION POR ADELANTO DIRECTO S/. 0.000 S/. 0.000

VALORIZACION BRUTA S/. 2,485,732.092 S/. 2,382,772.775


AMORTIZACIONES
AMORTIZACION POR ADELANTODE MATERIALES S/. 0.000 S/. 0.000
AMORTIZACION POR ADELANTO DIRECTO S/. 0.000 S/. 0.000

VALORIZACION NETA S/. 2,485,732.092 S/. 2,382,772.775

EFECTIVO S/. 2,485,732.092 S/. 2,382,772.775


IGV S/. 447,431.777 S/. 428,899.100

MONTO A FACTURAR S/. 2,933,163.869 S/. 2,811,671.875


PRACTICA DE CALCULO DE MONTO A FACTURAR

CALACULO DEL K

K
PRACTICA DE CALCULO DE MONTO A FACTURAR

0.35 Mor + 0.247 Cer + 0.154 Eqr + 0.249 Ipr


Moo Ceo Eqo Ipo

JULIO SETIEMBRE
MANO DE OBRA 808.20 580.9 0.25156521
CEMENTO PORTLAND 686.58 686.33 0.24691006
MAQUINARIA Y EQUIPO IMPORTADO 446.20 450.52 0.15549099
INDICE GENERAL DEL PRECIO AL CONSUMIDOR 465.71 465.71 0.2490
467.84 485.11 0.0000
107.67 107.68 0.0000
441.67 444.57 0.0000
PRACTICA DE CALCULO DE MONTO A FACTURAR

JULIO SETIEMBRE
01 47 MANO DE OBRA 808.20 580.9
02 66 TUBERÍA DE PVC PARA AGUA POT. Y ALC. 686.58 686.33
03 5 CEMENTO PORTLAND TIPO I 446.20 450.52
21 AGREGADO GRUESO 465.71 465.71
04 2 ACERO DE CONSTRUCCIÓN LISO 467.84 485.11
05 80 CONCRETO PREMEZCLADO 107.67 107.68
06 39 ÍNDICE GENERAL DE PRECIOS AL CONSUMID441.67 444.57