HARGA
NO. JENIS BAHAN SATUAN
(Rp.)
1 Pasir Urug m3 143,000.00
2 Pasir Pasang m3 143,000.00
3 Pasir Beton ( Palu ) m3 715,400.00
4 Kerikil Beton m3 643,700.00
5 Tanah Urug m3 107,300.00
6 Portland Cement (50 kg) sak 100,000.00
7 Pancang Galam m 18,774.00
8 besi beton kg 11,803.86
9 kawat beton kg 32,900.00
10 wiremes Ø 6 kg 15,433.54
11 kayu kelas III M³ 2,682,000.00
12 Paku 5 cm - 12 cm Kg 27,200.00
13 Minyak Bekesting Ltr 56,600.00
14 Balok Kayu Kelas II M³ 3,754,800.00
15 Pliwood Tebal 9 mm Lbr 250,400.00
16 kayu ulin 10/10 4 m m3 5,900,400.00
17 kayu ulin 5/10 4 m m3 5,900,400.00
18 paku ilin kg 28,600.00
19 Pancang beton 20/20 m' 715,400.00
DAFTAR HARGA SATUAN UPAH
Jumlah 246,990.00
Keuntungan Max 24,699.00
Total Harga 271,689.00
Dibulatkan 271,700.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
III Alat
-Crane Jam 0.0667 740,453.29 49,388.23
-Pile Drive + Hammer Jam 0.0667 142,600.00 9,511.42
-Alat Bantu Jam 1.0000 1,000.00 1,000.00
Jumlah 68,677.27
Keuntungan Max 6,867.73
Total Harga 75,545.00
Dibulatkan 75,500.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
Jumlah 735,666.13
Keuntungan Max 73,566.61
Total Harga 809,232.75
Dibulatkan 809,200.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
III Peralatan :
- Excavator jam 0.019 984,919.76 18,409.72
Jumlah 27,644.92
Keuntungan Max 2,764.49
Total Harga 30,409.41
Dibulatkan 30,400.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
Jumlah 241,842.72
Keuntungan Max 24,184.27
Total Harga 266,026.99
Dibulatkan 266,000.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
Jumlah 200,720.00
Keuntungan Max Keuntungan 20,072.00
Total Harga 220,792.00
Dibulatkan Dibulatkan 220,800.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU
Uraian Pekerjaan : Galian Tanah Biasa (dg Alat berat dan ponton) dan dirapikan
Satuan : m3
Harga Satuan Pekerjaan : Rp. 21,100
Uraian Pekerjaan : Gebalan Rumput
Satuan : m2
Harga Satuan Pekerjaan : Rp. 21,100
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan
( Rp ) Pekerjaan
( Rp )
I Upah :
- Pekerja OH 0.1000 116,000.00 11,600.00
- Mandor OH 0.0100 185,200.00 1,852.00
II Bahan :
- Gebalan Rumput m2 1.1000 5,000.00 5,500.00
III Peralatan :
- Alat Bantu Jam 0.0500 5,000 250.00
Jumlah 19,202.00
Keuntungan Max 1,920.20
Total Harga 21,122.20
Dibulatkan 21,100.00
ANALISA HARGA SATUAN PEKERJAAN BEKISTING
BIATAN ILIR KAB. BERAU
Jumlah 173,077.00
Keuntungan Max 17,307.70
Total Harga 190,384.70
Dibulatkan 190,400.00
ANALISA HARGA SATUAN PEKERJAAN WIRE MESH
BIATAN ILIR KAB. BERAU
Jumlah 1,671,651.52
Keuntungan Max 167,165.15
Total Harga 1,838,816.67
Dibulatkan 1,838,800.00
Harga / 1 kg Wiremesh 18,388.00
ANALISA HARGA SATUAN PEKERJAAN BETON
BIATAN ILIR KAB. BERAU
Uraian Pekerjaan : Beton f'c = 7,4 Mpa (K 225), slump (12 + 2) cm.
Satuan : m3
Harga Satuan Pekerjaan : Rp. 1,967,200
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 1.323 116,000.00 153,468.00
- Tukang Batu OH 0.189 135,400.00 25,590.60
- Kepala Tukang Batu OH 0.019 162,800.00 3,093.20
- Mandor OH 0.132 185,200.00 24,446.40
II BAHAN :
- Semen PC zak 7.42 100,000.00 742,000.00
- Pasir Beton m3 0.50 715,400.00 357,700.00
- Kerikil Beton m3 0.78 643,700.00 251,043.00
III PERALATAN :
Mollen (sewa) hari 0.250 924,211.92 231,052.98
Jumlah 1,788,394.18
Keuntungan Max 178,839.42
Total Harga 1,967,233.60
Dibulatkan 1,967,200.00
ANALISA HARGA SATUAN PEKERJAAN BETON
BIATAN ILIR KAB. BERAU
Uraian Pekerjaan : Beton f'c = 7,4 Mpa (K 125), slump (12 + 2) cm.
Satuan : m3
Harga Satuan Pekerjaan : Rp. 1,509,800
Jumlah 1,372,561.88
Keuntungan Max 137,256.19
Total Harga 1,509,818.07
Dibulatkan 1,509,800.00
ANALISA HARGA SATUAN PEKERJAAN PEMBESIAN
BIATAN ILIR KAB. BERAU
III PERALATAN :
Jumlah 143,912.46
Keuntungan Max 14,391.25
Total Harga 158,303.70
Dibulatkan 158,300.00
pembesian / Kg 15,830.00
ANALISA HARGA SATUAN PEKERJAAN PANCANG CERUCUK
BIATAN ILIR KAB. BERAU
III PERALATAN :
-alat bantu ls 1.000 25,000.00 25,000.00
Jumlah 49,638.80
Keuntungan Max 4,963.88
Total Harga 54,602.68
Dibulatkan 54,600.00
harga per 1 titik galam panjang 2 m 109,200.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU
I PERALATAN
- Excavator 4 Unit 2.00 7,879,358.08 15,758,716.16
- Dump Truck 10 Ton 6 Unit 2.00 2,227,600.00 4,455,200.00
- Compactor 2 Unit 2.00 6,110,437.84 36,662,627.04
- Molen / Concrete Mixer 3 Unit 2.00 50,000.00 300,000.00
- Staff dan Personil LS 1.00 15,000,000.00 15,000,000.00
Jumlah 72,176,543.20
Dibulatkan 72,176,500.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU
Jumlah 108,000,000.00
Dibulatkan 108,000,000.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU
Jumlah 22,950,000.00
Dibulatkan 22,950,000.00
RENCANA ANGGARAN BIAYA
PROGRAM : Pengembangan dan pengelolaan Irigasi, Rawa Dan Jaringan pengairan Lain nya
KEGIATAN : Pembangunan Jaringan Irigasi
PEKERJAAN : Perencanaan Teknis Pembangunan Jaringan Irigasi Di Biatan Ilir
LOKASI : Biatan ilir Kab Berau
Tahun Anggaran : 2018
HARGA JUMLAH
JENIS PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
1 2 3.00 4 5
1.1. PEKERJAAN PENDAHULUAN
a. Mobilisasi dan Demobilisasi LS 1.00 72,176,500.00 72,176,500.00
b. Sarana, Prasarana Personil LS 1.00 108,000,000.00 108,000,000.00
c. Construction Drawing/As-Built Drawing LS 1.00 22,950,000.00 22,950,000.00
Total 203,126,500.00
1.2. PEKERJAAN SALURAN PRIMER
a. Timbunan m3 29,844.92 220,800.00 6,589,757,232.00
b. Pembersihan Hutan m 2
21,150.00 30,400.00 642,960,000.00
c. Pekerjaan beton m 3
2,878.07 1,967,200.00 5,661,741,094.15
d Besi wiremes kg 49,007.32 18,388.00 901,146,683.27
e Bekisting m2 2,164.85 190,400.00 412,188,258.72
Total 14,207,793,268.15
1.3. PEKERJAAN SALURAN SEKUNDER
a Timbunan m3 8,417.37 220,800.00 1,858,554,192.00
b Pekerjaan beton m 3
1,946.24 1,967,200.00 3,828,643,328.00
c Besi wiremes kg 33,469.01 18,388.00 615,428,222.08
d Bekisting m2 1,428.76 190,400.00 272,035,904.00
Total 6,574,661,646.08
1.4. PEKERJAAN BANGUNAN BAGI PRIMER 4 TITIK
TIPE 1 ( 3 PINTU )
A a. Pekerjaan Beton m3 12.69 1,967,200.00 24,963,768.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 12.00 2,115,000.00 25,380,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 327.00 109,200.00 35,708,400.00
d Beton B0 m3 34.59 1,509,800.00 52,223,982.00
e Bekisting m2 112.00 190,400.00 21,324,800.00
f Baja Tulangan kg 2,324.55 15,830.00 36,797,626.50
TIPE 2 ( 2 PINTU )
B a. Pekerjaan Beton m3 4.45 1,967,200.00 8,754,040.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 3.00 2,115,000.00 6,345,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 103.00 109,200.00 11,247,600.00
d Beton B0 m3 11.53 1,509,800.00 17,407,994.00
e Bekisting m2 28.00 190,400.00 5,331,200.00
f Baja Tulangan kg 881.96 15,830.00 13,961,426.80
Total 259,445,837.30
1.5 PEKERJAAN BANGUNAN SADAP 13 TITIK
a. Pekerjaan Beton m3 54.99 1,967,200.00 108,176,328.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 39.00 2,115,000.00 82,485,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 1,313.00 109,200.00 143,379,600.00
d Beton B0 m3 149.89 1,509,800.00 226,303,922.00
e Bekisting m2 364.00 190,400.00 69,305,600.00
f Baja Tulangan kg 11,506.56 15,830.00 182,148,844.80
Total 811,799,294.80
1.6 PEKERJAAN BANGUNAN AKHIR 8 TITIK
a. Pekerjaan Beton m3 39.10 1,967,200.00 76,925,388.80
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 8.00 2,115,000.00 16,920,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 712.00 109,200.00 77,750,400.00
d Beton B0 m3 92.24 1,509,800.00 139,263,952.00
e Bekisting m2 264.32 190,400.00 50,326,528.00
f Baja Tulangan kg 6,170.96 15,830.00 97,686,296.80
Total 458,872,565.60
1.7 PEKERJAAN BANGUNAN GORONG- GORONG
A TIPE 1 ( PRIMER 1 TITIK )
a. Pekerjaan Beton m3 8.20 1,967,200.00 16,138,948.14
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 27.00 109,200.00 2,948,400.00
c. Beton B0 m3 9.00 1,509,800.00 13,588,200.00
d Bekisting m2 112.42 190,400.00 21,403,915.01
e Baja Tulangan kg 842.48 15,830.00 13,336,458.40
B TIPE 2 ( SEKUNDER 6 TITIK )
a. Pekerjaan Beton m3 45.87 1,967,200.00 90,244,906.56
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 162.00 109,200.00 17,690,400.00
c. Baja Tulangan kg 4,839.12 15,830.00 76,603,269.60
d Beton B0 m3 54.00 1,509,800.00 81,529,200.00
e Bekisting m2 674.49 190,400.00 128,423,490.05
Total 461,907,187.76
1.8 PEKERJAAN BANGUNAN BENDUNG
a. Pekerjaan Beton m3 127.89 1,967,200.00 251,587,175.20
b. Pancang kayu Ulin titik 163.00 271,700.00 44,287,100.00
c. Baja Tulangan kg 4,989.00 15,830.00 78,975,870.00
d Beton B0 m3 18.20 1,509,800.00 27,478,360.00
e Bekisting m2 330.00 190,400.00 62,832,000.00
Total 465,160,505.20
JUMLAH 23,442,766,804.88
PPN 10 % 2,344,276,680.49
TOTAL 25,787,043,485.37
DIBULATKAN 25,787,043,500.00
RENCANA ANGGARAN BIAYA
PROGRAM : Pengembangan dan pengelolaan Irigasi, Rawa Dan Jaringan pengairan Lain nya
KEGIATAN : Pembangunan Jaringan Irigasi
PEKERJAAN : Perencanaan Teknis Pembangunan Jaringan Irigasi Di Biatan Ilir
LOKASI : Biatan ilir Kab Berau
Tahun Anggaran : 2018
HARGA JUMLAH
JENIS PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
1 2 3.00 4 5
1.1. PEKERJAAN PENDAHULUAN
a. Mobilisasi dan Demobilisasi LS 1.00 72,176,500.00 72,176,500.00
b. Sarana, Prasarana Personil LS 1.00 108,000,000.00 108,000,000.00
c. Construction Drawing/As-Built Drawing LS 1.00 22,950,000.00 22,950,000.00
Total 203,126,500.00
1.2. PEKERJAAN SALURAN PRIMER
a. Timbunan m3 29,844.92 220,800.00 6,589,757,232.00
b. Pembersihan Hutan m 2
21,150.00 30,400.00 642,960,000.00
c. Pekerjaan beton m3 2,878.07 1,967,200.00 5,661,741,094.15
d Besi wiremes kg 49,007.32 18,388.00 901,146,683.27
e Bekisting m2 2,164.85 190,400.00 412,188,258.72
Total 14,207,793,268.15
1.3. PEKERJAAN SALURAN SEKUNDER
a Timbunan m3 8,417.37 220,800.00 1,858,554,192.00
b Pekerjaan beton m3 1,946.24 1,967,200.00 3,828,643,328.00
c Besi wiremes kg 33,469.01 18,388.00 615,428,222.08
d Bekisting m2 1,428.76 190,400.00 272,035,904.00
Total 6,574,661,646.08
1.4. PEKERJAAN BANGUNAN BAGI PRIMER 4 TITIK
TIPE 1 ( 3 PINTU )
A a. Pekerjaan Beton m3 12.69 1,967,200.00 24,963,768.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 12.00 2,115,000.00 25,380,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 327.00 109,200.00 35,708,400.00
d Beton B0 m3 34.59 1,509,800.00 52,223,982.00
e Bekisting m2 112.00 190,400.00 21,324,800.00
f Baja Tulangan kg 2,324.55 15,830.00 36,797,626.50
TIPE 2 ( 2 PINTU )
B a. Pekerjaan Beton m3 4.45 1,967,200.00 8,754,040.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 3.00 2,115,000.00 6,345,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 103.00 109,200.00 11,247,600.00
d Beton B0 m3 11.53 1,509,800.00 17,407,994.00
e Bekisting m2 28.00 190,400.00 5,331,200.00
f Baja Tulangan kg 881.96 15,830.00 13,961,426.80
Total 259,445,837.30
1.5 PEKERJAAN BANGUNAN SADAP 13 TITIK
a. Pekerjaan Beton m3 54.99 1,967,200.00 108,176,328.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 39.00 2,115,000.00 82,485,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 1,313.00 109,200.00 143,379,600.00
d Beton B0 m3 149.89 1,509,800.00 226,303,922.00
e Bekisting m2 364.00 190,400.00 69,305,600.00
f Baja Tulangan kg 11,506.56 15,830.00 182,148,844.80
Total 811,799,294.80
1.6 PEKERJAAN BANGUNAN AKHIR 8 TITIK
a. Pekerjaan Beton m3 39.10 1,967,200.00 76,925,388.80
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 8.00 2,115,000.00 16,920,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 712.00 109,200.00 77,750,400.00
d Beton B0 m3 92.24 1,509,800.00 139,263,952.00
e Bekisting m2 264.32 190,400.00 50,326,528.00
f Baja Tulangan kg 6,170.96 15,830.00 97,686,296.80
Total 458,872,565.60
1.7 PEKERJAAN BANGUNAN GORONG- GORONG
A TIPE 1 ( PRIMER 1 TITIK )
a. Pekerjaan Beton m3 8.20 1,967,200.00 16,138,948.14
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 27.00 109,200.00 2,948,400.00
c. Beton B0 m3 9.00 1,509,800.00 13,588,200.00
d Bekisting m2 112.42 190,400.00 21,403,915.01
e Baja Tulangan kg 842.48 15,830.00 13,336,458.40
B TIPE 2 ( SEKUNDER 6 TITIK )
a. Pekerjaan Beton m3 45.87 1,967,200.00 90,244,906.56
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 162.00 109,200.00 17,690,400.00
c. Baja Tulangan kg 4,839.12 15,830.00 76,603,269.60
d Beton B0 m3 54.00 1,509,800.00 81,529,200.00
e Bekisting m2 674.49 190,400.00 128,423,490.05
Total 461,907,187.76
1.8 PEKERJAAN BANGUNAN BENDUNG
a. Pekerjaan Beton m3 127.89 1,967,200.00 251,587,175.20
b. Pengadaan tiang pancang 20/20 - 3 meter M' 489.00 809,200.00 395,698,800.00
c. Pemancangan tiang pancang 20/20 - 3 meter M' 489.00 75,500.00 36,919,500.00
d. Baja Tulangan kg 4,989.00 15,830.00 78,975,870.00
e. Beton B0 m3 18.20 1,509,800.00 27,478,360.00
f. Bekisting m2 330.00 190,400.00 62,832,000.00
Total 853,491,705.20
JUMLAH 23,831,098,004.88
PPN 10 % 2,383,109,800.49
TOTAL 26,214,207,805.37
DIBULATKAN 26,214,207,800.00
HARGA SATUAN JADI ( UNIT PRICE )
PEKERJAAN :
LO KAS I : BIATAN ILIR
TAHUN ANGGARAN : 2018
369.8632 0.8883333333
92.4658 3.5533333333
93
330.46 KG
TUL POKOK
DIDNDING KIRI KANAN
PANJANG JUMLAH
1.1 56 61.6 15.4 54.7213333333
TUL POKOK
DIDING DEPAN BELAKNG
PANJANG JUMLAH
1 56 56 14 49.7466666667
TUL POKOK PINTU AIR
PANJANG JUMLAH
0.2 60 12 3 10.66
TUL POKOK LANTAI
PANJANG JUMLAH
3.4 14 95.2 23.8 84.5693333333
224.8
56.2
199.69733 530.1573333333
TILANGAN TUMPUAN DINDING TUL POKOK DINDING KIRI 1 BANYAK NYA PANJANG NYA BATANG KG
TINGGI LEBAR BAWAHTINGGI LEBAR ATAS TOTAL JUMLAH TUL POKOK 14 3.5 49 49 174.11333 174.11333
1.3 0.1 1.3 0.1 2.8 LANTAI 14 3.4 76.16 38.08 135.31093 270.62187
3.5533333333
TAMBAHAN LANTAI 2.04 444.735 KG
JARAK ANTAR TUL TUMPUAN YA ITU 20 CM
2.6 : 0.2 13
10 PANJANG SALURAN 3381 m primer Beton mutu sedang dengan fc’= 20 MPa ( K- 225 ) SUDAH
10143 16355 Beton Mutu Rendah Dengan fc'=10 Mpa (K-125) SUDAH
PEKERJAAN ACIAN PANJANG LEBAR JUMLAH Pengadaan Dan Pemancangan Cerucuk SUDAH
SEKUNDER 3106 3.2 9939.2 M2 SAYAP BETON 4 BUAH TEBAL LUASAN JUMLAH
21.6
bangunan sadap
tinggi panjang dalam
1.4 20 20 28 m2
bangunan bagi
tinggi panjang dalam
1.4 20 20 28 m2
bangunan akhir
tinggi panjang dalam panjang luar
1.4 23.6 23.6 33.04 m2
gorong- gorong
tinggi dinding lantai + atas
1.4 25.8592 54.4376 80.2968 112.41552 m2
saluran primer
panjang luasa di kurang lantai
3381 0.8981 0.2578 871.6218 2164.8543 m2
saluran sekunder
panjang luasa di kurang lantai
3106 0.64 0.18 559.08 1428.76 m2
wiremes
primer
panjan lebar lembar lembar
3381 x 4.17 ; 10 1409.877
sekunder
panjan lebar lembar lembar
3106 x 3.1 ; 10 962.86
pancang ulin
di bendungan 163
primer
lantai
panjang lebar tinggi / tebal m3
17.5 10.4 0.2 = 36.4 m3
36.4 total
dinding
panjang sisi kanan lebar tinggi / tebal m3
25.5 1 2 = 51 m3
panjang sisi kiri lebar tinggi / tebal m3
15 1 2 = 30 m3
81 total
bangunan mercu
bangunan mercu tinggi / tebal m3
5.2455 x 2 = 10.491 m3
10.491 total
127.891 keseluruhan
lantai B0
panjang lebar tinggi / tebal m3
17.5 10.4 0.1 = 18.2 m3
18.2 total
18.2
BEKISTING
DINDING KIRI
panjang sisi kiri tinggi / tebal m3
25.5 2 = 51 m2
DINDING KANAN 102 total
panjang sisi kanan tinggi / tebal m3
15 2 = 30 m2
60 total
BANGUNAN MERCU
Panjang tinggi / tebal m3
10.5 8 = 84 m2
168 total
330