DAFTAR HARGA DASAR SATUAN BAHAN

HARGA
NO. JENIS BAHAN SATUAN
(Rp.)
1 Pasir Urug m3 143,000.00
2 Pasir Pasang m3 143,000.00
3 Pasir Beton ( Palu ) m3 715,400.00
4 Kerikil Beton m3 643,700.00
5 Tanah Urug m3 107,300.00
6 Portland Cement (50 kg) sak 100,000.00
7 Pancang Galam m 18,774.00
8 besi beton kg 11,803.86
9 kawat beton kg 32,900.00
10 wiremes Ø 6 kg 15,433.54
11 kayu kelas III M³ 2,682,000.00
12 Paku 5 cm - 12 cm Kg 27,200.00
13 Minyak Bekesting Ltr 56,600.00
14 Balok Kayu Kelas II M³ 3,754,800.00
15 Pliwood Tebal 9 mm Lbr 250,400.00
16 kayu ulin 10/10 4 m m3 5,900,400.00
17 kayu ulin 5/10 4 m m3 5,900,400.00
18 paku ilin kg 28,600.00
19 Pancang beton 20/20 m' 715,400.00
DAFTAR HARGA SATUAN UPAH

HARGA SATUAN HARGA SATUAN


NO. URAIAN
(Rp./ Hari) (Rp. / Jam)
1 Mandor 185,200.00 23,150.00
2 Kepala Tukang 162,800.00 20,350.00
3 Tukang Gali Tanah 135,400.00 16,925.00
4 Tukang Batu 135,400.00 16,925.00
5 Tukang Kayu 135,400.00 16,925.00
6 Pekerja/ Buruh 116,000.00 14,500.00
7 Operator/ Operator alat berat 178,100.00 22,262.50
8 Pembantu Operator 121,100.00 15,137.50
DAFTAR HARGA SATUAN ALAT

HARGA SATUAN HARGA SATUAN


NO. URAIAN SATUAN SATUAN
(Rp.) (Rp.)
1 EXCAVATOR A (Type Caterpillar PC. 200) Jam 984,919.76 HARI 7,879,358.08
2 DUMP TRUCK 10 TON (Type Isuzu KSJR 361 D) Jam 556,900.00 HARI 4,455,200.00
3 COMPACTOR, VIBRO ROLLER (Dynamic - CA 51 D) Jam 763,804.73 HARI 6,110,437.84
4 CONCRETE MIXER (MOLEN) (350 LTR) Jam 115,526.49 HARI 924,211.92
5 STEMPER Jam 91,000.00 HARI 728,000.00
6 CRANE Jam 740,453.29 HARI 5,923,626.32
7 PILE DRIVE + HAMMER Jam 142,600.00 HARI 1,140,800.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pemancangan Pancang Ulin


Satuan : m1
Harga Satuan Pekerjaan :: Rp. 271,700
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I Upah :
- Pekerja OH 0.150 116,000.00 17,400.00
- tukang kayu OH 0.075 135,400.00 10,155.00
- kepala tukang kayu OH 0.075 162,800.00 12,210.00
- Mandor OH 0.075 185,200.00 13,890.00
II Bahan :
- balok ulin 10 /10 4 m m3 0.0200 5,900,400.00 118,008.00
- sunduk balok ulin 5/10 - 60 cm m3 0.0025 5,900,400.00 14,751.00
- kalang balok ulin 5/10 m3 0.0100 5,900,400.00 59,004.00
- paku ilin kg 0.0200 28,600.00 572.00
III Alat
-alat bantu ls 1.000 1,000.00 1,000.00

Jumlah 246,990.00
Keuntungan Max 24,699.00
Total Harga 271,689.00
Dibulatkan 271,700.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

ANALISA HARGA SATUAN PEKERJAAN TANAH


BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pemancangan Pancang beton 20/20


Satuan : M'
Harga Satuan Pekerjaan : Rp. 75,500
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I Upah :
- Pekerja OH 0.0167 116,000.00 1,937.20
- tukang kayu OH 0.0333 135,400.00 4,508.82
- kepala tukang kayu OH 0.0067 162,800.00 1,090.76
- Mandor OH 0.0067 185,200.00 1,240.84
II Bahan :

III Alat
-Crane Jam 0.0667 740,453.29 49,388.23
-Pile Drive + Hammer Jam 0.0667 142,600.00 9,511.42
-Alat Bantu Jam 1.0000 1,000.00 1,000.00

Jumlah 68,677.27
Keuntungan Max 6,867.73
Total Harga 75,545.00
Dibulatkan 75,500.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

ANALISA HARGA SATUAN PEKERJAAN TANAH


BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pengadaan Pancang beton 20/20


Satuan : M'
Harga Satuan Pekerjaan : Rp. 809,200
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I Upah :
- Pekerja OH 0.0100 116,000.00 1,160.00
- tukang kayu OH 0.0200 135,400.00 2,708.00
- kepala tukang kayu OH 0.0400 162,800.00 6,512.00
- Mandor OH 0.0080 185,200.00 1,481.60
II Bahan :
- Pancang Beton 20x20 - 3 m M' 1.0000 715,400.00 715,400.00
III Alat
-Crane Jam 0.0100 740,453.29 7,404.53
-Alat Bantu Jam 1.0000 1,000.00 1,000.00

Jumlah 735,666.13
Keuntungan Max 73,566.61
Total Harga 809,232.75
Dibulatkan 809,200.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pembersihan Lahan


Satuan : m2
Harga Satuan Pekerjaan :: Rp. 30,400
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I Upah :
- Pekerja OH 0.060 135,400.00 8,124.00
- Mandor OH 0.006 185,200.00 1,111.20
II Bahan :

III Peralatan :
- Excavator jam 0.019 984,919.76 18,409.72

Jumlah 27,644.92
Keuntungan Max 2,764.49
Total Harga 30,409.41
Dibulatkan 30,400.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Tanah Urug didatangkan dari luar (pemadatan excavator)


Satuan : m3
Harga Satuan Pekerjaan : Rp. 266,000
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I Upah :
- Pekerja OH -
- Mandor OH -
II Bahan :
- Tanah m3 1.2000 107,300.00 128,760.00
III Peralatan :
- Dump Truck 10 Ton jam 0.170 556,900.00 94,673.00
- Excavator jam 0.019 984,919.76 18,409.72

Jumlah 241,842.72
Keuntungan Max 24,184.27
Total Harga 266,026.99
Dibulatkan 266,000.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Urugan Tanah


Satuan : m3
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan
( Rp ) Pekerjaan
( Rp )
I Upah :
- Pekerja OH 0.5000 116,000.00 58,000.00
- Mandor OH 0.0500 185,200.00 9,260.00
II Bahan :
- Tanah Urug m3 1.2000 107,300.00 128,760.00
III Peralatan :
- Pemadat Timbunan (StamPer) Hari 0.0500 91,000.00 4,550.00
- Alat Bantu Jam 0.0300 5,000.00 150.00

Jumlah 200,720.00
Keuntungan Max Keuntungan 20,072.00
Total Harga 220,792.00
Dibulatkan Dibulatkan 220,800.00
ANALISA HARGA SATUAN PEKERJAAN TANAH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Galian Tanah Biasa (dg Alat berat dan ponton) dan dirapikan
Satuan : m3
Harga Satuan Pekerjaan : Rp. 21,100
Uraian Pekerjaan : Gebalan Rumput
Satuan : m2
Harga Satuan Pekerjaan : Rp. 21,100
:
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan
( Rp ) Pekerjaan
( Rp )
I Upah :
- Pekerja OH 0.1000 116,000.00 11,600.00
- Mandor OH 0.0100 185,200.00 1,852.00
II Bahan :
- Gebalan Rumput m2 1.1000 5,000.00 5,500.00
III Peralatan :
- Alat Bantu Jam 0.0500 5,000 250.00

Jumlah 19,202.00
Keuntungan Max 1,920.20
Total Harga 21,122.20
Dibulatkan 21,100.00
ANALISA HARGA SATUAN PEKERJAAN BEKISTING
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pemasangan 1 m2 bekistingg


Satuan : m2
Harga Satuan Pekerjaan : Rp. 190,400.00
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 0.6600 116,000.00 76,560.00
- Tukang Kayu OH 0.3300 135,400.00 44,682.00
- Kepala Tukang Kayu OH 0.0330 162,800.00 5,372.40
- Mandor OH 0.0330 185,200.00 6,111.60
II BAHAN :
- Kayu kelas III m3 0.0035 2,682,000.00 9,387.00
- Paku 5 cm - 12 cm kg 0.4000 27,200.00 10,880.00
- Minyak Bekisting liter 0.2000 56,600.00 11,320.00
- Plywood tebal 9 mm lbr 0.0350 250,400.00 8,764.00
III PERALATAN :

Jumlah 173,077.00
Keuntungan Max 17,307.70
Total Harga 190,384.70
Dibulatkan 190,400.00
ANALISA HARGA SATUAN PEKERJAAN WIRE MESH
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : pembesian 100 kg Jaring Kawat ( Wire Mesh )


Satuan : kg
Harga Satuan Pekerjaan : Rp. 1,838,800.00
Harga Pekerjaan / 1 kg : Rp. 18,388.00
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 0.2500 178,100.00 44,525.00
- Tukang besi OH 0.2500 116,000.00 29,000.00
- Kepala Tukang Besi OH 0.0250 135,400.00 3,385.00
- Mandor OH 0.0250 162,800.00 4,070.00
II BAHAN :
- wiremesh kg 102.0000 15,433.54 1,574,221.52
- kawat ikat kg 0.5000 32,900.00 16,450.00
III PERALATAN :

Jumlah 1,671,651.52
Keuntungan Max 167,165.15
Total Harga 1,838,816.67
Dibulatkan 1,838,800.00
Harga / 1 kg Wiremesh 18,388.00
ANALISA HARGA SATUAN PEKERJAAN BETON
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Beton f'c = 7,4 Mpa (K 225), slump (12 + 2) cm.
Satuan : m3
Harga Satuan Pekerjaan : Rp. 1,967,200
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 1.323 116,000.00 153,468.00
- Tukang Batu OH 0.189 135,400.00 25,590.60
- Kepala Tukang Batu OH 0.019 162,800.00 3,093.20
- Mandor OH 0.132 185,200.00 24,446.40
II BAHAN :
- Semen PC zak 7.42 100,000.00 742,000.00
- Pasir Beton m3 0.50 715,400.00 357,700.00
- Kerikil Beton m3 0.78 643,700.00 251,043.00
III PERALATAN :
Mollen (sewa) hari 0.250 924,211.92 231,052.98

Jumlah 1,788,394.18
Keuntungan Max 178,839.42
Total Harga 1,967,233.60
Dibulatkan 1,967,200.00
ANALISA HARGA SATUAN PEKERJAAN BETON
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Beton f'c = 7,4 Mpa (K 125), slump (12 + 2) cm.
Satuan : m3
Harga Satuan Pekerjaan : Rp. 1,509,800

Harga Harga Satuan


No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 1.650 116,000.00 191,400.00
- Tukang Batu OH 0.275 135,400.00 37,235.00
- Kepala Tukang Batu OH 0.028 162,800.00 4,558.40
- Mandor OH 0.165 185,200.00 30,558.00
II BAHAN :
- Semen PC zak 5.52 100,000.00 552,000.00
- Pasir Beton m3 0.59 143,000.00 84,370.00
- Kerikil Beton m3 0.75 643,700.00 241,387.50
III PERALATAN :
Mollen (sewa) hari 0.250 924,211.92 231,052.98

Jumlah 1,372,561.88
Keuntungan Max 137,256.19
Total Harga 1,509,818.07
Dibulatkan 1,509,800.00
ANALISA HARGA SATUAN PEKERJAAN PEMBESIAN
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Pembesian 10 kg dengan besi polos / ulir


Satuan : kg
Harga Satuan Pekerjaan : Rp. 158,300
Harga Satuan / 1 kg : Rp. 15,830
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 0.070 116,000.00 8,120.00
- Tukang Besi OH 0.070 135,400.00 9,478.00
- Kepala Tukang Besi OH 0.007 162,800.00 1,139.60
- Mandor OH 0.004 185,200.00 740.80
II BAHAN :
- Besi Beton kg 10.50 11,803.86 123,940.56
- Kawat Beton kg 0.02 32,900.00 493.50

III PERALATAN :

Jumlah 143,912.46
Keuntungan Max 14,391.25
Total Harga 158,303.70
Dibulatkan 158,300.00
pembesian / Kg 15,830.00
ANALISA HARGA SATUAN PEKERJAAN PANCANG CERUCUK
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : 1 m panjang cerucuk kayu/ dolken diameter 8-10 cm


Satuan : m
Harga Satuan Pekerjaan : Rp. 54,600
Harga Satuan 1 titik / 2m : Rp. 109,200
Harga Harga Satuan
No Uraian Pekerjaan Satuan Kuantitas Satuan Pekerjaan
( Rp ) ( Rp )
I UPAH
- Pekerja OH 0.030 116,000.00 3,480.00
- Mandor OH 0.003 185,200.00 555.60
- Oprator Tripode OH 0.005 178,100.00 890.50
II BAHAN :
- Kayu Galam 8-10 cm m 1.05 18,774.00 19,712.70

III PERALATAN :
-alat bantu ls 1.000 25,000.00 25,000.00

Jumlah 49,638.80
Keuntungan Max 4,963.88
Total Harga 54,602.68
Dibulatkan 54,600.00
harga per 1 titik galam panjang 2 m 109,200.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Mobilisasi dan Demobilisasi


Satuan : LS
Harga Satuan Pekerjaan : Rp. 72,176,500.00

HARGA HARGA SATUAN


NO URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN PEKERJAAN
( TRIP ) ( Rp ) ( Rp )

I PERALATAN
- Excavator 4 Unit 2.00 7,879,358.08 15,758,716.16
- Dump Truck 10 Ton 6 Unit 2.00 2,227,600.00 4,455,200.00
- Compactor 2 Unit 2.00 6,110,437.84 36,662,627.04
- Molen / Concrete Mixer 3 Unit 2.00 50,000.00 300,000.00
- Staff dan Personil LS 1.00 15,000,000.00 15,000,000.00

Jumlah 72,176,543.20
Dibulatkan 72,176,500.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Sarana, Prasarana Personil


Satuan : LS
Harga Satuan Pekerjaan : Rp. 108,000,000.00

HARGA HARGA SATUAN


NO URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN PEKERJAAN
( Rp ) ( Rp )

A. Direksi Keet dan Papan 8 x 5 (m2) 40.00 200,000.00 8,000,000.00


Nama Proyek
B. Peralatan Kantor Set 2.00 500,000.00 1,000,000.00
C. Penerangan Listrik
- Generator Set 6 bulan 7,500,000.00 45,000,000.00
- Bahan Bakar, Pelumas, dll unit 6 bulan 2,500,000.00 15,000,000.00
D. Biaya Transportasi
- Mobil 2 bh 12 bulan 5,000,000.00 30,000,000.00
- Bahan Bakar, Pelumas, dll unit 12 bulan 1,500,000.00 9,000,000.00

Jumlah 108,000,000.00
Dibulatkan 108,000,000.00
ANALISA HARGA SATUAN BIAYA UMUM / PEKERJAAN PERSIAPAN
BIATAN ILIR KAB. BERAU

Uraian Pekerjaan : Construction Drawing/As-Built Drawing


Satuan : LS
Harga Satuan Pekerjaan : Rp. 22,950,000.00

HARGA HARGA SATUAN


NO URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN PEKERJAAN
( BULAN ) ( Rp ) ( Rp )
A. Juru gambar ORANG-BULAN 6.00 825,000.00 4,950,000.00
B. Alat gambar Set 6.00 500,000.00 3,000,000.00
C. Biaya cetak dan kertas gambar A-1 lbr 200.00 75,000.00 15,000,000.00

Jumlah 22,950,000.00
Dibulatkan 22,950,000.00
RENCANA ANGGARAN BIAYA
PROGRAM : Pengembangan dan pengelolaan Irigasi, Rawa Dan Jaringan pengairan Lain nya
KEGIATAN : Pembangunan Jaringan Irigasi
PEKERJAAN : Perencanaan Teknis Pembangunan Jaringan Irigasi Di Biatan Ilir
LOKASI : Biatan ilir Kab Berau
Tahun Anggaran : 2018
HARGA JUMLAH
JENIS PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
1 2 3.00 4 5
1.1. PEKERJAAN PENDAHULUAN
a. Mobilisasi dan Demobilisasi LS 1.00 72,176,500.00 72,176,500.00
b. Sarana, Prasarana Personil LS 1.00 108,000,000.00 108,000,000.00
c. Construction Drawing/As-Built Drawing LS 1.00 22,950,000.00 22,950,000.00
Total 203,126,500.00
1.2. PEKERJAAN SALURAN PRIMER
a. Timbunan m3 29,844.92 220,800.00 6,589,757,232.00
b. Pembersihan Hutan m 2
21,150.00 30,400.00 642,960,000.00
c. Pekerjaan beton m 3
2,878.07 1,967,200.00 5,661,741,094.15
d Besi wiremes kg 49,007.32 18,388.00 901,146,683.27
e Bekisting m2 2,164.85 190,400.00 412,188,258.72
Total 14,207,793,268.15
1.3. PEKERJAAN SALURAN SEKUNDER
a Timbunan m3 8,417.37 220,800.00 1,858,554,192.00
b Pekerjaan beton m 3
1,946.24 1,967,200.00 3,828,643,328.00
c Besi wiremes kg 33,469.01 18,388.00 615,428,222.08
d Bekisting m2 1,428.76 190,400.00 272,035,904.00
Total 6,574,661,646.08
1.4. PEKERJAAN BANGUNAN BAGI PRIMER 4 TITIK
TIPE 1 ( 3 PINTU )
A a. Pekerjaan Beton m3 12.69 1,967,200.00 24,963,768.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 12.00 2,115,000.00 25,380,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 327.00 109,200.00 35,708,400.00
d Beton B0 m3 34.59 1,509,800.00 52,223,982.00
e Bekisting m2 112.00 190,400.00 21,324,800.00
f Baja Tulangan kg 2,324.55 15,830.00 36,797,626.50
TIPE 2 ( 2 PINTU )
B a. Pekerjaan Beton m3 4.45 1,967,200.00 8,754,040.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 3.00 2,115,000.00 6,345,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 103.00 109,200.00 11,247,600.00
d Beton B0 m3 11.53 1,509,800.00 17,407,994.00
e Bekisting m2 28.00 190,400.00 5,331,200.00
f Baja Tulangan kg 881.96 15,830.00 13,961,426.80
Total 259,445,837.30
1.5 PEKERJAAN BANGUNAN SADAP 13 TITIK
a. Pekerjaan Beton m3 54.99 1,967,200.00 108,176,328.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 39.00 2,115,000.00 82,485,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 1,313.00 109,200.00 143,379,600.00
d Beton B0 m3 149.89 1,509,800.00 226,303,922.00
e Bekisting m2 364.00 190,400.00 69,305,600.00
f Baja Tulangan kg 11,506.56 15,830.00 182,148,844.80
Total 811,799,294.80
1.6 PEKERJAAN BANGUNAN AKHIR 8 TITIK
a. Pekerjaan Beton m3 39.10 1,967,200.00 76,925,388.80
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 8.00 2,115,000.00 16,920,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 712.00 109,200.00 77,750,400.00
d Beton B0 m3 92.24 1,509,800.00 139,263,952.00
e Bekisting m2 264.32 190,400.00 50,326,528.00
f Baja Tulangan kg 6,170.96 15,830.00 97,686,296.80
Total 458,872,565.60
1.7 PEKERJAAN BANGUNAN GORONG- GORONG
A TIPE 1 ( PRIMER 1 TITIK )
a. Pekerjaan Beton m3 8.20 1,967,200.00 16,138,948.14
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 27.00 109,200.00 2,948,400.00
c. Beton B0 m3 9.00 1,509,800.00 13,588,200.00
d Bekisting m2 112.42 190,400.00 21,403,915.01
e Baja Tulangan kg 842.48 15,830.00 13,336,458.40
B TIPE 2 ( SEKUNDER 6 TITIK )
a. Pekerjaan Beton m3 45.87 1,967,200.00 90,244,906.56
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 162.00 109,200.00 17,690,400.00
c. Baja Tulangan kg 4,839.12 15,830.00 76,603,269.60
d Beton B0 m3 54.00 1,509,800.00 81,529,200.00
e Bekisting m2 674.49 190,400.00 128,423,490.05
Total 461,907,187.76
1.8 PEKERJAAN BANGUNAN BENDUNG
a. Pekerjaan Beton m3 127.89 1,967,200.00 251,587,175.20
b. Pancang kayu Ulin titik 163.00 271,700.00 44,287,100.00
c. Baja Tulangan kg 4,989.00 15,830.00 78,975,870.00
d Beton B0 m3 18.20 1,509,800.00 27,478,360.00
e Bekisting m2 330.00 190,400.00 62,832,000.00
Total 465,160,505.20

JUMLAH 23,442,766,804.88
PPN 10 % 2,344,276,680.49
TOTAL 25,787,043,485.37
DIBULATKAN 25,787,043,500.00
RENCANA ANGGARAN BIAYA
PROGRAM : Pengembangan dan pengelolaan Irigasi, Rawa Dan Jaringan pengairan Lain nya
KEGIATAN : Pembangunan Jaringan Irigasi
PEKERJAAN : Perencanaan Teknis Pembangunan Jaringan Irigasi Di Biatan Ilir
LOKASI : Biatan ilir Kab Berau
Tahun Anggaran : 2018
HARGA JUMLAH
JENIS PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (Rp)
1 2 3.00 4 5
1.1. PEKERJAAN PENDAHULUAN
a. Mobilisasi dan Demobilisasi LS 1.00 72,176,500.00 72,176,500.00
b. Sarana, Prasarana Personil LS 1.00 108,000,000.00 108,000,000.00
c. Construction Drawing/As-Built Drawing LS 1.00 22,950,000.00 22,950,000.00
Total 203,126,500.00
1.2. PEKERJAAN SALURAN PRIMER
a. Timbunan m3 29,844.92 220,800.00 6,589,757,232.00
b. Pembersihan Hutan m 2
21,150.00 30,400.00 642,960,000.00
c. Pekerjaan beton m3 2,878.07 1,967,200.00 5,661,741,094.15
d Besi wiremes kg 49,007.32 18,388.00 901,146,683.27
e Bekisting m2 2,164.85 190,400.00 412,188,258.72
Total 14,207,793,268.15
1.3. PEKERJAAN SALURAN SEKUNDER
a Timbunan m3 8,417.37 220,800.00 1,858,554,192.00
b Pekerjaan beton m3 1,946.24 1,967,200.00 3,828,643,328.00
c Besi wiremes kg 33,469.01 18,388.00 615,428,222.08
d Bekisting m2 1,428.76 190,400.00 272,035,904.00
Total 6,574,661,646.08
1.4. PEKERJAAN BANGUNAN BAGI PRIMER 4 TITIK
TIPE 1 ( 3 PINTU )
A a. Pekerjaan Beton m3 12.69 1,967,200.00 24,963,768.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 12.00 2,115,000.00 25,380,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 327.00 109,200.00 35,708,400.00
d Beton B0 m3 34.59 1,509,800.00 52,223,982.00
e Bekisting m2 112.00 190,400.00 21,324,800.00
f Baja Tulangan kg 2,324.55 15,830.00 36,797,626.50
TIPE 2 ( 2 PINTU )
B a. Pekerjaan Beton m3 4.45 1,967,200.00 8,754,040.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 3.00 2,115,000.00 6,345,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 103.00 109,200.00 11,247,600.00
d Beton B0 m3 11.53 1,509,800.00 17,407,994.00
e Bekisting m2 28.00 190,400.00 5,331,200.00
f Baja Tulangan kg 881.96 15,830.00 13,961,426.80
Total 259,445,837.30
1.5 PEKERJAAN BANGUNAN SADAP 13 TITIK
a. Pekerjaan Beton m3 54.99 1,967,200.00 108,176,328.00
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 39.00 2,115,000.00 82,485,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 1,313.00 109,200.00 143,379,600.00
d Beton B0 m3 149.89 1,509,800.00 226,303,922.00
e Bekisting m2 364.00 190,400.00 69,305,600.00
f Baja Tulangan kg 11,506.56 15,830.00 182,148,844.80
Total 811,799,294.80
1.6 PEKERJAAN BANGUNAN AKHIR 8 TITIK
a. Pekerjaan Beton m3 39.10 1,967,200.00 76,925,388.80
b. Pintu Angkat 0.8 m x 0.8 m t : 5 mm bh 8.00 2,115,000.00 16,920,000.00
c. Pancang kayu galam P = 2 Dia 10-15 cm titik 712.00 109,200.00 77,750,400.00
d Beton B0 m3 92.24 1,509,800.00 139,263,952.00
e Bekisting m2 264.32 190,400.00 50,326,528.00
f Baja Tulangan kg 6,170.96 15,830.00 97,686,296.80
Total 458,872,565.60
1.7 PEKERJAAN BANGUNAN GORONG- GORONG
A TIPE 1 ( PRIMER 1 TITIK )
a. Pekerjaan Beton m3 8.20 1,967,200.00 16,138,948.14
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 27.00 109,200.00 2,948,400.00
c. Beton B0 m3 9.00 1,509,800.00 13,588,200.00
d Bekisting m2 112.42 190,400.00 21,403,915.01
e Baja Tulangan kg 842.48 15,830.00 13,336,458.40
B TIPE 2 ( SEKUNDER 6 TITIK )
a. Pekerjaan Beton m3 45.87 1,967,200.00 90,244,906.56
b. Pancang kayu galam P = 2 Dia 10-15 cm titik 162.00 109,200.00 17,690,400.00
c. Baja Tulangan kg 4,839.12 15,830.00 76,603,269.60
d Beton B0 m3 54.00 1,509,800.00 81,529,200.00
e Bekisting m2 674.49 190,400.00 128,423,490.05
Total 461,907,187.76
1.8 PEKERJAAN BANGUNAN BENDUNG
a. Pekerjaan Beton m3 127.89 1,967,200.00 251,587,175.20
b. Pengadaan tiang pancang 20/20 - 3 meter M' 489.00 809,200.00 395,698,800.00
c. Pemancangan tiang pancang 20/20 - 3 meter M' 489.00 75,500.00 36,919,500.00
d. Baja Tulangan kg 4,989.00 15,830.00 78,975,870.00
e. Beton B0 m3 18.20 1,509,800.00 27,478,360.00
f. Bekisting m2 330.00 190,400.00 62,832,000.00
Total 853,491,705.20

JUMLAH 23,831,098,004.88
PPN 10 % 2,383,109,800.49
TOTAL 26,214,207,805.37
DIBULATKAN 26,214,207,800.00
HARGA SATUAN JADI ( UNIT PRICE )

PEKERJAAN :
LO KAS I : BIATAN ILIR
TAHUN ANGGARAN : 2018

No Uraian Satuan Harga Satuan

1 Pembersihan Lahan m2 30,400.00


2 Galian Biasa m3 119,800.00
3 Galian Tanah Menggunakan Alat Berat m3 60,800.00
4 Tanah Urug didatangkan dari luar (pemadatan excavator) m3 266,000.00
5 Urugan Tanah m3 61,400.00
6 Timbunan tanah dr luar dipadatkan & dirapikan (pemadatan stamper) m3 220,800.00
7 Gebalan Rumput m 2
21,100.00
8 Pembuatan dan Pemasangan Pintu Angkat (b = 0.20 m) bh 2,115,000.00
9 Pembuatan dan Pemasangan Pintu Angkat (b = 0.30 m) bh 2,405,000.00
PINTU AIR TEBAL 2O CM
2 + 2.37 8.74
LANTAI BAWAH
6.78 x 17 115.26
DINDING KIRI KANAN
5.5878 x 22 122.9316
DINDING DEPAN BELAKANG
5.5878 x 22 122.9316

369.8632 0.8883333333
92.4658 3.5533333333
93
330.46 KG

TUL POKOK
DIDNDING KIRI KANAN
PANJANG JUMLAH
1.1 56 61.6 15.4 54.7213333333
TUL POKOK
DIDING DEPAN BELAKNG
PANJANG JUMLAH
1 56 56 14 49.7466666667
TUL POKOK PINTU AIR
PANJANG JUMLAH
0.2 60 12 3 10.66
TUL POKOK LANTAI
PANJANG JUMLAH
3.4 14 95.2 23.8 84.5693333333
224.8
56.2
199.69733 530.1573333333
TILANGAN TUMPUAN DINDING TUL POKOK DINDING KIRI 1 BANYAK NYA PANJANG NYA BATANG KG
TINGGI LEBAR BAWAHTINGGI LEBAR ATAS TOTAL JUMLAH TUL POKOK 14 3.5 49 49 174.11333 174.11333
1.3 0.1 1.3 0.1 2.8 LANTAI 14 3.4 76.16 38.08 135.31093 270.62187

3.5533333333
TAMBAHAN LANTAI 2.04 444.735 KG
JARAK ANTAR TUL TUMPUAN YA ITU 20 CM
2.6 : 0.2 13

DENGAN ADA NYA 4 SISI MAKA JUMLAH NYA


1 2 3 4
13 13 13 13 52
145.6 METER
PINTU AIR 36.4 BATANG TOTAL 1 BANGUNAN SADAP 13 BANGUNAN SADAP
129.341 KG
574.0765333333 X 7462.99493
574.077 TOTAL
NO PEKERJAAN VOLUME SATUAN KETERANGAN backup volume gorong2
1 VOLUME TIMBUNAN PRIMER 30813.25 M3

2 VOLUME TIMBUNAN SEKUNDER 9439.58 M3 PANCANG GORONG2 PANJANG LEBAR JUMLAH

3 PRIMER 5 1.8 27 TITIK

4 BANGUNAN BAGI 3 Bh 4 sisi PASNGAN BETON PANJANG LUASAN JUMLAH

5 BANGUNAN BAGI 1 Bh 3 sisi DIDNDING GORONG2 5 1.2957 6.4785 M3

6 BANGUNAN SADAP 13 Bh sekunder KUKU GORONG2 PANJANG LUASAN JUMLAH

7 GORONG - GORONG 1 Bh primer PRIMER 0.8 0.3666 0.29328 M3

7 GORONG - GORONG 6 Bh sekunder SAYAP BETON 4 BUAH TEBAL LUASAN JUMLAH

8 BANGUNAN AKHIR 1 Bh primer PRIMER 0.8 1.7903 1.43224 M3

8 BANGUNAN AKHIR 7 Bh sekunder 8.20402 M3

9 PANJANG SALURAN 3106 m sekunder

10 PANJANG SALURAN 3381 m primer Beton mutu sedang dengan fc’= 20 MPa ( K- 225 ) SUDAH

10143 16355 Beton Mutu Rendah Dengan fc'=10 Mpa (K-125) SUDAH

6212 Baja Tulangan BELUM

PEKERJAAN ACIAN PANJANG LEBAR JUMLAH Pengadaan Dan Pemancangan Cerucuk SUDAH

PRIMER 3381 4.29 14504.49 M2

backup volume gorong2

PANCANG GORONG2 PANJANG LEBAR JUMLAH

SEKUNDER 5 1.8 27 TITIK

PASNGAN BETON PANJANG LUASAN JUMLAH

SEKUNDER 5 1.048 5.24 M3

LANTAI KERJA PANJANG LUASAN JUMLAH

PEKERJAAN ACIAN PANJANG LEBAR JUMLAH SEKUNDER 5 0.1842 0.921 M3

SEKUNDER 3106 3.2 9939.2 M2 SAYAP BETON 4 BUAH TEBAL LUASAN JUMLAH

SEKUNDER 0.8 1.4887 1.19096 M3

KUKU BETON TEBAL LUASAN JUMLAH

SEKUNDER 0.8 0.3673 0.29384 M3

Beton mutu sedang dengan fc’= 20 MPa ( K- 225 ) SUDAH 7.6458

Beton Mutu Rendah Dengan fc'=10 Mpa (K-125) SUDAH

Baja Tulangan BELUM

Pengadaan Dan Pemancangan Cerucuk SUDAH


KUPASAN TANAMAN PANJANG LEBAR SPES JUMLAH

PRIMER 2350 7 2 21150 M2

PASANGAN BETON PANJANG LUASAN JUMLAH

PRIMER 3354.395 0.858 2878.07091 M3 2362 1013.995 3375.995 3354.395

21.6

PASANGAN BETON PANJANG LUASAN JUMLAH di potong setiap bangunan 5meter


SEKUNDER 3041 0.64 1946.24 M3 65
bekisting

bangunan sadap
tinggi panjang dalam
1.4 20 20 28 m2
bangunan bagi
tinggi panjang dalam
1.4 20 20 28 m2
bangunan akhir
tinggi panjang dalam panjang luar
1.4 23.6 23.6 33.04 m2
gorong- gorong
tinggi dinding lantai + atas
1.4 25.8592 54.4376 80.2968 112.41552 m2
saluran primer
panjang luasa di kurang lantai
3381 0.8981 0.2578 871.6218 2164.8543 m2
saluran sekunder
panjang luasa di kurang lantai
3106 0.64 0.18 559.08 1428.76 m2

wiremes

primer
panjan lebar lembar lembar
3381 x 4.17 ; 10 1409.877

berat wiremes primer


kg/ lembar 49007.32452
34.76

sekunder
panjan lebar lembar lembar
3106 x 3.1 ; 10 962.86

berat wiremes primer


kg/ lembar 33469.0136
34.76

pancang ulin

di bendungan 163

volum beton bendungan

primer
lantai
panjang lebar tinggi / tebal m3
17.5 10.4 0.2 = 36.4 m3
36.4 total

dinding
panjang sisi kanan lebar tinggi / tebal m3
25.5 1 2 = 51 m3
panjang sisi kiri lebar tinggi / tebal m3
15 1 2 = 30 m3
81 total

bangunan mercu
bangunan mercu tinggi / tebal m3
5.2455 x 2 = 10.491 m3

10.491 total
127.891 keseluruhan

lantai B0
panjang lebar tinggi / tebal m3
17.5 10.4 0.1 = 18.2 m3
18.2 total
18.2

BEKISTING
DINDING KIRI
panjang sisi kiri tinggi / tebal m3
25.5 2 = 51 m2
DINDING KANAN 102 total
panjang sisi kanan tinggi / tebal m3
15 2 = 30 m2
60 total
BANGUNAN MERCU
Panjang tinggi / tebal m3
10.5 8 = 84 m2
168 total
330