Resumen Operacional
Resumen Operacional
Resúmen (24 Hrs): Bajó Coiled Tubing con BHA # 1 hasta 8764 ft (Tope de memorias). Realizó
limpieza de pozo. Bombeó tren de píldoras viscosas (20 bbl; 42 cp; > 125 s). Sacó Coiled Tubing
con BHA # 1 a superficie. R/D stack Coiled Tubing. R/U equipos y herramientas para recuperar
memorias.
Próximas actividades: Bajar Coiled tubing con BHA # 2 a 8764 ft (tope memorias). Realizar
limpieza de pozo hasta 9217 ft.
Current Status (06:00 Hrs): RIH Coiled Tubing with BHA # 2 with G.S Pulling Tool @ 8000 ft.
Summary (24:00 Hrs): RIH Coiled Tubing with BHA # 1 @ 8764 ft. Performed wellbore clean up.
Pumped tamdem of viscous pill (20 bbl; 42 cp; > 125 s). Pull out of hole Coiled tubing with BHA # 1
to surface. R/D stack Coiled Tubing. R/U tools to memory gauge.
Forecast: RIH Coiled Tubing ith BHA # 2 @ 8764 ft to memory gauge. Performed wellbore clean up
to 9217 ft.