APPROVED Date DATE OF 

TOILET CIVIL/MEP APPROVED INSPECTIONS NOT YET SUBMITTED ─ UPDATE 


N/A N/A 16‐Sep‐18
Waterproofing 
Thermostat  Thermostat  Steel Structure   Clearance  Final 
item  Wc/Bidet  flash tank     Waterproofing  Water Leak  test at  Accessories      Mapelastic 
Description embedded  piping pressure  (Basin,  Floor Drain Shower drain Bathtub drain Date By  Clearance By 
# frame leak test by ITD Test By ITD shower,bathtub  Support Works(Walls)
body Test Bathtub,Bench) IMAR AEB
wc/bidets areas 

MAIN VILLA 1 (GROUND FLOOR)                                                                                                                                                                                                                                                          

1 Wash 1,Toilet 1,toilet 2 9‐May‐18 9‐May‐18 N/A N/A 28‐May‐18  06‐Sep‐2018 N/A N/A 28‐May‐18 16‐May‐18
2 Bathroom 1 9‐May‐18 9‐May‐18 2‐May‐18 7‐May‐18 28‐May‐18 06‐Sep‐18 06‐Sep‐18 ─ ─ 30‐May‐18 18‐Sep‐18 18‐Sep‐18
3 toilet 2,wash 2 17‐May‐18 17‐May‐18 N/A N/A 28‐May‐18  To be relocate by ITD N/A N/A N/A 30‐May‐18

MAIN VILLA 1 (FIRST FLOOR)

4 Bathroom1  2‐Jun‐18 2‐Jun‐18 2‐May‐18 30‐Apr‐18 28‐May‐18 30‐Apr‐18 30‐Apr‐18 30‐Apr‐18 21‐Apr‐18 2‐Jun‐18
5 Wash,Toilet  18‐Aug‐18 18‐Aug‐18 N/A N/A 12‐Aug‐18 To be relocate by ITD ─ ─ ─ 12‐Aug‐18 ─ UR UR
6 Bathroom2  ─ ─ ─ ─ ─ To be relocate by ITD To be relocate by ITD ─ 30‐May‐18 18‐Aug‐18 ─ 20‐Sep‐18 20‐Sep‐18
7 Lady's Bathroom 1 4‐Jun‐18 4‐Jun‐18 ─ ─ ─ To be relocate by ITD To be relocate by ITD ─ 30‐May‐18 4‐Jun‐18 27‐Sep‐18 27‐Sep‐18
8 Lady's Bathroom 2 ─ ─ ─ ─ ─ To be relocate by ITD To be relocate by ITD To be relocate by ITD 30‐May‐18 18‐Aug‐18 ─ 27‐Sep‐18 27‐Sep‐18
9 Lady's Bathroom 3 ─ ─ 18‐Aug‐48 18‐Aug‐18 ─ To be relocate by ITD To be relocate by ITD To be relocate by ITD ─ ─ 27‐Sep‐18 27‐Sep‐18

MAIN VILLA 2    

10 Bathroom MB 11‐Aug‐18 11‐Aug‐18 ─ ─ 12‐Aug‐18 To be relocate by ITD To be relocate by ITD ─ ─ 12‐Aug‐18


11 Bathroom 1 16‐May‐18 16‐May‐18 ─ ─ ─ To be relocate by ITD To be relocate by ITD ─ ─ 12‐Aug‐18 ─ 13‐Sep‐18 13‐Sep‐18
12 Toilet MB 16‐May‐18 16‐May‐18 N/A N/A 12‐Aug‐18 06‐Sep‐18 N/A N/A ─ 12‐Aug‐18 ─
13 Toilet 1 2‐Aug‐18 2‐Aug‐18 N/A N/A 21‐Jun‐18 ─ N/A N/A 28‐May‐18 21‐Jun‐18
14 Bathroom 2  16‐May‐18 16‐May‐18 ─ ─ ─ To be relocate by ITD To be relocate by ITD ─ ─ 12‐Aug‐18 ─ 13‐Sep‐18 13‐Sep‐18
15 Wash/ Toilet 2 16‐May‐18 16‐May‐18 N/A N/A 27‐Jun‐18  To be relocate by ITD N/A N/A 24‐Jun‐18 21‐Jun‐18

DUNE VILLA 

16 Wash 1, Toilet 1 30‐Apr‐18 30‐Apr‐18 N/A N/A 28‐May‐18 06‐Sep‐18 N/A N/A 21‐Jun‐18 14‐Jun‐18
17  Entrance Toilet 30‐Apr‐18 30‐Apr‐18 2‐May‐18 2‐May‐18 28‐May‐18  To be relocate by ITD 06‐Sep‐18 N/A 21‐Jun‐18 14‐Jun‐18
18 Wash 2,Toilet 2 30‐Apr‐18 30‐Apr‐18 N/A N/A 28‐May‐18  To be relocate by ITD N/A N/A 14‐Jun‐18 14‐Jun‐18

CLUB HOUSE (GROUND FLOOR)   

19 Toilet SPA ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─

CLUB HOUSE (FIRST FLOOR) 

20 Master Bathroom ─ ─ ─ ─ ─ ─ ─ ─ ─ ─ ─

# APPROVED TOILETS

CLEARANCE APPROVED TO START TILING 
TILE/MARBLE INSTALLED
WORKS

CLEARANCE RAISED BUT NOT YET RECEIVED