Está en la página 1de 4

Componant

TMT Steel For 3 strips


HYFLEX steel wire rope – ( 6 by 36 steel core) ( 17.55 x 5 x 3)
Aluminum ferrules (19 S) ( 27 x 5 x 3)
Binding wire For 3 strips

2. Material
Componant
Steel Rings 8.2 Kg/Block For 15 blocks
Bottom / top bars 3.40747776 For 15 blocks
Steel Hooks (Out of 15 for Every 3 block ) For 5 Blocks
Binding Wire For 15 blocks
Description Quantity Rate (Rs) Unit Amount(Rs) MT/RMT
For 3 strips 0.303 45785.00 MT 13872.86 0.0057549858
( 17.55 x 5 x 3) 263.250 261.00 RMT 68708.25 0
( 27 x 5 x 3) 405.000 105.00 Nos 42525.00 0
For 3 strips 2.000 70.00 Kg 140.00 3.79867E-05
Sub Total 2 125246.11
0.0057929725 MT/RMT
5.7929724596 kg/RMT

Description Quantity Rate (Rs) Unit Amount(Rs)


For 15 blocks 0.1230 45785.00 (MT) 5631.56 0.0082
For 15 blocks 0.0511 45785.00 (MT) 2340.17 0.0034074778
For 5 Blocks 0.0375 45785.00 (MT) 1716.94 0.0075
For 15 blocks 1.0000 70.00 (Kg) 70.00 6.666667E-05
Sub Total 2 9758.67

Total 0.0191741444 MT
FOR BLOCK

Steel required for lifting and placing of concrete blocks


Binding wire requierd for each block

FOR SOCKET

1m long Socket casting everyday, steel required


Binding wire requierd for each SOCKET

FOR SCREED CONCRETE

10 mm diameter bars on top of wire ropes for grip.


8 mm diameter bars to embed in Ferrules with rope
WIRE ROPE REQUIRED
NO. OF BLOCKS

= 7.67 KG/BLOCK 27 207.09 KG


= 0.1 KG/BLOCK 27 2.7 KG

209.79 TOTAL

NO. OF SOCKETS

= 76.33 KG/SOCKET 112 8548.96 KG


= 0.0053571 KG/SOCKET 112 0.6 KG

8549.56 TOTAL

NO. OF BLOCKS

= 1.2083111 KG/BLOCK 27 32.6244 KG


= 0.39 KG/BLOCK 27 10.53 KG
= 7.2333136 KG/BLOCK 27 195.29947 KG

238.45387 TOTAL