MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018

Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO
HABITACIONAL Coef. Previsión = 1.20
POBLACION = 562 Hab Coef. Harmon =3.95
DENSIDAD POBLACION = 0.38 Hab/m Long. total red = 1469.53m
DOTACION = 120 l/Hab/Día Infiltración = 0.10 lps/Km
APORTACION = 96 l/Hab/Día
Qmin = 0.31 lps GASTO MINIMO = 0.31 lps
Qmed = 0.62 lps GASTO MEDIO = 0.62 lps
Qmax inst = 2.47 lps GASTO MAX. INST. = 2.47 lps
Qmax prev = 2.96 lps GASTO MAX. PREV. = 3.11 lps

LONGITUD(m) GASTOS(lps) COTAS TERRENO(m) PENDIENTE(m/km)


COEF.
NOMBRE DE LA CALLE TRAMO POBLACION
HARMON
Tramo Tributaria Total Qmed Qmin Infiltración QMax Prev Inicial Final Terreno Propuesta

CALLE A 8-9 46.25 0.00 46.25 18 4.387 1.500 0.005 7.897 7.902 2501.671 2501.311 15.396 15
PASAJE 2 9-15 25.99 46.25 72.23 28 4.360 1.500 0.007 7.849 7.856 2501.311 2498.232 119.000 119
AV. INDEPENDENCIA 14-15 59.36 0.00 59.36 23 4.373 1.500 0.006 7.871 7.877 2499.086 2498.232 16.218 16
AV. PLAZA 7-14 29.69 0.00 29.69 11 4.409 1.500 0.003 7.937 7.939 2500.840 2499.086 59.000 59
PASAJE 1 10-8 35.00 0.00 35.00 13 4.402 1.500 0.003 7.923 7.926 2505.710 2501.671 115.000 115
CALLE A 8-7 8.38 35.00 43.38 17 4.391 1.500 0.004 7.903 7.908 2501.671 2500.840 99.000 99
CALLE A 7-6 33.96 43.38 77.33 30 4.356 1.500 0.008 7.840 7.848 2500.840 2500.000 26.416 26
CALLE A 1-2 32.00 0.00 32.00 12 4.406 1.500 0.003 7.930 7.934 2520.060 2517.500 79.733 80
CALLE A 2-3 79.39 32.00 111.39 43 4.328 1.500 0.011 7.791 7.802 2517.500 2511.000 81.870 82
CALLE A 3-4 31.97 111.39 143.36 55 4.306 1.500 0.014 7.752 7.766 2511.000 2505.665 166.875 167
CALLE A 4-5 28.00 143.36 171.36 66 4.289 1.500 0.017 7.721 7.738 2505.665 2502.000 130.910 131
CALLE A 5-6 51.70 171.36 223.06 85 4.262 1.500 0.022 7.671 7.694 2502.000 2500.000 40.000 40
AV. CORONEL 6-13 31.34 300.39 331.73 127 4.214 1.500 0.033 7.585 7.618 2500.000 2498.400 49.239 49
AV. INDEPENDENCIA 14-13 30.12 29.69 59.81 23 4.372 1.500 0.006 7.870 7.876 2499.086 2498.400 23.000 23
JR. GENERAL ODRIA 5-12 39.37 0.00 39.37 15 4.396 1.500 0.004 7.912 7.916 2502.000 2500.200 45.803 46
AV. INDEPENDENCIA 11-12 35.00 0.00 35.00 13 4.402 1.500 0.003 7.923 7.926 2503.144 2500.200 83.929 84
AV. INDEPENDENCIA 12-13 48.97 74.37 123.34 47 4.320 1.500 0.012 7.776 7.788 2500.200 2498.400 37.025 37
PASAJE 2 15-24 39.58 131.59 171.17 65 4.290 1.500 0.017 7.721 7.738 2498.232 2491.508 191.990 192
AV. CORONEL 13-17 33.27 514.88 548.15 210 4.141 1.500 0.055 7.453 7.508 2498.400 2495.327 133.620 134
JR. GENERAL ODRIA 12-16 29.76 74.37 104.13 40 4.334 1.500 0.010 7.801 7.811 2500.200 2497.648 120.034 120
JR. GENERAL ODRIA 19-16 30.00 0.00 30.00 11 4.409 1.500 0.003 7.936 7.939 2496.061 2497.648 14.926 15
CALLE B 16-17 47.21 134.13 181.34 69 4.284 1.500 0.018 7.711 7.729 2497.648 2495.327 45.768 46
CALLE B 17-18 34.75 729.48 764.23 292 4.083 1.500 0.076 7.350 7.426 2495.327 2493.750 40.000 40
CALLE B 18-23 5.93 764.23 770.16 295 4.082 1.500 0.077 7.347 7.424 2493.750 2493.239 135.784 136
CALLE S/N 20-21 30.00 0.00 30.00 11 4.409 1.500 0.003 7.936 7.939 2495.797 2494.194 53.000 53
CALLE S/N 21-22 70.45 30.00 100.45 38 4.337 1.500 0.010 7.806 7.816 2494.194 2491.687 36.000 36
CALLE S/N 22-23 27.18 100.45 127.63 49 4.317 1.500 0.013 7.770 7.783 2491.687 2493.239 14.997 15
CALLE B 23-24 56.50 897.79 954.29 365 4.041 1.500 0.095 7.273 7.369 2493.239 2491.508 28.647 29
EMISOR PRINCIPAL 24-25 22.72 1125.46 1148.18 439 4.003 1.500 0.115 7.205 7.319 2491.508 2489.728 78.000 78
EMISOR PRINCIPAL 25-26 36.57 1148.18 1184.75 453 3.996 1.500 0.118 7.193 7.311 2489.728 2489.241 15.000 15
EMISOR PRINCIPAL 26-27 53.86 1184.75 1238.61 474 3.986 1.500 0.124 7.175 7.299 2489.241 2485.000 50.000 50
EMISOR PRINCIPAL 27-28 40.01 1238.61 1278.62 489 3.979 1.500 0.128 7.163 7.290 2485.000 2482.500 59.994 60
EMISOR PRINCIPAL 28-29 35.14 1278.62 1313.77 502 3.973 1.500 0.131 7.152 7.283 2482.500 2483.500 14.998 15
EMISOR PRINCIPAL 29-30 100.51 1313.77 1414.28 541 3.956 1.500 0.141 7.122 7.263 2483.500 2477.408 44.273 44
EMISOR PRINCIPAL 30-31 45.00 1414.28 1459.28 558 3.949 1.500 0.146 7.109 7.254 2477.408 2476.894 20.000 20
EMISOR PRINCIPAL 31-32 57.33 1459.28 1516.61 580 3.940 1.500 0.152 7.092 7.244 2476.894 2476.000 15.001 15
MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018
Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO

DIAMETRO TUBO LLENO RELACION DE GASTOS RELACION VELOCIDAD RELACION TIRANTES VELOCIDAD (m/s)
Coef. Rug.
NOMBRE DE LA CALLE TRAMO
Comercial Manning
Cálculo (cm) Pulg. Qll (lps) Vll (m/s) Qmin/Qll Qmax/Qll Vmin/Vll Vmax/Vll ymin/D ymax/D Vmin Vmax
(cm)

CALLE A 8-9 10.817 20 8" 0.013 42.455 1.309 0.035 0.186 0.470 0.765 0.129 0.292 0.615 1.001
PASAJE 2 9-15 7.356 20 8" 0.013 118.035 3.640 0.013 0.066 0.345 0.567 0.079 0.175 1.257 2.064
AV. INDEPENDENCIA 14-15 10.699 20 8" 0.013 43.575 1.344 0.034 0.181 0.466 0.759 0.127 0.288 0.626 1.019
AV. PLAZA 7-14 8.423 20 8" 0.013 83.112 2.563 0.018 0.095 0.384 0.631 0.093 0.209 0.984 1.617
PASAJE 1 10-8 7.428 20 8" 0.013 116.034 3.578 0.013 0.068 0.347 0.572 0.080 0.177 1.242 2.045
CALLE A 8-7 7.633 20 8" 0.013 107.660 3.320 0.014 0.073 0.355 0.584 0.083 0.183 1.179 1.939
CALLE A 7-6 9.750 20 8" 0.013 55.612 1.715 0.027 0.141 0.433 0.707 0.113 0.254 0.743 1.212
CALLE A 1-2 7.958 20 8" 0.013 96.617 2.979 0.016 0.082 0.367 0.603 0.087 0.194 1.093 1.798
CALLE A 2-3 7.870 20 8" 0.013 97.904 3.019 0.015 0.080 0.365 0.598 0.086 0.191 1.103 1.805
CALLE A 3-4 6.874 20 8" 0.013 139.776 4.310 0.011 0.055 0.328 0.537 0.073 0.160 1.414 2.316
CALLE A 4-5 7.184 20 8" 0.013 123.801 3.818 0.012 0.062 0.340 0.556 0.077 0.169 1.299 2.124
CALLE A 5-6 8.954 20 8" 0.013 68.433 2.110 0.022 0.112 0.407 0.661 0.102 0.226 0.859 1.395
AV. CORONEL 6-13 8.580 20 8" 0.013 75.926 2.341 0.020 0.100 0.395 0.639 0.097 0.213 0.924 1.497
AV. INDEPENDENCIA 14-13 10.020 20 8" 0.013 51.892 1.600 0.029 0.152 0.442 0.722 0.117 0.263 0.708 1.155
JR. GENERAL ODRIA 5-12 8.823 20 8" 0.013 73.229 2.258 0.020 0.108 0.399 0.654 0.099 0.222 0.901 1.477
AV. INDEPENDENCIA 11-12 7.880 20 8" 0.013 99.127 3.057 0.015 0.080 0.364 0.599 0.086 0.191 1.113 1.830
AV. INDEPENDENCIA 12-13 9.126 20 8" 0.013 65.839 2.030 0.023 0.118 0.412 0.671 0.104 0.232 0.836 1.363
PASAJE 2 15-24 6.687 20 8" 0.013 149.926 4.623 0.010 0.052 0.321 0.526 0.071 0.154 1.485 2.431
AV. CORONEL 13-17 7.076 20 8" 0.013 125.075 3.857 0.012 0.060 0.339 0.549 0.077 0.166 1.309 2.117
JR. GENERAL ODRIA 12-16 7.328 20 8" 0.013 118.547 3.656 0.013 0.066 0.345 0.565 0.079 0.174 1.261 2.067
JR. GENERAL ODRIA 19-16 10.899 20 8" 0.013 41.804 1.289 0.036 0.190 0.472 0.769 0.130 0.295 0.608 0.992
CALLE B 16-17 8.745 20 8" 0.013 73.201 2.257 0.020 0.105 0.399 0.649 0.099 0.219 0.900 1.465
CALLE B 17-18 8.836 20 8" 0.013 68.433 2.110 0.022 0.107 0.407 0.653 0.102 0.221 0.859 1.378
CALLE B 18-23 7.025 20 8" 0.013 126.084 3.888 0.012 0.058 0.338 0.545 0.077 0.164 1.316 2.120
CALLE S/N 20-21 8.594 20 8" 0.013 78.772 2.429 0.019 0.101 0.390 0.641 0.096 0.214 0.948 1.557
CALLE S/N 21-22 9.186 20 8" 0.013 64.921 2.002 0.023 0.120 0.414 0.675 0.105 0.234 0.828 1.351
CALLE S/N 22-23 10.808 20 8" 0.013 41.903 1.292 0.036 0.185 0.472 0.764 0.129 0.292 0.609 0.987
CALLE B 23-24 9.379 20 8" 0.013 57.913 1.786 0.026 0.126 0.428 0.683 0.111 0.239 0.764 1.220
EMISOR PRINCIPAL 24-25 7.753 20 8" 0.013 95.562 2.947 0.016 0.075 0.368 0.589 0.087 0.186 1.085 1.734
EMISOR PRINCIPAL 25-26 10.557 20 8" 0.013 41.907 1.292 0.036 0.172 0.472 0.748 0.129 0.280 0.610 0.966
EMISOR PRINCIPAL 26-27 8.419 20 8" 0.013 76.511 2.359 0.020 0.094 0.394 0.628 0.097 0.207 0.929 1.481
EMISOR PRINCIPAL 27-28 8.132 20 8" 0.013 83.809 2.584 0.018 0.085 0.383 0.611 0.093 0.198 0.990 1.578
EMISOR PRINCIPAL 28-29 10.543 20 8" 0.013 41.904 1.292 0.036 0.171 0.472 0.746 0.129 0.280 0.609 0.964
EMISOR PRINCIPAL 29-30 8.597 20 8" 0.013 71.995 2.220 0.021 0.099 0.401 0.637 0.100 0.212 0.890 1.415
EMISOR PRINCIPAL 30-31 9.974 20 8" 0.013 48.390 1.492 0.031 0.147 0.452 0.715 0.121 0.259 0.674 1.067
EMISOR PRINCIPAL 31-32 10.521 20 8" 0.013 41.908 1.292 0.036 0.169 0.472 0.745 0.129 0.278 0.610 0.962
MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018
Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO

TIRANTE (cm) COTA CLAVE (m) COTA BATEA (m) PROFUNDIDAD (m) VOLUMENES (m3)
NOMBRE DE LA CALLE TRAMO OBSERVACIONES
ymin ymax Inicial Final Inicial Final Pozo Media Excavación Plantilla Relleno

CALLE A 8-9 2.613 5.936 2500.673 2499.961 2500.470 2499.758 1.101 1.453 44.299 3.469 40.830
PASAJE 2 9-15 1.606 3.550 2500.209 2497.116 2500.005 2496.913 1.206 1.219 23.625 1.949 21.676
AV. INDEPENDENCIA 14-15 2.581 5.848 2498.063 2497.100 2497.859 2496.897 1.126 1.235 52.562 4.452 48.110
AV. PLAZA 7-14 1.896 4.242 2499.838 2498.086 2499.635 2497.883 1.105 1.103 24.594 2.227 22.367
PASAJE 1 10-8 1.619 3.596 2504.696 2500.671 2504.493 2500.468 1.118 1.103 29.148 2.625 26.523
CALLE A 8-7 1.677 3.726 2500.669 2499.840 2500.466 2499.637 1.105 1.103 6.935 0.628 6.307
CALLE A 7-6 2.296 5.154 2499.840 2498.943 2499.637 2498.740 1.103 1.160 28.818 2.547 26.271
CALLE A 1-2 1.765 3.936 2519.055 2516.503 2518.851 2516.300 1.109 1.100 26.503 2.400 24.103
CALLE A 2-3 1.754 3.877 2516.500 2510.000 2516.297 2509.797 1.103 1.103 65.691 5.955 59.736
CALLE A 3-4 1.483 3.249 2510.000 2504.665 2509.797 2504.462 1.103 1.103 26.450 2.398 24.052
CALLE A 4-5 1.570 3.441 2504.665 2501.000 2504.462 2500.797 1.103 1.103 23.167 2.100 21.067
CALLE A 5-6 2.080 4.594 2501.003 2498.935 2500.800 2498.732 1.100 1.168 43.969 3.877 40.092
AV. CORONEL 6-13 1.979 4.338 2498.943 2497.400 2498.740 2497.197 1.160 1.103 26.596 2.350 24.246
AV. INDEPENDENCIA 14-13 2.373 5.349 2498.086 2497.393 2497.883 2497.190 1.103 1.110 24.997 2.259 22.738
JR. GENERAL ODRIA 5-12 2.014 4.510 2501.003 2499.200 2500.800 2498.997 1.100 1.103 32.526 2.953 29.574
AV. INDEPENDENCIA 11-12 1.744 3.885 2502.138 2499.200 2501.935 2498.997 1.109 1.103 29.038 2.625 26.413
AV. INDEPENDENCIA 12-13 2.118 4.715 2499.200 2497.387 2498.997 2497.184 1.103 1.116 40.758 3.673 37.085
PASAJE 2 15-24 1.434 3.135 2497.102 2489.503 2496.898 2489.300 1.233 2.108 49.591 2.968 46.623
AV. CORONEL 13-17 1.562 3.365 2497.387 2492.942 2497.184 2492.739 1.116 2.488 44.961 2.495 42.466
JR. GENERAL ODRIA 12-16 1.602 3.532 2499.203 2495.631 2499.000 2495.428 1.100 2.120 35.937 2.232 33.705
JR. GENERAL ODRIA 19-16 2.633 5.999 2495.061 2494.613 2494.858 2494.410 1.103 3.138 47.718 2.250 45.468
CALLE B 16-17 2.014 4.454 2494.608 2492.448 2494.405 2492.245 3.143 2.982 108.444 3.541 104.903
CALLE B 17-18 2.080 4.497 2492.448 2491.058 2492.245 2490.855 2.982 2.795 75.289 2.606 72.683
CALLE B 18-23 1.556 3.329 2491.058 2490.252 2490.855 2490.049 2.795 3.090 13.095 0.445 12.650
CALLE S/N 20-21 1.945 4.356 2494.784 2493.194 2494.581 2492.991 1.116 1.103 24.968 2.250 22.718
CALLE S/N 21-22 2.133 4.758 2493.194 2490.658 2492.991 2490.455 1.103 1.132 59.056 5.283 53.772
CALLE S/N 22-23 2.630 5.927 2490.658 2490.250 2490.455 2490.047 1.132 3.092 43.063 2.039 41.024
CALLE B 23-24 2.252 4.863 2490.253 2488.635 2490.050 2488.431 3.089 2.977 128.512 4.237 124.274
EMISOR PRINCIPAL 24-25 1.775 3.775 2488.635 2486.863 2488.431 2486.660 2.977 2.969 50.649 1.704 48.945
EMISOR PRINCIPAL 25-26 2.630 5.696 2486.863 2486.314 2486.660 2486.111 2.969 3.030 82.259 2.743 79.516
EMISOR PRINCIPAL 26-27 1.972 4.204 2486.387 2483.694 2486.184 2483.491 2.957 1.409 88.169 4.039 84.130
EMISOR PRINCIPAL 27-28 1.889 4.015 2483.693 2481.293 2483.490 2481.089 1.410 1.311 40.823 3.001 37.822
EMISOR PRINCIPAL 28-29 2.630 5.680 2481.290 2480.763 2481.087 2480.560 1.313 2.840 54.739 2.636 52.103
EMISOR PRINCIPAL 29-30 2.030 4.317 2480.763 2476.313 2480.560 2476.110 2.840 1.198 152.218 7.538 144.679
EMISOR PRINCIPAL 30-31 2.454 5.263 2476.313 2475.413 2476.110 2475.210 1.198 1.584 46.952 3.375 43.577
EMISOR PRINCIPAL 31-32 2.630 5.656 2475.417 2474.557 2475.214 2474.354 1.580 1.546 67.200 4.299 62.901
MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018
Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO
LONGITUD(m) GASTOS(lps) COTAS TERRENO(m) PENDIENTE(m/km)
COEF.
NOMBRE DE LA CALLE TRAMO POBLACION
HARMON
Tramo Tributaria Total Qmed Qmin Infiltración QMax Prev Inicial Final Terreno Propuesta

EMISOR PRINCIPAL 32-33 27.29 1516.61 1543.90 590 3.936 1.500 0.154 7.085 7.239 2476.000 2473.280 84.128 84
MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018
Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO
DIAMETRO TUBO LLENO RELACION DE GASTOS RELACION VELOCIDAD RELACION TIRANTES VELOCIDAD (m/s)
Coef. Rug.
NOMBRE DE LA CALLE TRAMO
Comercial Manning
Cálculo (cm) Pulg. Qll (lps) Vll (m/s) Qmin/Qll Qmax/Qll Vmin/Vll Vmax/Vll ymin/D ymax/D Vmin Vmax
(cm)

EMISOR PRINCIPAL 32-33 7.613 20 8" 0.013 99.245 3.060 0.015 0.071 0.364 0.579 0.086 0.181 1.114 1.772
MEMORIA DE CALCULO ALCANTARILLADO 09/23/2018
Proyecto: REHABILITACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE DESAGUE EN EL ANEXO DE TAMBILLO-PAUCARTAMBO
TIRANTE (cm) COTA CLAVE (m) COTA BATEA (m) PROFUNDIDAD (m) VOLUMENES (m3)
NOMBRE DE LA CALLE TRAMO OBSERVACIONES
ymin ymax Inicial Final Inicial Final Pozo Media Excavación Plantilla Relleno

EMISOR PRINCIPAL 32-33 1.743 3.675 2474.563 2472.267 2474.360 2472.064 1.540 1.116 27.180 2.047 25.133