analisis de losa reticular de entrepiso analisis de losa de azotea

material espesor (m) PV(t/m) peso (t) material espesor (m)


piso 0.02 0.055 0.0011 ladrillo 0.15
sobrefirme 0.05 2.2 0.11 mortero 0.03
losa 0.1 2.4 0.24 relleno 0.15
nervaduras 0.245 losa 0.05
yeso 0.03 1.5 0.045 nervadura
CM 1.5651 yeso 0.02
CV 350 CV 0.35
SUMA 1.9151 CV 350

DESCARGAS DE LOS MARCOS

HORIZONTALES ENTREPISO

CARGAS MUERTAS CARGAS VIVAS

EJE "A" CM= 1.5651 EJE "A" CV= 0.25


TRAMO 1--2 2--3 3--4 TRAMO 1--2 2--3
AREA TRIBUTARIA 4 6.25 11.25 m² AREA TRIBUT 4 6.25
CM EN AREA 6.2604 9.781875 17.607375 Ton CV EN AREA 1 1.5625
DISTANCIAS (m) 4 5 7 m DISTANCIAS ( 4 5
CARGA DISTRIBUI 1.565 1.956 2.515 Ton/m CARGA DISTR 0.250 0.313

CARGA DISTRIBUIDA EN EL EJE 2.012 CARGA DISTRIBUIDA EN EL EJE


peso total 39.025

EJE "B" CM= 1.565 EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4 TRAMO 1--2 2--3
AREA TRIBUTARIA 8 12.5 23.5 m² AREA TRIBUT 8 12.5
CM EN AREA 12.5208 19.56375 36.77985 Ton CV EN AREA 2 3.125
DISTANCIAS (m) 4 5 7 m DISTANCIAS ( 4 5
CARGA DISTRIBUI 3.130 3.913 5.254 Ton/m CARGA DISTR 0.500 0.625

carga distribuida en el eje 3.130 carga distribuida en el eje 0.839


peso total 79.864

EJE "C" CM= 1.565 EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4 TRAMO 1--2 2--3
AREA TRIBUTARIA 7.92 12.5 24.25 m² AREA TRIBUT 7.92 12.5
CM EN AREA 12.3948 19.5625 37.95125 Ton CV EN AREA 1.98 3.125
DISTANCIAS (m) 4 5 7 m DISTANCIAS ( 4 5
CARGA DISTRIBUI 3.099 3.913 5.422 Ton/m CARGA DISTR 0.495 0.625

carga distribuida en el eje 3.099 carga distribuida en el eje 0.866


peso total 81.076

EJE "D" CM= 1.565 EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4 TRAMO 1--2 2--3
AREA TRIBUTARIA 3.96 6.25 12 m² AREA TRIBUTARIA 3.96 6.25
CM EN AREA 6.1974 9.78125 18.78 Ton CV EN AREA 0.99 1.5625
DISTANCIAS (m) 5 7 8 m DISTANCIAS (m) 5 7
CARGA DISTRIBUIDA 1.239 1.397 2.348 Ton/m CARGA DISTRIBUIDA0.198 0.223

carga distribuida en el eje 2.348 carga distribuida en el eje 0.375


peso total 40.311

DESCARGAS DE LOS MARCOS

VERTICALES ENTREPISO

CARGAS MUERTAS CARGAS VIVAS

EJE "1" CM= 1.565 EJE "1" CV= 0.25


TRAMO A- B B-C C-D TRAMO A- B B-C
AREA TRIBUTARIA6 10 8 m² AREA TRIBUT6 10
CM EN AREA 9.39 15.65 12.52 Ton CV EN AREA 1.5 2.5
DISTANCIAS (m) 5 7 6 m DISTANCIAS (5 7
CARGA DISTRIBUI 1.878 2.236 2.087 Ton/m CARGA DISTR0.300 0.357

CARGA DISTR EN E2.087 T/m CARGA DISTR0.333 T/m


PESO TOTAL 43.56

EJE "2" CM= 1.565 EJE "2" CV= 0.25


TRAMO A- B B-C C-D TRAMO A- B B-C
AREA TRIBUTARIA12.25 21.23 16.7 m² AREA TRIBUT12.25 21.23
CM EN AREA 19.17125 33.22495 26.1355 Ton CV EN AREA 3.0625 5.3075
DISTANCIAS (m) 5 7 6 m DISTANCIAS (5 7
CARGA DISTRIBUI 3.834 4.746 4.356 Ton/m CARGA DISTR0.613 0.758

CARGA DISTR EN E4.356 T/m CARGA DISTR0.696 T/m


PESO TOTAL 91.0767
EJE "3" CM= 1.565 EJE "3" CV= 0.25
TRAMO A- B B-C C-D TRAMO A- B B-C
AREA TRIBUTARIA12.5 23.5 17.71 m² AREA TRIBUT12.5 23.5
CM EN AREA 19.5625 36.7775 27.71615 Ton CV EN AREA 3.125 5.875
DISTANCIAS (m) 5 7 6 m DISTANCIAS (5 7
CARGA DISTRIBUI 3.913 5.254 4.619 Ton/m CARGA DISTR0.625 0.839

CARGA DISTR EN E4.619 T/m CARGA DISTR0.738 T/m


PESO TOTAL 97.48365

EJE "4" CM= 1.565 EJE "4" CV= 0.25


TRAMO A- B B-C C-D TRAMO A- B B-C
AREA TRIBUTARIA6.25 12.25 8.96 m² AREA TRIBUT6.25 12.25
CM EN AREA 9.78125 19.17125 14.0224 Ton CV EN AREA 1.5625 3.0625
DISTANCIAS (m) 5 7 6 m DISTANCIAS (5 7
CARGA DISTRIBUI 1.956 2.739 2.337 Ton/m CARGA DISTR0.313 0.438

CARGA DISTR EN E2.337 T/m CARGA DISTR0.373 T/m


PESO TOTAL 49.8399

DETERMINACION DE LAS FUERZAS DEBIDAS A SISMO

PESO(tn) h(LIBRE) m h Ph V
N3 119.612 3.2 9.6 1148.28 34.98
N2 102.855 3.2 6.4 658.27 20.05
N1 102.85465 3.2 3.2 329.13 10.03
325.3213 2135.68 65.06

coef. Sis= 0.20


PV(t/m) peso (t)
1.8 0.27
2.1 0.063
1.5 0.225
2.4 0.12
0.245
1.5 0.03 1.877
CM 0.953
CV 0.35
SUMA 1.303

DESCARGAS DE LOS MARCOS

HORIZONTALES AZOTEA

CARGAS MUERTAS

EJE "A" CM= 1.877


3--4 TRAMO 1--2 2--3 3--4
11.25 m² AREA TRIBUTARIA 4 6.25 11.25
2.8125 Ton CM EN AREA 7.508 11.73125 21.11625
7 m DISTANCIAS (m) 4 5 7
0.402 Ton/m CARGA DISTRIBUID 1.877 2.346 3.017

0.321 CARGA DISTRIBUIDA EN EL EJE 2.413


peso total 45.731

EJE "B" CM= 1.877


3--4 TRAMO 1--2 2--3 3--4
23.5 m² AREA TRIBUTARIA 8 12.5 23.5
5.875 Ton CM EN AREA 15.016 23.4625 44.1095
7 m DISTANCIAS (m) 4 5 7
0.839 Ton/m CARGA DISTRIBUID 3.754 4.693 6.301

carga distribuida en el eje 3.754


peso total 93.588

EJE "C" CM= 1.877


3--4 TRAMO 1--2 2--3 3--4
24.25 m² AREA TRIBUTARIA 7.92 12.5 24.25
6.0625 Ton CM EN AREA 14.86584 23.4625 45.51725
7 m DISTANCIAS (m) 4 5 7
0.866 Ton/m CARGA DISTRIBUID 3.716 4.693 6.502

carga distribuida en el eje 3.716


peso total 95.013

EJE "D" CM= 1.877


3--4 TRAMO 1--2 2--3 3--4
12 m² AREA TRIBUTARIA 3.96 6.25 12
3 Ton CM EN AREA 7.43292 11.73125 22.524
8 m DISTANCIAS (m) 5 7 8
0.375 Ton/m CARGA DISTRIBUIDA 1.487 1.676 2.816

carga distribuida en el eje 2.816


peso total 47.241

EJE "1" CM= 1.877


C-D TRAMO A-B B-C C-D
8 m² AREA TRIBUTARIA 6 10 18
2 Ton/m² CM EN AREA 11.262 18.77 33.786
6 m DISTANCIAS (m) 5 7 8
0.333 Ton/m CARGA DISTRIBUIDA 2.252 2.681 4.223

carga distribuida en el eje 4.223


peso total 72.318

EJE "2" CM= 1.877


C-D TRAMO A-B B-C C-D
16.7 m² AREA TRIBUTARIA 12.25 21.23 16.7
4.175 Ton/m² CM EN AREA 22.99325 39.84871 31.3459
6 m DISTANCIAS (m) 5 7 8
0.696 Ton/m CARGA DISTRIBUIDA 4.599 5.693 3.918

carga distribuida en el eje 3.918


peso total 106.733
EJE "3" CM= 1.877
C-D TRAMO A-B B-C C-D
17.71 m² AREA TRIBUTARIA 12.5 23.5 17.71
4.4275 Ton/m² CM EN AREA 23.4625 44.1095 33.24167
6 m DISTANCIAS (m) 5 7 8
0.738 Ton/m CARGA DISTRIBUIDA 4.693 6.301 4.155

carga distribuida en el eje 4.155


peso total 114.241

EJE "4" CM= 1.877


C-D TRAMO A-B B-C C-D
8.96 m² AREA TRIBUTARIA 6.25 12.25 8.96
2.24 Ton/m² CM EN AREA 11.73125 22.99325 16.81792
6 m DISTANCIAS (m) 5 7 8
0.373 Ton/m CARGA DISTRIBUIDA 2.346 3.285 2.102

carga distribuida en el eje 2.102


peso total 58.407
CARGAS VIVAS

EJE "A" CV= 0.25


TRAMO 1--2 2--3 3--4
m² AREA TRIBUT 4 6.25 11.25 m²
Ton CV EN AREA 1 1.5625 2.8125 Ton
m DISTANCIAS ( 4 5 7 m
Ton/m CARGA DISTR 0.250 0.313 0.402 Ton/m

CARGA DISTRIBUIDA EN EL EJE 0.321

EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4
m² AREA TRIBUT 8 12.5 23.5 m²
Ton CV EN AREA 2 3.125 5.875 Ton
m DISTANCIAS ( 4 5 7 m
Ton/m CARGA DISTR 0.500 0.625 0.839 Ton/m

carga distribuida en el eje 0.839

EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4
m² AREA TRIBUT 7.92 12.5 24.25 m²
Ton CV EN AREA 1.98 3.125 6.0625 Ton
m DISTANCIAS ( 4 5 7 m
Ton/m CARGA DISTR 0.495 0.625 0.866 Ton/m

carga distribuida en el eje 0.866

EJE "B" CV= 0.25


TRAMO 1--2 2--3 3--4
m² AREA TRIBUTARIA 3.96 6.25 12 m²
Ton CV EN AREA 0.99 1.5625 3 Ton
m DISTANCIAS (m) 5 7 8 m
Ton/m CARGA DISTRIBUIDA0.198 0.223 0.375 Ton/m

carga distribuida en el eje 0.375

EJE "1" CV= 0.25


TRAMO A-B B-C C-D
m² AREA TRIBUTARIA 6 10 18 m²
Ton CV EN AREA 1.5 2.5 4.5 Ton
m DISTANCIAS (m) 5 7 8 m
Ton/m CARGA DISTRIBUIDA0.300 0.357 0.563 Ton/m

carga distribuida en el eje 0.563

EJE "2" CV= 0.25


TRAMO A-B B-C C-D
m² AREA TRIBUTARIA 12.25 21.23 16.7 m²
Ton CV EN AREA 3.0625 5.3075 4.175 Ton
m DISTANCIAS (m) 5 7 8 m
Ton/m CARGA DISTRIBUIDA0.613 0.758 0.522 Ton/m

carga distribuida en el eje 0.522


EJE "3" CV= 0.25
TRAMO A-B B-C C-D
m² AREA TRIBUTARIA 12.5 23.5 17.71 m²
Ton CV EN AREA 3.125 5.875 4.4275 Ton
m DISTANCIAS (m) 5 7 8 m
Ton/m CARGA DISTRIBUIDA0.625 0.839 0.553 Ton/m

carga distribuida en el eje 0.553

EJE "4" CV= 0.25


TRAMO A-B B-C C-D
m² AREA TRIBUTARIA 6.25 12.25 8.96 m²
Ton CV EN AREA 1.5625 3.0625 2.24 Ton
m DISTANCIAS (m) 5 7 8 m
Ton/m CARGA DISTRIBUIDA0.313 0.438 0.280 Ton/m

carga distribuida en el eje 0.280