Está en la página 1de 1

Comments on MCC Control Schemes

Note :
1. Point wise reply to be submitted along with revised drawing / document.
2. All changes made in drawing / document after revision shall be clearly indicated by revision triangle/cloud
3. Supplier to fill the revision no. of drawing/document in respective column after incorporating the comments, else "No Change" to be fill.

S.No Drawing Number WCL/Holtec Comments Meeting Conclusion Dated 12.09.2017 WCL/Holtec Comments Dated 13.10.17 ABB Reply Dated WCL/Holtec Comments Dated 28.11.17 ABB Reply Dated

I MCC Control Schemes


1 DOL Wiring Scheme UPS power Supply. ABB agreed. Point closed Incorporated. Point closed. - - -
3 DOL Wiring Scheme Trip indication ABB agreed. Point closed Incorporated. Point closed. - - -
Nomenclature shall be revised to avoid any confusion. every where X6 DOC has mentioned. Please ABB agreed. ABB shall Correct the same in revised
4 DOL Wiring Scheme Incorporated. Point closed. - - -
revise. control scheme. Point closed
ABB has considered DO0 & DO1 for forward &
5 DOL Wiring Scheme D01 shall be used for trip indication and D02 & D03 as a spare. Agreed. Point closed. - - -
reverse and DO2 for Tripping. Point closed.
6 DOL Wiring Scheme Spare DI & DO shall be wired upto TB ABB agreed. Point closed Incorporated. Point closed. - - -
No DI shall be used as feedback as feedback shall be derived internally with the help of current sensing
7 DOL Wiring Scheme ABB agreed. Point closed Incorporated. Point closed. - - -
in UMC100.
Shall be used for test and reset or should be provision in UMC 100 for test/reset. Also all DI spares shall
8 DOL Wiring Scheme ABB agreed. Point closed Incorporated. Point closed. - - -
be wired upto TB and mentioned as a spare.
Please confirm starter shall be suitable for
150% overload for 10 sec. Supporting
Motor starter shall be suitable for 150% overload for 10 sec. For fuse selection if fuse rating is
9 DOL Wiring Scheme ABB agreed. Point closed documents for componenet selection chart This point was already discussed and -
contradictory with IE-3 Type-2 Co-ordination, then it will be discussed mutually and finalised.
furnished with drawings for type-2 co- closed during last meeting submitting all the
ordination. relevant documents Noted. Point closed.
10 DOL Wiring Scheme Name of any sub-contractor shall not be acceptable on drawings. Only ABB shall be acceptable. ABB agreed. Point closed Incorporated. Point closed. - - -
New logo shall be used. Still old logo is
11 DOL Wiring Scheme New logo of wonder shall be used. ABB agreed. Point closed Incorporated. Point closed. -
showned in drawings Incorporated in the revised drawings
12 DOL Wiring Scheme E.Stop PB shall be stay put type turn to release without key. ABB agreed. Point closed Incorporated. Point closed. - - -
13 DOL Wiring Scheme RC circuit shall be used for all contactors ABB agreed. Point closed Incorporated. Point closed. - - -
ABB to furnish a chart consisting of Power Contactor, SFU & UMC ratings selected as per feeder rating Furnished. However please furnish support
Already Type-2 Coordination and relevant
14 DOL Wiring Scheme alongwith the rating as per type-2 co-ordination chart and as per selection table furnished in contract. ABB agreed. Point closed documents for type-2 co-ordination Kindly submit the type-2 co-ordination chart
documents has already been submitted
ABB also funish Type-2 co-ordination chart. selection.
15 DOL Wiring Scheme UMC100 earth terminal connect to electronic earth. ABB agreed. Point closed Incorporated. Point closed. - - -
16 DOL Wiring Scheme Profibus looping cable screen to be connected to electronic earth ABB agreed. Point closed Incorporated. Point closed. - - -

Power cable size from VBB to SFU, SFU to


Contactor, Contactor to O/G terminal and
Ok noted. Incorporated as per Cable
out going terminal type & size. Terminal
Common component selection chart as per feeder rating shall be provided, which includes power cable schedule in the revised drawings. Power
shall be selected as per O/G cable size as Not furnished in revised drawings. Kindly
17 DOL Wiring Scheme size & output terminal description and rating. In addition to it scheme wise BOM to be furnished for ABB agreed. Point closed Terminals shall be bolted type and control
per cable schedule. provide the same.
approval. terminal shall be screw type as per the cable
Suitable sized terminals (Bolt type rather
sizes given in the cable schedule
than screwed type) shall be considered for
over sized cables as per cable schedule.

Aux contactor shall be considered instead of


18 DOL Wiring Scheme Only contactors shall be used for control. Relays are not acceptable ABB agreed. Point closed Aux relay for 15-30kW DOL & 37-90kW Incorporated in the revised drawings Incorporated. Point closed. -
DOL control schemes
19 DOL Wiring Scheme Feeder type & rating wise Internal GA drawing shall be furnished. ABB agreed. Point closed Furnished. Point closed. - - -
ABB informed that the Connectivity of laptop with UMC100 is possible through UTP22 which shall be
Please confirm & validate by C&I for UTP22
20 DOL Wiring Scheme placed along with each reapter as against the requirement of PGPC connector at every repeater. For ABB agreed. Point closed Ok noted ABB confrmed. Point closed. -
provision along with each repeater
reset & test facility necessary DI & push buttons shall be added in logic.
As per the mail dated 20.08.2017 point no.4 ABB is proposing to connect PAN by opeing the door of the WCL/Holtec agreed the request of ABB. Point
21 Agreed. Point closed. - - -
MCC feeder only. Hence cutout on feeder is not required. closed.

As per mutual agreement inplace of approx. 69


module for RDOL feeders, ABB shall supply 15 nos
All RDOL feeder shall have equivalent feature of Simocode Pro-V, hence voltage module to be
of Voltage module which is over and above 10nos
22 RDOL Wiring Feeder considered. In addition to RDOL feeder, 10nos DOL feeder mentioned in feeder list shall also have Will provide shortly.
modules required for DOL feeders. However, the
voltage modules. Details for these feeders are indicated in the revised feeder list.
WCL/Holtec will inform the details of 25nos feeders
where these modules are to be installed.

23 RDOL Wiring Feeder 9.3kW RDOL feeder is in revised drive list. RDOL control scheme upto 11kW motor shall be provided. ABB agreed. Point closed Furnished. Point closed. - - -

230V UPS supply shall be considered for UMC100 only. 230V AC control supply for control circuit shall
24 Wiring Diagram of UPS bus ABB agreed. Point closed Incorporated. Point closed. - - -
be considered from 230V control bus fed from control transformer.
25 Actuator Scheme Torque switch shall be NC for actuators ABB agreed. Point closed Incorporated. Point closed. - - -
Please find enclosed minor comments on
26 Incorporated in the revised drawings Incorporated. Point closed. -
BOM

También podría gustarte