Camino V (km/hr) = 100 G= 3.25 ℎ TE = 3+135.

45
Tramo S máx (%) = 10 S= 10 EC = 3+215.45 DS = 0.125
Subtramo G máx (°) = 3.25 Le (m) = 80 CE = 3+285.14 DA = 0.0080
C (m) = 12 N= 16.00 ET = 3+365.14
b (%) = 2 A= 0.64
B (m) = 0.43
a (m) = 7

SEMIANCHOS PARA
SOBREELEVACIÓN AMPLIACIÓN TALUDES ENSANCHES
ESTACIÓN d PROYECTO
Izquierdo Derecho Izquierdo Derecho Izquierdo Derecho Izquierdo Derecho Izquierdo Derecho

3+119.45 TE - N -2 -2 0 0 1/1 1/1 0.89 0.89 6.89 6.89


3+120.00 15.45 -1.93 -2 0 0 1/1 1/1 0.89 0.89 6.89 6.89

3+135.45 TE 0.00 0 -2 0 0 1/1 1/1 0.90 0.89 6.90 6.89


3+140.00 4.55 0.57 -2 0 0.04 1/1 1/1 0.91 0.89 6.91 6.92

3+151.45 TE + N 16.00 2 -2 0 0.13 1/1 1/1 0.92 0.89 6.92 7.01


3+160.00 24.55 3.07 -3.07 0 0.20 1/1 1/1 0.93 0.88 6.93 7.07
3+180.00 44.55 5.57 -5.57 0 0.36 1/1 1/1 0.96 0.86 6.96 7.21
3+200.00 64.55 8.07 -8.07 0 0.52 1/1 1/1 0.98 0.84 6.98 7.35

3+215.45 EC 10 -10 0 0.64 1/1 1/1 1.00 0.82 7.00 7.46


3+220.00 10 -10 0 0.64 1/1 1/1 1.00 0.82 7.00 7.46
3+240.00 10 -10 0 0.64 1.5 1/1 0.56 0.82 6.56 7.46
3+260.00 10 -10 0 0.64 1.5 1.5 0.56 0.76 6.56 7.40
3+280.00 10 -10 0 0.64 1/1 1/1 1.00 0.82 7.00 7.46

3+285.14 CE 10 -10 0 0.64 1.5 1.5 0.56 0.76 6.56 7.40


3+300.00 65.14 8.14 -8.14 0 0.52 1.5 1/1 0.57 0.84 6.57 7.36
3+320.00 45.14 5.64 -5.64 0 0.36 1.5 1.5 0.59 0.70 6.59 7.07
3+340.00 25.14 3.14 -3.14 0 0.20 1.5 1.5 0.62 0.68 6.62 6.88

3+349.14 ET - N 16.00 2 -2 0 0.13 1.5 1.5 0.63 0.66 6.63 6.79


3+360.00 5.14 0.6425 -2 0 0.04 1.5 1.5 0.64 0.66 6.64 6.71

3+365.14 ET 0.00 0 -2 0 0 1.5 1.5 0.65 0.66 6.65 6.66


3+380.00 14.86 -1.86 -2 0 0 1.5 1.5 0.66 0.66 6.66 6.66

3+381.14 ET + N -2 -2 0 0 1.5 1.5 0.66 0.66 6.66 6.66

CALCULÓ REVISÓ FECHA