Está en la página 1de 4

OFFSHORE INFRASTRUCTURES LTD

COORDON OFF DISTANCE CALCULATION


Curie of Source (Ci), A, Se-75 24.1
Dose Rate of Se75 0.203
Hours/Week, H 36
Work Load, W=Dose RateX AXH 176.12
Occupancy Factor, T 0.125
Prescribed Radiation Level Along the Coordon Off Area, P 0.42
Coordon Off Distance, d=√(W*T/P) 7.24
RUCTURES LTD
E CALCULATION
Ci
R/Hr/Ci/meter
Hr/Week, (6hrs/day and 6 days/Week)
R/Week at 1m

R/Week, (2.5mR/hr)
m
OFFSHORE INFRASTRUCTURES LTD
COORDON OFF DISTANCE CALCULATION
Curie of Source (Ci), A, Se-75 12
Dose Rate of Se75 0.5
Hours/Week, H 6
Work Load, W=Dose RateX AXH 36.00
Occupancy Factor, T 1
Prescribed Radiation Level Along the Coordon Off Area, P 0.336
Coordon Off Distance, d=√(W*T/P) 10.35
RUCTURES LTD
E CALCULATION
Ci
R/Hr/Ci/meter
Hr/Week, (6 Hr/Week)
R/Week at 1m
Considering Office/Control Room
R/Week, (2.0mR/hr)
m