MES SEMANA 34 (AGOSTO) SEMANA 35 (AGOSTO) SEMANA 36 (AGOSTO) SEMANA 37 (AGO

DIAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Frente / Actividades
L M W J V S D L M W J V S D L M W J V S D L M
CALENDARIO
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
OBRAS PORTUARIAS
OBRAS PROVISIONALES
TRAZO Y REPLANTEO DE OBRA X X X X X X X X X X X X X X X X X X X X
AGUA PARA LA OBRA X X X X X X X X X X X X X X X X X X X X
ENERGIA PARA LA OBRA X X X X X X X X X X X X X X X X X X X X
PUENTE DE ACCESO
FABRICACION DE PILOTES DE CONCRETO
CONCRETO EN PILOTES F'C 350 KG/CM2 X X X X X X X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN PILOTES X X X X X X X X X X X X X X X X X X X X
ACERO DE REFUERZO f'y 4200 kglcm2 EN PILOTES X X X X X X X X X X X X X X X X X X X X
FABRICACION DE LOSAS NERVADAS
ACERO DE REFUERZO f'y 4200 kglcm2 EN LOSA NERVADAS X X X X X X X X X X X X X X
CONCRETO EN LOSAS NERVADAS f'c 280 kg/cm2 X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN LOSAS NERVADAS X X X X X X X X X X X X X X
NUCLEOS
CONCRETO EN NUCLEO f'c 280 kg/cm2 X X X X X X X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN NUCLEO X X X X X X X X X X X X X X X X X X X X
ACERO DE REFUERZO fy 4200 kg/cm2 EN NUCLEO X X X X X X X X X X X X X X X X X X X X

DESINFECCION
FALSO PISO
CONCRETO FALSO PISO f'c 210 kg/cm2 X
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:5 X X X X X X
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X X X X
TARRAJEO RAYADO C/MORTERO 1:5 X X X X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X X X X X
CIELO RASO
TARRAJEO DE CIELO RASO X X X X
PISOS
CONTRAPISO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X X
CONTRAZOCALO CERAMICO H=0.10 m X X X X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X X
PINTURAS
PINTURA LATEX EN CIELO RASO
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

REDES Y TALLERES
1° PISO
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X
PISOS
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X X
PINTURAS
PINTURA EPOXICA EN MUROS X X X X
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO X X X X
PINTURA LATEX EN CIELO RASO
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
2° PISO
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X
PISOS
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X
PISO VINILICO DE ALTO TRANSITO X X
ZOCALOS
CONTRAZOCALO CERAMICO H=0.10 m X X
CONTRAZOCALO DE CEDRO DE E=1", H=0.10 m X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES X X X
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X

SS-HH
1° PISO
ESTRUCTURAS
FALSO PISO
CONCRETO FALSO PISO f'c 210 kg/cm2 X X
ARQUITECTURA
REVOQUES
DERRAMES A=0.15 m.MORTERO 1:5 X X X
PISOS
CONTRAPISO X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

2° PISO
ARQUITECTURA
REVOQUES
DERRAMES A=0.15 m.MORTERO 1:5 X X X
PISOS
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X
CONTRAZOCALO CERAMICO H=0.10 m X X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

FRIO
1° PISO
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMENTACION X X
CONCRETO SIMPLE
CONCRETO FALSOCIMIENTOS 100 kg/cm2 + 30% P.G. X X
CIMIENTOS
CONCRETO EN CIMIENTOS CORRIDOS f´c 175 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTOS f´c 175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
CONCRETO ARMADO
ZAPATAS
CONCRETO ZAPATAS f'c=210 kg/cm2 X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
VIGA DE CIMENTACION
CONCRETO VIGA DE CIMENTACION f'c=210 kg/cm2 X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
SOBRECIMIENTO REFORZADO
CONCRETO EN SOBRECIMIENTO REFORZADO f'c=210 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE SOGA
MURO LADRILLO K.K AMARRE DE CABEZA X X X X

INSTALACIONES MENORES
MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL DE PRESTAMO X X X X X
ELIMINACION DE MATERIAL EXCEDENTE X X
POZO SEPTICO
LOSA MACIZA X
CONCRETO F´C = 350 KG/CM2 X X
ENCOFRADO Y DESENCOFRADO X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X
EMISOR SUBMARINO Y CUARTO DE BOMBAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMENTACION X X
LOSA MACIZA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
CIMIENTOS
CONCRETO F´C = 210 KG/CM2 EN CIMIENTOS X X
SOBRECIMIENTOS
CONCRETO F´C = 350 KG/CM2 EN SOBRECIMIENTOS X
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS X X
CONCRETO ARMADO
ZAPATAS
CONCRETO F´C = 350 KG/CM2 EN ZAPATAS X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE SOGA X X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X
CAMARA DE REJAS Y TRAMPA DE GRASA
CONCRETO SIMPLE
CONCRETO FALSOCIMIENTOS 100 kg/cm2 + 30% P.G. X
MUROS
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
LOSA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
LOSA MACIZA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
TAREAS PREVIAS
ESTRUCTURAS
FALSO PISO
CONCRETO FALSO PISO 210 kg/cm2 + 30% P.G. X X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS X
CONCRETO VIGAS f'c=210 kg/cm2 X X X X
ENCOFRADO Y DESENCOFRADO DE VIGAS X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSA ALIGRADA X
CONCRETO LOSA ALIGERADA f'c=210 kg/cm2 X X X X
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE CABEZA X X X

TANQUE ELEVADO
MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL DE PRESTAMO X X X X
FALSO PISO X
CONCRETO FALSO PISO 210 kg/cm2 + 30% P.G.
CONCRETO ARMADO
ZAPATAS
CONCRETO F´C = 350 KG/CM2 EN ZAPATAS X
ENCOFRADO Y DESENCOFRADO DE ZAPATAS X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGA DE CIMENTACION
CONCRETO F´C = 350 KG/CM2 EN VIGA DE CIMENTACION X
ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
PLATEA DE CIMENTACION
CONCRETO F´C = 350 KG/CM2 EN PLATEA X
ENCOFRADO Y DESENCOFRADO DE PLATEA X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X X X X X
VIGAS
CONCRETO VIGAS f'c=210 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO DE VIGAS X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X X X
SEMANA 37 (AGOSTO)
24 25 26 27 28
% REAL
W J V S D
12 13 14 15 16

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

100.00%

100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%

X X X 100.00%
100.00%
100.00%

X 10.00%

X X X X 60.00%

X X X X 60.00%

100.00%
100.00%

100.00%

X 100.00%
X X X 100.00%

100.00%

X X X X 100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%

100.00%

X 100.00%
X X X 80.00%

100.00%

X X X X
100.00%

100.00%

100.00%

100.00%
100.00%
100.00%

100.00%

X X X 60.00%

X X 100.00%

X X X X 100.00%

X X X X 100.00%

100.00%

100.00%
100.00%

100.00%
100.00%

100.00%

X X X 100.00%

X X 100.00%

X X X X 100.00%
X X X X 100.00%

100.00%

100.00%

X 100.00%

X X 100.00%
X X X 100.00%

100.00%
100.00%

100.00%
100.00%

X X 100.00%
X 100.00%

X X 100.00%
X 100.00%
100.00%

X 60.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%
100.00%

X 100.00%
X X 100.00%
X 100.00%

100.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%

X X 100.00%

100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

X X 100.00%

X X 70.00%
100.00%

10.00%
10.00%

10.00%
10.00%

20.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

60.00%
60.00%
X 60.00%

X 60.00%
X X 60.00%
X X 60.00%
FUERZA OBRERA - SEC III

Jefe de Campo:
Maestro de Obra: Luis Nonalaya

Operario Oficial Peon total


Cuadrilla Cap
Real Requerim. Real Requerim. Real Requerim. Real
Albañileria 1 4 6 2 2 3 2 10
Acero 1 2 5 3 3 1 2 7
Carpinteria 1 4 8 3 2 5 3 13
Mov. Tierras 1 3 4
19 7 7 34

Requerimiento Total 33
total
Requerim.
20
17
26
4
67