CALENDARIO VALORIZADO DE AVANCE DE OBRA

PROYECTO : “CONSTRUCCION VIVENDA MULTIFAMILIAR - COMERCIAL”

CLIENTE : SERVICIOS MULTIPLES Y DE CONSTRUCCION SAIDCO E.I.R.L

LUGAR : HUANCAYO - HUANCAYO - JUNIN

ITEM DESCRIPCION UNIDAD METRADO P.U. PARCIAL MES 01 MES 02

METRADO PARCIAL METRADO PARCIAL

TROCHA CARROZABLE
01 ESTRUCTURAS
01.01 OBRAS DE CONCRETO ARMADO
01.01.01 COLUMNAS
01.01.01.01 CONCRETO EN COLUMNAS FC=210 KG/CM2 m3 17.79 S/ 346.30 S/ 6,160.68 17.79 S/. 6,160.68

01.01.01.02 ACERO EN COLUMNAS fy = 4200 Kg/cm2 kg 3237.72 S/ 3.96 S/ 12,821.37 3237.72 S/. 12,821.37

01.01.01.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 170.80 S/ 15.75 S/ 2,690.10 170.80 S/. 2,690.10

01.01.02 VIGAS
01.01.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 26.04 S/ 346.30 S/ 9,017.65 26.04 S/. 9,017.65

01.01.02.02 ACERO DE VIGAS fy=4200 Kg/cm2. kg 5372.28 S/ 3.69 S/ 19,823.71 5372.28 S/. 19,823.71

01.01.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 210.94 S/ 14.46 S/ 3,050.19 113.91 S/. 1,647.10 97.03 S/. 1,403.09

01.01.03 LOSAS ALIGERADAS


01.01.03.01 CONCRETO EN LOSA ALIGERADA f'c=210 kg/cm2 m3 19.17 S/ 346.30 S/ 6,638.57 19.17 S/. 6,638.57

01.01.03.02 ACERO EN LOSAS FY= 4200 kg/cm2 GRADO 60 kg 960.35 S/ 3.89 S/ 3,735.76 960.35 S/. 3,735.76

01.01.03.03 ENCOFRADO Y DESENCOFRADO EN LOSA m2 209.64 S/ 15.69 S/ 3,289.25 209.64 S/. 3,289.25

01.01.03.04 BLOCK DE TECKNOPOR und 421.45 S/ 6.08 S/ 2,562.42 168.58 S/. 1,024.97 252.87 S/. 1,537.45

01.01.04 ESCALERAS
01.01.04.01 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3 9.96 S/ 346.30 S/ 3,449.15 9.96 S/. 3,449.15

01.01.04.02 ACERO EN ESCALERAS FY= 4200 kg/cm2 GRADO 60 kg 446.00 S/ 3.96 S/ 1,766.16 446.00 S/. 1,766.16

01.01.04.03 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m2 80.00 S/ 15.69 S/ 1,255.20 80.00 S/. 1,255.20

01.01.05 PLACAS
01.01.05.01 CONCRETO EN PLACAS f'c=210 kg/cm2 m3 24.78 S/ 346.30 S/ 8,581.31 24.78 S/. 8,581.31

01.01.05.02 ACERO EN PLACAS FY= 4200 kg/cm2 GRADO 60 kg 1983.74 S/ 3.89 S/ 7,716.75 1983.74 S/. 7,716.75

01.01.05.03 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 123.92 S/ 15.69 S/ 1,944.30 123.92 S/. 1,944.30

02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑELERIA
02.01.01 MURO LADRILLO KK 18 HUECOS C.A. 1:4 m2 105.12 S/ 36.73 S/ 3,861.06 105.12 S/. 3,861.06

02.02 REVOQUES ENLUCIDOS Y MOLDURAS


02.02.01 TARRAJEO EN MUROS DE INTERIOR CEMENTO ARENA 1:5 m2 105.12 S/ 14.57 S/ 1,531.60 105.12 S/. 1,531.60

02.02.02 TARRAJEO EN MUROS DE EXTERIOR CEMENTO ARENA 1:5 m2 41.44 S/ 21.87 S/ 906.29 41.44 S/. 906.29

02.02.03 TARREJEO DE SUPERFICIE DE COLUMNAS CEMENTO ARENA m2 12.30 S/ 17.00 S/ 209.10 12.30 S/. 209.10

02.02.04 TARRAJEO DE SUPERFICIE DE VIGAS CEMENTO ARENA 1:5 m2 31.99 S/ 21.87 S/ 699.62 31.99 S/. 699.62

02.02.05 VESTIDURA DE DERRAMES CEMENTO ARENA 1:5 ML 14.40 S/ 10.19 S/ 146.74 14.40 S/. 146.74

02.03 CIELORRASOS
02.03.01 CIELORRASO CON MEZCLA DE ESPESOR 1.5 cm m2 209.64 S/ 14.02 S/ 2,939.15 209.64 S/. 2,939.15

02.04 PISOS Y PAVIMENTOS


02.04.01 CONTRAPISO DE CEMENTO DE 40 mm m2 230.45 S/ 40.96 S/ 9,439.23 230.45 S/. 9,439.23

02.04.02 PISO CERAMICA CELIMA 30 X 30 m2 230.45 S/ 48.77 S/ 11,239.05 230.45 S/. 11,239.05

02.05 CONTRAZOCALOS
02.05.01 CONTRAZOCALO CERAMICO H=0.15 m. ML 94.25 S/ 41.06 S/ 3,869.91 94.25 S/. 3,869.91

02.06 CARPINTERIA DE MADERA


02.06.01 PUERTA MADERA CONTRAPLACADA m2 37.26 S/ 293.11 S/ 10,921.28 37.26 S/. 10,921.28

02.07 CERRAJERIA
02.07.01 CERRADURA PUERTA TIPO PERILLA und 9.00 S/ 117.25 S/ 1,055.25 9.00 S/. 1,055.25

02.07.02 BISAGRA ALUMINIZADA CAPUCHINAS DE 3"X 3" und 27.00 S/ 8.61 S/ 232.47 27.00 S/. 232.47

02.08 VIDRIOS, CRISTALES Y SIMILARES


02.08.01 VIDRIO DOBLE NACIONAL und 56.00 S/ 53.15 S/ 2,976.40 56.00 S/. 2,976.40

02.09 PINTURA
02.09.01 PINTURA EN MURO INTERIOR LATEX 2 MANOS m2 105.12 S/ 53.70 S/ 5,644.94 105.12 S/. 5,644.94

02.09.02 PINTURA EN CARPINTERIA METALICA m2 42.40 S/ 41.18 S/ 1,746.03 42.40 S/. 1,746.03

02.09.03 PINTURA EN PUERTA CON BARNIZ 2 MANOS m2 37.26 S/ 42.66 S/ 1,589.51 37.26 S/. 1,589.51

03 INSTALACIONES SANITARIAS
03.01 APARATOS Y ACCESORIOS SANITARIOS
03.01.01 INODORO TANQUE BAJO und 6.00 S/ 200.25 S/ 1,201.50 6.00 S/. 1,201.50

03.01.02 LAVATORIO DE PARED 1 LLAVE und 6.00 S/ 127.25 S/ 763.50 6.00 S/. 763.50
03.01.03 LAVADERO DE ACERO INOXIDABLE DOS POZAS und 4.00 S/ 140.25 S/ 561.00 4.00 S/. 561.00

03.02 SALIDAS DE DESAGUE


03.02.01 SALIDA PVC SAP DESAGUE 4" pto 6.00 S/ 83.75 S/ 502.50 6.00 S/. 502.50

03.02.02 SALIDA PVC SAP AGUA 2" pto 8.00 S/ 27.29 S/ 218.32 8.00 S/. 218.32

03.03 REDES DE DERIVACION


03.03.01 TUBERIA PVC SAP O 2" ML 25.00 S/ 34.31 S/ 857.75 25.00 S/. 857.75

03.03.02 TUBERIA PVC SAP O 4" ML 25.00 S/ 25.50 S/ 637.50 25.00 S/. 637.50

03.04 ACCESORIOS R/DERIV. DE DESAGUE


03.04.01 YEE PVC SAP CON REDUCCION pza 3.00 S/ 11.56 S/ 34.68 3.00 S/. 34.68

03.04.02 SALIDA CODO 90 PVC SAP 2" pto 4.00 S/ 35.90 S/ 143.60 4.00 S/. 143.60

03.04.03 CODO 90 PVC SAP 2" pza 10.00 S/ 17.95 S/ 179.50 10.00 S/. 179.50

03.04.04 CODO 90 PVC SAP 4" REDUCCION A 2" pto 4.00 S/ 31.20 S/ 124.80 4.00 S/. 124.80

03.04.05 TEE PVC SAP 4" pto 4.00 S/ 31.50 S/ 126.00 4.00 S/. 126.00

03.04.06 CODO 45 PVC SAP 2" pza 4.00 S/ 31.20 S/ 124.80 4.00 S/. 124.80

03.04.07 SUMIDERO DE PISO DE BRONCE 2" pza 6.00 S/ 31.20 S/ 187.20 6.00 S/. 187.20

03.04.08 REGISTRO ROSACADO DE BRONCE 4" pza 4.00 S/ 30.90 S/ 123.60 4.00 S/. 123.60

03.05 SISTEMA DE AGUA FRIA


03.05.01 SALIDA DE AGUA FRIA TUBERIA PVC SAP 1/2" ML 50.00 S/ 15.45 S/ 772.50 50.00 S/. 772.50

03.05.02 VALVULA DE COMPUERTA 1/2" und 6.00 S/ 23.40 S/ 140.40 6.00 S/. 140.40

03.05.03 SALIDA CODO 90 PVC SAP 1/2" pto 4.00 S/ 31.20 S/ 124.80 4.00 S/. 124.80

03.05.04 CODO 90 PVC SAP 1/2" und 3.00 S/ 38.63 S/ 115.89 3.00 S/. 115.89

03.05.05 TEE RECTAPVC SAP 1/2" und 4.00 S/ 18.54 S/ 74.16 4.00 S/. 74.16

03.05.06 CAÑO TIPO GANZO DE LLAVE DE 1/2 und 4.00 S/ 77.25 S/ 309.00 4.00 S/. 309.00

03.05.07 CAÑO DE BRONCE ESTANDAR LLAVE DE 1/2 und 4.00 S/ 77.25 S/ 309.00 4.00 S/. 309.00

03.06 INSTALACIONES CONTRAINCENDIOS


03.06.01 SISTEMA HIDRAULICO CONTRAINCENDIOS und 24.00 S/ 191.60 S/ 4,598.40 24.00 S/. 4,598.40

04 INSTALACIONES ELECTRICAS
04.01 SALIDA PARA ELECTRICIDAD
04.01.01 SALIDA PARA CENTRO DE LUZ pto 16.00 S/ 19.31 S/ 308.96 16.00 S/. 308.96

04.01.02 SALIDA PARA INTERRUPTOR pto 14.00 S/ 22.78 S/ 318.92 14.00 S/. 318.92

04.01.03 SALIDA PARA TOMACORIENTE DE LUZ pto 14.00 S/ 19.94 S/ 279.16 14.00 S/. 279.16

04.02 CANALIZACIONES Y/O TUBERIAS


04.02.01 TUBERIA PVC SAP (ELEC) 3/4" ML 300.00 S/ 5.58 S/ 1,674.00 300.00 S/. 1,674.00

04.03 CONDUCTORES Y/O CABLES


04.03.01 CONDUCTOR ELECTRICO TW N°12 -4.0mm ML 400.00 S/ 8.93 S/ 3,572.00 400.00 S/. 3,572.00

04.03.02 CONDUCTOR ELECTRICO 6.0mm ML 200.00 S/ 4.29 S/ 858.00 200.00 S/. 858.00

04.04 TABLEROS Y CUCHILLAS


04.04.01 TABLERO DE DISTRIBUCION CAJA MEDIDOR 12 POLOS pza 2.00 S/ 31.90 S/ 63.80 2.00 S/. 63.80

04.05 INSTALACIONES INTERNET Y COMUNICACIONES


04.05.01 SISTEMA DE INTERNET Y COMUNICACIONES glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/. 2,500.00

COSTO DIRECTO S/ 175,315.44


MONTO PROGRAMADO MENSUAL S/. 91,562.03 S/. 83,753.41
PORCENTAJE PROGRAMADO MENSUAL 52.2% 47.8%
MONTO PROGRAMADO ACUMULADO 91,562.03 175,315.44
PORCENTAJE PROGRAMADO ACUMULADO 52.2% 100.0%