Ground Invert

Label Elevation Elevation


(m) (m)

MH-1 31.39 30.27


MH-2 33.22 31.79
MH-3 34.44 33.01
MH-4 32.00 30.88
MH-5 34.75 32.40
MH-6 36.58 33.62
MH-7 32.92 31.79
MH-8 35.66 33.93
MH-9 38.10 35.76
MH-10 33.83 32.40
MH-11 36.58 34.54
MH-12 38.71 36.37
MH-13 35.97 34.54
Cámaras 1, 6 y 10 Cámara 12
Tiempo Tiempo
Caudal (L/s) Caudal (L/s)
(hours) (hours)
0 0.00 0 0.00
3 0.00 3 0.00
4 6.31 4 2.52
5 18.93 5 6.31
6 69.40 6 25.24
7 88.33 7 28.39
8 82.02 8 26.81
9 66.24 9 23.66
10 53.63 10 18.93
11 37.85 11 6.31
12 12.62 12 2.52
13 6.31 13 0.63
14 0.00 14 0.00
24 0.00 24 0.00
Cota de Fondo
Cota Terreno – – Invert Elev.
Pozo Ground Elev. (m)
(m)
MH-1 153.92 152.4
MH-2 154.08 151.79
MH-3 154.23 151.18
MH-4 153.92 150.57
MH-5 153.77 149.96
MH-6 156.67 154.84
MH-7 154.99 153.62
MH-8 154.53 153.01
MH-9 154.23 152.4
Datos de los tubos Datos de los pozos

Longitud, Diámetro, Pozo de Ground


Colector Material Inspección
m mm Elev, m
CO-1 121.92 304.8 Concrete MH-1 17.68
CO-2 121.92 304.8 Concrete MH-2 16.76
CO-3 121.92 457.2 Concrete MH-3 12.19
CO-4 121.92 457.2 Concrete MH-4 10.97
CO-5 121.92 609.6 Concrete MH-5 10.67
Hidrogramas Unitarios

Invert Tiempo CM-1 CM-2 CM-3 CM-4

Elev, m (hr) L/s L/s L/s L/s


15.85 0 5.66 2.83 14.16 14.16
14.33 1 28.32 19.82 70.79 84.95
10.67 2 31.15 18.41 84.95 79.29
9.75 3 28.32 11.33 79.29 62.3
9.14 4 22.65 5.66 56.63 42.48
5 14.16 1.42 42.48 28.32
6 2.83 0.57 5.66 11.33
7 0.57 0.28 1.42 2.83