ETAP Página: 1
12.6.0H
Ubicación: Fecha: 07-05-2018
Contrato: SN:
Ingeniero: Caso de Estudio: GRD2 Nombre de Archivo: palanda-yucasur
Revisión: Base
Datos de Sistema:
Datos de Suelo:
Rod Copper-clad steel rod 20.0 0.00378 245.0 1084.0 8.62 3.85
ConductorDatos:
C1 Copper, annealed soft-drawn 107 37.40 43.30 0.60 51.40 43.30 0.60 14.00 NO 0.00
C10 Copper, annealed soft-drawn 107 23.40 29.00 0.60 27.40 29.00 0.60 4.00 NO 0.00
C11 Copper, annealed soft-drawn 107 32.40 7.20 0.60 32.40 23.80 0.60 16.60 NO 0.00
C12 Copper, annealed soft-drawn 107 32.40 7.20 0.60 39.30 7.20 0.60 6.90 NO 0.00
C13 Copper, annealed soft-drawn 107 39.30 7.20 0.60 39.30 34.30 0.60 27.10 NO 0.00
C14 Copper, annealed soft-drawn 107 32.40 10.20 0.60 39.30 10.20 0.60 6.90 NO 0.00
C15 Copper, annealed soft-drawn 107 35.90 7.20 0.60 35.90 10.20 0.60 3.00 NO 0.00
C17 Copper, annealed soft-drawn 107 43.60 24.00 0.60 45.60 24.00 0.60 2.00 NO 0.00
C18 Copper, annealed soft-drawn 107 43.50 24.00 0.60 43.50 22.00 0.60 2.00 NO 0.00
C2 Copper, annealed soft-drawn 107 51.40 34.30 0.60 51.40 43.30 0.60 9.00 NO 0.00
C20 Copper, annealed soft-drawn 107 43.50 24.10 0.60 43.50 26.10 0.60 2.00 NO 0.00
C21 Copper, annealed soft-drawn 107 39.20 24.00 0.60 43.20 24.00 0.60 4.00 NO 0.00
C23 Copper, annealed soft-drawn 107 37.50 43.30 0.60 37.40 34.30 0.60 9.00 NO 0.00
C25 Copper, annealed soft-drawn 107 44.50 34.50 0.60 44.50 43.50 0.60 9.00 NO 0.00
C3 Copper, annealed soft-drawn 107 47.90 34.30 0.60 47.90 43.30 0.60 9.00 NO 0.00
Proyecto:
ETAP Página: 2
12.6.0H
Ubicación: Fecha: 07-05-2018
Contrato: SN:
Ingeniero: Caso de Estudio: GRD2 Nombre de Archivo: palanda-yucasur
Revisión: Base
ConductorDatos:
C39 Copper, annealed soft-drawn 107 44.50 41.00 0.60 51.50 41.00 0.60 7.00 NO 0.00
C4 Copper, annealed soft-drawn 107 44.50 38.80 0.60 51.50 38.80 0.60 7.00 NO 0.00
C41 Copper, annealed soft-drawn 107 27.30 34.20 0.60 27.30 23.70 0.60 10.50 NO 0.00
C6 Copper, annealed soft-drawn 107 23.40 34.30 0.60 45.00 34.30 0.60 21.60 NO 0.00
C7 Copper, annealed soft-drawn 107 23.40 34.30 0.60 23.40 23.80 0.60 10.50 NO 0.00
C8 Copper, annealed soft-drawn 107 23.40 23.80 0.60 32.40 23.80 0.60 9.00 NO 0.00
RodDatos:
R10 Copper-clad steel rod 1.600 27.30 23.90 0.60 27.30 23.90 2.40 1.80 NO 0.00
R11 Copper-clad steel rod 1.600 23.40 29.00 0.60 23.40 29.00 2.40 1.80 NO 0.00
R12 Copper-clad steel rod 1.600 27.40 29.00 0.60 27.40 29.00 2.40 1.80 NO 0.00
R13 Copper-clad steel rod 1.600 23.30 34.20 0.60 23.30 34.20 2.40 1.80 NO 0.00
R14 Copper-clad steel rod 1.600 27.40 34.30 0.60 27.40 34.30 2.40 1.80 NO 0.00
R15 Copper-clad steel rod 1.600 43.50 26.20 0.60 43.50 26.20 2.40 1.80 NO 0.00
R16 Copper-clad steel rod 1.600 43.50 21.80 0.60 43.50 21.80 2.40 1.80 NO 0.00
R17 Copper-clad steel rod 1.600 43.50 24.10 0.60 43.50 24.10 2.40 1.80 NO 0.00
R18 Copper-clad steel rod 1.600 45.90 24.10 0.60 45.90 24.10 2.40 1.80 NO 0.00
R19 Copper-clad steel rod 1.600 44.40 34.40 0.60 44.40 34.40 2.40 1.80 NO 0.00
R2 Copper-clad steel rod 1.600 37.50 39.00 0.60 37.50 39.00 2.40 1.80 NO 0.00
R20 Copper-clad steel rod 1.600 51.50 34.30 0.60 51.50 34.30 2.40 1.80 NO 0.00
R21 Copper-clad steel rod 1.600 51.50 43.20 0.60 51.50 43.20 2.40 1.80 NO 0.00
R22 Copper-clad steel rod 1.600 44.50 43.40 0.60 44.50 43.40 2.40 1.80 NO 0.00
R23 Copper-clad steel rod 1.600 37.50 34.40 0.60 37.50 34.40 2.40 1.80 NO 0.00
R24 Copper-clad steel rod 1.600 32.50 16.90 0.60 32.50 16.90 2.40 1.80 NO 0.00
R3 Copper-clad steel rod 1.600 39.30 7.30 0.60 39.30 7.30 2.40 1.80 NO 0.00
R4 Copper-clad steel rod 1.600 39.30 10.10 0.60 39.30 10.10 2.40 1.80 NO 0.00
R5 Copper-clad steel rod 1.600 35.90 8.80 0.60 35.90 8.80 2.40 1.80 NO 0.00
R6 Copper-clad steel rod 1.600 32.50 7.30 0.60 32.50 7.30 2.40 1.80 NO 0.00
R7 Copper-clad steel rod 1.600 32.60 10.10 0.60 32.60 10.10 2.40 1.80 NO 0.00
R8 Copper-clad steel rod 1.600 32.60 23.80 0.60 32.60 23.80 2.40 1.80 NO 0.00
R9 Copper-clad steel rod 1.600 23.30 23.90 0.60 23.30 23.90 2.40 1.80 NO 0.00
Proyecto:
ETAP Página: 3
12.6.0H
Ubicación: Fecha: 07-05-2018
Contrato: SN:
Ingeniero: Caso de Estudio: GRD2 Nombre de Archivo: palanda-yucasur
Revisión: Base
Costo:
Conductor Jabalina
Total Longitud Total Costo Total Longitud Total Costo Costo Total
No. m $ No. m $ $
23 204.10 0.00 24 43.20 0.00 0.00