Está en la página 1de 2

SALINE WATER CONVERSION CORPORATION

STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I

REVISION SHEET
DOC. TITLE: PID LEGEND AND SYMBOLS

FROM REV: A TO REV: B

DOC. NO: 7 7 - Q P 2 0 - D - 0 0 1
REV. DATE: 10.05.2018

CHANGES TO THE DOCUMENT: Acc. to Engineer’s Comment Sheet EH-AH-D-0103 (02.04.2018)

ENGINEER’S NOTE NO CONTRACTOR’S ACTION


1. “PID Legend and Symbols” should be
prepared by Contractor Designer (IBG)
and it should submit as a Detailed
Document with following chapters:
a. Introduction.
b. Legend and Symbols:
 Used Standards
 Graphical symbols
Noted. Please refer to following report:
 Delimiters and Flow Arrows PROCESS AND INSTRUMENTATION DIAGRAM
(P&ID)
 Water Quality Instruments LEGEND AND SYMBOLS
 Text Specifiers 77-QA20-R-001

 EMCE Point Circle


 Color Coding for P&ID
 Pipelines and Operating Lines
c. Identification System
 Identification Procedure
 Examples of P&I Identification
Letters
Noted:
Site Layout is task of General Plot Plan
2. In order to review such submittal
regarding P&IDs, site layout and pipe Pipe Schedule indication diameter and
schedule (indicating diameters and materials is task of Isometric Drawings, which
materials) should be approved firstly. follows after approval of PID. However, Pipe
dimension is part of Hydraulic Report.

3. All equipments (valves & instruments)


typical signal, interlocks and function Noted and revised accordingly.
requirement should be added.
Some Symbols are put together with the
4. Some symbols not exist, like (motor actual Valve and a prime mover (refer to
operated valve and non-return valve). section “Actuators and prime movers” in the
PID Legend and Symbols. Not all possible
variants of the Symbol can be shown in the
legend.
5. Some symbols not correct, like pump,
Adjusted accordingly
blind flange, Barrel Drum.
6. Correct “Diaphragm Membrane”
Noted.
spelling.

7. Use symbols for equipment required at Noted.


the site, Water Balancing Tank symbol is For overall overview, we advise to show all
not necessary. symbols.
8. Add Electrical Measurement and Control
Engineering (EMCE) Text Abbreviations:
a. LCON - Local Control Noted and revised accordingly.
b. UNCON - Unit Control
c. STATCON - Station Control
Tag Number is not part of Legend.

AKZ Pressure

9. Tag number description should be


Class
added in the legend.

Pipe Diameter in inch

10. Tag number for pipeline should present


Refer our comment 9
the fluid service and pipe specs.
11. Tag number for tanks should comply with
Noted and revised accordingly.
the tender documents.
OTHER CHANGES (REASONS FOR CHANGES):

none