JSA: JOB SAFETY ANALYSIS REVISION: 0

WORKSHEET
JOB: Rigging Up on New TEAM LEADER: A. Khalifa / P. Dayao DATE: 05.08.09
Location

WEAR FULL PPE: SAFETY HELMET - SAFETY BOOTS – SAFETY GLASSES- GLOVES- LONG-SLEEVED COVERALLS –
HEARING PROTECTION IF NECESSARY; SEE REMARKS UNDER RIGGING DOWN ON OLD LOCATION

Steps Description of Job Potential Accident or Hazards Safe Condition or Activity required
Step
1 Obstruction along the road On the route to new location, obstruction on the road Scout route well before move and check for any
may be encounter. This might disturb normal driving obstruction. Use of as many as possible on truck trailers.
with heavy loads and force the driver to drive in an
unacceptable lane instead in the preferred lane.
2 Heavy lifting Breaking of slings, shackles, etc. All lifting gear are inspected and certified. Ensure that all
lifting slings and shackles are of current color code.
Damaged lifting gear shall be destroyed and disposed of.

Drop load. Check and ensure crane, appropriate slings and shackles
are in good condition. Consider load safety factor.

Load collision with object/person. Perform pre-lifting check. Ensure all people are clear from
vicinity of load. Provide barriers if necessary.
3 Extending crane outrigger and Not enough support for crane jacks. Lay matting boards under crane jacks. Supervisor will
jack survey the ground for level and stability for the maximum
loading to be imposed.
4 Crane operation Crane breaking down. Crane operator and stand-by mechanic shall conduct
vehicle inspection before the operation. Check POWER –
Petrol, Oil, Water, Electrical, and Rubber such as hoses,
tire, etc.

Improper handling of cranes. Only experienced crane operators are allowed to operate.

REMEMBER: Discuss with Work Group Attach Copy to Work Permit File Original
Copy to Safety Dept
JSA: JOB SAFETY ANALYSIS REVISION: 0
WORKSHEET
JOB: Rigging Up on New TEAM LEADER: A. Khalifa / P. Dayao DATE: 05.08.09
Location

Sinking ground for crane due to crane weight. Lay matting boards under crane. Supervisor will survey
the ground for level and stability for the maximum loading
to be imposed.