PROYECTO: "CONSTRUCCION C.E.

Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO, III ETAPA"

PLANILLA DE METRADOS CONSTRUCCION DE UNA INSTITUCIÓN EDUCATIVA

01 OBRAS PROVISIONALES

01.01 CARTEL DE OBRA-GIGANTOGRAFIA 2.40 x 3.60 m 1.00 und

02 DEMOLICIONES
TOTAL
02.01 DESMONTAJE DE COBERTURA ETERNIT - CALAMINA 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
PARED 4 10.00 3.00 2.5 300.00
PISO 2 8.00 4.00 0.2 12.80

0.00
0.00
0.00
TOTAL (m2) 0.00

TOTAL ETAPA 3
02.03 DESMONTAJE DE PUERTAS Y VENTANAS 0.00 und 0.00 und

Nº LARGO ANCHO ALTO UNIDADES VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (und) (m3) (und)
PUERTAS 1.20 0.10 2.10

TOTAL (und) 0 0

TOTAL ETAPA 3
02.04 DEMOLICION DE MUROS DE LADRILLO 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO, III ETAPA"

TOTAL (m3)

TOTAL ETAPA 3
02.05 DEMOLICION DE VIGAS Y COLUMNAS DE CONCRETO 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
02.06 DEMOLICION DE PISOS Y VEREDAS DE CONCRETO 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

VEREDAS
TOTAL (m2) 0.00 0

TOTAL ETAPA 3
02.07 DEMOLICION DE CIMIENTOS Y SOBRECIMIENTOS 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00


NOTA: VALOR ESTIMADO AL NO CONTAR CON PLANOS DE ESTRUCTURA ACTUAL

TOTAL ETAPA 3
02.08 ELIMINACION DE MAT. EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

SUBTOTAL
FACTOR DE ESPONJAMIENTO
TOTAL 0.00 0.00
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

03 TRABAJOS PRELIMINARES
TOTAL III ETAPA
03.01 LIMPIEZA DE TERRENO MANUAL 300.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
ÁREA AB2C-01 1 20.00 6.00 0.00 120.00
ÁREA 2211 1 30.00 15.00 8.00 180.00
TOTAL (m2) 300.00 0.00

TOTAL ETAPA 3
03.02 TRAZO Y REPLANTEO 300.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
ÁREA AB2C-01 1 20.00 6.00 0.00 120.00
ÁREA 2211 1 30.00 15.00 8.00 180.00
TOTAL (m2) 300.00 0.00

04 MOVIMIENTO DE TIERRAS
TOTAL ETAPA 3
04.01 EXCAVACION PARA CIMIENTOS - ZAPATAS 341.57 m3 0.00 m3

EXCAVACION PARA ZAPATAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
Z-01 1 2.05 2.20 2.05 4.51 9.25
Z-02 1 2.70 2.70 2.05 7.29 36.87
1 3.45 3.10 10.70
Z-03 2 2.45 2.80 2.05 6.86 28.13
Z-04 1 3.45 3.10 2.05 10.70 21.92
Z-05 3 2.50 1.70 2.05 4.25 26.14
Z-06 3 2.85 2.70 2.05 7.70 47.32
Z-07 1 2.30 2.15 2.05 4.95 10.14
Z-08 1 2.35 2.70 2.05 6.35 31.78
2.03 1.85 3.76
2.25 2.40 5.40
Z-09 1 3.22 3.05 2.05 9.82 20.13
Z-09 -1 1 2.70 3.05 2.05 8.24 16.88
Z-10 1 2.05 7.17 14.70
Z-11 1 1.65 1.50 2.05 2.48 5.07
Z-12 1 2.25 1.90 2.05 4.28 8.76
Z-13 1 1.96 1.80 2.05 3.53 7.23
Z-14 1 2.50 2.15 2.05 5.38 11.02
Z-15 1 1.65 1.50 2.05 2.48 5.07
Z-16 1 1.85 1.00 1.35 1.85 2.50
Z-17 1 1.70 1.35 1.00 2.30 2.30
Z-18 2 1.00 1.00 1.35 1.00 2.70
TOTAL (m3) 120.94 307.91 0.00

EXCAVACION PARA CIMIENTOS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
EJE 1-1 TRAMO A-A' 1 2.48 0.60 1.20 1.49 1.79
EJE 1-1 TRAMO A'-C 1 2.48 0.60 1.20 1.49 1.79
EJE 1-1 TRAMO C-E 1 3.63 0.60 1.20 2.18 2.61
EJE 1-1 TRAMO E-F 1 3.10 0.60 1.20 1.86 2.23
EJE 1-1 TRAMO F-G 1 1.95 0.60 1.20 1.17 1.40
EJE 1-1 TRAMO G-H 1 1.93 0.60 1.20 1.16 1.39
EJE 1'-1' TRAMO E-F' 1 6.70 0.60 1.20 4.02 4.82
EJE 1'-1' TRAMO G-H 1 2.21 0.60 1.20 1.33 1.59
EJE 2-2 TRAMO E-F 1 2.80 0.25 1.20 0.70 0.84
EJE 2-2 TRAMO F-G 1 2.75 0.25 0.55 0.69 0.38
EJE 2-2 TRAMO E-F 1 1.95 0.60 1.20 1.17 1.40
EJE 2'-2' TRAMO G-H y C'-E 1 0.35 0.60 1.20 0.21 0.25
EJE E'-E' TRAMO 1-1' 1 0.63 0.60 1.20 0.38 0.45
EJE E'-E' TRAMO 1'-2 1 1.00 0.60 1.20 0.60 0.72
EJE F-F TRAMO 1-1' 1 0.63 0.25 0.55 0.16 0.09
EJE F'-F' TRAMO 1-1' 1 2.53 0.60 1.20 1.52 1.82
EJE G-G TRAMO 1-3' 1 3.58 0.60 1.20 2.15 2.58
EJE G'-G' TRAMO 1'-2 1 1.25 0.60 1.20 0.75 0.90
EJE H-H TRAMO 1-6' 1 9.17 0.60 1.20 5.50 6.60
TOTAL (m3) 33.66 0.00

TOTAL ETAPA 3
04.02 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE (CARGUIO A MANO) 426.96 m3 0.00 m3

Nº LARGO ANCHO FACTOR VOLUMEN VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) ESPONJAM (m3) (m3) (m3)
ZAPATAS 1.25 341.57 426.96

TOTAL (m3) 426.96 0.00


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
04.03 RELLENO COMPACTADO MANUAL, MATERIAL PROPIO 4.95 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
ENTRE EJE 1-2 Y F-F (ZAPATA) 1 1.68 1.90 1.55 4.95
EJE 1-1 TRAMO F-G(CIMIENTO) 1 4.10 0.55 0.60
EJE 1-1 TRAMO G-G(ZAPATA) 1 1.30 1.65 1.55
EJE 1-1 TRAMO G-H 1 4.03 0.35 0.60
ENTRE EJE 1-1 Y H-H 1 1.55
EJE 1-1' TRAMO E-F 1 7.35 0.45 0.60
EJE 1'-1' TRAMO G-H 1 3.21 0.45 0.60
ENTRE EJE 2-2 E'-E'(ZAPATA) 1 1.50
ENTRE EJE 2-2 Y E-F (CIMIENTO) 1 1.45
EJE 2-2 , E-F (ZAPATA) 1 0.92 0.35 0.50
ENTRE 2-2 TRAMO G-H 1 0.40 0.35 0.50
ENTRE 2-2 TRAMO G-H (CIMIENTO) 1 0.60
ENTRE 2-2 TRAMO G-H (CIMIENTO) 1
EJE 2'-2'

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 4.95 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04.04 NIVELACION INT. Y APISONADO PARA FALSO PISO Y VEREDAS 0.00 m2 0.00 m2

NIVELACION INT. Y APISONADO PARA FALSO PISO


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

NIVELACION INT. Y APISONADO PARA VEREDAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0

TOTAL ETAPA 3
04.05 AFIRMADO COMPACTADO E=4", FALSO PISO Y VEREDAS 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXXXXXXXXXXXXX

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0

TOTAL ETAPA 3
04.06 AFIRMADO COMPACTADO, PARA FONDO DE CIMENTACION 0.00 m3 0.00 m3

AFIRMADO COMPACTADO DE ZAPATAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

AFIRMADO COMPACTADO DE CIMIENTOS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00

05 OBRAS DE CONCRETO SIMPLE XXXXXXXXXXXXXXXXXXXXXX

05.01 SOLADOS
TOTAL ETAPA 3
05.01.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO - HORMIGON 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

05.02 CIMIENTOS CORRIDOS


TOTAL ETAPA 3
05.02.01 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 + 30% PG MAX 6" 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
05.02.02 ENCOFRADO Y DESENCOFRADO CIMIENTOS 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

05.03 SOBRECIMIENTOS
TOTAL ETAPA 3
05.03.01 SOBRECIMIENTOS DE CONCRETO C:H 1:8 +25% PM MAX 3" 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

06 OBRAS DE CONCRETO ARMADO

06.01 ZAPATAS
TOTAL ETAPA 3
06.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00

06.01.02 ACERO EN ZAPATAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

06.02 VIGAS DE ARRIOSTRE


TOTAL ETAPA 3
06.02.01 CONCRETO EN VIGAS DE ARRIOSTRE F'C=210 KG/CM2 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE ARRIOSTRE 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

06.02.03 ACERO EN VIGAS DE ARRIOSTRE FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

06.03 COLUMNAS Y COLUMNETAS


TOTAL ETAPA 3
06.03.01 CONCRETO EN COLUMNAS Y COLUMNETAS F'C=210 KG/CM2 0.00 m3 0.00 m3

CONCRETO EN COLUMNAS
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

CONCRETO EN COLUMNETAS Y VIGUILLAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
06.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y COLUMNETAS 0.00 m2 0.00 m2

ENCOFRADO Y DESENCOFRADO EN COLUMNAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

ENCOFRADO Y DESENCOFRADO EN COLUMNETAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

06.03.03 ACERO EN COLUMNAS Y COLUMNETAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

06.04 VIGAS Y DINTELES


TOTAL ETAPA 3
06.04.01 CONCRETO EN VIGAS Y DINTELES F'C=210 KG/CM2 0.00 m3 0.00 m3

CONCRETO EN VIGAS (1P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00

CONCRETO EN VIGAS (2P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

CONCRETO EN VIGAS (3P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

CONCRETO EN DINTELES
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

9 puertas p2 con dintel


TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS Y DINTELES 0.00 m2 0.00 m2

ENCOFRADO Y DESENCOFRADO EN VIGAS (1P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

ENCOFRADO Y DESENCOFRADO EN VIGAS (2P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

ENCOFRADO Y DESENCOFRADO EN VIGAS (3P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00

ENCOFRADO Y DESENCOFRADO EN DINTELES


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

06.04.03 ACERO EN VIGAS Y DINTELES FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

06.05 LOSA ALIGERADA Y LAVADERO CORRIDO


TOTAL ETAPA 3
06.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 0.00 m3 0.00 m3

ALIGERADO PRIMERA PLANTA

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00

TOTAL ETAPA 3
06.05.02 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS 151.53 m2 0.00 m2

ALIGERADO PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

06.05.03 ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.05.04 LADRILLO HUECO DE ARCILLA 15x30x30 CM PARA TECHO ALIGERADO 0 und 0 und XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

ALIGERADO PRIMERA PLANTA

Nº LARGO ANCHO LAD/m2 AREA UNIDADES ETAPA 3


DESCRIPCION
VECES (m) (m) (und) (m2) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.05.05 LADRILLO HUECO DE ARCILLA 12x30x30 CM PARA TECHO ALIGERADO 0 und 0 und XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Nº LARGO ANCHO LAD/m2 AREA UNIDADES ETAPA 3
DESCRIPCION
VECES (m) (m) (und) (m2) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

06.06 ESCALERAS
TOTAL ETAPA 3
06.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 0.00 m3 0.00 m3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

ESCALERA SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.06.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS 0.00 m2 0.00 m2

ESCALERA SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

06.06.03 ACERO EN ESCALERAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

06.07 VARIOS
TOTAL ETAPA 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
06.07.01 CURADO DE OBRAS DE CONCRETO CON ADITIVOS 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06.07.02 LIMPIEZA GENERAL Y ENTREGA DE OBRA 1.00 GBL 1.00 GBL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

07 MUROS Y TABIQUES DE ALBAÑILERIA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


TOTAL ETAPA 3
07.01 MURO DE SOGA LADRILLO DE ARCILLA 9x13x24 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
07.02 MURO DE CABEZA LADRILLO DE ARCILLA 9x13x24 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
07.03 JUNTA SISMICA 1" CON TEKNOPORT 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

08 COBERTURA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL ETAPA 3
08.01 VIGUETAS DE MADERA TORNILLO DE 4"x7" 0.00 m 0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
08.02 VIGUETAS DE MADERA TORNILLO DE 4"x6" 0.00 m 0.00

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
08.03 COBERTURA CON TEJA ANDINA 0.00 m2 0.00

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
08.04 CUMBRERA TEJA ANDINA 0.00 m 0.00

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

09 REVOQUES ENLUCIDOS Y MOLDURAS


TOTAL ETAPA 3
09.01 TARRAJEO EN INTERIORES ESPESOR 1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
09.02 TARRAJEO EN EXTERIORES ESPESOR 1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
09.03 TARRAJEO DE COLUMNAS, SUPERFICIE E=1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

TARRAJEO DE COLUMNAS PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
EXT
EXT
EXT
INT
EXT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TARRAJEO DE COLUMNAS SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
EXT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TARRAJEO DE COLUMNAS TERCERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

INT

INT
EXT
INT

INT
EXT
INT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
EXT

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
09.04 TARRAJEO DE VIGAS, SUPERFICIE E=1.5 cm, MEZ 1:5 0.00 m2 0.00 m2

TARRAJEO DE VIGAS PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TARRAJEO DE VIGAS SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TARRAJEO DE VIGAS TERCERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 S/. 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
09.05 TARRAJEO PRIMARIO RAYADO EN ZOCALOS Y CONTRAZOCALOS E=1:5 CM, MEZ 1:5 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXXXXXXXXXXXXX

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
09.06 VESTIDURA DE DERRAMES E=1.5, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

10.00 CIELORRASOS
TOTAL ETAPA 3
10.01 CIELORRASOS CON MEZCLA DE CEMENTO - ARENA 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
10.02 CIELORRASOS CON TRIPLAY 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
10.03 VESTIDURA FONDO DE ESCALERA MEZCLA 1:5 x 1.5 CM 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

11.00 PISOS Y PAVIMENTOS


TOTAL ETAPA 3
11.01 FALSO PISO DE 4" DE CONCRETO C:H 1:8 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.02 CONTRAPISO DE 48 MM 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.03 PISO CERAMICO DE ALTO TRANSITO 30x30 cm 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
11.04 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.05 REVESTIMIENTO GRADAS C/MORTERO 1:4 x 2 CM + PULIDO COLOREADO 1:2 x 1 CM 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.06 VEREDA DE CONCRETO E=4" + SARDINEL, PASTA E=1.5 CM 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.07 CANTONERA 2"x2" - ALUMINIO, ESCALERA 0.00 m 0.00 m

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.08 JUNTAS ASFALTICAS 1", VEREDAS 0.00 m 0.00 m

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
11.09 JUNTAS ASFALTICAS 1/2", AMBIENTES 16.65 m 16.65 m

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)
DEPOSITO 1 3.20 3.20 3.20
ESTRADO 2 3.00 6.00 6.00
INGRESO 1 4.10 4.10 4.10
1 3.35 3.35 3.35
TOTAL (m) 16.65 16.65 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

12.00 ZOCALOS Y CONTRAZOCALOS


TOTAL ETAPA 3 XXXXXXXXXXXXXXXXXXXXXXXXX
12.01 ZOCALO CERAMICO DE PRIMERA, 20cm X 30cm - SSHH, LAVADERO CORRIDO 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
12.02 CONTRAZOCALO DE CERAMICO DE PRIMERA, H=20cm 0.00 m 0.00 m

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

XXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3

12.03 CONTRAZOCALO CEMENTO S/COLOREAR H=20 CM. 0.00 m 0.00 m XXXXXXXXXXXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
12.04 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR EN EXTERIORES, H=60cm 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

13.00 CARPINTERIA DE MADERA


TOTAL ETAPA 3
13.01 PUERTA APANELADA, MADERA CEDRO E=1 1/4" 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
13.02 PUERTA CONTRAPLACADA - MADERA CEDRO E=35 MM 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

14.00 CARPINTERIA METALICA


TOTAL ETAPA 3
14.01 VENTANA METALICA 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
14.02 BARANDA METALICA PASAMANO ALUMINIO - ESCALERAS 0.00 m 0.00 m

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
14.03 PORTON METALICO/M2 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

15.00 CERRAJERIA

TOTAL ETAPA 3
15.01 BISAGRA CAPUCHINA DE 4" x 4" 0.00 und 0.00 und

PRIMERA PLANTA

Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3


DESCRIPCION TA
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
15.02 BISAGRA 2 1/2" x 2 1/2" PARA SS.HH. 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION TA
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
15.03 CERRADURA 3 GOLPES EN PUERTA 0.00 pza 0.00 pza

PRIMERA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION PTA
VECES (m) (m) (m) (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION PTA
VECES (m) (m) (m) (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION PTA
VECES (m) (m) (m) (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
15.04 CERROJO 3" P/PUERTAS DE BAÑO 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
15.05 CERROJO DE FIERRO DE 6" 0.00 und 0.00 und

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
15.06 MANIJA DE BRONCE DE 4" PARA PUERTAS 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) A (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

16.00 VIDRIOS
TOTAL ETAPA 3
16.01 VIDRIO SEMIDOBLE 0.00 p2 0.00 p2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX
PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

17.00 PINTURA
TOTAL ETAPA 3
17.01 PINTURA LATEX EN INTERIORES Y CIELORRASOS 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
17.02 PINTURA LATEX EN EXTERIORES 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
17.03 PINTURA ESMALTE EN ZOCALO DE CEMENTO 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX


PROYECTO: "CONSTRUCCION C.E. Nº 82554 INMACULADA CONCEPCION MAGNA VALLEJO MAGNA VALLEJO, III ETAPA"

TOTAL ETAPA 3
17.04 PINTURA EN PUERTAS DE MADERA CON BARNIZ 0.00 m2 0.00 m2

PUERTAS APANELADAS
PRIMERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

PUERTAS CONTRAPLACADAS
PRIMERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
17.05 PINTURA EN CARPINTERIA METALICA, ESMALTE Y ANTICORROSIVA 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

PORTON METALICO
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX


02 #REF! ACERO EN ZAPATAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

02 #REF! VIGAS DE ARRIOSTRE


TOTAL ETAPA 3
01 #REF! CONCRETO EN VIGAS DE ARRIOSTRE F'C=210 KG/CM2 0.00 m3 0.00 m3

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 #REF! ENCOFRADO Y DESENCOFRADO VIGA DE ARRIOSTRE 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

03 #REF! ACERO EN VIGAS DE ARRIOSTRE FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

03 #REF! COLUMNAS Y COLUMNETAS


TOTAL ETAPA 3
01 #REF! CONCRETO EN COLUMNAS Y COLUMNETAS F'C=210 KG/CM2 0.00 m3 0.00 m3

CONCRETO EN COLUMNAS
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

CONCRETO EN COLUMNETAS Y VIGUILLAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 #REF! ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y COLUMNETAS 0.00 m2 0.00 m2

ENCOFRADO Y DESENCOFRADO EN COLUMNAS


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX


ENCOFRADO Y DESENCOFRADO EN COLUMNETAS
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

03 #REF! ACERO EN COLUMNAS Y COLUMNETAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

04 #REF! VIGAS Y DINTELES


TOTAL ETAPA 3
01 #REF! CONCRETO EN VIGAS Y DINTELES F'C=210 KG/CM2 0.00 m3 0.00 m3

CONCRETO EN VIGAS (1P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00

CONCRETO EN VIGAS (2P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

CONCRETO EN VIGAS (3P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

CONCRETO EN DINTELES
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

9 puertas p2 con dintel


TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX
TOTAL ETAPA 3
02 #REF! ENCOFRADO Y DESENCOFRADO EN VIGAS Y DINTELES 0.00 m2 0.00 m2

ENCOFRADO Y DESENCOFRADO EN VIGAS (1P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

ENCOFRADO Y DESENCOFRADO EN VIGAS (2P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

ENCOFRADO Y DESENCOFRADO EN VIGAS (3P)


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00

ENCOFRADO Y DESENCOFRADO EN DINTELES


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXX

03 #REF! ACERO EN VIGAS Y DINTELES FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXX

05 #REF! LOSA ALIGERADA Y LAVADERO CORRIDO


TOTAL ETAPA 3
01 #REF! CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 0.00 m3 0.00 m3

ALIGERADO PRIMERA PLANTA

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m3) 0.00 0.00

TOTAL ETAPA 3
02 #REF! ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS 151.53 m2 0.00 m2

ALIGERADO PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

03 #REF! ACERO EN LOSAS ALIGERADAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 #REF! LADRILLO HUECO DE ARCILLA 15x30x30 CM PARA TECHO ALIGERADO 0 und 0 und XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

ALIGERADO PRIMERA PLANTA

Nº LARGO ANCHO LAD/m2 AREA UNIDADES ETAPA 3


DESCRIPCION
VECES (m) (m) (und) (m2) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05 #REF! LADRILLO HUECO DE ARCILLA 12x30x30 CM PARA TECHO ALIGERADO 0 und 0 und XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
. Nº LARGO ANCHO LAD/m2 AREA UNIDADES ETAPA 3
DESCRIPCION
VECES (m) (m) (und) (m2) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

06 #REF! ESCALERAS
TOTAL ETAPA 3
01 #REF! CONCRETO EN ESCALERAS F'C=210 KG/CM2 0.00 m3 0.00 m3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

ESCALERA SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m3)

TOTAL (m3) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 #REF! ENCOFRADO Y DESENCOFRADO EN ESCALERAS 0.00 m2 0.00 m2

ESCALERA SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

03 #REF! ACERO EN ESCALERAS FY=4200 KG/CM2 #REF! XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

07 #REF! VARIOS
TOTAL ETAPA 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
01 #REF! CURADO DE OBRAS DE CONCRETO CON ADITIVOS 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 #REF! LIMPIEZA GENERAL Y ENTREGA DE OBRA 1.00 GBL 1.00 GBL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

07 MUROS Y TABIQUES DE ALBAÑILERIA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX


TOTAL ETAPA 3
01 07.01 MURO DE SOGA LADRILLO DE ARCILLA 9x13x24 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 07.02 MURO DE CABEZA LADRILLO DE ARCILLA 9x13x24 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TOTAL ETAPA 3
03 07.03 JUNTA SISMICA 1" CON TEKNOPORT 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

08 COBERTURA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL ETAPA 3
01 08.01 VIGUETAS DE MADERA TORNILLO DE 4"x7" 0.00 m 0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 08.02 VIGUETAS DE MADERA TORNILLO DE 4"x6" 0.00 m 0.00

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 08.03 COBERTURA CON TEJA ANDINA 0.00 m2 0.00

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 08.04 CUMBRERA TEJA ANDINA 0.00 m 0.00

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

09 REVOQUES ENLUCIDOS Y MOLDURAS


TOTAL ETAPA 3
01 09.01 TARRAJEO EN INTERIORES ESPESOR 1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 09.02 TARRAJEO EN EXTERIORES ESPESOR 1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 09.03 TARRAJEO DE COLUMNAS, SUPERFICIE E=1.5 CM, MEZ 1:5 0.00 m2 0.00 m2

TARRAJEO DE COLUMNAS PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
EXT
EXT
EXT
INT
EXT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TARRAJEO DE COLUMNAS SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
EXT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
EXT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
INT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
EXT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00

TARRAJEO DE COLUMNAS TERCERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
EXT
INT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

INT

INT
EXT
INT

INT
EXT
INT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
INT
INT
EXT

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 09.04 TARRAJEO DE VIGAS, SUPERFICIE E=1.5 cm, MEZ 1:5 0.00 m2 0.00 m2

TARRAJEO DE VIGAS PRIMERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TARRAJEO DE VIGAS SEGUNDA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TARRAJEO DE VIGAS TERCERA PLANTA


Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 S/. 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05 09.05 TARRAJEO PRIMARIO RAYADO EN ZOCALOS Y CONTRAZOCALOS E=1:5 CM, MEZ 1:5 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXXXXXXXXXXXXX

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06 09.06 VESTIDURA DE DERRAMES E=1.5, MEZ 1:5 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

XXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

10.00 CIELORRASOS
TOTAL ETAPA 3
01 10.01 CIELORRASOS CON MEZCLA DE CEMENTO - ARENA 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
XXXXXXXXXXXXXXXX

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 10.02 CIELORRASOS CON TRIPLAY 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 10.03 VESTIDURA FONDO DE ESCALERA MEZCLA 1:5 x 1.5 CM 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

11.00 PISOS Y PAVIMENTOS


TOTAL ETAPA 3
01 11.01 FALSO PISO DE 4" DE CONCRETO C:H 1:8 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 11.02 CONTRAPISO DE 48 MM 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 11.03 PISO CERAMICO DE ALTO TRANSITO 30x30 cm 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 11.04 PISO DE CEMENTO PULIDO COLOREADO BRUÑADO E=2" 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05 11.05 REVESTIMIENTO GRADAS C/MORTERO 1:4 x 2 CM + PULIDO COLOREADO 1:2 x 1 CM 0.00 m2 0.00 m2

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06 11.06 VEREDA DE CONCRETO E=4" + SARDINEL, PASTA E=1.5 CM 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
07 11.07 CANTONERA 2"x2" - ALUMINIO, ESCALERA 0.00 m 0.00 m

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
08 11.08 JUNTAS ASFALTICAS 1", VEREDAS 0.00 m 0.00 m

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TOTAL ETAPA 3
09 11.09 JUNTAS ASFALTICAS 1/2", AMBIENTES 16.65 m 16.65 m

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)
DEPOSITO 1 3.20 3.20 3.20
ESTRADO 2 3.00 6.00 6.00
INGRESO 1 4.10 4.10 4.10
1 3.35 3.35 3.35
TOTAL (m) 16.65 16.65 XXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)
TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXX

12.00 ZOCALOS Y CONTRAZOCALOS


TOTAL ETAPA 3 XXXXXXXXXXXXXXXXXXXXXXXXX
01 12.01 ZOCALO CERAMICO DE PRIMERA, 20cm X 30cm - SSHH, LAVADERO CORRIDO 0.00 m2 0.00 m2 XXXXXXXXXXXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 12.02 CONTRAZOCALO DE CERAMICO DE PRIMERA, H=20cm 0.00 m 0.00 m

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

XXXXXXXXXXXXXXXXXXXXXXXXX
TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3

03 12.03 CONTRAZOCALO CEMENTO S/COLOREAR H=20 CM. 0.00 m 0.00 m XXXXXXXXXXXXXXXXXXXXXXXXX

PRIMERA PLANTA
Nº LARGO ANCHO ALTO LONG. VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 12.04 CONTRAZOCALO CEMENTO PULIDO S/COLOREAR EN EXTERIORES, H=60cm 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

13.00 CARPINTERIA DE MADERA


TOTAL ETAPA 3
01 13.01 PUERTA APANELADA, MADERA CEDRO E=1 1/4" 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 13.02 PUERTA CONTRAPLACADA - MADERA CEDRO E=35 MM 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

14.00 CARPINTERIA METALICA


TOTAL ETAPA 3
01 14.01 VENTANA METALICA 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 14.02 BARANDA METALICA PASAMANO ALUMINIO - ESCALERAS 0.00 m 0.00 m

Nº LARGO ANCHO ALTO LONGITUD VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m) (m3) (m)

TOTAL (m) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 14.03 PORTON METALICO/M2 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

15.00 CERRAJERIA

TOTAL ETAPA 3
01 15.01 BISAGRA CAPUCHINA DE 4" x 4" 0.00 und 0.00 und

PRIMERA PLANTA

Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3


DESCRIPCION TA
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA 338.983051


Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION TA
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 15.02 BISAGRA 2 1/2" x 2 1/2" PARA SS.HH. 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO BISAGRAS/P UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) TA (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 15.03 CERRADURA 3 GOLPES EN PUERTA 0.00 pza 0.00 pza

PRIMERA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION PTA
VECES (m) (m) (m) (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) PTA (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERRADU./ UNIDAD ETAPA 3
DESCRIPCION PTA
VECES (m) (m) (m) (pza) (pza)

TOTAL (pza) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 15.04 CERROJO 3" P/PUERTAS DE BAÑO 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) A (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05 15.05 CERROJO DE FIERRO DE 6" 0.00 und 0.00 und

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) A (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO CERROJO/PT UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) A (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
06 15.06 MANIJA DE BRONCE DE 4" PARA PUERTAS 0.00 und 0.00 und

PRIMERA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION A
VECES (m) (m) (m) (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO MANIJAS/PT UNIDAD ETAPA 3
DESCRIPCION
VECES (m) (m) (m) A (und) (und)

TOTAL (und) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

16.00 VIDRIOS
TOTAL ETAPA 3
01 16.01 VIDRIO SEMIDOBLE 0.00 p2 0.00 p2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL (p2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

17.00 PINTURA
TOTAL ETAPA 3
01 17.01 PINTURA LATEX EN INTERIORES Y CIELORRASOS 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
02 17.02 PINTURA LATEX EN EXTERIORES 0.00 m2 0.00 m2

Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3


DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
03 17.03 PINTURA ESMALTE EN ZOCALO DE CEMENTO 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
04 17.04 PINTURA EN PUERTAS DE MADERA CON BARNIZ 0.00 m2 0.00 m2

PUERTAS APANELADAS
PRIMERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)
TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

PUERTAS CONTRAPLACADAS
PRIMERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL ETAPA 3
05 17.05 PINTURA EN CARPINTERIA METALICA, ESMALTE Y ANTICORROSIVA 0.00 m2 0.00 m2

PRIMERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

SEGUNDA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

TERCERA PLANTA
Nº LARGO ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES (m) (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00


TOTAL 35% DEL AREA 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX

PORTON METALICO
Nº Nº CARAS ANCHO ALTO AREA VOLUMEN ETAPA 3
DESCRIPCION
VECES A PINTAR (m) (m) (m2) (m3) (m2)

TOTAL (m2) 0.00 0.00 XXXXXXXXXXXXXXXXXXXXXXXXX