Deducciones:
Por Adelanto Directo S/. -
Por Adelanto Para Materiales S/. -
Total de las deducciones: S/. -
Deducciones
D.R.N.C. Por Adelanto Directo S/. 354.77
D.R.N.C. Por Adelanto Materiales S/. -
Total de las deducciones: S/. 354.77
Oct. 2010 430.83 0.153 431.91 572.55 0.249 416.97 0.100 517.91 0.118 330.88 0.100 354.01 0.304 1.024
Nov. 2010 430.83 0.153 433.62 569.51 0.249 416.97 0.100 520.51 0.118 331.70 0.100 354.04 0.304 1.024
Dic. 2010 430.83 0.153 435.90 571.11 0.250 416.97 0.100 522.36 0.119 332.35 0.100 354.67 0.305 1.027
Ene. 2011 427.68 0.152 432.77 574.70 0.250 446.74 0.107 533.49 0.121 331.54 0.100 356.05 0.306 1.036
Feb. 2011 427.68 0.152 430.55 582.39 0.249 416.97 0.100 578.78 0.132 331.31 0.100 357.41 0.307 1.040
Mar. 2011 427.68 0.152 428.84 584.31 0.249 415.90 0.100 586.17 0.133 332.16 0.100 359.92 0.309 1.043
Abr. 2011 427.68 0.152 429.97 579.69 0.249 415.90 0.100 591.89 0.135 334.30 0.101 362.38 0.311 1.048
May. 2011 427.68 0.152 430.95 577.90 0.249 415.90 0.100 583.48 0.133 331.87 0.100 362.29 0.311 1.045
VERIFICACION DE VALORIZACIONES DE OBRA: Estructuras
con IGV sin IGV
PRESUPUESTO BASE : ### 1,259,660.50
PRESUPUESTO CONTRATADO: ### 1,259,660.50
FACTOR DE RELACION : 1.00000 1.00000
ADELANTO DIRECTO : 299,799.20 251,932.10
PORCENTAJE : 20.00% 20.00%
ADEL. PARA MATERIALES : 599,598.40 503,864.20
PORCENTAJE : 40.00% 40.00% Todos los montos son sin IGV
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE INCAHUASI OBRA: SUSTITUCIÓN DE INFRAESTRUCTURA Y
EQUIPAMIENTO BÁSICO DEL PUESTO DE
CONTRATISTA : CONSORCIO NVA - ANVAYNEVA SALUD DE MOYAN – INCAHUASI
INSPECTOR : Oscar Acuña Cabanillas R= V(Kr-1) D=V(A/C)(Kr/Ka-1)
CALCULO DE REAJUSTES Y REINTEGROS
VALORIZACION MONTO BRUTO COEFICIENTES REAJUSTE A CUENTA REINTEGRO DEDUCCION
Nº MES VALORIZADO Ka Kr MES MENSUAL EN EL MES DEL MES POR ADEL.
01 OCTUBRE '10 212,958.63 1.023 1.023 SET 4,898.05 0.00 4,898.05 0.00
02 NOVIEMBRE '10 212,368.17 1.023 1.024 OCT 5,096.84 0.00 5,096.84 41.52
03 MARZO '11 123,424.75 1.023 1.040 FEB. 2011 4,936.99 0.00 4,936.99 410.21
04 ABRIL '11 23,322.07 1.023 1.043 MARZO 2011 1,002.85 0.00 1,002.85 91.19
05 MAYO '11 8,428.68 1.023 1.045 MAYO 2011 379.29 0.00 379.29 32.96
01 OCTUBRE '10 72,837.95 1.030 1.030 SET 2,185.14 0.00 2,185.14 0.00
02 NOVIEMBRE '10 30,875.83 1.030 1.030 OCT 926.27 0.00 926.27 0.00
03 MARZO '11 57,556.56 1.030 1.042 FEB. 2011 2,417.38 0.00 2,417.38 134.11
04 ABRIL '11 67,892.14 1.030 1.043 MAR. 2011 2,919.36 0.00 2,919.36 171.38
05 MAYO '11 71,479.39 1.030 1.044 MAYO 2011 3,145.09 0.00 3,145.09 180.43
01 OCTUBRE '10 4,642.89 1.018 1.018 SET 83.57 0.00 83.57 0.00
02 NOVIEMBRE '10 0.00 1.018 1.016 OCT 0.00 0.00 0.00 0.00
03 MARZO '11 13,313.83 1.018 1.027 FEB.2011 359.47 0.00 359.47 23.54
04 ABRIL '11 7,951.69 1.018 1.032 MAR.2011 254.45 0.00 254.45 21.87
FORMULA MATERIAL VALORIZACION MONTO FECHA DE AMORTIZADO MONTO MONTO POR SALDO POR D.R.N.C.
I N D I C E S
POLINOMICA (INDICE UNIFICADO) OTORGADO DE INCIDENCIA EN ESTA OTORGADO AMORTIZAR AMORTIZAR REAJUSTADA
INST. (Fecha o) (Fecha a) Imo Ima Imr (Fecha o) (Fecha o) (Fecha o) (Fecha r)
SANITARIAS
(1) (2) "a" (3) (4) (5) (6) (7) = (1) x (3) (8) = (2x4/5) (9) = (9) - (7) = (7 x (6-5) / 4)
VALORIZ. N°
01 OCT. TUBERIA PVC SEL 72 4,642.89 10,500.00 10/7/2010 0.390 328.49 330.10 330.10 1,810.73 10,448.79 10,500.00 8,689.27 0.00
2010
10,500.00 1,810.73 10,448.79 10,500.00 8,689.27 0.00
VALORIZ. N°
02 NOV. TUBERIA PVC SEL 72 0.00 10,500.00 10/7/2010 0.390 328.49 330.10 329.24 1,810.73 10,448.79 8,689.27 6,878.54 -4.74
2010
10,500.00 1,810.73 10,448.79 8,689.27 6,878.54 -4.74
VALORIZ. N° 03
MARZO 2011 TUBERIA PVC SEL 72 13,313.83 10,500.00 10/7/2010 0.390 328.49 330.10 329.24 6,878.54 10,448.79 6,878.54 0.00 -18.01