5 3 5

WK 4 WK 4 WK 5 WK 5
Cluster Wise FI 24HRS NBH 24HRS NBH
NEW_CLUSTE Cluster Name BCR2 DCR RCR FI2 BCR2 DCR RCR FI2 BCR2 DCR RCR FI2 BCR2 DCR
R_ID
1 Colaba, Nariman Point 0.00 0.75 1.48 2.23 0.00 0.71 1.49 2.20 0.02 0.75 1.48 2.25 0.07 0.74
2 Marine Lines 0.01 0.95 1.55 2.51 0.01 0.87 1.37 2.25 0.00 0.96 1.53 2.49 0.00 0.83
3 Grant Road, Mumbai Central, Tardeo 0.00 0.93 1.71 2.64 0.00 0.82 1.52 2.34 0.01 0.89 1.70 2.60 0.04 0.76
4 Bhyculla, Dockward 0.08 0.73 1.67 2.48 0.10 0.63 1.39 2.12 0.02 0.78 1.66 2.46 0.07 0.60
5 Lower Parel, Worli 0.03 1.09 1.50 2.62 0.06 0.93 1.34 2.33 0.03 1.11 1.54 2.68 0.07 0.95

6 Wadala, Dadar, Sewri, Matunga 0.00 1.12 1.67 2.79 0.00 0.99 1.49 2.48 0.02 1.18 1.68 2.88 0.06 0.96

7 Bandra, Khar 0.05 1.01 2.13 3.19 0.10 0.91 1.98 2.99 0.10 1.01 2.08 3.19 0.25 0.97

8 Dharavi, Sion 0.04 1.24 2.08 3.36 0.14 1.13 1.90 3.17 0.02 1.08 2.01 3.11 0.07 0.99

9 Santacruz 0.01 1.02 1.79 2.82 0.05 0.92 1.70 2.67 0.00 1.01 1.69 2.70 0.04 0.98
10 Kurla, Chunnabhat 0.02 1.04 1.61 2.67 0.09 1.09 1.51 2.69 0.07 1.05 1.56 2.68 0.05 0.99

11 Juhu, Vile Parle, Andheri East 0.11 1.01 1.82 2.94 0.00 0.87 1.74 2.61 0.01 0.94 1.82 2.77 0.02 0.70

12 Jogeshwari, Andheri MIDC, Saki Naka 0.02 0.71 1.85 2.58 0.04 0.68 1.89 2.61 0.01 0.68 1.83 2.52 0.05 0.64
13 Goregaon East & West 0.02 0.88 1.63 2.53 0.02 0.77 1.43 2.22 0.03 1.09 1.57 2.69 0.02 0.82

14 Malad East & West 0.04 0.78 1.81 2.63 0.14 0.73 1.73 2.60 0.02 0.99 1.79 2.80 0.03 0.95

15 Kandivli East & West 0.00 0.72 1.81 2.53 0.01 0.65 1.86 2.52 0.06 0.78 1.80 2.64 0.22 0.71

16 Mira Road, Bhayander 0.00 0.52 1.41 1.93 0.02 0.50 1.28 1.80 0.05 0.53 1.38 1.96 0.10 0.51
17 Chembur, Mankhur, Trombay 0.11 0.78 1.63 2.52 0.43 0.76 1.55 2.74 0.17 0.81 1.61 2.59 0.14 0.69
18 Powai, Chandivali 0.01 0.82 1.66 2.49 0.04 0.78 1.71 2.53 0.02 0.90 1.60 2.52 0.20 0.85
19 Bhandup, Mulund 0.03 0.77 1.49 2.29 0.00 0.77 1.39 2.16 0.01 0.86 1.48 2.35 0.07 0.81
20 Thane / Ghodbandar 0.07 0.79 1.65 2.51 0.01 0.66 1.46 2.13 0.01 0.82 1.60 2.43 0.00 0.66
21 Thane, Kalwa 0.05 1.03 1.49 2.57 0.01 1.05 1.45 2.51 0.01 1.08 1.44 2.53 0.02 1.10
22 Mumbar, Diva, Dombivli 0.02 0.97 1.53 2.52 0.08 0.91 1.36 2.35 0.01 0.97 1.53 2.51 0.08 1.00
23 Gansoli, Airoli, Koparkhairane 0.18 0.76 1.45 2.39 0.10 0.70 1.32 2.12 0.00 0.74 1.39 2.13 0.00 0.72
24 Vashi, Turbe, Sanpada, Nerul 0.00 0.78 1.57 2.35 0.00 0.76 1.45 2.21 0.01 0.88 1.56 2.45 0.01 0.92
25 Belapur, Uran, Panvel 0.03 0.68 1.64 2.35 0.06 0.68 1.68 2.42 0.04 0.69 1.59 2.32 0.16 0.67
26 Thakurli, Kalyan, Titwala 0.01 0.83 1.46 2.30 0.03 0.87 1.39 2.29 0.01 0.86 1.44 2.31 0.06 0.84
27 Turbe, Kalamboli 0.00 0.56 1.67 2.23 0.01 0.52 1.72 2.25 0.06 0.63 1.51 2.20 0.18 0.59
28 Dahisar, Borivali 0.06 0.64 1.77 2.47 0.07 0.64 1.87 2.58 0.02 0.74 1.70 2.46 0.02 0.72
29 Ghatkopar, Vikroli, Vidhyavihar 0.00 0.94 1.51 2.45 0.01 0.91 1.53 2.45 0.00 0.99 1.49 2.48 0.00 0.94
NW 0.04 ### ### ### 0.07 ### ### ### 0.03 ### ### ### 0.07 ###
3
WK 5
NBH 24HR
RCR FI2 DIP Remark

1.43 2.24
1.29 2.12
1.41 2.21
1.31 1.98
1.36 2.38

DCR is impacted due to RF mod.Faulty at milan on 29 & 30th


JAN(NOM~832), ATC Power issue at harish impacting NBR
1.46 2.48 sites (NOM~351) on 30th JAN & coverage hole between
kashev Bhavan & Nilesh APT new site Planned Bombay GYM
KHANA

BCR is impacted due to sudden increase in traffic at Garib


Nawas(NOM~1140) Optimization done & Hardware issue at
Kala nagar(NOM~620)
1.97 3.19 DCR is impacted due to E1 Port Faulty at Site INGVYSYA on
30 & 31 JAN(NOM~324),IP20 Link Malfunctioning between
Edelwies to Sri Chaitnya(NOM~783) on 29th JAN,LOS Block at
site anjuman impacting 5 sites (NOM~721)

DCR is impacted due to Asgarkhan toggling due to Power


issue on 29th JAN(NOM~ 1532), BTS HW issue at Uday
1.81 2.87 CHS(NOM~1289) on 29th Jan & Coverage hole Near
Swaminit, balaji building, wadala monorail station new site
planned 2288, 3620 & 4050.

1.65 2.67
1.43 2.47
DCR is impacted due to BTS Configuration problem on
1.57 2.29 Jevanjyot (NOM~348) on 29th Jan.Cascading optimization at
Vidya Villa on (NOM~208) 29th Jan
1.74 2.43
1.15 1.99

DCR is impacted due to BTS faulty Alarms at field view,hotel


YATR & madhuvan (NOM~2087) on 31st Jan, BTS Hang at
1.64 2.62 Monalisa apt(NOM~348)on 31st Jan. & outage due to CEN
media issue from Sneah dhara Docket no 6770946 impacting
ajay & sejplaza(NOM~953) on 29th Jan.

1.80 2.73

1.22 1.83
1.46 2.29
1.58 2.63
1.35 2.23
1.34 2.00
1.36 2.48
1.36 2.44
1.24 1.96
1.39 2.32
1.57 2.40
1.35 2.25
1.55 2.32
1.80 2.54
1.44 2.38
### ###
NBH
DIP Remark

BCR is impacted due to sudden increase in traffic at Garib


Nawas(NOM~320) Optimization done
DCR is impacted due to E1 Port Faulty at Site INGVYSYA on 30
& 31 JAN(NOM~132),IP20 Link Malfunctioning between
Edelwies to Sri Chaitnya(NOM~483) on 29th JAN,Hardware
issue at kalanagar(NOM~327) on 30 & 31st JAN & LOS Block
at site anjuman impacting 5 sites (NOM~218)

BCR is impacted due to increase in traffic at 3177 KUMELAHM


NBR site optimization done
DCR is impacted due to Asgarkhan toggling due to Power
issue on 29th JAN(NOM~ 218), BTS HW issue at Uday
CHS(NOM~198) on 29th Jan,& Power issue at kamraj &
Aslamkhan(NOM~98) on 30th & 31st Jan. & Coverage hole
Near Swaminit, balaji building, wadala monorail station new
site planned 2288, 3620 & 4050.

BCR is impacted due to Low TCH availability at shankl


(NOM~363)
DCR is impacted due to outage due to CEN media issue
Docket no 6758685 at Esselwdu(NOM~23) on 29th Jan. RF
module port faulty at evergreen(NOM~51) on 31st Jan