A-C 67 85.2185515
C-D 105 133.551461 5 0.301
C-E 109 138.639136 7 0.421
A-F 98 124.64803 0 0.000
F-G 86 109.385006 4 0.241
F-H 100 127.191868 6 0.361
1.564
Total-> 787 1001 26 1.564
�=√((4×�)/(𝜋×𝑉))
1.5640625
ab 125 0.21555437
bc 97 0.16727019
cd 67 0.11553714
ce 105 0.18106567
bcr 109 0.18796341
crf 98 0.16899463
fg 86 0.14830141
f 100 0.1724435
hi 120 0.20693219
907 1.5640625
Cota Piezometrica Cota del terreno Presión (m)
(m.s.n.m)
Inicial Final Inicial Final Inicial Final
Gasto×Tramo
Tramo Qd (l/s) Long (m)
(l/s)
3-4' 50 50 1000
3-5' 180 180 1100
5-CRP' 220 220 700
CRP-6' 220 220 1000
�=√((4×�)/(𝜋×𝑉))
l/s/hab
Cota Piezometrica
Pérdida de Carga Cota del terreno
(m.s.n.m)
Dia(plg) Vel(m/s) Longitud Tramo (m) Inicial Final Inicial
(1/1000)
30 1.644583333 2.50216533 3.002598396 1850 1846.997402 1850
18 1.827314815 5.514829339 4.411863471 1846.997402 1842.585538 1800
22 1/2 1.754222222 3.942622884 0.098565572 1846.997402 1846.898836 1800
22 1/2 1.754222222 3.942622884 1.478483581 1795 1793.521516 1795
1800 0 46.9974016
1810 46.9974016 32.58553813
1795 46.9974016 51.89883603
1750 0 43.52151642
Pérdida de Carga Cota Piezometrica (m.s.n.m) Cota del terreno Presión (m)
Longitud (1/1 Tramo (m) Inicial Final Inicial Final Inicial
142.797957 22.84767311 1775 1752.152327 1775 1715 0
13.27754122 0.796652473 1752.152327 1751.355674 1715 1710 37.15232689
14.05749457 1.040254598 1751.355674 1750.31542 1715 1720 36.35567441
0.145935491 0.011091097 1750.31542 1750.304329 1720 1745 30.31541982
5.182460326 0.362772223 1750.304329 1749.941556 1720 1700 30.30432872
4.743927166 1.043663977 1749.941556 1748.897893 1715 1625 34.9415565
4.48334325 0.277967281 1748.897893 1748.619925 1625 1645 123.8978925
9.468011679 0.681696841 1748.619925 1747.938228 1625 1610 123.6199252
Presión (m)
Final
37.15232689
41.35567441
30.31541982
5.304328719
49.9415565
123.8978925
103.6199252
137.9382284
Pf: 11000 hab
Dotacion: 220 l/hab/dia
Material PVC:
C: 140
Lreal: 800 m
Hd: 27 m
Ps: 2m
Tiempo de Fu 24 hrs
J: 0.03375 m/m
�=0.2785∗�∗�^2.65∗�^0.54
D: 0.10262939 m
D: 10.2629395 cm
D: 4.04052735 plg
D1: 6 plg
D2: 6 plg
H: 27 m
V1^2/2*g 0.03446386 m
V1^2/2*g 0.03446386 m
L1: -70853.833 m
L2: 71653.8334 m
800
Verificacion de Perdidas:
hf: 0.02153991 m
hf: 0.08615964 m
P×entrada de borde: K: 1
hf: 0.03446386 m
K: 0.3
hf: 0.01033916 m
P×salida de la tuberia: K: 1
hf: 0.03446386 m
Ht: 0.18696643 m
Qimpul: 15 l/s 0.015 m3/s
Ec.Continuidad:
D: 0.13819766 m
D: 13.819766 cm
D: 5.44085275 plg
Adoptamos el D comercial
D: 12 plg
D: 12 plg
L: 800 m
Q: 15 l/s
Potencia de la Bomba:
Pbomba: 7.40894205 HP
Diametro de la Tuberia:
D: 12 plg 304.8 mm
Espesor de la 11.4 mm
K: 10^10/E
K: 33.3333333
C: 322.983484 m/s
Lreal: 800 m
Tiempo de Cierre
T: 4.95381368 seg
ha: 49.3858538 m ok
Ha:
Pérdida de Pérdida de
Tramo Longitud TotaCaudal Qmd Cota Terreno Carga
Presion Carga Unitaria
Residual Deseada Hf Deseada hf
Inicial Final Deseada
A-B 420 1.18 3506 3447 10 49 0.11666667
Diámetros Diámetros
Longitud Caudal Qmd Cota Terreno Considerado Considerado
Total
Tramo Desnivel del s D plg s D plg
Terreno (m)
Inicial Final
Pérdida de
Velocidad Carga Cota Piezometrica
(m/s) Diponible Pérdida de Pérdida de
hf1 (m/m) Carga Presión
Unitaria Carga Tramo Final
Hf1,Hf2 (m)
Deseada hf Inicial Final