Está en la página 1de 24
PED, = lu LO r : t BELANIGA “sen. OPERATING AND “MAINTENANCE PISL&SIL -| bil & GORDON LTD 20028 - Telex 65125 sisi sii millaleac sae 1 UNPACKING 2 ~ ASSELBLY 3 ASSEMBLY TUTOR PUMP SETS 4 ASSEHBLY TUTOR PELTON 5 : ASSEMBLY TUDOR FRANCIS SETS 6 FORCE GAUGES 7 INITIAL TESTING AND OPERATION 8 ROUDINE LABCRATORY TESTS ‘ 9 UAINTEN: @ INSTRUCTIONS cr INDEX 10 ILLUSTRATIONS | PLATE NC SUBIRCT B58 SINGLE SPEED PUKP ARRANGEMENT E167 " VARIABLE SPEED PUMP ARRANG 163 VARIABLE SPEED WIRING DLAGRAN E103 “FORCE GAUGES BT2 ° PELLON TURBINE ASSEMBLY BTS FRANCIS TURBINE ASSEMBLY E88 PRONY BRAKE ASSEMBLY E87 * PIPEWORK ARRANGELENT E84 TANK ARRANGEMENT B85 nes TROLLEY ARRANGEMENT INDE 70 FERFORMANCE CURVES PLATE NO. 35-0 PURP PERFORMANCE at 1450 r.p.m. 1 36-02 PUMP PERFORMANCE at 2900 r.p.m. | leer - PELTON NOZZLE CHARACTERISTIC 38-0r PELTON ISO-EFFICIENCY CURVES 37-0 PRANCIS ISQ-ZFFICIZNCY CURVES i INDEX TO DRAW . 2 # 4287-601 TUTOR PUMP UIT DESIGN DATA 4 4287-201 TUTOR PELTON UNIT DESIGN DATA $2877--401, TUTOR FRANCIS UNIT DESIGN DavA INSTRUCTIONS FOR MAL’ UNPACKING lel The unit will arrive in one packing case containing all the necessary parts. As you unpack the case be careful not to lose any suall items.” Small items are normally wrapped in black paper or felt or both. 1.2 The parts should be checked off against the actailed parts list that will be found in the packing case. 1.3 Carefully clcay_all componente to remove packing naterial,etc. ‘Remember that careful cleaning at this stage will avoid the need for subsequent dis- tantLing operations. ASSEMBLY 2.1 Your 'Tutor' test set will arrive almost completely BUTOR PUKE 3.1 364 assembled. If you have ordered an interchangeable turbine unit this will be supplied but not assembled on to the tank. The various small loose items should be mounted as described. below. S These units are supplied with either a two-speed motor or an infinitely variable speed motor according to your order. In both cases the uotor freme should be checked for freedoa of rotation and any retaining straps or stops removed. The pressure gauge should be installed in the boss on the pump discharge pipe. See Plate B67. Fill the Force Gauge as described in section 6 of this manual. Hount the force gauge on the mounting block provided under the motor torque arm. ct to your laboratory supply, fhe-#e— nodela-all—roquire-a—3vhaseo—eleetie_cupsly, The infinitely variable speed models may run from a single phase supply or from two lines of a three phase supply.

También podría gustarte

  • Factura PDF
    Factura PDF
    Documento2 páginas
    Factura PDF
    José Luis García
    Aún no hay calificaciones
  • Diferencia Les
    Diferencia Les
    Documento5 páginas
    Diferencia Les
    José Luis García
    Aún no hay calificaciones
  • Deber 2 Fluidos
    Deber 2 Fluidos
    Documento12 páginas
    Deber 2 Fluidos
    José Luis García
    Aún no hay calificaciones
  • Ecuapar
    Ecuapar
    Documento2 páginas
    Ecuapar
    José Luis García
    Aún no hay calificaciones
  • Deber Termoquímica
    Deber Termoquímica
    Documento4 páginas
    Deber Termoquímica
    José Luis García
    Aún no hay calificaciones