1 UNPACKING
2 ~ ASSELBLY
3 ASSEMBLY TUTOR PUMP SETS
4 ASSEHBLY TUTOR PELTON
5 : ASSEMBLY TUDOR FRANCIS SETS
6 FORCE GAUGES
7 INITIAL TESTING AND OPERATION
8 ROUDINE LABCRATORY TESTS ‘
9 UAINTEN:
@ INSTRUCTIONS
cr
INDEX 10 ILLUSTRATIONS
| PLATE NC SUBIRCT
B58 SINGLE SPEED PUKP ARRANGEMENT
E167 " VARIABLE SPEED PUMP ARRANG
163 VARIABLE SPEED WIRING DLAGRAN
E103 “FORCE GAUGES
BT2 ° PELLON TURBINE ASSEMBLY
BTS FRANCIS TURBINE ASSEMBLY
E88 PRONY BRAKE ASSEMBLY
E87 * PIPEWORK ARRANGELENT
E84 TANK ARRANGEMENT
B85 nes TROLLEY ARRANGEMENT
INDE 70 FERFORMANCE CURVES
PLATE NO.
35-0 PURP PERFORMANCE at 1450 r.p.m.
1 36-02 PUMP PERFORMANCE at 2900 r.p.m.
| leer - PELTON NOZZLE CHARACTERISTIC
38-0r PELTON ISO-EFFICIENCY CURVES
37-0 PRANCIS ISQ-ZFFICIZNCY CURVES
i INDEX TO DRAW .
2 #
4287-601 TUTOR PUMP UIT DESIGN DATA 4
4287-201 TUTOR PELTON UNIT DESIGN DATA
$2877--401, TUTOR FRANCIS UNIT DESIGN DavAINSTRUCTIONS FOR MAL’
UNPACKING
lel
The unit will arrive in one packing case containing
all the necessary parts. As you unpack the case
be careful not to lose any suall items.” Small items
are normally wrapped in black paper or felt or both.
1.2 The parts should be checked off against the actailed
parts list that will be found in the packing case.
1.3 Carefully clcay_all componente to remove packing
naterial,etc. ‘Remember that careful cleaning at
this stage will avoid the need for subsequent dis-
tantLing operations.
ASSEMBLY
2.1 Your 'Tutor' test set will arrive almost completely
BUTOR PUKE
3.1
364
assembled. If you have ordered an interchangeable
turbine unit this will be supplied but not assembled
on to the tank. The various small loose items
should be mounted as described. below.
S
These units are supplied with either a two-speed
motor or an infinitely variable speed motor according
to your order. In both cases the uotor freme should
be checked for freedoa of rotation and any retaining
straps or stops removed.
The pressure gauge should be installed in the boss
on the pump discharge pipe. See Plate B67.
Fill the Force Gauge as described in section 6 of
this manual. Hount the force gauge on the mounting
block provided under the motor torque arm.
ct to your laboratory supply, fhe-#e—
nodela-all—roquire-a—3vhaseo—eleetie_cupsly,
The infinitely variable speed models may run from a
single phase supply or from two lines of a three
phase supply.