CEMENTO ARENA ARENA FINA HORMIGON PIEDRA DE 1/2" PIEDRA GRANDE PIEDRA MEDIANA AGUA LADRILLO LADRILLO ACERO
CANTIDADES
MATERIALES METRADO UNIDADES Ø 5/8 " Ø 1/2 " Ø 3/8 "
UNITARIAS bol m3 m3 m3 m3 m3 m3 MURO UND TECHO UND
varillas varillas varillas
1 .- CONCRETO SIMPLE
CIMIENTO CORRIDO 1:10 + 30% P.G. 52.30
CEMENTO 2.70 BOL 141.21 141.21
HORMIGON 0.91 M3 47.59 47.59
M3 PIEDRA GRANDE 0.49 M3 25.63 25.63
AGUA 0.16 M3 8.37 8.37
2 .- CONCRETO ARMADO
ZAPATAS F'c= 210 Kg/cm2 30.64
CEMENTO 9.2 BOL 281.89 281.9
ARENA 0.52 M3 15.93 15.93
M3
PIEDRA DE 1/2" 0.53 M3 16.24 16.24
AGUA 0.18 M3 5.52 5.52
3 .- ALBAÑILERIA
MUROS DE SOGA 191.40
LADRILLO 41 UND 7847.40 7847.40
CEMENTO 0.22 BOL 42.11 42.11
M2
ARENA 0.034 M3 6.51 6.51
AGUA 0.185 M3 35.41 35.41
4 .- ACABADOS
TARRAJEO EN MUROS, COLUMNAS Y VIGAS (1:5) 46.12
CEMENTO 0.120 BOL 5.53 5.53
M2
ARENA FINA 0.019 M3 0.88 0.88
5.- ACEROS
EN ZAPATAS
Ø 1/2 " varillas 85 VARILL 85.00 85.00
EN COLUMNAS
Ø 5/8 " varillas 76 VARILL 76.00 76.00
Ø 1/2 " varillas 40 VARILL 40.00 40.00
Ø 3/8 " varillas 100 VARILL 100.00 100.00
Ø 1/4 " varillas 20 VARILL 20.00
EN VIGAS
Ø 5/8 " varillas 55 VARILL 55.00 55.00
Ø 1/2 " varillas 35 VARILL 35.00 35.00
Ø 3/8 " varillas 82 VARILL 82.00 82.00
Ø 1/4 " varillas 14 VARILL 14.00
VIGUETAS
Ø 1/2 " varillas 65 VARILL 65.00 65.00
Ø 3/8 " varillas 0 VARILL 0.00 0.00
ACERO DE TEMPERATURA Ø 1/4 " varillas 67 VARILL 67.00
TOTAL 893.3 37.1 3.0 89.7 34.4 25.6 1.4 55.2 7847.4 933.3 131.0 225.0 182.0
P UNITARIO (S/.) 25.00 36.00 36.00 30.00 30.00 36.00 36.00 10.00 0.85 2.70 39.00 25.00 15.00
COSTO 22333.74 1336.78 108.18 2692.25 1032.88 922.57 50.77 551.92 6670.29 2519.89 5109.00 5625.00 2730.00
20.00
14.00
67.00
101.0
9.00
909.00 52592.27
52592.27
VILLA DEL CARMEN SECTOR 1 MURO DE CONTENCION CANTIDADES DE MATERIALES
CEMENTO ARENA ARENA FINA HORMIGON PIEDRA DE 1/2" PIEDRA GRANDE PIEDRA MEDIANA AGUA LADRILLO LADRILLO ACERO
CANTIDADES
MATERIALES METRADO UNIDADES Ø 5/8 " Ø 1/2 " Ø 3/8 "
UNITARIAS bol m3 m3 m3 m3 m3 m3 MURO UND TECHO UND
varillas varillas varillas
1 .- CONCRETO SIMPLE
CIMIENTO CORRIDO 1:10 + 30% P.G. 0.00
CEMENTO 2.70 BOL 0.00 0.00
HORMIGON 0.91 M3 0.00 0.00
M3 PIEDRA GRANDE 0.49 M3 0.00 0.00
AGUA 0.16 M3 0.00 0.00
2 .- CONCRETO ARMADO
ZAPATAS F'c= 210 Kg/cm2 28.62
CEMENTO 9.2 BOL 263.30 263.3
ARENA 0.52 M3 14.88 14.88
M3
PIEDRA DE 1/2" 0.53 M3 15.17 15.17
AGUA 0.18 M3 5.15 5.15
3 .- ALBAÑILERIA
MUROS DE CABEZA
LADRILLO 63 UND 0.00 0.00
CEMENTO 0.43 BOL 0.00 0.00
M2
ARENA 0.068 M3 0.00 0.00
AGUA 0.185 M3 0.00 0.00
MUROS DE SOGA
LADRILLO 41 UND 0.00 0.00
CEMENTO 0.22 BOL 0.00 0.00
M2
ARENA 0.034 M3 0.00 0.00
AGUA 0.185 M3 0.00 0.00
LADRILLO DE TECHO
M2 LADRILLO 8.33 UND 0.00 0.00
4 .- ACABADOS
TARRAJEO EN MUROS, COLUMNAS Y VIGAS (1:5)
CEMENTO 0.120 BOL 0.00 0.00
M2
ARENA FINA 0.019 M3 0.00 0.00
5.- ACEROS
EN ZAPATAS
Ø 1/2 " varillas VARILL 0.00 0.00
EN COLUMNAS
Ø 5/8 " varillas VARILL 0.00 0.00
Ø 1/2 " varillas VARILL 0.00 0.00
Ø 3/8 " varillas VARILL 0.00 0.00
Ø 1/4 " varillas VARILL 0.00
EN VIGAS
Ø 1/2 " varillas VARILL 0.00 0.00
Ø 1/4 " varillas VARILL 0.00
VIGUETAS
Ø 1/2 " varillas VARILL 0.00 0.00
Ø 3/8 " varillas VARILL 0.00 0.00
ACERO DE TEMPERATURA Ø 1/4 " varillas VARILL 0.00
TOTAL 515.0 28.4 0.0 4.6 28.9 0.0 9.8 0.0 0.0 0.0 0.0 0.0
P UNITARIO (S/.) 17.50 36.00 36.00 30.00 30.00 36.00 10.00 0.85 2.70 39.00 25.00 15.00
COSTO 9013.13 1020.99 0.00 138.57 867.19 0.00 98.17 0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.0
9.00
0.00 11138.05
11138.05