CRONOGRAMA DE ADQUISICION DE MATERIALES

PROYECTO: CONSTRUCCION DEL EDIFICIO SANTA SILVINA

PRESUPUESTO
DESCRIPCION UND. CANT.
OPERADOR DE EQUIPO LIVIANO hh 80.2256
OPERADOR DE EQUIPO PESADO hh 83.9400
TOPOGRAFO hh 3.0400
CAPATAZ hh 609.7680
OPERARIO hh 5,650.8804
OFICIAL hh 5,437.0780
PEON hh 7,507.5822
ALAMBRE NEGRO RECOCIDO # 16 kg 2,532.0915
ALAMBRE NEGRO RECOCIDO # 8 kg 1,191.6068
CLAVOS C/C PARA MADERA PROMEDIO kg 1,008.5135
PERNO ANCLAJE PARA ENCOFRADO 1/2" X 0.50 m TUERCA + HUACHA u 240.0000
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 53,706.4023
PIEDRA CHANCADA DE 1/2" m3 421.8947
PIEDRA MEDIANA m3 55.9076
ARENA GRUESA m3 277.6226
LADRILLO PARA TECHO 15 X 30 X 30 cm 8 HUECOS REX u 9,738.7920
CEMENTO PORTLAND TIPO I (42.5 kg) bls 6,001.3072
CAL (BOLSA X 20KG) bls 9.5000
GIGANTOGRAFIA und 1.0000
GASOLINA gal 28.5000
HORMIGON m3 141.4955
AGUA m3 151.5550
CORDEL rll 36.1000
MADERA TORNILLO p2 1,373.8000
REGLA DE MADERA p2 131.3700
MADERA EUCALIPTO ROLLIZO (p2) p2 1,125.8300
TRIPLAY DE 4' X 8' X 12 mm pln 41.6640
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 24,026.7857
PETROLEO gal 345.8550
PINTURA ESMALTE gal 1.5000
HERRAMIENTAS MANUALES %MO
CAMION VOLQUETE 4 X 2 210-280 HP 8 m3 hm 41.8037
CIZALLA PARA ACERO CONSTRUCCION HASTA 1" hm 614.8600
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP d 4.7500
CARGADOR S/ LLANTAS 80-95 HP 1.5-1.75 yd3 hm 42.0152
SEMI-TRAYLER 6X4, 330 HP 40 TN. d 1.3373
VIBRADOR DE CONCRETO 4 HP 1.50" hm 183.4896
34.94 664.23 804.78 140.58
8 57.34 301.44 54.85
502.77 2,444.60 5,176.70 692.27
0.78
15.67 109.7
100.63
73.88
0.35 2.47
23.8 166.58
2.72 12.84
1
1
74.88
1,533.13
419.22 485.06
15,331.28
21.5 205.92
214.99 331.01
37.46 262.22
87.75 421.2
0.04 0.19
18.51 129.57
0.29 46.8
1 1,215.63 2,776.41
118.72
80 11,437.92
288.4 4.3 6.62
1
0.32 0.31 0.32 0.06
12
12
12
12
47.2
47.2
47.2
47.2

98.47 8.68
29.85 18.72
80.86 66.55
54.1
113.77 8.68
7.84 54.85
7.84 54.85
1
3.53 16.54 19.64 10.51 9.84 20.16
3.93 50.35 8.84 8.55 8.84 3.42
3.03
2.29 85.23 87.77 60.05 61.54 64.48 63.71 61.55
16.18 588 698.4 648.68 426.2 673.37 632.7 653.79
11.92 573.41 612.6 522.81 417 711.83 649.81 644.95
40.31 814.12 873.07 1,220.87 559.22 770.85 805.82 736.45
0.31 204.66 250.65 203.06 183.75 347.56 303.54 313.66
1.46 40.3 51.06 56.07 57.01 125.91 187.64 193.9
4.14 87.21 80.2 85.21 77.29 116.16 121.76 125.81
94.96 145.04
6.46 4,357.44 5,339.26 4,318.23 3,909.18 7,389.32 6,419.95 6,633.95
23.42 48.85 29.31 25.67 70.85 52.42 54.17
0.09 0.05 55.77
16.95 33.64 20.73 18.39 47.03 32.99 34.09
2,638.25 2,942.29 2,942.29 1,215.96
40.65 402.45 644.11 905.3 342.42 912.35 644.79 666.28
9.5
0.62 0.38
18.88 9.62
9.02 19.61 112.86
1.2 8.98 12.66 31.77 6.93 29.03 18.2 13.5
36.1
1.19 39.66 511.85 762.27 34.67 24.16
40.92 90.45
96.3 257.94 210.54 210.54 196.95 153.56
16.48 25.18
82.93 2,514.47 1,727 1,727 1,768.52 2,858.56 2,908.99 3,005.96
139.45 206.41
0.93 0.57

41.8
0.16 28.6 31.51 34.84 29.41 61.94 97.14 100.38
3.15 1.6
8.49 12.57 20.93
0.07 0.1
4.92 14.46 6.21 4.99 27.59 29.6 30.59
3.53 20.83 24.24 69.7 14.14 42.56 45.56 47.07
3.03
0.62 9.38
59.56 61.19 26.31
632.7 646.66 272.91
624.15 637.82 269.48
712.69 700.81 273.36
303.54 313.66 107.7
187.64 193.9 96.72
121.76 125.81 63.16

6,419.95 6,633.95 2,278.72


52.42 49.9 14.9

32.99 31.42 9.4

644.79 614.22 183.97

13.07 12.46 3.75

2,908.99 3,005.96 1,518.38

97.14 100.38 33.36


29.6 27.74 7.79
45.56 43.51 13.16
MES 05
DESCRIPCION UND.
CANT.
OPERADOR DE EQUIPO LIVIANO hh 9.84
OPERADOR DE EQUIPO PESADO hh 8.55
TOPOGRAFO hh
CAPATAZ hh 61.54
OPERARIO hh 426.2
OFICIAL hh 417
PEON hh 559.22
ALAMBRE NEGRO RECOCIDO # 16 kg 183.75
ALAMBRE NEGRO RECOCIDO # 8 kg 57.01
CLAVOS C/C PARA MADERA PROMEDIO kg 77.29
PERNO ANCLAJE PARA ENCOFRADO 1/2" X 0.50 m TUERCA + HUACHA u
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 3,909.18
PIEDRA CHANCADA DE 1/2" m3 25.67
PIEDRA MEDIANA m3
ARENA GRUESA m3 18.39
LADRILLO PARA TECHO 15 X 30 X 30 cm 8 HUECOS REX u 1,215.96
CEMENTO PORTLAND TIPO I (42.5 kg) bls 342.42
CAL (BOLSA X 20KG) bls
GIGANTOGRAFIA und
GASOLINA gal
HORMIGON m3
AGUA m3 6.93
CORDEL rll
MADERA TORNILLO p2 34.67
REGLA DE MADERA p2
MADERA EUCALIPTO ROLLIZO (p2) p2 196.95
TRIPLAY DE 4' X 8' X 12 mm pln
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 1,768.52
PETROLEO gal
PINTURA ESMALTE gal
HERRAMIENTAS MANUALES %MO
CAMION VOLQUETE 4 X 2 210-280 HP 8 m3 hm
CIZALLA PARA ACERO CONSTRUCCION HASTA 1" hm 29.41
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP d
CARGADOR S/ LLANTAS 80-95 HP 1.5-1.75 yd3 hm
SEMI-TRAYLER 6X4, 330 HP 40 TN. d
VIBRADOR DE CONCRETO 4 HP 1.50" hm 4.99
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 14.14
NIVEL TOPOGRAFICO hm
CAMPAMENTO PROVISIONAL DE OBRA mes
MES 06 MES 07
CANT. CANT.
20.16
8.84 3.42

64.48 63.71
673.37 632.7
711.83 649.81
770.85 805.82
347.56 303.54
125.91 187.64
116.16 121.76

7,389.32 6,419.95
70.85 52.42

47.03 32.99

912.35 644.79

29.03 18.2

24.16

153.56

2,858.56 2,908.99

61.94 97.14

27.59 29.6
42.56 45.56