PRESIDENCIA DE ZEMPOALA FECHA ESTIMACION N°
0 01/06/16
OBRA: LA TRINIDAD ESTIMACION DE OBRA 2
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DATOS DEL CONTRATISTA DATOS DEL CONTRATO INFORMACION GENERAL 0 0 0 0
NOMBRE: INSTALACIONES RAUNA SA DE CV. FECHA DE INICIO 0 0 S/ IVA C/IVA ANTICIPO OTORGADO
REG.FED DE CAUSANTES: IRA1108112J9 MES DIA AÑO PRORROGA FECHA TERMINACION IMPORTE TOTAL CONTRATO $ 105,500,009.20 $ 122,380,010.67 AMORTIZACION HASTA
N° REGISTRO I.M.S.S. B70-039571106 5 30 2016 ESTIMADO A LA FECHA $ 42,200,003.68 $ 48,952,004.27 ESTIMACION ANTERIOR $ -
FECHA DE TERMINACION DEDUCTIVAS A LA FECHA $ - $ - AMORTIZACION EN ESTA $ -
UBICACIÓN MES DIA AÑO PERIODO ESTIMACION IMPORTE CONTRACTUAL MODIFICAD $ - ESTIMACION $ -
PROGRAMA : 133 B 6 7 2016 DEL AL IMPORTE POR ESTIMAR $ 63,300,005.52 $ 73,428,006.40 TOTAL AMORTIZADO $ -
TRABAJO : RELLENO SANITARIO NUMERO DE CONTRATO 22/05/15 26/06/15 0 0 0 0 POR AMORTIZAR $ -
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 PRESUPUESTO HASTA ESTIMACION ANTERIOR ESTA ESTIMACION ESTIMADO A LA FECHA POR EJECUTAR

VOLUMEN No.
CLAVE CONCEPTO UNIDAD PRECIO UNITARIO VOLUMEN IMPORTE VOLUMEN IMPORTE VOLUMEN IMPORTE VOLUMEN IMPORTE
VIV.

PRIVADAS TIERZO Y ARIENZA.

EXCAVACION DE MATERIAL 55.00 VIVIENDA $ 16,640.38 55.00 $ 21,100,001.84 55.00 $ 21,100,001.84 0.00 $ -
CARGA DE MATERIAL 55.00 VIVIENDA $ 16,640.38 $ - 55.00 $ 21,100,002.84 55.00 $ 21,100,001.84 0.00 $ -
ACARREO DE MATERIAL 55.00 VIVIENDA $ 16,640.38 $ - $ - $ - 55.00 $ 21,100,001.84
COLOCACION DE GEOMEMBRANA 55.00 VIVIENDA $ 16,640.38 $ - $ - $ - 55.00 $ 21,100,001.84
COLOCACION DE GEOTEXTIL 55.00 VIVIENDA $ 16,640.38 $ - $ - $ - 55.00 $ 21,100,001.84

0.00 0.00
SUBTOTAL $ 21,100,001.84 $ 21,100,002.84 $ 42,200,003.68 $ 63,300,005.52

SUB TOTAL HOJA 01 $ 83,201.90 $ 21,100,002.84 $ -

TOTAL HOJA 01 $ 83,201.90 $ 21,100,002.84

GRAN TOTAL $ 21,100,002.84

OBSERVACIONES: SUBTOTAL $ 21,100,002.84


MENOS AMORTIZACION ANTICIPO $ - FONDO DE GARANTIA RETENIDO:
SUBTOTAL $ 21,100,002.84 F.G. RETENIDO ESTA ESTIMACION: $ 1,055,000.14
I.V.A 16% $ 3,376,000.45 TOTAL RETENIDO A LA FECHA: $ 1,055,000.14
TOTAL $ 24,476,003.29
MENOS FONDO DE GARANTIA ( 5% ) $ 1,055,000.14
NETO A PAGAR $ 23,421,003.15
FORMULO APROBO ELABORÓ AUTORIZO AUTORIZO

SUPERINTENDENTE DE OBRA
ARQ. KAREN JUAREZ GONZALEZ
CONTRATISTA ING. MIGUEL LOPEZ HERRERA CONTROL DE OBRA COORDINADOR DE OBRAS COORDINADOR DE COSTOS
CESAR ISRAEL CIPLINA LEON ARQ. MIGUEL ANGEL MORALES ZUÑIGA. ING. ISAAC GOMEZ CASTELAN ING. ALFREDO RODRIGUEZ SALGADO ING. ERIK AVENDAÑO VAZQUEZ
COLOCACION
NUMERO COLOCACION
EXCAVACION DE ACARREO DE DE
NUM DE MAQUINAS CONCEPTO MATERIAL
CARGA DE MATERIAL
MATERIAL GEOMEMBRAN
DE
GEOTEXTIL
A
$16,640.38 $16,640.38 $16,640.38 $16,640.38 $16,640.38
1 25 $83,201.90 1 1
2 25 $83,201.90 1 1
3 25 $83,201.90 1 1
4 25 $83,201.90 1 1
5 25 $83,201.90 1 1
6 25 $83,201.90 1 1
7 25 $83,201.90 1 1
8 25 $83,201.90 1 1
9 25 $83,201.90 1 1
10 25 $83,201.90 1 1
11 25 $83,201.90 1 1
12 25 $83,201.90 1 1
13 25 $83,201.90 1 1
14 25 $83,201.90 1 1
15 25 $83,201.90 1 1
16 25 $83,201.90 1 1
17 25 $83,201.90 1 1
18 25 $83,201.90 1 1
19 25 $83,201.90 1 1
20 25 $83,201.90 1 1
21 25 $83,201.90 1 1
22 25 $83,201.90 1 1
23 25 $83,201.90 1 1
24 25 $83,201.90 1 1
25 25 $83,201.90 1 1
26 25 $83,201.90 1 1
27 25 $83,201.90 1 1
28 25 $83,201.90 1 1
29 25 $83,201.90 1 1
30 25 $83,201.90 1 1
31 25 $83,201.90 1 1
32 25 $83,201.90 1 1
33 25 $83,201.90 1 1
34 25 $83,201.90 1 1
35 25 $83,201.90 1 1
36 25 $83,201.90 1 1
37 25 $83,201.90 1 1
38 25 $83,201.90 1 1
39 25 $83,201.90 1 1
40 25 $83,201.90 1 1
41 25 $83,201.90 1 1
42 25 $83,201.90 1 1
43 25 $83,201.90 1 1
44 25 $83,201.90 1 1
45 25 $83,201.90 1 1
46 25 $83,201.90 1 1
47 25 $83,201.90 1 1
48 25 $83,201.90 1 1
49 25 $83,201.90 1 1
50 25 $83,201.90 1 1
51 25 $83,201.90 1 1
52 25 $83,201.90 1 1
53 25 $83,201.90 1 1
54 25 $83,201.90 1 1
55 18 $83,201.90 1 1

55 55 0 0

SUBTOTAL $42,200,003.68 $21,100,001.84 $21,100,001.84 $0.00 $0.00


IVA $6,752,000.59
TOTAL $48,952,004.27
FOTOGRAFÍAS CARGA DE MATERIAL

LUGAR: LA TRINIDAD

Programa: 133 B
CONCEPTO: -Utilizando cargadores frontales, se utlizaran para la carga de material.

carga de material
CARTA DE TERMINACIÓN

Pachuca de Soto, Hgo. A 25 de junio del 2013.

OBRA: Real Toledo.


CONTRATISTA: INSTALACIONES RAUNA S.A. de C.V.
No. DE CONTRATO: EEIC-E 71/12
IMPORTE CONTRACTUAL: $ 312,879.84
IMPORTE CONTRACTUAL MODIFICADO: $000,000.00
PROGRAMA: 65 B
FONDO DE GARANTÍA RETENIDO: $ 13,486.2

CON ESTA FECHA SE DAN POR TERMINADOS LOS TRABAJOS DE SUMINISTRO Y COLOCACION DE

INSTALACIONES ELECTRICAS EN LA PRIVADA VALSAIN Y PORTOS DEL PROGRAMA 73 B EJECU-

TADOS EN ESTE DESARROLLO LOCALIZADAS EN EL CONJUNTO URBANO DENOMINADO REAL

TOLEDO EN PACHUCA DE SOTO, HGO. DE LA CUAL EL SUBCONTRATISTA SE COMPROMETE A

CORREGIR POSIBLES DETALLES O VICIOS OCULTOS QUE DE ESTOS TRABAJOS PUDIERAN

SURGIR. (SEGÚN GARANTIA DE APLICACIÓN POR UN AÑO).

__________________________________ _____________________________
ING. SIGRID RAZO REYES ING. EDUARDO
MONDRAGON G

ENTREGA CONTRATISTA ENTERADO POR

__________________________________ _____________________________
INSTALACIONES RAUNA S.A. de C.V. ING. ANTONIO SOLIS
ALFARO
ACIÓN

unio del 2013.

ION DE

_____________
ARDO

NTERADO POR

_____________
ONIO SOLIS