FIRE WATER SYSTEM CALCULATION
Page : 3/7
CONTENTS
1. SCOPE ................................................................................................................4
2. DEFINITION ........................................................................................................4
3. REFERENCES ....................................................................................................4
4. FIREWATER DEMAND CALCULATION ............................................................5
5. SUMMARY ..........................................................................................................6
Rev. No :
FIRE WATER SYSTEM CALCULATION
Page : 4/7
1. SCOPE
This document summaries the firewater demand for firewater system due to hazard from the
Indonesia LNG Transportation And Receiving Terminal Pesanggaran Site.
2. REFERENCES
The references that use in this document are:
• NFPA 15 – Standard for Water Spray Fixed Systems for Fire Protection
• NFPA 20 – Standard for the Installation of Stationary Pumps for Fire Protection
• NFPA 59A - tandard for the Production, Storage, and Handling of Liquefied Natural Gas
(LNG)
• IS 15301 – Installation and Maintenance of Fire Fighting Pumps
=228 cu.m/hr
Now Total water required for BOG Compressor = 61 + 228 = 289 cu.m/hr. …… (02)
3.5 CASE 05 : WATER DEMAND CALCULATION FOR SENT OUT MANIFOLD AREA :
Designed density of the water as per NFPA-59A / NFPA-15 : 10.2 lpm/sq.mtr
Surface area of the Sent Out Manifold : ( 6 x 5 ) Sq.mtr
= 30 sq.mtr.
Water required for cooling : 306 lpm = 18 cu.m/hr
Allowance of hand hose stream =1000 gpm
=228 cu.m/hr
Now Total water required for Sent Out Manifold Area = 18 + 228 = 246 cu.m/hr.……(05)
3.6 CASE 06 : WATER DEMAND CALCULATION FOR LNG TANK TOP AREA
Rev. No :
FIRE WATER SYSTEM CALCULATION
Page : 6/7
4. SUMMARY
Case No. Areas Maximum Fire Water Demand
01 Vaporiser Area 764 cu.m/hr.
02 BOG Compressor 289 cu.m/hr.
03 HP Pump House 340 cu.m/hr.
04 Metering Station 243 cu.m/hr.
05 Send Out Manifold 246 cu.m/hr.
06 LNG Tank Top 997 cu.m/hr.
2 nos Fire Water Tank to be installed of size = 12.50 M Dia x 10.50 M Ht.
of Nominal Capacity
1250 cu.m. each