Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1037.74
543.28
112.15
28.98
04.05 CONCRETO F´C=210 KG/CM2
293.82
m2 528.00
Ø3/8"@.25
CONDUCTO INTERNOS
TRANS.. φ=3/8" @ 0.25 Kg 661.00 4.86 0.60 1922.68
LONG. φ=3/8" @ 0.25 Kg 58.73 165.00 0.60 5804.38
L= 107m
877.44
cantidad 2
1754.88 m3
1181.01
cantidad 1
1181.01 m3
10.53
05.10 CONCRETO F´C=210 KG/CM2 m3 1
40.52
CASETA MUROS
CASETA 1.15 Kg 6 2.55 1.00 2.93
CASETA CENTRO 0.05 0.50 3.00 0.08
SALIDA 0.80 Kg 3 2.00 1.00 1.60
LOSA 0.48 2.55 1.00 1.22
salida 1.12 5.50 1.00 6.16
CANAL 0.16 11.00 1.00 1.76
TOTAL 108.53
0+000.00 -
0+005.00 5.00 0.70 2.00 7.00
0+010.00 5.00 0.70 2.00 7.00
0+015.00 5.00 0.70 2.00 7.00
0+020.00 5.00 0.70 2.00 7.00
0+025.00 5.00 0.70 2.00 7.00
0+030.00 5.00 0.70 2.00 7.00
0+035.00 5.00 0.70 2.00 7.00
0+040.00 5.00 0.70 2.00 7.00
0+045.00 5.00 0.70 2.00 7.00
0+050.00 5.00 0.70 2.00 7.00
0+055.00 5.00 0.70 2.00 7.00
0+060.00 5.00 0.70 2.00 7.00
0+065.00 5.00 0.70 2.00 7.00
0+070.00 5.00 0.70 2.00 7.00
0+075.00 5.00 0.70 2.00 7.00
0+080.00 5.00 0.70 2.00 7.00
0+085.00 5.00 0.70 2.00 7.00
0+090.00 5.00 0.70 2.00 7.00
0+095.00 5.00 0.70 2.00 7.00
0+100.00 5.00 0.70 2.00 7.00
0+105.00 5.00 0.70 2.00 7.00
0+110.00 5.00 0.70 2.00 7.00
m2 154.00
CASETA MUROS
POSTERIOR Kg 1.00 2.55 2.00 5.10
MEDIO Kg 0.50 0.50 6.00 1.50
FRENTE Kg 1.80 2.55 2.00 9.18
MEDIO SALIDA Kg 1.10 2.00 1.00 2.20
SALIDA 2 Kg 0.45 2.00 2.00 1.80
TECHO 3.20 3.35 1.00 10.72
CANAL 1.25 5.50 4.00 27.50
CANAL 0.45 11.00 4.00 19.80
TOTAL 463.60
05.09 ACERO DE REFUERZO f`y= 4200 Kg/cm2 kg 1 1 9485.83
CONDUCTO EXTERNOS
L= 107m
CONDUCTO INTERNOS
TRANS.. φ=3/8" @ 0.25 Kg 441.00 2.12 0.60 560.02
L= 107m
LONG. φ=3/8" @ 0.25 Kg 9.00 117.00 0.60 630.75
LARGO= 100 m
CAPTACION ARRIBA
TRANS.. φ=1/2" @ 0.15 Kg 19.80 1.61 0.99 31.65
LONG. φ=1/2" @ 0.15 Kg 10.40 3.02 0.99 31.19
CAPTACION CENTRO
TRANS.. φ=1/2" @ 0.15 Kg 3.67 1.22 0.99 4.44
LONG. φ=1/2" @ 0.15 Kg 7.80 1.64 0.99 12.70
CAPTACION ABAJO
TRANS.. φ=1/2" @ 0.15 Kg 33.87 1.61 0.99 54.14
LONG. Φ =1/2" @ 0.15 Kg 10.40 5.13 0.99 52.98
CASETA MUROS
TRANS.. φ=1/2" @ 0.20 Kg 6 2.55 0.99 2.00 27.85
TRANS.. φ=1/2" @ 0.20 Kg 3 0.50 0.99 6.00 8.94
TRANS.. φ=1/2" @ 0.20 Kg 10 2.55 0.99 2.00 48.11
TRANS.. φ=1/2" @ 0.20 Kg 6 2.00 0.99 1.00 11.92
TRANS.. φ=1/2" @ 0.20 Kg 3 2.00 0.99 2.00 10.92
LONG. φ=1/2" @ 0.20 Kg 14 1.30 0.99 2.00 35.50
LONG. φ=1/2" @ 0.20 Kg 4 0.80 0.99 2.00 5.56
LONG. φ=1/2" @ 0.20 Kg 14 2.10 0.99 2.00 57.35
LONG. φ=1/2" @ 0.21 Kg 11 1.40 0.99 1.00 15.29
LONG. φ=1/2" @ 0.20 Kg 11 0.75 0.99 2.00 16.38
CASETA FONDO
TRANS.. φ=1/2" @ 0.20 Kg 13 2.55 0.99 1.00 31.65
TRANS.. φ=1/2" @ 0.20 Kg 15 2.55 0.99 1.00 38.62
TRANS.. φ=1/2" @ 0.20 Kg 4 2.00 0.99 2.00 13.90
TRANS.. φ=1/2" @ 0.20 Kg 8 2.00 0.99 1.00 16.38
LONG. φ=1/2" @ 0.20 Kg 14 2.70 0.99 36.87
LONG. φ=1/2" @ 0.20 Kg 14 3.25 0.99 44.37
LONG. φ=1/2" @ 0.20 Kg 11 1.15 0.99 2.00 25.12
LONG. φ=1/2" @ 0.20 Kg 11 1.85 0.99 20.21
A B
TOTAL 9485.83
TOTAL 13984.162 m3
TOTAL 23997.200 m3
23997.200 2% 479.944
PLANILLA DE METRADOS
TOTAL 17784.536 m3
PLANILLA DE METRADOS
TOTAL 2725.500 m3
PLANILLA DE METRADOS
TOTAL 5691.000 ml
07 ESTRUCTURA DE CONTROL
07.01 ESTRUCTURA DE CONTROL DE FILTRACIONES
07.01.01 EXCAVACION PLATAFORMA MATERIAL SUELTO A MANO m3 72.97
AREA LONGITUD
AREA LONGITUD
0.5 3.52 1.76
AREA 1 AREA 2
LONGITUD PROFUNDIDAD
3.699 1.864 6.89
AREA 1
1.5 1.5 2.25
AREA 1
1.15 0.3 0.35
AREA 2
0.9 0.55 0.50
3.09
07.01.06 TARRAJEO CON MORTERO DE CEMENTO/ARENA 1:3 (HASTA e=1") m2 6.89
LONGITUD PROFUNDIDAD
3.699 1.864 6.89
COMPUERTA
3 1 3.00
4222.58
08.03 RELLENO COMPACTADO EN CAPAS e=0.15m m3 549.19
549.19
TOTAL
15% de volumen excavado 4222.58 15% 899.04
135.45
500.10
DEMASIAS TRAMO A
TRANS.. φ=3/8" @ 0.20 Kg 103.40 27.89 0.60 1727.16
LONG. φ=1/2" @ 0.20 Kg 139.43 20.68 0.99 2863.23
DEMASIAS TRAMO B
TRANS.. φ=3/8" @ 0.20 Kg 87.40 28.06 0.60 1468.80
LONG. φ=1/2" @ 0.20 Kg 140.28 17.48 0.99 2434.93
DEMASIAS TRAMO C
TRANS.. φ=3/8" @ 0.15 Kg 79.40 256.13 0.60 12181.60
LONG. φ=1/2" @ 0.15 Kg 1280.64 15.88 0.99 20194.21
VERTEDERO
TRAMO N1
TRANS.. φ=1/2" @ 0.25 Kg 22.00 19.20 0.99 419.44
LONG. φ=1/2" @ 0.25 Kg 76.80 5.50 0.99 419.44
TRAMO N2
TRANS.. φ=3/8" @ 0.20 Kg 20.40 19.20 0.60 234.62
LONG. φ=1/2" @ 0.25 Kg 76.80 5.10 0.99 388.94
TRAMO N3
TRANS.. φ=1/2" @ 0.25 Kg 58.40 38.40 0.99 2226.86
LONG. φ=5/8" @ 0.40 Kg 96.00 14.60 1.55 2175.28
LATERAL N1
TRANS.. φ=1/2" @ 0.25 Kg 24.00 9.40 0.99 224.02
LONG. φ=1/2" @ 0.25 Kg 37.60 6.00 0.99 224.02
LATERAL N2
TRANS.. φ=1/2" @ 0.25 Kg 32.00 3.60 0.99 114.39
LONG. φ=5/8" @ 0.40 Kg 9.00 8.00 1.55 111.74
m2 1003.86
interior
m2 599.53
TOTAL 1603.39
170.50
170.50
09 CASETA DE OPERACIONES
09.01 CONCRETO F´C=100 KG/CM2 P/SOLADO m2 1.20
L A ESPESOR PARCIAL
1.20
L A ESPESOR PARCIAL
Columnas
3.50 0.25 0.25 0.22
3.50 0.25 0.25 0.22
3.50 0.25 0.25 0.22
3.50 0.25 0.25 0.22
Vigas
14.00 0.25 0.20 0.70
Aligerado
4.00 3.00 0.20 2.40
3.98
L A veces PARCIAL
m2 14.80
MUROS POSA A 20
TRANS.. φ=3/8" @ 0.20 Kg 26 1.91 0.599 29.37
LONG. φ=3/8" @ 0.20 Kg 9 5.14 0.599 26.18
MUROS POSA A 30
TRANS.. φ=3/8" @ 0.30 Kg 17 1.91 0.599 19.96
LONG. φ=3/8" @ 0.30 Kg 6 5.14 0.599 18.48
POSA PISO Y CASETA
TRANS.. φ=1/2" @ 0.20 Kg 78 2.85 0.993 219.33
LONG. φ=1/2" @ 0.20 Kg 14 5.53 0.993 78.31
MUROS TECHO
TRANS.. φ=3/8" @ 0.20 Kg 16 2.85 0.599 27.40
LONG. φ=3/8" @ 0.20 Kg 14 2.41 0.599 20.57
MUROS TECHO
TRANS.. φ=3/8" @ 0.30 Kg 11 2.85 0.599 18.84
LONG. φ=3/8" @ 0.30 Kg 10 2.41 0.599 14.20
MUROS ENTRADA
TRANS.. φ=3/8" @ 0.20 Kg 20 1.82 0.599 21.43
LONG. φ=3/8" @ 0.20 Kg 8 2.02 0.599 9.81
MUROS ENTRADA
TRANS.. φ=3/8" @ 0.30 Kg 13 1.85 0.599 14.85
LONG. φ=3/8" @ 0.30 Kg 6 2.02 0.599 6.94
TOTAL 1039.71
L A veces PARCIAL
Unid 108.00
L A veces PARCIAL
Unid 35.00
10 MEDIDOR DE CAUDAL
10.01 EXCAVACION CAJA CANAL MATERIAL SUELTO A MANO m3 0.90
10.02 ENCOFRADO Y DESENCOFRADO m2 3.20
10.03 CONCRETO F´C=175 KG/CM2 m3 0.30
10.04 TARRAJEO CON MORTERO DE CEMENTO/ARENA 1:3 (HASTA e=1") m2 3.50
10.05 COLOCACION DE REGLILLA GRADUADA und 1.00
11 INSTALACION DE PIEZOMETROS
11.01 SUMINISTRO Y COLOCACION DE PIEZOMETROS GLB 8.00
13 INSTRUMENTACION
12.01 EXCAVACION P/CAJA DE INSTRUMENTACION Y PUNTOS TOPOGRAFICOS m3 12.21
12.02 CONCRETO F´C=210 KG/CM2 m3 12.21
12.03 ENCOFRADO Y DESENCOFRADO m2 43.52
12.04 PERNO DE BRONCE 1/2" kg 35.00
12.05 TUBERIA DE ACERO DE 2" kg 4.40
12.06 REGLA CON PLATINA DE ACERO GRADUADA CON PINTURA m 60.00
12.07 CONSTRUCCION DE MEDIDOR DE FILTRACIONES und 1.00
12.08 SUMINISTRO E INSTALACION DE ESTACION CLIMATOLOGICA und 1.00
12.09 MONITOREO GLB 1.00
m3 12.21
m3 12.21
m2 43.52
Partida Perno de Bronce
Total 35.00
PUNTOS TOP
0.20 22.00 4.40
Total 4.40
Total 60.00
Total 1.00
Total 1.00
Partida Monitoreo
Total 1.00
13 MITIGACION AMBIENTAL
13.01 MITIGACION DE IMPACTO AMBIENTAL est 1.00
14 ESTUDIOS COMPLEMENTARIOS
14.01 ESTUDIOS GEOTECNICOS
14.01.01 ESTUDIOS GEOTÉCNICOS COMPLEMENTARIOS EN PRESAS GLB 1.00 1.00