CASING & TUBING INFORMATION

OD IN ID IN
5 4.494
9 5/8 8.669

JTS MD TVD LOWER ANNU


74 3004.8 2795 945.37
88 3462.6 3209 1123.88
102 3920.4 3618 1273.95
116 4378.2 4000 1441.97
130 4836 4450 1680.22
144 5293.8 4900 1858.19
156 5686.2 5270 2070.89
170 6144 5715 2189.62
231 8171 7730 3000

7553.7
617.3
CSG DESPLACEMENT BLS/JT LENGTHDPLCMNT/JT 0.068338
0.0046667612 32.7 0.1526030919
0.0730052079

VOLUMEN DESPLA. EN FTDIF JTS

31.2626843416 14
31.2626843416 14
31.2626843416 14
31.2626843416 14
31.2626843416 14
26.7965865785 12
31.2626843416 14

NIVEL FLUIDO
60 80 100 120 140 160 180 200 220 240
0
100
200
300 NIVEL FLUIDO
400
500
600
700
800
900
1000
llena 12 tubing + 10 anular

ANULAR VACIO ANULAR VACIO + DESPLAZAMIENTO TOMA POZO


H CLUM @PRDIF TVD - H COLUM
2164.30861 630.6913919414
2572.98535 636.0146520147 599.4287075998 2.670964
2916.5522 701.4478021978 604.7519676731 7.0593
3301.21337 698.7866300366 670.1851178562 2.088059
3846.65751 603.3424908425 667.523945695 -4.68558
4254.09799 645.902014652 572.0798065009 5.389406
4741.04853 528.9514652015 619.1054280735 -6.58171
5012.8663 702.1336996337 497.6887808599 14.92554
6868.13187 861.8681318681

762
8.8313320206
CONTINUAR BAJANDO COMPLETACIONREALIZAR
I ESPACIAMIENTO + COLOCAR TUBING HANG
MIENTO + COLOCAR TUBING HANGER, REALIZAR ULTIMA PRUEBA DE PRESION, CONEXIONES HIDRAULICAS Y ELECTRICAS DEBAJO DEL HANG
Y ELECTRICAS DEBAJO DEL HANGER, ASENTAR HANGER, OPERACIONES CON S/L