PROYECTO FINAL

Memoria de Calculo - Sección Equivalente


Para C1-C3-C10-C12
Paso 1: Área de Influencia

3.90𝑚 ∗ 3.90𝑚
𝐴= = 3.80 𝑚2
4
Paso 2: Altura Losa
𝐿𝑚𝑒𝑛𝑜𝑟
ℎ= = 9.75𝑐𝑚 → ℎ = 10𝑐𝑚
40
Paso 3: Sobrecargas
𝑆𝐶 = 150 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔
𝑃𝑃 𝑙𝑜𝑠𝑎 = 0.10𝑚 ∗ 2500 = 250
𝑚3 𝑚2
𝑅𝑒𝑣. = 100 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔 𝑘𝑔 𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 150 + 100 + 250 = 𝟓𝟎𝟎
𝑚2 𝑚2 𝑚2 𝒎𝟐
Paso 4: Peso Propio de Vigas

U.A.G.R.M. 1
PROYECTO FINAL

𝑘𝑔 𝑘𝑔
𝑃𝑃𝑣𝑖𝑔𝑎 = 0.20𝑚 ∗ 0.40𝑚 ∗ 2500 = 200
𝑚3 𝑚
𝑘𝑔 𝑘𝑔
𝑃𝑃𝑎𝑟𝑒𝑑 = 0.20𝑚 ∗ 2.60𝑚 ∗ 1300 = 676
𝑚3 𝑚
𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 𝟖𝟕𝟔
𝒎
Paso 5:
876 𝑘𝑔/𝑚
𝑉𝑖𝑔𝑎 1 = = 224.61 𝑘𝑔/𝑚2
3.90𝑚
Paso 6:
876 𝑘𝑔/𝑚
𝑉𝑖𝑔𝑎 6 = = 224.61 𝑘𝑔/𝑚2
3.90𝑚
Paso 7: Peso Losa + Peso Vigas
449.22 𝑘𝑔/𝑚2 + 500𝑘𝑔/𝑚2 = 949.22 𝑘𝑔/𝑚2 → 950 𝑘𝑔/𝑚2
Paso 8:
3.80𝑚2 ∗ 950 𝑘𝑔/𝑚2 = 3610 𝑘𝑔
Paso 9: Cobertura
𝐶𝑜𝑏𝑒𝑟𝑡𝑢𝑟𝑎 = 3610 𝑘𝑔 ∗ 0.80 = 2888 𝑘𝑔

Paso 10: Peso Pilar


𝑘𝑔
𝑃𝑝𝑖𝑙𝑎𝑟 = 2500 ∗ 0.20𝑚 ∗ 0.40𝑚 ∗ 14𝑚 = 2800 𝑘𝑔
𝑚3
Paso 11: Sumatoria de Cargas

Cob= 2888
C2= 3610
C3= 3610
C4= 3610
C5= 3610
Peso Zapata= 800
Peso Pilar= 2800
TOTAL 20928 kg

Paso 12: Dimensionamiento de Zapata 1-3-10-12

𝑁 20928𝑘𝑔
𝐿=√ =√ = 145 𝑐𝑚
𝜎𝑎𝑑𝑚 1

U.A.G.R.M. 2
PROYECTO FINAL

Para C2-C4-C6-C7-C9-C11
Paso 1: Área de Influencia

3.90𝑚 ∗ 3.90𝑚
𝐴= = 7.605 𝑚2
2
Paso 2: Altura Losa
𝐿𝑚𝑒𝑛𝑜𝑟
ℎ= = 9.75𝑐𝑚 → ℎ = 10𝑐𝑚
40
Paso 3: Sobrecargas
𝑆𝐶 = 150 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔
𝑃𝑃 𝑙𝑜𝑠𝑎 = 0.10𝑚 ∗ 2500 = 250
𝑚3 𝑚2
𝑅𝑒𝑣. = 100 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔 𝑘𝑔 𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 150 + 100 + 250 = 𝟓𝟎𝟎
𝑚2 𝑚2 𝑚2 𝒎𝟐
Paso 4: Peso Propio de Vigas

U.A.G.R.M. 3
PROYECTO FINAL

𝑘𝑔 𝑘𝑔
𝑃𝑃𝑣𝑖𝑔𝑎 = 0.20𝑚 ∗ 0.40𝑚 ∗ 2500 = 200
𝑚3 𝑚
𝑘𝑔 𝑘𝑔
𝑃𝑃𝑎𝑟𝑒𝑑 = 0.20𝑚 ∗ 2.60𝑚 ∗ 1300 = 676
𝑚3 𝑚
𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 𝟖𝟕𝟔
𝒎
Paso 5:
876 𝑘𝑔/𝑚
𝑉𝑖𝑔𝑎 = = 224.61 𝑘𝑔/𝑚2
3.90𝑚
Paso 6:
𝑉1 + 𝑉6 + 𝑉8 = 673.83 𝑘𝑔/𝑚2
Paso 7: Peso Losa + Peso Vigas
673.83 𝑘𝑔/𝑚2 + 500𝑘𝑔/𝑚2 = 1173.83 𝑘𝑔/𝑚2
Paso 8:
7.605𝑚2 ∗ 1173.83 𝑘𝑔/𝑚2 = 8926.98 𝑘𝑔
Paso 9: Cobertura
𝐶𝑜𝑏𝑒𝑟𝑡𝑢𝑟𝑎 = 8926 𝑘𝑔 ∗ 0.80 = 7141.58 𝑘𝑔

Paso 10: Peso Pilar


𝑘𝑔
𝑃𝑝𝑖𝑙𝑎𝑟 = 2500 ∗ 0.20𝑚 ∗ 0.20𝑚 ∗ 14𝑚 = 1400 𝑘𝑔
𝑚3
Paso 11: Sumatoria de Cargas

Cob= 7143.46
C2= 8929.32
C3= 8929.32
C4= 8929.32
C5= 8929.32
Peso Zapata= 800
Peso Pilar= 1400
TOTAL 45060.74 kg

Paso 12: Dimensionamiento de Zapata 2-4-6-7-9-11

𝑁 45060.74 𝑘𝑔
𝐿=√ =√ = 212.3 𝑐𝑚 → 𝐿 = 220𝑐𝑚
𝜎𝑎𝑑𝑚 1

U.A.G.R.M. 4
PROYECTO FINAL

Para C5-C8
Paso 1: Área de Influencia

3.90𝑚 ∗ 3.90𝑚
𝐴= = 15.21 𝑚2
1
Paso 2: Altura Losa
𝐿𝑚𝑒𝑛𝑜𝑟
ℎ= = 9.75𝑐𝑚 → ℎ = 10𝑐𝑚
40
Paso 3: Sobrecargas
𝑆𝐶 = 150 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔
𝑃𝑃 𝑙𝑜𝑠𝑎 = 0.10𝑚 ∗ 2500 = 250
𝑚3 𝑚2
𝑅𝑒𝑣. = 100 𝑘𝑔/𝑚2
𝑘𝑔 𝑘𝑔 𝑘𝑔 𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 150 + 100 + 250 = 𝟓𝟎𝟎
𝑚2 𝑚2 𝑚2 𝒎𝟐
Paso 4: Peso Propio de Vigas

U.A.G.R.M. 5
PROYECTO FINAL

𝑘𝑔 𝑘𝑔
𝑃𝑃𝑣𝑖𝑔𝑎 = 0.20𝑚 ∗ 0.40𝑚 ∗ 2500 = 200
𝑚3 𝑚
𝑘𝑔 𝑘𝑔
𝑃𝑃𝑎𝑟𝑒𝑑 = 0.20𝑚 ∗ 2.60𝑚 ∗ 1300 = 676
𝑚3 𝑚
𝒌𝒈
𝑇𝑜𝑡𝑎𝑙 = 𝟖𝟕𝟔
𝒎
Paso 5:
876 𝑘𝑔/𝑚
𝑉𝑖𝑔𝑎 = = 224.61 𝑘𝑔/𝑚2
3.90𝑚
Paso 6:
𝑉2 + 𝑉4 + 𝑉8 + 𝑉2 = 898.46 𝑘𝑔/𝑚2
Paso 7: Peso Losa + Peso Vigas
898.46 𝑘𝑔/𝑚2 + 500𝑘𝑔/𝑚2 = 1398.46 𝑘𝑔/𝑚2
Paso 8:
15.21𝑚2 ∗ 1398.46 𝑘𝑔/𝑚2 = 21270.58 𝑘𝑔
Paso 9: Cobertura
𝐶𝑜𝑏𝑒𝑟𝑡𝑢𝑟𝑎 = 21270.6 𝑘𝑔 ∗ 0.80 = 17016.46 𝑘𝑔

Paso 10: Peso Pilar


𝑘𝑔
𝑃𝑝𝑖𝑙𝑎𝑟 = 2500 ∗ 0.20𝑚 ∗ 0.40𝑚 ∗ 14𝑚 = 2800 𝑘𝑔
𝑚3
Paso 11: Sumatoria de Cargas

Cob= 17016.46
C2= 21270.58
C3= 21270.58
C4= 21270.58
C5= 21270.58
Peso Zapata= 800
Peso Pilar= 2800
TOTAL 105698.80 kg

Paso 12: Dimensionamiento de Zapata 5-8

𝑁 105698.80 𝑘𝑔
𝐿=√ =√ = 325.11 𝑐𝑚 → 𝐿 = 330𝑐𝑚
𝜎𝑎𝑑𝑚 1

U.A.G.R.M. 6
PROYECTO FINAL

CUADRO DE CARGAS EN PILARES

Pilar Sección Cargas Tipo Planta Baja 1er Piso 2do Piso 3er Piso Cubierta TOTAL kg

P1 20/40 3610 3610 3610 3610 3610 2888 20928

P2 20/40 8930 8930 8930 8930 8930 7145 45061

P3 20/40 3610 3610 3610 3610 3610 2888 20928

P4 20/20 8930 8930 8930 8930 8930 7145 45061

P5 20/40 21271 21271 21271 21271 21271 17017 105699

P6 20/20 8930 8930 8930 8930 8930 7145 45061

P7 20/20 8930 8930 8930 8930 8930 7145 45061

P8 20/40 21271 21271 21271 21271 21271 17017 105699

P9 20/20 8930 8930 8930 8930 8930 7145 45061

P10 20/40 3610 3610 3610 3610 3610 2888 20928

P11 20/40 8930 8930 8930 8930 8930 7145 45061

P12 20/40 3610 3610 3610 3610 3610 2888 20928

U.A.G.R.M. 7

También podría gustarte