Está en la página 1de 2

case study

SGS Project Management Consultancy:


Wind Farm in India
Issued – august 2013

In August 2013, SGS was awarded down into a 10-month project completion SGS Comprehensive Consultancy
a contract to provide comprehensive period, a 2-month stabilisation period and in India
a 12-month operations and maintenance
project management consultancy period.
SGS consultants will manage and
services for a 51MW wind control every aspect of the project
execution. Inspectors will be responsible
farm project in Tamil Nadu, India Neyveli Lignite Corporation Limited for reviewing and approving electrical
by Neyveli Lignite Corporation Neyveli Lignite Corporation (NLC) is a installation and equipment drawings as
Limited. government-owned lignite mining and well as single line diagrams for wind
power generating company with a farm interfacing. SGS will examine the
In August 2013, state-owned Neyveli
history of achievement since its 1956 layout plan control and metering station,
Lignite Corporation Limited contracted
inception. unit sub-station, internal OH lines,
SGS project management consultancy
control room, trenches, earthing, lighting,
services for a 51MW wind farm project A pioneer among companies in the
fencing and gating as well as oversee
at Kaluneerkulam in the Thirunelveli public sector working in energy, NLC has
details of the civil work required.
district of Tamil Nadu. Expected to be been a member of Navratna, the elite club
A quality plan and checklists for wind
completed in mid-2014 and commissioned of public sector enterprises backed by
turbine generator (WTG) tower
in June, the project marks the Neyveli the government to give them comparative
foundations and electrical installations
entry into the renewable energy sector. advantages and greater autonomy to
will be prepared and implemented.
Appointed to manage and control all compete in the global market, since 2011.
Scheduling of various activities related to
aspects of project execution, SGS project NLC falls under the administrative control
WTG foundations, installations, erection
management consultants will provide of the India Ministry of Coal.
and commissioning will be tracked.
services for 24 months to be broken
An experienced and skilled SGS site
engineer will be posted to supervise
the main construction of the WTG
towers and foundations and the wind
turbine generators as well as WTG
commissioning according to schedule.
On-site SGS professional consulting
staff will inspect all equipment upon
receipt, witness pre-commissioning and
commissioning equipment tests, control
and certify quality, check construction
plan, check and certify WTG protocols,
review supplier-provided operation and
maintenance documents, prepare a list
of any defects or incomplete work for
suppliers and submit a weekly progress
report to NLC project leaders.
The scope of services to be provided to A complete analysis will be presented to As a world-leading provider of project
Neyveli for the Indian wind farm project NLC representatives in a prepared report management services, SGS delivers
include overall project management including information about: support to a diverse range of projects
comprised of: yyphysical condition across all industries. The unrivalled SGS
yythe review and approval of all global network and extensive expertise
yyactual generation compared to minimise risk and maximise success,
documents/drawings submitted by guaranteed/estimated generation
suppliers wherever needed.
yyactual KVA consumption SGS is proud to have been selected for
yyconstruction supervision of WTG
double pole yard yyinternal losses this prestigious project delivering clean
yydowntime documentation illustrating power to the citizens of India.
yysubstation and connection to grid
both periods of low wind/non-availability
yyconstruction management of grid and machine Contact
yyquality management yycomponent failure power@sgs.com
yysite supervision www.sgs.com/Power
yypresent maintenance status
yycoordination of vendors and agencies yyrecommendations to improve operation
SGS is the world’s leading
yydelivery of complete facility to the and maintenance
inspection, verification, testing
owner SGS will ensure that all works are and certification company.
yysubmission of all final documents and conducted in accordance with the
© SGS Group Management SA – 2014 – All rights reserved – SGS is a registered trademark of SGS Group Management SA

“as-built” drawings safety plan throughout the course of


Upon project completion and the construction project. Senior SGS
commissioning, SGS services will follow management of PMC will attend regular
up with a senior engineer monitoring the monthly review meetings at the Neyveli
Neyveli wind farm. Detailed data along offices.
with information regarding operation and SGS project management services
maintenance records covering generation, reduce risk, assure quality, ensure
reactive power consumption, down time compliance with all applicable regulatory,
and spare consumption will be collected voluntary or client-based requirements
and reviewed. and guarantee a project complete on
time and on budget.