COSTOS ANUALES FABRICACION METAL MECANICA PESADA

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 2500 100 %TOLVA
MATERIALES total Kg de material 60% peso tolva 24600 M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 212.00 213M3 260 M2
total Kg de material 60% peso tolva 260 213 260 1

RENDIMIENTO DE CONSUMIBLES UNID/KG 0.000099


CONSUMIBLES CONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
113.64
DISCOS DE CORTE 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE DESBASTE 0.002475 0.28 6.1875 7.50 46.41

DISCO DE ESMERIL 0.002475 0.28 6.19 12.00 74.25


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANICO 65 M $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4.5 MIL $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQUIV JET MP 85 ) $147.69 S/. 494.76 1.01 0.60 S/. 499.47
OTROS INSUMOS
THINER STD S/. 18.00 8.48 0.00 S/. 152.64 Material
TRAPO S/. 2.50 2.00 0.80 S/. 2.00 S/. 10,502.22 S/. 49.54
SOLDADURA (KG) 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 (10M3) 0.0002475 0.03 0.62 210.00 129.94

ACCESORIOS DE EQUIPO PLASMA (kit) 0.0002475 0.03 0.62 80.00 49.50

OXIGENO (10 M3) 0.0002475 0.03 0.62 110.00 68.06

PINTURA (Gln) 0.3900 0.96 21.20 210.00 4452.00

SOILVENTE (gln) 0.390000 0.96 21.20 18.00 381.60


TOTAL 16910.5389

MANO DE OBRA DIRE TRABAJADOR CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
SUELDO ARMADOR CALIFICADO 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25

SUELDO SOLDADOR CALIFICADO 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25
SUELDO PINTOR CALIFICADO 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77

SUELDO AYUDANTES/PRACTICANTES 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03

SUELDO PINTOR CALIFICADO 0.0500011793 3800 380 209.00 17.765419 1.51 0.80 1.42 0.89
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA COSTO POR HORA COSTO POR DIA COSTO MENSUAL COSTO MENSUAL
CAMION DE 2 TON 8 12 96 1920 96.0022642
MONTACARGAS DE 4 TON 8 8 64 1280 64.00150947
GRUA DE 6 TON 8 12 96 1920 96.0022642
CAMIONETA 4X4 8 10 80 1600 80.00188684
AUTOMOVIL 8 5 40 800 40.00094342
TOTAL 7520 376.00887
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL COSTO MENSUAL COSTO MENSUAL
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA ACTIVA 1 6000 500 25.00058964
0
IMPUESTOS DE LOCALIMPUESTO PREDIAL MUNICIPAL 1 450 37.5 1.875044223
0
DEPRECIACION DE AC SOLDADORAS (VIDA UTIL 10 AÑOS) 2 1200 200 10.00023585
CORTADORAS DE PLASMA/OXICORTE (VU. 10A) 2 800 133.33 6.666823903
0
WPS -WPQR (PROBETCertificacion de probetas 1 400 33.33 1.666705976
Prueba destructiva 1 1200 100 5.000117927
Prueba no destructiva 1 1200 100 5.000117927
SEGUROS SEGURO CONTRA TODO RIESGO 1 900 75 3.750088445
TOTAL 1179.17 58.96

ADMINISTRACION GE TRABAJADOR CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
SUELDO INGENIERIO SUPERVISION GENERAL 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25

CONTADOR GENERAL 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25

SUELDO ADMINISTRADOR 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77

SUELDO SECRETARIA/RECURSOS HUMANOS 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77

MANO DE OBRA INDIRECTA

ENCARGADO DE ALMANCEN/COMPRAS 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09

JEFE DE TALLER/CAPATAZ 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36

DIBUJANTE Y PRESUPUESTOS 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
INGENIERIO DE OBRA 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36

Mano de obra administracion pintura 0.0500011793 3500 350 192.5045402014 16.36288592 1.39 0.74 1.31 0.82
PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDAD UNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDAD UNID /MES TOTAL
CORTE/TALADRADO 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE UNIR PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMBLE 50 12 600

PRECALENTAMIENTO 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL 3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /GRANALLADO 18 212.00 3816 3816.00

PINTURA 25 212.00 5300.00 265.01


TOTAL MENSUAL 9116.00 455.8107503
DEPRECIACION

TIPO COSTO COSTO ANUAL COSTO MENSUAL


VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000 4000 333.33 16.66705976
CAMION 80000 8000 666.67 33.33411952
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000 8000 666.67 33.33411952
MONTACARGA 35000 3500 291.67 14.58367729
INMUEBLES (VIDA UTILS 30 AÑOS) TALLER 600M2 300000 10000 833.33 41.66764939
TOTAL MENSUAL 2791.67 139.5866255
VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000 4000 333.33
RESUMEN
COSTOS DIRECTOS TOTAL ANUAL TOTAL MENSUAL POR KG POR M2
CONSUMIBLES 202926.47 16910.54 6.76 65.04 10502.22
MANO DE OBRA 261932.90 21827.74 8.73 83.95 235.65 235.65
TRANSPORTE MATERIALES 90240.00 7520.00 3.01 28.92 376.01 376.01
COSTOS INDIRECTOS 0.00 0.00 0.00
ENERGIA ELECTRICA 6000.00 500 0.20 1.92 25.00 25.00
IMPUESTOS 450.00 37.5 0.02 0.14 1.88 1.88
DEPRECIACION EQUIPOS 1600.00 133.33 0.05 0.51 16.67 16.67
WPQR WPQS PROBETAS 2800.00 233.33 0.09 0.90 0.00
SEGUROS 900.00 75.00 0.03 0.29 3.75 3.75
ADMINISTRACION 273838.94 22819.91 9.13 87.77 1141.02 1141.02
MANO DE OBRA INDIRECTA 187520.15 15626.68 6.25 60.10 781.35 781.35
PROCESOS DE MANUFACTURFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 109392.00 9116.00 3.65 35.06 265.01 3816.00
DEPRECIACION VEHICULOS 12000.00 1000.00 0.40 3.85 50.00 50.00
EQUIPOS 11500.00 958.33 0.38 3.69 47.92 47.92
LOCAL INMUEBLE 10000.00 833.33 0.33 3.21 41.67 41.67
OTROS GASTOS 10% MO 72329.20 6027.433236 2.41 23.18 23.56 23.56 pintura
COSTO DIRECTO ANUAL 1295029.65 s/KG
Sub Total 107919.14 43.17 415.07 13511.70 6560.47 5.40
GF 3% 3237.57 1.30 12.45 405.35 196.81 0.16
UTIL 15% 16187.87 6.48 62.26 2026.76 984.07 0.81

TOTAL 127344.58 50.94 600.68 15943.81 7741.36 6.38

TOTAL POR 3MESES 382033.75 152.81 1802.05 47831.42 23224.08 19.13

S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 435.27 100 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 33.32 213M3 260 M2
total Kg de material 60% peso
33.32
tolva 213 33.32 1

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLES CONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
19.79
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE D 0.002475 0.28 6.1875 7.50 46.41

DISCO DE ES 0.002475 0.28 6.19 12.00 74.25


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 1.01 0.60 S/. 499.47
OTROS INSUMOS
THINER STD S/. 18.00 1.33 0.00 S/. 23.99
TRAPO S/. 2.50 2.00 0.80 S/. 2.00
SOLDADURA ( 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 0.0002475 0.03 0.62 210.00 129.94

ACCESORIOS 0.0002475 0.03 0.62 80.00 49.50

OXIGENO (10 0.0002475 0.03 0.62 110.00 68.06

PINTURA (Gl 0.0500 0.15 3.33 210.00 699.72

SOILVENTE (g 0.049980 0.15 3.33 18.00 59.98


TOTAL 12707.985

SEGUROS EPP VACACIONES SALUD APORTES TOTAL MANO DE OBRA DIREC


TRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
6.96% 3.50% 8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
35.14 17.67 42.92 25.25 6697.15 SUELDO ARM 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25

35.14 17.67 42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25
24.73 12.44 30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77

19.52 9.82 23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03

TOTAL MENSUAL 21827.74


1.24 0.62 1.51 0.89 235.65 SUELDO PINT 1 3800 380 4180.00 355.3 1.51 0.80 1.42 0.89
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIACOSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELECTRICA TRFASICA , 1 6000 500 0

IMPUESTOS DE LOCALIMPUESTO PR 1 450 37.5 0

DEPRECIACION DE AC SOLDADORA 2 1200 200 0


CORTADORAS 2 800 133.33 0.00

WPS -WPQR (PROBET Certificacion 1 400 33.33 0.00


Prueba destru 1 1200 100 0
Prueba no des 1 1200 100 0
SEGUROS SEGURO CON 1 900 75 0
TOTAL 1179.17 0.00

SEGUROS EPP VACACIONES SALUD APORTES TOTAL ADMINISTRACION GETRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
6.96% 3.50% 8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
35.14 17.67 42.92 25.25 6697.15 SUELDO INGE 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25

35.14 17.67 42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25

24.73 12.44 30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77

24.73 12.44 30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77
TOTAL MENSUAL 22819.91 1141.0225029081
MANO DE OBRA INDIRECTA

18.22 9.16 22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09

22.78 11.45 27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36

18.22 9.16 22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
22.78 11.45 27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36
TOTAL MENSUAL 15626.68 781.3523661218
1.14 0.57 1.39 0.82 217.04
PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 33.32 399.84

PINTURA 25 33.32 833.00


TOTAL MENSUAL1232.84
DEPRECIACION

TIPO COSTO COSTO ANUAL


COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 152495.82 12707.99 5.08 48.88
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 14794.08 1232.84 0.49 4.74
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
arenado pintura arenado OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
s/KG s/M2 s/M2 COSTO DI ###
2.62 51.97 25.23 Sub Total 95833.42 38.33 368.59
0.08 1.56 0.76 GF 3% 2875.00 1.15 11.06
0.39 7.80 3.78 UTIL 15% 14375.01 5.75 55.29

3.10 61.32 29.77 TOTAL 113083.44 45.23 533.41

9.29 183.97 89.32 TOTAL POR 3MESES 339250.32 135.70 1600.24

S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 1432 100 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 127.00 213M3 260 M2
total Kg de material 60% peso127
tolva 213 127 1

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
65.09
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE D 0.002475 0.28 6.1875 7.50 46.41

DISCO DE ES 0.002475 0.28 6.19 12.00 74.25


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 1.01 0.60 S/. 499.47
OTROS INSUMOS
THINER STD S/. 18.00 5.08 0.00 S/. 91.44
TRAPO S/. 2.50 2.00 0.80 S/. 2.00
SOLDADURA ( 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 0.0002475 0.03 0.62 210.00 129.94

ACCESORIOS 0.0002475 0.03 0.62 80.00 49.50

OXIGENO (10 0.0002475 0.03 0.62 110.00 68.06

PINTURA (Gl 0.1905 0.58 12.70 210.00 2667.00

SOILVENTE (g 0.190500 0.58 12.70 18.00 228.60


TOTAL 14911.339

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP
6.96% 3.50% 8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50%
35.14 17.67 42.92 25.25 6697.15 SUELDO ARM 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67

35.14 17.67 42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67
24.73 12.44 30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77 24.73 12.44

19.52 9.82 23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03 19.52 9.82

21827.74
TOTAL MENSUAL
1.24 0.62 1.51 0.89 4544.18 SUELDO PINT 1 3800 380 4180.00 355.3 1.51 0.80 1.42 0.89 1.24 0.62
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0

IMPUESTOS DIMPUESTO PR 1 450 37.5 0

DEPRECIACIO SOLDADORA 2 1200 200 0


CORTADORAS 2 800 133.33 0.00

WPS -WPQR Certificacion 1 400 33.33 0.00


Prueba destru 1 1200 100 0
Prueba no des 1 1200 100 0
SEGUROS SEGURO CON 1 900 75 0
TOTAL 1179.17 0.00

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP
6.96% 3.50% 8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50%
35.14 17.67 42.92 25.25 6697.15 SUELDO INGE 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67

35.14 17.67 42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67

24.73 12.44 30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44

24.73 12.44 30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44
22819.91
TOTAL MENSUAL
MANO DE OBRA INDIRECTA

18.22 9.16 22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16

22.78 11.45 27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45

18.22 9.16 22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16
22.78 11.45 27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45
15626.68
TOTAL MENSUAL

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 127.00 1524

PINTURA 25 127.00 3175.00


TOTAL MENSUAL4699.00
DEPRECIACION

TIPO COSTO COSTO ANUAL


COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 178936.07 14911.34 5.96 57.35
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 56388.00 4699.00 1.88 18.07
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
COSTO DI ###
Sub Total 101502.94 40.60 390.40
GF 3% 3045.09 1.22 11.71
UTIL 15% 15225.44 6.09 58.56

TOTAL 119773.47 47.91 564.97

TOTAL POR 3MESES 359320.40 143.73 1694.91

S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 326 100 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 16.67 213M3 260 M2
total Kg de material 60% peso
16.67
tolva 213 16.67 1

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
14.82
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE D 0.002475 0.28 6.1875 7.50 46.41

DISCO DE ES 0.002475 0.28 6.19 12.00 74.25


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 1.01 0.60 S/. 499.47
OTROS INSUMOS
THINER STD S/. 18.00 0.67 0.00 S/. 12.00
TRAPO S/. 2.50 2.00 0.80 S/. 2.00
SOLDADURA ( 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 0.0002475 0.03 0.62 210.00 129.94

ACCESORIOS 0.0002475 0.03 0.62 80.00 49.50

OXIGENO (10 0.0002475 0.03 0.62 110.00 68.06

PINTURA (Gl 0.0250 0.08 1.67 210.00 350.07

SOILVENTE (g 0.025005 0.08 1.67 18.00 30.01


TOTAL 12316.377

VACACIONES SALUD
APORTES TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES
8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
42.92 25.25 6697.15 SUELDO ARM 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25

42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25
30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77

23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03 19.52 9.82 23.84 14.03

21827.74
TOTAL MENSUAL TOTAL MENSUAL
1.51 0.89 4544.18 SUELDO PINT 1 3800 380 4180.00 355.3 1.51 0.80 1.42 0.89 1.24 0.62 1.51 0.89
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0

IMPUESTOS DIMPUESTO PR 1 450 37.5 0

DEPRECIACIO SOLDADORA 2 1200 200 0


CORTADORAS 2 800 133.33 0.00

WPS -WPQR Certificacion 1 400 33.33 0.00


Prueba destru 1 1200 100 0
Prueba no des 1 1200 100 0
SEGUROS SEGURO CON 1 900 75 0
TOTAL 1179.17 0.00

VACACIONES SALUD
APORTES TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES
8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
42.92 25.25 6697.15 SUELDO INGE 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25

42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25

30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77

30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77
22819.91
TOTAL MENSUAL TOTAL MENSUAL
MANO DE OBRA INDIRECTA

22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16 22.25 13.09

27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45 27.82 16.36

22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16 22.25 13.09
27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45 27.82 16.36
15626.68
TOTAL MENSUAL TOTAL MENSUAL

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 16.67 200.04

PINTURA 25 16.67 416.75


TOTAL MENSUAL 616.79
DEPRECIACION

TIPO COSTO COSTO ANUAL


COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 147796.53 12316.38 4.93 47.37
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 7401.48 616.79 0.25 2.37
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
COSTO DI ###
Sub Total 94825.77 37.93 364.71
GF 3% 2844.77 1.14 10.94
UTIL 15% 14223.86 5.69 54.71

TOTAL 111894.40 44.76 527.80

TOTAL POR 3MESES 335683.21 134.27 1583.41

S//KG:
S/M2
TOTAL

6697.15

6697.15
4712.81

3720.64

21827.74
4544.18

TOTAL

6697.15

6697.15

4712.81

4712.81
22819.91

3472.60

4340.74

3472.60
4340.74
15626.68
COSTOS ANUALES FABRICACION METAL MEC

COSTOS DIRECTOS
RENDIMIENTO
MATERIALES total Kg de material 60% peso tolva
RENDIMIENTO
total Kg de material 60% peso tolva

RENDIMIENTO DE CONSUMIBLES
CONSUMIBLES CONSUMIBLE

DISCOS DE CORTE

DISCOS DE DESBASTE

DISCO DE ESMERIL
PRIMERA CAPA:
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANICO 65 M
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4.5 MIL
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQUIV JET MP 85 )
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA (KG)

ARGON -CO2 (10M3)

ACCESORIOS DE EQUIPO PLASMA (kit)

OXIGENO (10 M3)

PINTURA (Gln)

SOILVENTE (gln)

MANO DE OBRA DIRECTA TRABAJADOR


SUELDO ARMADOR CALIFICADO

SUELDO SOLDADOR CALIFICADO

SUELDO PINTOR CALIFICADO

SUELDO AYUDANTES/PRACTICANTES

SUELDO PINTOR CALIFICADO


TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD
CAMION DE 2 TON
MONTACARGAS DE 4 TON
GRUA DE 6 TON
CAMIONETA 4X4
AUTOMOVIL

COSTOS INDIRECTOS
TIPO
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA ACTIVA

IMPUESTOS DE LOCAL IMPUESTO PREDIAL MUNICIPAL

DEPRECIACION DE ACTIVOS SOLDADORAS (VIDA UTIL 10 AÑOS)


CORTADORAS DE PLASMA/OXICORTE (VU. 10A)
WPS -WPQR (PROBETEADO) Certificacion de probetas
Prueba destructiva
Prueba no destructiva
SEGUROS SEGURO CONTRA TODO RIESGO

ADMINISTRACION GENERAL TRABAJADOR

SUELDO INGENIERIO SUPERVISION GENERAL

CONTADOR GENERAL

SUELDO ADMINISTRADOR

SUELDO SECRETARIA/RECURSOS HUMANOS

MANO DE OBRA INDIRECTA


ENCARGADO DE ALMANCEN/COMPRAS

ING CONTROL DE CALIDAD

JEFE DE TALLER/CAPATAZ

DIBUJANTE Y PRESUPUESTOS

INGENIERIO DE OBRA

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO

PROCESO DE REMOCION DE MATERIAL

PROCESO DE UNIR

PROCESO DE SUPERFICIES

DEPRECIACION
VEHICULOS (VIDA UTIL 10 AÑOS)

EQUIPOS (VIDAD UTIL 10 AÑOS)

INMUEBLES (VIDA UTILS 30 AÑOS)

RESUMEN
ABRICACION METAL MECANICA PESADA

KG/MES
KG/OBRA 2500 50 %TOLVA
24600 M2/MES VOLUMEN AREA
M2/OBRA 212.00 213M3 260 M2
212 127 212.00 1

UNID/KG 0.000099
CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
113.64
0.02475 2.81 61.875 7.50 464.0625

0.02475 2.81 61.875 7.50 464.06

0.02475 2.81 61.88 12.00 742.50


UNITARIO CANTIDAD MERMA 80% TOTAL
$143.51 S/. 480.76 10.10 0.00 S/. 4,853.37

$147.69 S/. 494.76 10.10 0.80 S/. 4,994.74

$147.69 S/. 494.76 10.10 0.60 S/. 4,994.74

S/. 18.00 8.48 0.00 S/. 152.64


S/. 2.50 2.00 0.80 S/. 2.00
0.02475 2.81 61.88 12.00 742.50

0.02475 2.81 61.88 210.00 12993.75

0.02475 2.81 61.88 80.00 4950.00

0.02475 2.81 61.88 110.00 6806.25

0.3180 0.96 21.20 210.00 4452.00

0.318000 0.96 21.20 18.00 381.60


TOTAL 46994.207

CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES


100% 10% 8.50% 8.50% 4.50%
0.75 5400 540 4455.00 378.675 378.675 200.475

0.75 5400 5400.75 8100.56 688.547813 688.5478125 364.525313

0.75 3800 3800.75 5700.56 484.547813 484.5478125 256.525313

0.75 3000 3000.75 4500.56 382.547813 382.5478125 202.525313

0.75 3800 3800.75 5700.56 2762195.09 2762195.089 1462338.58

CTD HRAS DIA COSTO POR HORA COSTO POR DCOSTO MENSUAL
8 12 96 1920
8 8 64 1280
8 12 96 1920
8 10 80 1600
8 5 40 800
TOTAL 7520

CTD COSTO ANUAL COSTO MENSUAL COSTO MENSUAL


1 6000 500 0

1 450 37.5 0

2 1200 100 0
2 800 66.67 0.00
1 400 33.33 0.00
1 1200 100 0
1 1200 100 0
1 900 75 0
TOTAL 1012.50 0.00

CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES


100% 10% 8.50% 8.50% 4.50%
0.75 5400 540 4590 390.15 390.15 206.55

0.75 5400 540 4590 390.15 390.15 206.55

0.75 3800 380 3230 274.55 274.55 145.35

0.75 3800 380 3230 274.55 274.55 145.35


0.75 2100 210 1785 252.875 252.875 133.875

0.75 3500 350 2975 252.875 252.875 133.875

0.75 2100 210 1785 151.725 151.725 80.325

0.75 3500 350 2975 252.875 252.875 133.875

0.75 2100 210 1785 151.725 151.725 80.325

CERIZADO)

PROCESO COSTO UNIDAD UNID /MES TOTAL


DOBLADO 8 20 160
TOTAL MENSUAL 160.00

PROCESO COSTO UNIDAD UNID /MES TOTAL


CORTE/TALADRADO 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMBLE 50 12 600

PRECALENTAMIENTO 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO COSTO M2 UNID /MES TOTAL


ARENADO /GRANALLAD 12 212.00 2544

PINTURA 25 212.00 5300.00


TOTAL MENSUAL7844.00
TIPO COSTO COSTO ANUAL
COSTO MENSUAL
CAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
TALLER 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 563930.48 46994.21 18.80 221.67
MANO DE OBRA 432722.96 36060.25 14.42 170.10
TRANSPORTE MATERIAL 90240.00 7520.00 3.01 35.47
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELECTRICA 6000.00 500 0.20 2.36
IMPUESTOS 450.00 37.5 0.02 0.18
DEPRECIACION EQUIPOS 2000.00 166.67 0.07 0.79
WPQR WPQS PROBETAS 2800.00 233.33 0.09 1.10
SEGUROS 900.00 75.00 0.03 0.35
ADMINISTRACION 297397.73 24783.14 9.91 116.90
MANO DE OBRA INDIREC 223314.92 18609.58 7.44 87.78
PROCESOS DE MANUFACTUFORMADO 1920.00 160.00 0.06 0.75
REMOCION 6480.00 540.00 0.22 2.55
UNIR 43200.00 3600.00 1.44 16.98
SUPERFICIES 94128.00 7844.00 3.14 37.00
DEPRECIACION VEHICULOS 12000.00 1000.00 0.40 4.72
EQUIPOS 11500.00 958.33 0.38 4.52
LOCAL INMUEBLE 10000.00 833.33 0.33 3.93
OTROS GASTOS 10% MO 95343.56 7945.29680125 3.18 37.48
COSTO DIRECTO ### 0.00 0.00
Sub Total 157860.64 63.14 744.63
GF 3% 4735.82 1.89 22.34
UTIL 15% 23679.10 9.47 111.69

TOTAL 186275.55 74.51 7.57

TOTAL POR 3MESES 558826.66 223.53 2635.97

S//KG:
S/M2
SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
8.00% 5.00% 6.96% 3.50% 8.50% 5%
356.4 222.75 310.068 155.925 378.675 222.75 7059.393

648.045 405.028125 563.79915 283.519688 688.547813 405.028125 12836.15

456.045 285.028125 396.75915 199.519688 484.547813 285.028125 9033.11

360.045 225.028125 313.23915 157.519688 382.547813 225.028125 7131.59

TOTAL MENSUAL 36060.25


2599713.03 1624820.64 2261750.33 1137374.45 2762195.09 1624820.64 19003103.49

SALUD PENSION SEGUROS EPP VACACIONES SALUD


APORTES TOTAL
8.00% 5.00% 6.96% 3.50% 8.50% 5%
367.2 229.5 319.464 160.65 390.15 229.5 7273.31

367.2 229.5 319.464 160.65 390.15 229.5 7273.31

258.4 161.5 224.808 113.05 274.55 161.5 5118.26

258.4 161.5 224.808 113.05 274.55 161.5 5118.26


TOTAL MENSUAL 24783.14
238 148.75 207.06 104.125 252.875 148.75 3524.19

238 148.75 207.06 104.125 252.875 148.75 4714.19

142.8 89.25 124.236 62.475 151.725 89.25 2828.51

238 148.75 207.06 104.125 252.875 148.75 4714.19

142.8 89.25 124.236 62.475 151.725 89.25 2828.51


TOTAL MENSUAL 18609.58
COSTOS ANUALES FABRICACION METAL MECANICA PE

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 750 50 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 65.00 213M3 260 M2
total Kg de material 60% peso65
tolva 127 65.00

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
34.09
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE D 0.02475 2.81 61.875 7.50 464.06

DISCO DE ES 0.02475 2.81 61.88 12.00 742.50


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 10.10 0.60 S/. 4,994.74
OTROS INSUMOS
THINER STD S/. 18.00 2.60 0.00 S/. 46.80
TRAPO S/. 2.50 2.00 0.80 S/. 2.00
SOLDADURA ( 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 0.02475 2.81 61.88 210.00 12993.75

ACCESORIOS 0.02475 2.81 61.88 80.00 4950.00

OXIGENO (10 0.02475 2.81 61.88 110.00 6806.25

PINTURA (Gl 0.0975 0.30 6.50 210.00 1365.00

SOILVENTE (g 0.097500 0.30 6.50 18.00 117.00


TOTAL 43536.767

MANO DE OBTRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL CESANTIA
100% 10% 8.50%
SUELDO ARM 0.75 5400 540 4455.00 378.675

SUELDO SOLD 0.75 5400 5400.75 8100.56 688.547813

SUELDO PINT 0.75 3800 3800.75 5700.56 484.547813

SUELDO AYU 0.75 3000 3000.75 4500.56 382.547813

SUELDO PINT 0.75 3800 3800.75 5700.56 2762195.09


TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0

IMPUESTOS DIMPUESTO PR 1 450 37.5 0

DEPRECIACIO SOLDADORA 2 1200 100 0


CORTADORAS 2 800 66.67 0.00
WPS -WPQR Certificacion 1 400 33.33 0.00
Prueba destru 1 1200 100 0
Prueba no des 1 1200 100 0
SEGUROS SEGURO CON 1 900 75 0
TOTAL 1012.50 0.00

ADMINISTRATRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL CESANTIA
100% 10% 8.50%
SUELDO INGE 0.75 5400 540 4590 390.15

CONTADOR G 0.75 5400 540 4590 390.15

SUELDO ADM 0.75 3800 380 3230 274.55

SUELDO SEC 0.75 3800 380 3230 274.55

MANO DE OBRA INDIRECTA


ENCARGADO 0.75 2100 210 1785 252.875

ING CONTRO 0.75 3500 350 2975 252.875

JEFE DE TALL 0.75 2100 210 1785 151.725

DIBUJANTE Y 0.75 3500 350 2975 252.875

INGENIERIO 0.75 2100 210 1785 151.725

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 65.00 780

PINTURA 25 65.00 1625.00


TOTAL MENSUAL2405.00
DEPRECIACION
TIPO COSTO COSTO ANUAL
COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN

COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG


CONSUMIBLES 522441.20 43536.77 17.41
MANO DE OBR 432722.96 36060.25 14.42
TRANSPORTE M 90240.00 7520.00 3.01
COSTOS INDIRECTOS 0.00
ENERGIA ELEC 6000.00 500 0.20
IMPUESTOS 450.00 37.5 0.02
DEPRECIACION 2000.00 166.67 0.07
WPQR WPQS 2800.00 233.33 0.09
SEGUROS 900.00 75.00 0.03
ADMINISTRACI 297397.73 24783.14 9.91
MANO DE OBRA 223314.92 18609.58 7.44
PROCESOS DEFORMADO 1920.00 160.00 0.06
REMOCION 6480.00 540.00 0.22
UNIR 43200.00 3600.00 1.44
SUPERFICIES 28860.00 2405.00 0.96
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40
EQUIPOS 11500.00 958.33 0.38
LOCAL INMUEB 10000.00 833.33 0.33
OTROS GASTO10% MO 95343.56 7945.29680125 3.18
COSTO DI ### 0.00
Sub Total 148964.20 59.59
GF 3% 4468.93 1.79
UTIL 15% 22344.63 8.94

TOTAL 175777.75 70.31

TOTAL POR 3MESES 527333.26 210.93

S//KG:
S/M2
ETAL MECANICA PESADA

AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


APORTES
8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
378.675 200.475 356.4 222.75 310.068 155.925 378.675 222.75

688.547813 364.525313 648.045 405.028125 563.79915 283.519688 688.547813 405.028125

484.547813 256.525313 456.045 285.028125 396.75915 199.519688 484.547813 285.028125

382.547813 202.525313 360.045 225.028125 313.23915 157.519688 382.547813 225.028125

TOTAL MENSUAL
2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09 1624820.64

STO MENSUAL

AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


APORTES
8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
390.15 206.55 367.2 229.5 319.464 160.65 390.15 229.5

390.15 206.55 367.2 229.5 319.464 160.65 390.15 229.5

274.55 145.35 258.4 161.5 224.808 113.05 274.55 161.5

274.55 145.35 258.4 161.5 224.808 113.05 274.55 161.5


TOTAL MENSUAL
252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

151.725 80.325 142.8 89.25 124.236 62.475 151.725 89.25

252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

151.725 80.325 142.8 89.25 124.236 62.475 151.725 89.25


TOTAL MENSUAL
POR M2
205.36
170.10
35.47
0.00
2.36
0.18
0.79
1.10
0.35
116.90
87.78
0.75
2.55
16.98
11.34
4.72
4.52
3.93
37.48

0.00
702.66
21.08
105.40

7.15

2487.42
COSTOS ANUALES FABRICACION METAL MECANICA PE

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 2043 50 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN AREA
RENDIMIENTO M2/OBRA 127.00 213M3 260 M2
total Kg de material 60% peso127
tolva 127 127.00

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
92.86
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625

DISCOS DE D 0.02475 2.81 61.875 7.50 464.06

DISCO DE ES 0.02475 2.81 61.88 12.00 742.50


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80% TOTAL
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00 S/. 4,853.37
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80 S/. 4,994.74
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 10.10 0.60 S/. 4,994.74
OTROS INSUMOS
THINER STD S/. 18.00 5.08 0.00 S/. 91.44
TRAPO S/. 2.50 2.00 0.80 S/. 2.00
SOLDADURA ( 0.02475 2.81 61.88 12.00 742.50

ARGON -CO2 0.02475 2.81 61.88 210.00 12993.75

ACCESORIOS 0.02475 2.81 61.88 80.00 4950.00

OXIGENO (10 0.02475 2.81 61.88 110.00 6806.25

PINTURA (Gl 0.1905 0.58 12.70 210.00 2667.00

SOILVENTE (g 0.190500 0.58 12.70 18.00 228.60


TOTAL 44995.007

TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL CESANTIA
100% 10% 8.50%
7059.393 SUELDO ARM 0.75 5400 540 4455.00 378.675

12836.15 SUELDO SOLD 0.75 5400 5400.75 8100.56 688.547813

9033.11 SUELDO PINT 0.75 3800 3800.75 5700.56 484.547813

7131.59 SUELDO AYU 0.75 3000 3000.75 4500.56 382.547813

36060.25
### SUELDO PINT 0.75 3800 3800.75 5700.56 2762195.09
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0

IMPUESTOS DIMPUESTO PR 1 450 37.5 0

DEPRECIACIO SOLDADORA 2 1200 100 0


CORTADORAS 2 800 66.67 0.00
WPS -WPQR Certificacion 1 400 33.33 0.00
Prueba destru 1 1200 100 0
Prueba no des 1 1200 100 0
SEGUROS SEGURO CON 1 900 75 0
TOTAL 1012.50 0.00

TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL CESANTIA
100% 10% 8.50%
7273.31 SUELDO INGE 0.75 5400 540 4590 390.15

7273.31 CONTADOR G 0.75 5400 540 4590 390.15

5118.26 SUELDO ADM 0.75 3800 380 3230 274.55

5118.26 SUELDO SEC 0.75 3800 380 3230 274.55


24783.14
MANO DE OBRA INDIRECTA
3524.19 ENCARGADO 0.75 2100 210 1785 252.875

4714.19 ING CONTRO 0.75 3500 350 2975 252.875

2828.51 JEFE DE TALL 0.75 2100 210 1785 151.725

4714.19 DIBUJANTE Y 0.75 3500 350 2975 252.875

2828.51 INGENIERIO 0.75 2100 210 1785 151.725


18609.58

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 127.00 1524

PINTURA 25 127.00 3175.00


TOTAL MENSUAL4699.00
DEPRECIACION
TIPO COSTO COSTO ANUAL
COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN

COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG


CONSUMIBLES 539940.08 44995.01 18.00
MANO DE OBR 432722.96 36060.25 14.42
TRANSPORTE M 90240.00 7520.00 3.01
COSTOS INDIRECTOS 0.00
ENERGIA ELEC 6000.00 500 0.20
IMPUESTOS 450.00 37.5 0.02
DEPRECIACION 2000.00 166.67 0.07
WPQR WPQS 2800.00 233.33 0.09
SEGUROS 900.00 75.00 0.03
ADMINISTRACI 297397.73 24783.14 9.91
MANO DE OBRA 223314.92 18609.58 7.44
PROCESOS DEFORMADO 1920.00 160.00 0.06
REMOCION 6480.00 540.00 0.22
UNIR 43200.00 3600.00 1.44
SUPERFICIES 56388.00 4699.00 1.88
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40
EQUIPOS 11500.00 958.33 0.38
LOCAL INMUEB 10000.00 833.33 0.33
OTROS GASTO10% MO 95343.56 7945.29680125 3.18
COSTO DI ### 0.00
Sub Total 152716.44 61.09
GF 3% 4581.49 1.83
UTIL 15% 22907.47 9.16

TOTAL 180205.40 72.08

TOTAL POR 3MESES 540616.19 216.25

S//KG:
S/M2
ETAL MECANICA PESADA

AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


APORTES
8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
378.675 200.475 356.4 222.75 310.068 155.925 378.675 222.75

688.547813 364.525313 648.045 405.028125 563.79915 283.519688 688.547813 405.028125

484.547813 256.525313 456.045 285.028125 396.75915 199.519688 484.547813 285.028125

382.547813 202.525313 360.045 225.028125 313.23915 157.519688 382.547813 225.028125

TOTAL MENSUAL
2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09 1624820.64

STO MENSUAL

AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


APORTES
8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
390.15 206.55 367.2 229.5 319.464 160.65 390.15 229.5

390.15 206.55 367.2 229.5 319.464 160.65 390.15 229.5

274.55 145.35 258.4 161.5 224.808 113.05 274.55 161.5

274.55 145.35 258.4 161.5 224.808 113.05 274.55 161.5


TOTAL MENSUAL
252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

151.725 80.325 142.8 89.25 124.236 62.475 151.725 89.25

252.875 133.875 238 148.75 207.06 104.125 252.875 148.75

151.725 80.325 142.8 89.25 124.236 62.475 151.725 89.25


TOTAL MENSUAL
POR M2
212.24
170.10
35.47
0.00
2.36
0.18
0.79
1.10
0.35
116.90
87.78
0.75
2.55
16.98
22.17
4.72
4.52
3.93
37.48

0.00
720.36
21.61
108.05

7.33

2550.08
COSTOS ANUALES FABRICACION METAL MECAN

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 467 50 %TOLVA
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES VOLUMEN
RENDIMIENTO M2/OBRA 28.70 213M3
total Kg de material 60% peso
28.7
tolva 127

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT
21.23
DISCOS DE C 0.02475 2.81 61.875 7.50

DISCOS DE D 0.02475 2.81 61.875 7.50

DISCO DE ES 0.02475 2.81 61.88 12.00


PRIMERA CAPA: UNITARIO CANTIDAD MERMA 80%
PINTURA AMERC $143.51 S/. 480.76 10.10 0.00
ACABADO
PINTURA AMERO $147.69 S/. 494.76 10.10 0.80
RETOQUE
PINTURA AMERO $147.69 S/. 494.76 10.10 0.60
OTROS INSUMOS
THINER STD S/. 18.00 1.15 0.00
TRAPO S/. 2.50 2.00 0.80
SOLDADURA ( 0.02475 2.81 61.88 12.00

ARGON -CO2 0.02475 2.81 61.88 210.00

ACCESORIOS 0.02475 2.81 61.88 80.00

OXIGENO (10 0.02475 2.81 61.88 110.00

PINTURA (Gl 0.0431 0.13 2.87 210.00

SOILVENTE (g 0.043050 0.13 2.87 18.00


TOTAL

TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL
100% 10%
7059.393 SUELDO ARM 0.75 5400 540 4455.00

12836.15 SUELDO SOLD 0.75 5400 5400.75 8100.56

9033.11 SUELDO PINT 0.75 3800 3800.75 5700.56

7131.59 SUELDO AYU 0.75 3000 3000.75 4500.56

36060.25
19003103.49 SUELDO PINT 0.75 3800 3800.75 5700.56
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500

IMPUESTOS DIMPUESTO PR 1 450 37.5

DEPRECIACIO SOLDADORA 2 1200 100


CORTADORAS 2 800 66.67
WPS -WPQR Certificacion 1 400 33.33
Prueba destru 1 1200 100
Prueba no des 1 1200 100
SEGUROS SEGURO CON 1 900 75
TOTAL 1012.50

TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO


MOVILIDAD SUB TOTAL
100% 10%
7273.31 SUELDO INGE 0.75 5400 540 4590

7273.31 CONTADOR G 0.75 5400 540 4590

5118.26 SUELDO ADM 0.75 3800 380 3230

5118.26 SUELDO SEC 0.75 3800 380 3230


24783.14
MANO DE OBRA INDIRECTA
3524.19 ENCARGADO 0.75 2100 210 1785

4714.19 ING CONTRO 0.75 3500 350 2975

2828.51 JEFE DE TALL 0.75 2100 210 1785

4714.19 DIBUJANTE Y 0.75 3500 350 2975

2828.51 INGENIERIO 0.75 2100 210 1785


18609.58

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDADUNID /MES TOTAL
DOBLADO 8 20 160
TOTAL MENSUAL 160.00
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDADUNID /MES TOTAL
CORTE/TALA 25 20 500

ESMERILADO 2 20 40
TOTAL MENSUAL 540.00

PROCESO DE PROCESO COSTO UNIT UNID /MES TOTAL


PRE ENSAMB 50 12 600

PRECALENTA 50 12 600

SOLDADURA 200 12 2400


TOTAL MENSUAL3600.00

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 28.70 344.4

PINTURA 25 28.70 717.50


TOTAL MENSUAL1061.90
DEPRECIACION
TIPO COSTO COSTO ANUAL
COSTO MENSUAL
VEHICULOS (VCAMIONETA 40000 4000 333.33
CAMION 80000 8000 666.67
EQUIPOS (VID GRUA 80000 8000 666.67
MONTACARGA 35000 3500 291.67
INMUEBLESTALLER
(V 600M2 300000 10000 833.33
TOTAL MENSUAL2791.67

RESUMEN

COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL


CONSUMIBLES 512195.89 42682.99
MANO DE OBR 432722.96 36060.25
TRANSPORTE M 90240.00 7520.00
COSTOS INDIRECTOS
ENERGIA ELEC 6000.00 500
IMPUESTOS 450.00 37.5
DEPRECIACION 2000.00 166.67
WPQR WPQS 2800.00 233.33
SEGUROS 900.00 75.00
ADMINISTRACI 297397.73 24783.14
MANO DE OBRA 223314.92 18609.58
PROCESOS DEFORMADO 1920.00 160.00
REMOCION 6480.00 540.00
UNIR 43200.00 3600.00
SUPERFICIES 12742.80 1061.90
DEPRECIACIONVEHICULOS 12000.00 1000.00
EQUIPOS 11500.00 958.33
LOCAL INMUEB 10000.00 833.33
OTROS GASTO10% MO 95343.56 7945.29680125
COSTO DI ###
Sub Total 146767.32
GF 3% 4403.02
UTIL 15% 22015.10

TOTAL 173185.44

TOTAL POR 3MESES 519556.32

S//KG:
S/M2
ION METAL MECANICA PESADA

50 %TOLVA
AREA
260 M2
28.70 1

COSTO MES

464.0625

464.06

742.50
TOTAL
S/. 4,853.37

S/. 4,994.74

S/. 4,994.74

S/. 20.66
S/. 2.00
742.50

12993.75

4950.00

6806.25

602.70

51.66
42682.991

CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50%
378.675 378.675 200.475 356.4 222.75 310.068 155.925 378.675

688.547813 688.547813 364.525313 648.045 405.028125 563.79915 283.519688 688.547813

484.547813 484.547813 256.525313 456.045 285.028125 396.75915 199.519688 484.547813

382.547813 382.547813 202.525313 360.045 225.028125 313.23915 157.519688 382.547813

TOTAL MENSUAL
2762195.09 2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09

OSTO MENSUAL

COSTO MENSUAL
0

0
0.00
0.00
0
0
0
0.00

CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD


8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50%
390.15 390.15 206.55 367.2 229.5 319.464 160.65 390.15

390.15 390.15 206.55 367.2 229.5 319.464 160.65 390.15

274.55 274.55 145.35 258.4 161.5 224.808 113.05 274.55

274.55 274.55 145.35 258.4 161.5 224.808 113.05 274.55


TOTAL MENSUAL
252.875 252.875 133.875 238 148.75 207.06 104.125 252.875

252.875 252.875 133.875 238 148.75 207.06 104.125 252.875

151.725 151.725 80.325 142.8 89.25 124.236 62.475 151.725

252.875 252.875 133.875 238 148.75 207.06 104.125 252.875

151.725 151.725 80.325 142.8 89.25 124.236 62.475 151.725


TOTAL MENSUAL

RCERIZADO)
STO MENSUAL

POR KG POR M2
17.07 201.33
14.42 170.10
3.01 35.47
0.00 0.00
0.20 2.36
0.02 0.18
0.07 0.79
0.09 1.10
0.03 0.35
9.91 116.90
7.44 87.78
0.06 0.75
0.22 2.55
1.44 16.98
0.42 5.01
0.40 4.72
0.38 4.52
0.33 3.93
3.18 37.48

0.00 0.00
58.71 692.30
1.76 20.77
8.81 103.84

69.27 7.04

207.82 2450.74
APORTES TOTAL
5%
222.75 7059.393

405.028125 12836.15

285.028125 9033.11

225.028125 7131.59

TOTAL MENSUAL36060.25
1624820.64 ###

APORTES TOTAL
5%
229.5 7273.31

229.5 7273.31

161.5 5118.26

161.5 5118.26
24783.14
TOTAL MENSUAL
148.75 3524.19

148.75 4714.19

89.25 2828.51

148.75 4714.19

89.25 2828.51
18609.58
TOTAL MENSUAL
COSTOS ANUALES FABRICACION METAL MEC

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 1200
MATERIALES total Kg de material 60% peso tolva 24600 M2/MES
RENDIMIENTO M2/OBRA 106.00
total Kg de material 60% peso tolva 106

RENDIMIENTO DE CONSUMIBLES UNID/KG 0.000099


CONSUMIBLES CONSUMIBLE CTD/ KG CTD DIA
54.55
DISCOS DE CORTE 0.01188 0.65

DISCOS DE DESBASTE 0.01188 0.65

DISCO DE ESMERIL 0.01188 0.65


PRIMERA CAPA: UNITARIO
PINTURA AMERCOAT DIMETCOTE 9 ZINC I $143.51 S/. 480.76
ACABADO
PINTURA AMERON AMERLOCK 400 125 MIC$147.69 S/. 494.76
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQUIV $147.69 S/. 494.76
OTROS INSUMOS
THINER STD S/. 18.00
TRAPO S/. 2.50

SOLDADURA (KG) 0.01188 0.65

ARGON -CO2 (10M3) 0.01188 0.65

ACCESORIOS DE EQUIPO PLASMA (kit 0.01188 0.65

OXIGENO (10 M3) 0.01188 0.65

PINTURA (Gln) 0.1590 0.48

SOILVENTE (gln) 0.159000 0.48


MANO DE OBRA DIRECTA TRABAJADOR CTD SUELDO PACTADO
100%
SUELDO ARMADOR CALIFICADO 0.7 5400
|
SUELDO SOLDADOR CALIFICADO 0.7 5400

SUELDO PINTOR CALIFICADO 0.7 3800

SUELDO AYUDANTES/PRACTICANTES 0.7 3000

SUELDO PINTOR CALIFICADO 0.7 3800


TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
CAMION DE 2 TON 8 12
MONTACARGAS DE 4 TON 8 8
GRUA DE 6 TON 8 12
CAMIONETA 4X4 8 10
AUTOMOVIL 8 5

COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA AC 1 6000

IMPUESTOS DE LOCAL IMPUESTO PREDIAL MUNICIPAL 1 450

DEPRECIACION DE ACTIVOS SOLDADORAS (VIDA UTIL 10 AÑOS 2 1200


CORTADORAS DE PLASMA/OXICORTE 2 800

WPS -WPQR (PROBETEADO) Certificacion de probetas 1 400


Prueba destructiva 1 1200
Prueba no destructiva 1 1200
SEGUROS SEGURO CONTRA TODO RIESGO 1 900
TOTAL

ADMINISTRACION GENERAL TRABAJADOR CTD SUELDO PACTADO


100%
SUELDO INGENIERIO SUPERVISION 0.7 5400

CONTADOR GENERAL 0.7 5400

SUELDO ADMINISTRADOR 0.7 3800


SUELDO SECRETARIA/RECURSOS H 0.7 3800

MANO DE OBRA INDIRECTA

ENCARGADO DE ALMANCEN/COMP 0.7 1960

JEFE DE TALLER/CAPATAZ 0.7 3500

DIBUJANTE Y PRESUPUESTOS 0.7 1960

INGENIERIO DE OBRA 0.7 3500

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDAD
DOBLADO 8

PROCESO DE REMOCION DE MATERIAL


PROCESO COSTO UNIDAD
CORTE/TALA 25

ESMERILADO 2

PROCESO DE UNIR PROCESO COSTO UNIT


PRE ENSAMB 50

PRECALENTA 50

SOLDADURA 200

PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12

PINTURA 25

DEPRECIACION
TIPO COSTO
VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000
CAMION 80000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000
MONTACARGA 35000
INMUEBLES (VIDA UTILS 30 AÑOS) TALLER 600M2 300000

RESUMEN

COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBR
TRANSPORTE M
COSTOS INDIRECTOS
ENERGIA ELEC
IMPUESTOS
DEPRECIACION
WPQR WPQS
SEGUROS
ADMINISTRACI
MANO DE OBRA
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEB
OTROS GASTO10% MO
COSTO DI

TOTAL POR 3MESES


CION METAL MECANICA PESADA

40 %TOLVA
VOLUMEN AREA
213M3 260 M2
106 106.00 1

CTD MES COSTO UNIT COSTO MES

14.256 7.50 106.92

14.256 7.50 106.92

14.26 12.00 171.07


CANTIDAD MERMA 80% TOTAL
5.05 0.00 S/. 2,426.69

5.05 0.80 S/. 2,497.37

5.05 0.60 S/. 2,497.37

4.24 0.00 S/. 76.32


2.00 0.80 S/. 2.00

14.26 12.00 171.07

14.26 210.00 2993.76

14.26 80.00 1140.48

14.26 110.00 1568.16

10.60 210.00 2226.00

10.60 18.00 190.80


TOTAL 16174.925
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS
10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 4158.00 353.43 353.43 187.11 332.64 207.9 289.3968

5400.7 7560.49 642.64165 642.64165 340.22205 604.8392 378.0245 526.210104

3800.7 5320.49 452.24165 452.24165 239.42205 425.6392 266.0245 370.306104

3000.7 4200.49 357.04165 357.04165 189.02205 336.0392 210.0245 292.354104

3800.7 5320.49 2406147.18 2406147.18 1273842.62 2264609.11 1415380.69 1970209.92

COSTO POR DIA COSTO MENSUAL


96 1920
64 1280
96 1920
80 1600
40 800
TOTAL 7520

COSTO MENSUAL COSTO MENSUAL


500 0

37.5 0

100 0
66.67 0.00

33.33 0.00
100 0
100 0
75 0
1012.50 0.00

MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS


10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 4158 353.43 353.43 187.11 332.64 207.9 289.3968

540 4158 353.43 353.43 187.11 332.64 207.9 289.3968


0
380 2926 248.71 248.71 131.67 234.08 146.3 203.6496
0
380 2926 248.71 248.71 131.67 234.08 146.3 203.6496
0
0
0
196 1509.2 128.282 128.282 67.914 120.736 75.46 105.04032
0
350 2695 229.075 229.075 121.275 215.6 134.75 187.572
0
196 1509.2 128.282 128.282 67.914 120.736 75.46 105.04032
0
350 2695 229.075 229.075 121.275 215.6 134.75 187.572

UNID /MES TOTAL


20 160
TOTAL MENSUAL 160.00

UNID /MES TOTAL


20 500

20 40
TOTAL MENSUAL 540.00

UNID /MES TOTAL


12 600

12 600

12 2400
TOTAL MENSUAL 3600.00

UNID /MES TOTAL


106.00 1272

106.00 2650.00
TOTAL MENSUAL 3922.00
COSTO ANUALCOSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL 2791.67

TOTAL ANUAL TOTAL MENSUAL POR KG POR M2


194099.10 16174.92 13.48 152.59
403872.77 33656.06 28.05 317.51
90240.00 7520.00 6.27 70.94
0.00 0.00
6000.00 500 0.42 4.72
450.00 37.5 0.03 0.35
1600.00 133.33 0.11 1.26
2800.00 233.33 0.19 2.20
900.00 75.00 0.06 0.71
269407.35 22450.61 18.71 211.80
159887.41 13323.95 11.10 125.70
1920.00 160.00 0.13 1.51
6480.00 540.00 0.45 5.09
43200.00 3600.00 3.00 33.96
47064.00 3922.00 3.27 37.00
12000.00 1000.00 0.83 9.43
11500.00 958.33 0.80 9.04
10000.00 833.33 0.69 7.86
83316.75 6943.0627602 5.79 65.50
1344737.38 0.00 0.00
Sub Total 112061.45 93.38 1057.18
GF 3% 3361.84 2.80 31.72
UTIL 15% 16809.22 14.01 158.58
0.00 0.00
TOTAL 132232.51 110.19 1247.48

TOTAL POR 3MESES 396697.53 330.58 3742.43

S//KG:
S/M2
COSTOS ANUALES FABR

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso212
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.01188

DISCOS DE D 0.01188

DISCO DE ES 0.01188
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO

SOLDADURA ( 0.01188

ARGON -CO2 0.01188

ACCESORIOS 0.01188

OXIGENO (10 0.01188

PINTURA (Gl 0.3180

SOILVENTE (g 0.318000
EPP VACACIONES SALUD APORTES TOTAL MANO DE OBTRABAJADOR CTD
3.50% 8.50% 5%
145.53 353.43 207.9 6588.7668 SUELDO ARM 0.5
|
264.61715 642.64165 378.0245 11980.35 SUELDO SOLD 0.5

186.21715 452.24165 266.0245 8430.85 SUELDO PINT 0.5

147.01715 357.04165 210.0245 6656.10 SUELDO AYU 0.5

TOTAL MENSUAL 33656.06


990766.484 2406147.18 1415380.692005 16553951.54 SUELDO PINT 0.7
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

EPP VACACIONES SALUD APORTES TOTAL ADMINISTRATRABAJADOR CTD


3.50% 8.50% 5%
145.53 353.43 207.9 6588.77 SUELDO INGE 0.5

145.53 353.43 207.9 6588.77 CONTADOR G 0.5

102.41 248.71 146.3 4636.54 SUELDO ADM 0.5


102.41 248.71 146.3 4636.54 SUELDO SEC 0.5
TOTAL MENSUAL 22450.61
MANO DE OBRA INDIRECTA

52.822 128.282 75.46 2391.48 ENCARGADO 0.5

94.325 229.075 134.75 4270.50 JEFE DE TALL 0.5

52.822 128.282 75.46 2391.48 DIBUJANTE Y 0.5

94.325 229.075 134.75 4270.50 INGENIERIO 0.5


TOTAL MENSUAL 13323.95

PROCESOS DE MANUFACTURA EN MET

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
2769 40 %TOLVA
M2/MES VOLUMEN AREA
212.00 213M3 260 M2
106 212.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
125.86
0.65 14.256 7.50 106.92

0.65 14.256 7.50 106.92

0.65 14.26 12.00 171.07


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 5.05 0.00 S/. 2,426.69

S/. 494.76 5.05 0.80 S/. 2,497.37

S/. 494.76 5.05 0.60 S/. 2,497.37

S/. 18.00 8.48 0.00 S/. 152.64


S/. 2.50 2.00 0.80 S/. 2.00

0.65 14.26 12.00 171.07

0.65 14.26 210.00 2993.76

0.65 14.26 80.00 1140.48

0.65 14.26 110.00 1568.16

0.96 21.20 210.00 4452.00

0.96 21.20 18.00 381.60


TOTAL 18668.045
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 2970.00 353.43 353.43 187.11 332.64 207.9

5400 5400.5 5400.25 642.64165 642.64165 340.22205 604.8392 378.0245

3800 3800.5 3800.25 452.24165 452.24165 239.42205 425.6392 266.0245

3000 3000.5 3000.25 357.04165 357.04165 189.02205 336.0392 210.0245

3800 3800.7 5320.49 2406147.18 2406147.18 1273842.62 2264609.11 1415380.69


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 2970 353.43 353.43 187.11 332.64 207.9

5400 540 2970 353.43 353.43 187.11 332.64 207.9


0
3800 380 2090 248.71 248.71 131.67 234.08 146.3
0
3800 380 2090 248.71 248.71 131.67 234.08 146.3
0
0
0
1400 140 770 128.282 128.282 67.914 120.736 75.46
0
3500 350 1925 229.075 229.075 121.275 215.6 134.75
0
1400 140 770 128.282 128.282 67.914 120.736 75.46
0
3500 350 1925 229.075 229.075 121.275 215.6 134.75

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 212.00 2544

25 212.00 5300.00
TOTAL MENSUAL7844.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 224016.54 18668.04 15.56 176.11
MANO DE OBR 331048.13 27587.34 22.99 260.26
TRANSPORTE M 90240.00 7520.00 6.27 70.94
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.42 4.72
IMPUESTOS 450.00 37.5 0.03 0.35
DEPRECIACION 1600.00 133.33 0.11 1.26
WPQR WPQS 2800.00 233.33 0.19 2.20
SEGUROS 900.00 75.00 0.06 0.71
ADMINISTRACI 220831.35 18402.61 15.34 173.61
MANO DE OBRA 123666.61 10305.55 8.59 97.22
FORMADO 1920.00 160.00 0.13 1.51
REMOCION 6480.00 540.00 0.45 5.09
UNIR 43200.00 3600.00 3.00 33.96
SUPERFICIES 94128.00 7844.00 6.54 74.00
VEHICULOS 12000.00 1000.00 0.83 9.43
EQUIPOS 11500.00 958.33 0.80 9.04
LOCAL INMUEB 10000.00 833.33 0.69 7.86
10% MO 67554.61 5629.5507602 4.69 53.11
COSTO DI ### 0.00 0.00
Sub Total 104027.94 86.69 981.40
GF 3% 3120.84 2.60 29.44
UTIL 15% 15604.19 13.00 147.21
0.00 0.00
TOTAL 122752.97 102.29 1158.05

TOTAL POR 3MESES 368258.90 306.88 3474.14

S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
289.3968 145.53 353.43 207.9 5400.7668

526.210104 264.61715 642.64165 378.0245 9820.11

370.306104 186.21715 452.24165 266.0245 6910.61

292.354104 147.01715 357.04165 210.0245 5455.86

TOTAL MENSUAL27587.34
1970209.92 990766.484 2406147.18 1415380.69 ###

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL
6.96% 3.50% 8.50% 5%
289.3968 145.53 353.43 207.9 5400.77

289.3968 145.53 353.43 207.9 5400.77

203.6496 102.41 248.71 146.3 3800.54


203.6496 102.41 248.71 146.3 3800.54
18402.61
TOTAL MENSUAL

105.04032 52.822 128.282 75.46 1652.28

187.572 94.325 229.075 134.75 3500.50

105.04032 52.822 128.282 75.46 1652.28

187.572 94.325 229.075 134.75 3500.50


10305.55
TOTAL MENSUAL
COSTOS ANUALES FABRICACION METAL MECANICA PE

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 700
MATERIALES
total Kg de material 60% peso tolva 24600 M2/MES
RENDIMIENTO M2/OBRA 72.00
total Kg de material 60% peso tolva 72

RENDIMIENTO DE CONSUMIBLES UNID/KG 0.000099


CONSUMIBLE CONSUMIBLE CTD/ KG CTD DIA CTD MES
31.82
DISCOS DE CORTE 0.00693 0.22 4.851

DISCOS DE DESBASTE 0.00693 0.22 4.851

DISCO DE ESMERIL 0.00693 0.22 4.85


PRIMERA CAPA: UNITARIO CANTIDAD
PINTURA AMERCOAT DIMETCOTE 9 ZI $143.51 S/. 480.76 3.43
ACABADO
PINTURA AMERON AMERLOCK 400 125$147.69 S/. 494.76 3.43
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQU$147.69 S/. 494.76 3.43
OTROS INSUMOS
THINER STD S/. 18.00 2.88
TRAPO S/. 2.50 2.00
SOLDADURA (KG) 0.00693 0.22 4.85

ARGON -CO2 (10M3) 0.00693 0.22 4.85

ACCESORIOS DE EQUIPO PLASMA 0.00693 0.22 4.85

OXIGENO (10 M3) 0.00693 0.22 4.85

PINTURA (Gln) 0.1080 0.33 7.20

SOILVENTE (gln) 0.108000 0.33 7.20

MANO DE OB TRABAJADOR CTD SUELDO PACTADO MOVILIDAD


100% 10%
SUELDO ARMADOR CALIFICADO 0.5 5400 540

SUELDO SOLDADOR CALIFICADO 0.5 5400 5400.5

SUELDO PINTOR CALIFICADO 0.5 3800 3800.5

SUELDO AYUDANTES/PRACTICA 0.5 3000 3000.5

SUELDO PINTOR CALIFICADO 0.5 3800 3800.5


TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DIA
CAMION DE 2 TON 8 12 96
MONTACARGAS DE 4 TON 8 8 64
GRUA DE 6 TON 8 12 96
CAMIONETA 4X4 8 10 80
AUTOMOVIL 8 5 40
TOTAL
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL COSTO MENSUAL
ENERGIA ELETRFASICA , CONTRATO POTENCI 1 6000 500

IMPUESTOS DIMPUESTO PREDIAL MUNICIPAL 1 450 37.5

DEPRECIACIO SOLDADORAS (VIDA UTIL 10 2 1200 100


CORTADORAS DE PLASMA/OXICOR 2 800 66.67

WPS -WPQR Certificacion de probetas 1 400 33.33


Prueba destructiva 1 1200 100
Prueba no destructiva 1 1200 100
SEGUROS SEGURO CONTRA TODO RIESGO 1 900 75
TOTAL 1012.50

ADMINISTRA TRABAJADOR CTD SUELDO PACTADO MOVILIDAD


100% 10%
SUELDO INGENIERIO SUPERVISI 0.5 5400 540

CONTADOR GENERAL 0.5 5400 540

SUELDO ADMINISTRADOR 0.5 3800 380

SUELDO SECRETARIA/RECURSO 0.5 3800 380


MANO DE OBRA INDIRECTA

ENCARGADO DE ALMANCEN/C 0.5 1400 140

JEFE DE TALLER/CAPATAZ 0.5 3500 350

DIBUJANTE Y PRESUPUESTOS 0.5 1400 140

INGENIERIO DE OBRA 0.5 3500 350

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDAD UNID /MES
DOBLADO 8 20
TOTAL MENSUAL
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDAD UNID /MES
CORTE/TALA 25 20

ESMERILADO 2 20
TOTAL MENSUAL

PROCESO DE UNIR PROCESO COSTO UNIT UNID /MES


PRE ENSAMB 50 12

PRECALENTA 50 12

SOLDADURA 200 12
TOTAL MENSUAL

PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES
ARENADO /G 12 72.00

PINTURA 25 72.00
TOTAL MENSUAL
DEPRECIACION
TIPO COSTO COSTO ANUAL
VEHICULOS (VIDA UTIL 10 AÑOSCAMIONETA 40000 4000
CAMION 80000 8000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000 8000
MONTACARGA 35000 3500
INMUEBLES (VIDA UTILS 30 AÑO
TALLER 600M2 300000 10000
TOTAL MENSUAL

RESUMEN

COSTOS DIRECTOS TOTAL ANUAL


CONSUMIBLES 106391.93
MANO DE OBR 288474.85
TRANSPORTE M 90240.00
COSTOS INDIRECTOS
ENERGIA ELEC 6000.00
IMPUESTOS 450.00
DEPRECIACION 1600.00
WPQR WPQS 2800.00
SEGUROS 900.00
ADMINISTRACI 192433.82
MANO DE OBRA 102491.93
PROCESOS DEFORMADO 1920.00
REMOCION 6480.00
UNIR 43200.00
SUPERFICIES 31968.00
DEPRECIACIONVEHICULOS 12000.00
EQUIPOS 11500.00
LOCAL INMUEB 10000.00
OTROS GASTO10% MO 58340.06
COSTO DI 967190.59
Sub Total
GF 3%
UTIL 15%

TOTAL

TOTAL POR 3MESES

S//KG:
S/M2
L MECANICA PESADA

30 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 72.00 1

COSTO UNIT COSTO MES

7.50 36.3825

7.50 36.38

12.00 58.21
MERMA 80% TOTAL
0.00 S/. 1,648.31

0.80 S/. 1,696.33

0.60 S/. 1,696.33

0.00 S/. 51.84


0.80 S/. 2.00
12.00 58.21

210.00 1018.71

80.00 388.08

110.00 533.61

210.00 1512.00

18.00 129.60
TOTAL 8865.9941

SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP


8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50%
2970.00 252.45 252.45 133.65 237.6 148.5 206.712 103.95

5400.25 459.02125 459.02125 243.01125 432.02 270.0125 375.8574 189.00875

3800.25 323.02125 323.02125 171.01125 304.02 190.0125 264.4974 133.00875

3000.25 255.02125 255.02125 135.01125 240.02 150.0125 208.8174 105.00875

3800.25 323.02125 323.02125 171.01125 304.02 190.0125 264.4974 133.00875

COSTO MENSUAL
1920
1280
1920
1600
800
7520

COSTO MENSUAL
0

0
0.00

0.00
0
0
0
0.00

SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP


8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50%
2970 252.45 252.45 133.65 237.6 148.5 206.712 103.95

2970 252.45 252.45 133.65 237.6 148.5 206.712 103.95

2090 177.65 177.65 94.05 167.2 104.5 145.464 73.15

2090 177.65 177.65 94.05 167.2 104.5 145.464 73.15


770 65.45 65.45 34.65 61.6 38.5 53.592 26.95

1925 163.625 163.625 86.625 154 96.25 133.98 67.375

770 65.45 65.45 34.65 61.6 38.5 53.592 26.95

1925 163.625 163.625 86.625 154 96.25 133.98 67.375

TOTAL
160
160.00

TOTAL
500

40
540.00

TOTAL
600

600

2400
3600.00

TOTAL
864

1800.00
2664.00
COSTO MENSUAL
333.33
666.67
666.67
291.67
833.33
2791.67

TOTAL MENSUAL POR KG POR M2


8865.99 12.67 123.14
24039.57 34.34 333.88
7520.00 10.74 104.44
0.00 0.00
500 0.71 6.94
37.5 0.05 0.52
133.33 0.19 1.85
233.33 0.33 3.24
75.00 0.11 1.04
16036.15 22.91 222.72
8540.99 12.20 118.62
160.00 0.23 2.22
540.00 0.77 7.50
3600.00 5.14 50.00
2664.00 3.81 37.00
1000.00 1.43 13.89
958.33 1.37 13.31
833.33 1.19 11.57
4861.671645 6.95 67.52

0.00 0.00
80599.22 115.14 1119.43
2417.98 3.45 33.58
12089.88 17.27 167.92
0.00 0.00
95107.07 135.87 1320.93

285321.22 407.60 3962.79


COSTOS ANUALES FABRICAC

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 350
MATERIALES
total Kg de material 60% peso
24600
tolva M2/MES
RENDIMIENTO M2/OBRA 35.00
total Kg de material 60% peso35
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA
15.91
DISCOS DE C 0.00693 0.22

DISCOS DE D 0.00693 0.22

DISCO DE ES 0.00693 0.22


PRIMERA CAPA: UNITARIO
PINTURA AMERC $143.51 S/. 480.76
ACABADO
PINTURA AMERO $147.69 S/. 494.76
RETOQUE
PINTURA AMERO $147.69 S/. 494.76
OTROS INSUMOS
THINER STD S/. 18.00
TRAPO S/. 2.50
SOLDADURA ( 0.00693 0.22

ARGON -CO2 0.00693 0.22

ACCESORIOS 0.00693 0.22

OXIGENO (10 0.00693 0.22

PINTURA (Gl 0.0525 0.16

SOILVENTE (g 0.052500 0.16

VACACIONES SALUD
APORTES TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO
8.50% 5% 100%
252.45 148.5 4706.262 SUELDO ARM 0.5 5400

459.02125 270.0125 8557.24 SUELDO SOLD 0.5 5400

323.02125 190.0125 6021.88 SUELDO PINT 0.5 3800

255.02125 150.0125 4754.20 SUELDO AYU 0.5 3000

TOTAL MENSUAL 24039.57


323.02125 190.0125 6021.88
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
CAMION DE 8 12
MONTACARGAS 8 8
GRUA DE 6 8 12
CAMIONETA 8 10
AUTOMOVIL 8 5

COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELETRFASICA , 1 6000

IMPUESTOS DIMPUESTO PR 1 450

DEPRECIACIO SOLDADORA 2 1200


CORTADORAS 2 800

WPS -WPQR Certificacion 1 400


Prueba destru 1 1200
Prueba no des 1 1200
SEGUROS SEGURO CON 1 900
TOTAL

VACACIONES SALUD
APORTES TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO
8.50% 5% 100%
252.45 148.5 4706.26 SUELDO INGE 0.5 5400

252.45 148.5 4706.26 CONTADOR G 0.5 5400

177.65 104.5 3311.81 SUELDO ADM 0.5 3800

177.65 104.5 3311.81 SUELDO SEC 0.5 3800


TOTAL MENSUAL 16036.15
MANO DE OBRA INDIRECTA

65.45 38.5 1220.14 ENCARGADO 0.5 1400

163.625 96.25 3050.36 JEFE DE TALL 0.5 3500

65.45 38.5 1220.14 DIBUJANTE Y 0.5 1400

163.625 96.25 3050.36 INGENIERIO 0.5 3500


TOTAL MENSUAL 8540.99

PROCESOS DE MANUFACTURA EN METAL (TE

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDAD
DOBLADO 8
TOTAL MENSUA
PROCESO DE REMOCION DE MATERIAL
PROCESO COSTO UNIDAD
CORTE/TALA 25

ESMERILADO 2
TOTAL MENSUA

PROCESO DE PROCESO COSTO UNIT


PRE ENSAMB 50

PRECALENTA 50

SOLDADURA 200
TOTAL MENSUA

PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12

PINTURA 25
TOTAL MENSUA
DEPRECIACION
TIPO COSTO
VEHICULOS (VCAMIONETA 40000
CAMION 80000
EQUIPOS (VID GRUA 80000
MONTACARGA 35000
INMUEBLESTALLER
(V 600M2 300000
TOTAL MENSUA

RESUMEN

COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBR
TRANSPORTE M
COSTOS INDIRECTOS
ENERGIA ELEC
IMPUESTOS
DEPRECIACION
WPQR WPQS
SEGUROS
ADMINISTRACI
MANO DE OBRA
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEB
OTROS GASTO10% MO
COSTO DI

TOTAL POR 3MESES


ALES FABRICACION METAL MECANICA PESADA

30 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 35.00 1

CTD MES COSTO UNIT COSTO MES

4.851 7.50 36.3825

4.851 7.50 36.38

4.85 12.00 58.21


CANTIDAD MERMA 80% TOTAL
3.43 0.00 S/. 1,648.31

3.43 0.80 S/. 1,696.33

3.43 0.60 S/. 1,696.33

1.40 0.00 S/. 25.20


2.00 0.80 S/. 2.00
4.85 12.00 58.21

4.85 210.00 1018.71

4.85 80.00 388.08

4.85 110.00 533.61

3.50 210.00 735.00

3.50 18.00 63.00


TOTAL 7995.7541

MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS


10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 2970.00 252.45 252.45 133.65 237.6 148.5 206.712

5400.5 5400.25 459.02125 459.02125 243.01125 432.02 270.0125 375.8574

3800.5 3800.25 323.02125 323.02125 171.01125 304.02 190.0125 264.4974

3000.5 3000.25 255.02125 255.02125 135.01125 240.02 150.0125 208.8174

COSTO POR DCOSTO MENSUAL


96 1920
64 1280
96 1920
80 1600
40 800
TOTAL 7520

COSTO MENSUAL COSTO MENSUAL


500 0

37.5 0

100 0
66.67 0.00

33.33 0.00
100 0
100 0
75 0
1012.50 0.00

MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS


10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 2970 252.45 252.45 133.65 237.6 148.5 206.712

540 2970 252.45 252.45 133.65 237.6 148.5 206.712

380 2090 177.65 177.65 94.05 167.2 104.5 145.464

380 2090 177.65 177.65 94.05 167.2 104.5 145.464


140 770 65.45 65.45 34.65 61.6 38.5 53.592

350 1925 163.625 163.625 86.625 154 96.25 133.98

140 770 65.45 65.45 34.65 61.6 38.5 53.592

350 1925 163.625 163.625 86.625 154 96.25 133.98

RA EN METAL (TERCERIZADO)

MODELADO
UNID /MES TOTAL
20 160
TOTAL MENSUAL 160.00
E MATERIAL
UNID /MES TOTAL
20 500

20 40
TOTAL MENSUAL 540.00

UNID /MES TOTAL


12 600

12 600

12 2400
TOTAL MENSUAL3600.00

UNID /MES TOTAL


35.00 420

35.00 875.00
TOTAL MENSUAL1295.00
COSTO ANUAL
COSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL2791.67

TOTAL ANUALTOTAL MENSUAL POR KG POR M2


95949.05 7995.75 11.42 111.05
288474.85 24039.57 34.34 333.88
90240.00 7520.00 10.74 104.44
0.00 0.00
6000.00 500 0.71 6.94
450.00 37.5 0.05 0.52
1600.00 133.33 0.19 1.85
2800.00 233.33 0.33 3.24
900.00 75.00 0.11 1.04
192433.82 16036.15 22.91 222.72
102491.93 8540.99 12.20 118.62
1920.00 160.00 0.23 2.22
6480.00 540.00 0.77 7.50
43200.00 3600.00 5.14 50.00
15540.00 1295.00 1.85 17.99
12000.00 1000.00 1.43 13.89
11500.00 958.33 1.37 13.31
10000.00 833.33 1.19 11.57
58340.06 4861.671645 6.95 67.52
### 0.00 0.00
Sub Total 78359.98 111.94 1088.33
GF 3% 2350.80 3.36 32.65
UTIL 15% 11754.00 16.79 163.25
0.00 0.00
TOTAL 92464.77 132.09 1284.23

TOTAL POR 3MESES 277394.31 396.28 3852.70

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso17
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00693

DISCOS DE D 0.00693

DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693

ARGON -CO2 0.00693

ACCESORIOS 0.00693

OXIGENO (10 0.00693

PINTURA (Gl 0.0255

SOILVENTE (g 0.025500

EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
3.50% 8.50% 5%
103.95 252.45 148.5 4706.262 SUELDO ARM 0.3

189.00875 459.02125 270.0125 8557.24 SUELDO SOLD 0.3

133.00875 323.02125 190.0125 6021.88 SUELDO PINT 0.3

105.00875 255.02125 150.0125 4754.20 SUELDO AYU 0.3

24039.57
TOTAL MENSUAL
SUELDO PINT 0.5
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
3.50% 8.50% 5%
103.95 252.45 148.5 4706.26 SUELDO INGE 0.3

103.95 252.45 148.5 4706.26 CONTADOR G 0.3

73.15 177.65 104.5 3311.81 SUELDO ADM 0.3

73.15 177.65 104.5 3311.81 SUELDO SEC 0.3


16036.15
TOTAL MENSUAL
MANO DE OBRA INDIRECTA

26.95 65.45 38.5 1220.14 ENCARGADO 0.3

67.375 163.625 96.25 3050.36 JEFE DE TALL 0.3

26.95 65.45 38.5 1220.14 DIBUJANTE Y 0.3

67.375 163.625 96.25 3050.36 INGENIERIO 0.3


TOTAL MENSUAL8540.99

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
175 30 %TOLVA
M2/MES VOLUMEN AREA
17.00 213M3 260 M2
213 17.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
7.95
0.22 4.851 7.50 36.3825

0.22 4.851 7.50 36.38

0.22 4.85 12.00 58.21


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 3.43 0.00 S/. 1,648.31

S/. 494.76 3.43 0.80 S/. 1,696.33

S/. 494.76 3.43 0.60 S/. 1,696.33

S/. 18.00 0.68 0.00 S/. 12.24


S/. 2.50 2.00 0.80 S/. 2.00
0.22 4.85 12.00 58.21

0.22 4.85 210.00 1018.71

0.22 4.85 80.00 388.08

0.22 4.85 110.00 533.61

0.08 1.70 210.00 357.00

0.08 1.70 18.00 30.60


TOTAL 7572.3941

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5

5400 5400.3 3240.09 459.02125 459.02125 243.01125 432.02 270.0125

3800 3800.3 2280.09 323.02125 323.02125 171.01125 304.02 190.0125

3000 3000.3 1800.09 255.02125 255.02125 135.01125 240.02 150.0125

3800 3800.5 3800.25 323.02125 323.02125 171.01125 304.02 190.0125


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5

5400 540 1782 252.45 252.45 133.65 237.6 148.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5


840 84 277.2 65.45 65.45 34.65 61.6 38.5

3500 350 1155 163.625 163.625 86.625 154 96.25

840 84 277.2 65.45 65.45 34.65 61.6 38.5

3500 350 1155 163.625 163.625 86.625 154 96.25

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 17.00 204

25 17.00 425.00
TOTAL MENSUAL 629.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 90868.73 7572.39 10.82 105.17
MANO DE OBR 215653.09 17971.09 25.67 249.60
TRANSPORTE M 90240.00 7520.00 10.74 104.44
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.71 6.94
IMPUESTOS 450.00 37.5 0.05 0.52
DEPRECIACION 1600.00 133.33 0.19 1.85
WPQR WPQS 2800.00 233.33 0.33 3.24
SEGUROS 900.00 75.00 0.11 1.04
ADMINISTRACI 143857.82 11988.15 17.13 166.50
MANO DE OBRA 72184.73 6015.39 8.59 83.55
FORMADO 1920.00 160.00 0.23 2.22
REMOCION 6480.00 540.00 0.77 7.50
UNIR 43200.00 3600.00 5.14 50.00
SUPERFICIES 7548.00 629.00 0.90 8.74
VEHICULOS 12000.00 1000.00 1.43 13.89
EQUIPOS 11500.00 958.33 1.37 13.31
LOCAL INMUEB 10000.00 833.33 1.19 11.57
10% MO 43169.56 3597.463645 5.14 49.96
COSTO DI ### 0.00 0.00
Sub Total 63364.33 90.52 880.06
GF 3% 1900.93 2.72 26.40
UTIL 15% 9504.65 13.58 132.01
0.00 0.00
TOTAL 74769.91 106.81 1038.47

TOTAL POR 3MESES 224309.72 320.44 3115.41

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso212
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00693

DISCOS DE D 0.00693

DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693

ARGON -CO2 0.00693

ACCESORIOS 0.00693

OXIGENO (10 0.00693

PINTURA (Gl 0.3180

SOILVENTE (g 0.318000

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.262 SUELDO ARM 0.3

375.8574 189.00875 459.02125 270.0125 6397.08 SUELDO SOLD 0.3

264.4974 133.00875 323.02125 190.0125 4501.72 SUELDO PINT 0.3

208.8174 105.00875 255.02125 150.0125 3554.04 SUELDO AYU 0.3

17971.09
TOTAL MENSUAL
264.4974 133.00875 323.02125 190.0125 6021.88
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.26 SUELDO INGE 0.3

206.712 103.95 252.45 148.5 3518.26 CONTADOR G 0.3

145.464 73.15 177.65 104.5 2475.81 SUELDO ADM 0.3

145.464 73.15 177.65 104.5 2475.81 SUELDO SEC 0.3


11988.15
TOTAL MENSUAL
MANO DE OBRA INDIRECTA

53.592 26.95 65.45 38.5 727.34 ENCARGADO 0.5

133.98 67.375 163.625 96.25 2280.36 JEFE DE TALL 0.5

53.592 26.95 65.45 38.5 727.34 DIBUJANTE Y 0.5

133.98 67.375 163.625 96.25 2280.36 INGENIERIO 0.5


TOTAL MENSUAL6015.39

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
2215 30 %TOLVA
M2/MES VOLUMEN AREA
212.00 213M3 260 M2
213 212.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
100.68
0.22 4.851 7.50 36.3825

0.22 4.851 7.50 36.38

0.22 4.85 12.00 58.21


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 3.43 0.00 S/. 1,648.31

S/. 494.76 3.43 0.80 S/. 1,696.33

S/. 494.76 3.43 0.60 S/. 1,696.33

S/. 18.00 8.48 0.00 S/. 152.64


S/. 2.50 2.00 0.80 S/. 2.00
0.22 4.85 12.00 58.21

0.22 4.85 210.00 1018.71

0.22 4.85 80.00 388.08

0.22 4.85 110.00 533.61

0.96 21.20 210.00 4452.00

0.96 21.20 18.00 381.60


TOTAL 12158.794

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5

5400 5400.3 3240.09 459.02125 459.02125 243.01125 432.02 270.0125

3800 3800.3 2280.09 323.02125 323.02125 171.01125 304.02 190.0125

3000 3000.3 1800.09 255.02125 255.02125 135.01125 240.02 150.0125

ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5

5400 540 1782 252.45 252.45 133.65 237.6 148.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5


1400 140 770 65.45 65.45 34.65 61.6 38.5

3500 350 1925 163.625 163.625 86.625 154 96.25

1400 140 770 65.45 65.45 34.65 61.6 38.5

3500 350 1925 163.625 163.625 86.625 154 96.25

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 212.00 2544

25 212.00 5300.00
TOTAL MENSUAL7844.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 145905.53 12158.79 17.37 168.87
MANO DE OBR 215653.09 17971.09 25.67 249.60
TRANSPORTE M 90240.00 7520.00 10.74 104.44
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.71 6.94
IMPUESTOS 450.00 37.5 0.05 0.52
DEPRECIACION 1600.00 133.33 0.19 1.85
WPQR WPQS 2800.00 233.33 0.33 3.24
SEGUROS 900.00 75.00 0.11 1.04
ADMINISTRACI 143857.82 11988.15 17.13 166.50
MANO DE OBRA 102491.93 8540.99 12.20 118.62
FORMADO 1920.00 160.00 0.23 2.22
REMOCION 6480.00 540.00 0.77 7.50
UNIR 43200.00 3600.00 5.14 50.00
SUPERFICIES 94128.00 7844.00 11.21 108.94
VEHICULOS 12000.00 1000.00 1.43 13.89
EQUIPOS 11500.00 958.33 1.37 13.31
LOCAL INMUEB 10000.00 833.33 1.19 11.57
10% MO 46200.28 3850.023645 5.50 53.47
COSTO DI ### 0.00 0.00
Sub Total 77943.89 111.35 1082.55
GF 3% 2338.32 3.34 32.48
UTIL 15% 11691.58 16.70 162.38
0.00 0.00
TOTAL 91973.79 131.39 1277.41

TOTAL POR 3MESES 275921.36 394.17 3832.24

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso144
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00693

DISCOS DE D 0.00693

DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693

ARGON -CO2 0.00693

ACCESORIOS 0.00693

OXIGENO (10 0.00693

PINTURA (Gl 0.2160

SOILVENTE (g 0.216000

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.262 SUELDO ARM 0.3

375.8574 189.00875 459.02125 270.0125 6397.08 SUELDO SOLD 0.3

264.4974 133.00875 323.02125 190.0125 4501.72 SUELDO PINT 0.3

208.8174 105.00875 255.02125 150.0125 3554.04 SUELDO AYU 0.3

17971.09
TOTAL MENSUAL
SUELDO PINT 0.5
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.26 SUELDO INGE 0.3

206.712 103.95 252.45 148.5 3518.26 CONTADOR G 0.3

145.464 73.15 177.65 104.5 2475.81 SUELDO ADM 0.3

145.464 73.15 177.65 104.5 2475.81 SUELDO SEC 0.3


11988.15
TOTAL MENSUAL
MANO DE OBRA INDIRECTA

53.592 26.95 65.45 38.5 1220.14 ENCARGADO 0.5

133.98 67.375 163.625 96.25 3050.36 JEFE DE TALL 0.5

53.592 26.95 65.45 38.5 1220.14 DIBUJANTE Y 0.5

133.98 67.375 163.625 96.25 3050.36 INGENIERIO 0.5


TOTAL MENSUAL8540.99

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
1504 30 %TOLVA
M2/MES VOLUMEN AREA
144.00 213M3 260 M2
213 144.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
68.36
0.22 4.851 7.50 36.3825

0.22 4.851 7.50 36.38

0.22 4.85 12.00 58.21


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 3.43 0.00 S/. 1,648.31

S/. 494.76 3.43 0.80 S/. 1,696.33

S/. 494.76 3.43 0.60 S/. 1,696.33

S/. 18.00 5.76 0.00 S/. 103.68


S/. 2.50 2.00 0.80 S/. 2.00
0.22 4.85 12.00 58.21

0.22 4.85 210.00 1018.71

0.22 4.85 80.00 388.08

0.22 4.85 110.00 533.61

0.65 14.40 210.00 3024.00

0.65 14.40 18.00 259.20


TOTAL 10559.434

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5

5400 5400.3 3240.09 459.02125 459.02125 243.01125 432.02 270.0125

3800 3800.3 2280.09 323.02125 323.02125 171.01125 304.02 190.0125

3000 3000.3 1800.09 255.02125 255.02125 135.01125 240.02 150.0125

3800 3800.5 3800.25 323.02125 323.02125 171.01125 304.02 190.0125


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5

5400 540 1782 252.45 252.45 133.65 237.6 148.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5

3800 380 1254 177.65 177.65 94.05 167.2 104.5


1400 140 770 65.45 65.45 34.65 61.6 38.5

3500 350 1925 163.625 163.625 86.625 154 96.25

1400 140 770 65.45 65.45 34.65 61.6 38.5

3500 350 1925 163.625 163.625 86.625 154 96.25

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 144.00 1728

25 144.00 3600.00
TOTAL MENSUAL5328.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 126713.21 10559.43 15.08 146.66
MANO DE OBR 215653.09 17971.09 25.67 249.60
TRANSPORTE M 90240.00 7520.00 10.74 104.44
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.71 6.94
IMPUESTOS 450.00 37.5 0.05 0.52
DEPRECIACION 1600.00 133.33 0.19 1.85
WPQR WPQS 2800.00 233.33 0.33 3.24
SEGUROS 900.00 75.00 0.11 1.04
ADMINISTRACI 143857.82 11988.15 17.13 166.50
MANO DE OBRA 102491.93 8540.99 12.20 118.62
FORMADO 1920.00 160.00 0.23 2.22
REMOCION 6480.00 540.00 0.77 7.50
UNIR 43200.00 3600.00 5.14 50.00
SUPERFICIES 63936.00 5328.00 7.61 74.00
VEHICULOS 12000.00 1000.00 1.43 13.89
EQUIPOS 11500.00 958.33 1.37 13.31
LOCAL INMUEB 10000.00 833.33 1.19 11.57
10% MO 46200.28 3850.023645 5.50 53.47
COSTO DI ### 0.00 0.00
Sub Total 73828.53 105.47 1025.40
GF 3% 2214.86 3.16 30.76
UTIL 15% 11074.28 15.82 153.81
0.00 0.00
TOTAL 87117.66 124.45 1209.97

TOTAL POR 3MESES 261352.99 373.36 3629.90

S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.262

375.8574 189.00875 459.02125 270.0125 6397.08

264.4974 133.00875 323.02125 190.0125 4501.72

208.8174 105.00875 255.02125 150.0125 3554.04

17971.09
TOTAL MENSUAL
264.4974 133.00875 323.02125 190.0125 6021.88

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.26

206.712 103.95 252.45 148.5 3518.26

145.464 73.15 177.65 104.5 2475.81

145.464 73.15 177.65 104.5 2475.81


11988.15
TOTAL MENSUAL

53.592 26.95 65.45 38.5 1220.14

133.98 67.375 163.625 96.25 3050.36

53.592 26.95 65.45 38.5 1220.14

133.98 67.375 163.625 96.25 3050.36


TOTAL MENSUAL8540.99
COSTOS ANUALES FABRICACION METAL MECANICA PE

COSTOS DIRECTOS KG/MES


RENDIMIENTO KG/OBRA 200
MATERIALES total Kg de material 60% peso tolva 24600 M2/MES
RENDIMIENTO M2/OBRA 21.00
total Kg de material 60% peso tolva 21

RENDIMIENTO DE CONSUMIBLES UNID/KG 0.000099


CONSUMIBLE CONSUMIBLE CTD/ KG CTD DIA
9.09
DISCOS DE CORTE 0.00198 0.02

DISCOS DE DESBASTE 0.00198 0.02

DISCO DE ESMERIL 0.00198 0.02


PRIMERA CAPA: UNITARIO
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANICO 6$143.51 S/. 480.76
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4.5 $147.69 S/. 494.76
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQUIV JET MP 8 $147.69 S/. 494.76
OTROS INSUMOS
THINER STD S/. 18.00
TRAPO S/. 2.50
SOLDADURA (KG) 0.00198 0.02

ARGON -CO2 (10M3) 0.00198 0.02

ACCESORIOS DE EQUIPO PLASMA (kit) 0.00198 0.02

OXIGENO (10 M3) 0.00198 0.02

PINTURA (Gln) 0.0315 0.10

SOILVENTE (gln) 0.031500 0.10

MANO DE OB TRABAJADOR CTD SUELDO PACTADO


100%
SUELDO ARMADOR CALIFICADO 0.25 5400

SUELDO SOLDADOR CALIFICADO 0.25 5400

SUELDO PINTOR CALIFICADO 0.25 3800

SUELDO AYUDANTES/PRACTICANTES 0.25 3000

SUELDO PINTOR CALIFICADO 0.25 3800


TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA COSTO POR HORA
CAMION DE 2 TON 8 12
MONTACARGAS DE 4 TON 8 8
GRUA DE 6 TON 8 12
CAMIONETA 4X4 8 10
AUTOMOVIL 8 5

COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELETRFASICA , CONTRATO POTENCIA ACTIVA 1 6000

IMPUESTOS DIMPUESTO PREDIAL MUNICIPAL 1 450

DEPRECIACIO SOLDADORAS (VIDA UTIL 10 AÑOS) 2 1200


CORTADORAS DE PLASMA/OXICORTE (VU. 10A) 2 800

WPS -WPQR Certificacion de probetas 1 400


Prueba destructiva 1 1200
Prueba no destructiva 1 1200
SEGUROS SEGURO CONTRA TODO RIESGO 1 900
TOTAL

ADMINISTRA TRABAJADOR CTD SUELDO PACTADO


100%
SUELDO INGENIERIO SUPERVISION GENERAL 0.25 5400

CONTADOR GENERAL 0.25 5400

SUELDO ADMINISTRADOR 0.25 3800

SUELDO SECRETARIA/RECURSOS HUMANOS 0.25 3800


MANO DE OBRA INDIRECTA

ENCARGADO DE ALMANCEN/COMPRAS 0.25 700

JEFE DE TALLER/CAPATAZ 0.25 3500

DIBUJANTE Y PRESUPUESTOS 0.25 700

INGENIERIO DE OBRA 0.25 3500

PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)

PROCESO DE FORMADO Y MODELADO


PROCESO COSTO UNIDAD
DOBLADO 8

PROCESO DE REMOCION DE MATERIAL


PROCESO COSTO UNIDAD
CORTE/TALA 25

ESMERILADO 2

PROCESO DE UNIR PROCESO COSTO UNIT


PRE ENSAMB 50

PRECALENTA 50

SOLDADURA 200

PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12

PINTURA 25

DEPRECIACION
TIPO COSTO
VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000
CAMION 80000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000
MONTACARGA 35000
INMUEBLES (VIDA UTILS 30 AÑOS) TALLER 600M2 300000

RESUMEN

COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBRA
TRANSPORTE MATERIAL
COSTOS INDIRECTOS
ENERGIA ELECTRICA
IMPUESTOS
DEPRECIACION EQUIPO
WPQR WPQS PROBETA
SEGUROS
ADMINISTRACION
MANO DE OBRA INDIREC
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEBLE
OTROS GASTO10% MO
COSTO DIRECTO

TOTAL POR 3MESES


AL MECANICA PESADA

20 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 21.00 1

CTD MES COSTO UNIT COSTO MES

0.396 7.50 2.97

0.396 7.50 2.97

0.40 12.00 4.75


CANTIDAD MERMA 80% TOTAL
1.00 0.00 S/. 480.76

1.00 0.80 S/. 494.76

1.00 0.60 S/. 494.76

0.84 0.00 S/. 15.12


2.00 0.80 S/. 2.00
0.40 12.00 4.75

0.40 210.00 83.16

0.40 80.00 31.68

0.40 110.00 43.56

2.10 210.00 441.00

2.10 18.00 37.80


TOTAL 2140.0455

MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS


10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 1485.00 126.225 126.225 66.825 118.8 74.25 103.356

5400.25 2700.06 229.505313 229.505313 121.502813 216.005 135.003125 187.92435

3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125 132.24435

3000.25 1500.06 127.505313 127.505313 67.5028125 120.005 75.003125 104.40435

3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125 132.24435

COSTO POR DIA COSTO MENSUAL


96 1920
64 1280
96 1920
80 1600
40 800
TOTAL 7520

COSTO MENSUAL COSTO MENSUAL


500 0

37.5 0

100 0
66.67 0.00

33.33 0.00
100 0
100 0
75 0
1012.50 0.00

MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS


10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96%
540 1485 126.225 126.225 66.825 118.8 74.25 103.356

540 1485 126.225 126.225 66.825 118.8 74.25 103.356


0
380 1045 88.825 88.825 47.025 83.6 52.25 72.732
0
380 1045 88.825 88.825 47.025 83.6 52.25 72.732
0
0
0
70 192.5 16.3625 16.3625 8.6625 15.4 9.625 13.398
0
350 962.5 81.8125 81.8125 43.3125 77 48.125 66.99
0
70 192.5 16.3625 16.3625 8.6625 15.4 9.625 13.398

350 962.5 81.8125 81.8125 43.3125 77 48.125 66.99

UNID /MES TOTAL


20 160
TOTAL MENSUAL 160.00

UNID /MES TOTAL


20 500

20 40
TOTAL MENSUAL 540.00

UNID /MES TOTAL


12 600

12 600

12 2400
TOTAL MENSUAL 3600.00

UNID /MES TOTAL


21.00 252

21.00 525.00
TOTAL MENSUAL 777.00
COSTO ANUAL COSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL 2791.67

TOTAL ANUAL TOTAL MENSUAL POR KG POR M2


25680.55 2140.05 10.70 101.91
144233.86 12019.49 60.10 572.36
90240.00 7520.00 37.60 358.10
0.00 0.00
6000.00 500 2.50 23.81
450.00 37.5 0.19 1.79
1600.00 133.33 0.67 6.35
2800.00 233.33 1.17 11.11
900.00 75.00 0.38 3.57
96216.91 8018.08 40.09 381.81
43925.11 3660.43 18.30 174.31
1920.00 160.00 0.80 7.62
6480.00 540.00 2.70 25.71
43200.00 3600.00 18.00 171.43
9324.00 777.00 3.89 37.00
12000.00 1000.00 5.00 47.62
11500.00 958.33 4.79 45.63
10000.00 833.33 4.17 39.68
28437.59 2369.79901125 11.85 112.85
534908.02 0.00 0.00
Sub Total 44575.67 222.88 2122.65
GF 3% 1337.27 6.69 63.68
UTIL 15% 6686.35 33.43 318.40
0.00 0.00
TOTAL 52599.29 263.00 2504.73

TOTAL POR 3MESES 157797.86 788.99 7514.18

S//KG:
S/M2
COSTOS ANUALES FABRICA

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso10
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00198

DISCOS DE D 0.00198

DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198

ARGON -CO2 0.00198

ACCESORIOS 0.00198

OXIGENO (10 0.00198

PINTURA (Gl 0.0150

SOILVENTE (g 0.015000

EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
3.50% 8.50% 5%
51.975 126.225 74.25 2353.131 SUELDO ARM 0.25

94.5021875 229.505313 135.003125 4278.52 SUELDO SOLD 0.25

66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.25

52.5021875 127.505313 75.003125 2377.00 SUELDO AYU 0.25

TOTAL MENSUAL 12019.49


66.5021875 161.505313 95.003125 3010.84
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
3.50% 8.50% 5%
51.975 126.225 74.25 2353.13 SUELDO INGE 0.25

51.975 126.225 74.25 2353.13 CONTADOR G 0.25

36.575 88.825 52.25 1655.91 SUELDO ADM 0.25

36.575 88.825 52.25 1655.91 SUELDO SEC 0.25


TOTAL MENSUAL 8018.08
MANO DE OBRA INDIRECTA

6.7375 16.3625 9.625 305.04 ENCARGADO 0.25

33.6875 81.8125 48.125 1525.18 JEFE DE TALL 0.25

6.7375 16.3625 9.625 305.04 DIBUJANTE Y 0.25

33.6875 81.8125 48.125 1525.18 INGENIERIO 0.25


TOTAL MENSUAL 3660.43

PROCESOS DE MANUFACTURA EN METAL (T

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
100 20 %TOLVA
M2/MES VOLUMEN AREA
10.00 213M3 260 M2
213 10.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
4.55
0.02 0.396 7.50 2.97

0.02 0.396 7.50 2.97

0.02 0.40 12.00 4.75


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 1.00 0.00 S/. 480.76

S/. 494.76 1.00 0.80 S/. 494.76

S/. 494.76 1.00 0.60 S/. 494.76

S/. 18.00 0.40 0.00 S/. 7.20


S/. 2.50 2.00 0.80 S/. 2.00
0.02 0.40 12.00 4.75

0.02 0.40 210.00 83.16

0.02 0.40 80.00 31.68

0.02 0.40 110.00 43.56

0.05 1.00 210.00 210.00

0.05 1.00 18.00 18.00


TOTAL 1881.3255

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1485.00 126.225 126.225 66.825 118.8 74.25

5400 5400.25 2700.06 229.505313 229.505313 121.502813 216.005 135.003125

3800 3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125

3000 3000.25 1500.06 127.505313 127.505313 67.5028125 120.005 75.003125

5400
ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1485 126.225 126.225 66.825 118.8 74.25

5400 540 1485 126.225 126.225 66.825 118.8 74.25


0
3800 380 1045 88.825 88.825 47.025 83.6 52.25
0
3800 380 1045 88.825 88.825 47.025 83.6 52.25
0
0
0
700 70 192.5 16.3625 16.3625 8.6625 15.4 9.625
0
3500 350 962.5 81.8125 81.8125 43.3125 77 48.125
0
700 70 192.5 16.3625 16.3625 8.6625 15.4 9.625

3500 350 962.5 81.8125 81.8125 43.3125 77 48.125

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 10.00 120

25 10.00 250.00
TOTAL MENSUAL 370.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 22575.91 1881.33 9.41 89.59
MANO DE OBR 144233.86 12019.49 60.10 572.36
TRANSPORTE M 90240.00 7520.00 37.60 358.10
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 2.50 23.81
IMPUESTOS 450.00 37.5 0.19 1.79
DEPRECIACION 1600.00 133.33 0.67 6.35
WPQR WPQS 2800.00 233.33 1.17 11.11
SEGUROS 900.00 75.00 0.38 3.57
ADMINISTRACI 96216.91 8018.08 40.09 381.81
MANO DE OBRA 43925.11 3660.43 18.30 174.31
FORMADO 1920.00 160.00 0.80 7.62
REMOCION 6480.00 540.00 2.70 25.71
UNIR 43200.00 3600.00 18.00 171.43
SUPERFICIES 4440.00 370.00 1.85 17.62
VEHICULOS 12000.00 1000.00 5.00 47.62
EQUIPOS 11500.00 958.33 4.79 45.63
LOCAL INMUEB 10000.00 833.33 4.17 39.68
10% MO 28437.59 2369.79901125 11.85 112.85
COSTO DI ### 0.00 0.00
Sub Total 43909.95 219.55 2090.95
GF 3% 1317.30 6.59 62.73
UTIL 15% 6586.49 32.93 313.64
0.00 0.00
TOTAL 51813.74 259.07 2467.32

TOTAL POR 3MESES 155441.22 777.21 7401.96

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso42
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00198

DISCOS DE D 0.00198

DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198

ARGON -CO2 0.00198

ACCESORIOS 0.00198

OXIGENO (10 0.00198

PINTURA (Gl 0.0630

SOILVENTE (g 0.063000

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2353.131 SUELDO ARM 0.2

187.92435 94.5021875 229.505313 135.003125 4278.52 SUELDO SOLD 0.2

132.24435 66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.2

104.40435 52.5021875 127.505313 75.003125 2377.00 SUELDO AYU 0.2

12019.49
TOTAL MENSUAL
SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2353.13 SUELDO INGE 0.2

103.356 51.975 126.225 74.25 2353.13 CONTADOR G 0.2

72.732 36.575 88.825 52.25 1655.91 SUELDO ADM 0.2

72.732 36.575 88.825 52.25 1655.91 SUELDO SEC 0.2


TOTAL MENSUAL8018.08
MANO DE OBRA INDIRECTA

13.398 6.7375 16.3625 9.625 305.04 ENCARGADO 0.2

66.99 33.6875 81.8125 48.125 1525.18 JEFE DE TALL 0.2

13.398 6.7375 16.3625 9.625 305.04 DIBUJANTE Y 0.2

66.99 33.6875 81.8125 48.125 1525.18 INGENIERIO 0.2


TOTAL MENSUAL3660.43

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
274 20 %TOLVA
M2/MES VOLUMEN AREA
42.00 213M3 260 M2
213 42.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
12.45
0.02 0.396 7.50 2.97

0.02 0.396 7.50 2.97

0.02 0.40 12.00 4.75


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 1.00 0.00 S/. 480.76

S/. 494.76 1.00 0.80 S/. 494.76

S/. 494.76 1.00 0.60 S/. 494.76

S/. 18.00 1.68 0.00 S/. 30.24


S/. 2.50 2.00 0.80 S/. 2.00
0.02 0.40 12.00 4.75

0.02 0.40 210.00 83.16

0.02 0.40 80.00 31.68

0.02 0.40 110.00 43.56

0.19 4.20 210.00 882.00

0.19 4.20 18.00 75.60


TOTAL 2633.9655

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188.00 126.225 126.225 66.825 118.8 74.25

5400 5400.2 2160.04 229.505313 229.505313 121.502813 216.005 135.003125

3800 3800.2 1520.04 161.505313 161.505313 85.5028125 152.005 95.003125

3000 3000.2 1200.04 127.505313 127.505313 67.5028125 120.005 75.003125

3800 3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188 126.225 126.225 66.825 118.8 74.25

5400 540 1188 126.225 126.225 66.825 118.8 74.25


0
3800 380 836 88.825 88.825 47.025 83.6 52.25
0
3800 380 836 88.825 88.825 47.025 83.6 52.25
0
0
0
560 56 123.2 16.3625 16.3625 8.6625 15.4 9.625
0
3500 350 770 81.8125 81.8125 43.3125 77 48.125
0
560 56 123.2 16.3625 16.3625 8.6625 15.4 9.625

3500 350 770 81.8125 81.8125 43.3125 77 48.125

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 42.00 504

25 42.00 1050.00
TOTAL MENSUAL1554.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 31607.59 2633.97 13.17 125.43
MANO DE OBR 126029.05 10502.42 52.51 500.12
TRANSPORTE M 90240.00 7520.00 37.60 358.10
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 2.50 23.81
IMPUESTOS 450.00 37.5 0.19 1.79
DEPRECIACION 1600.00 133.33 0.67 6.35
WPQR WPQS 2800.00 233.33 1.17 11.11
SEGUROS 900.00 75.00 0.38 3.57
ADMINISTRACI 84072.91 7006.08 35.03 333.62
MANO DE OBRA 37641.91 3136.83 15.68 149.37
FORMADO 1920.00 160.00 0.80 7.62
REMOCION 6480.00 540.00 2.70 25.71
UNIR 43200.00 3600.00 18.00 171.43
SUPERFICIES 18648.00 1554.00 7.77 74.00
VEHICULOS 12000.00 1000.00 5.00 47.62
EQUIPOS 11500.00 958.33 4.79 45.63
LOCAL INMUEB 10000.00 833.33 4.17 39.68
10% MO 24774.39 2064.53226125 10.32 98.31
COSTO DI ### 0.00 0.00
Sub Total 42488.65 212.44 2023.27
GF 3% 1274.66 6.37 60.70
UTIL 15% 6373.30 31.87 303.49
0.00 0.00
TOTAL 50136.61 250.68 2387.46

TOTAL POR 3MESES 150409.83 752.05 7162.37

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso65
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00198

DISCOS DE D 0.00198

DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198

ARGON -CO2 0.00198

ACCESORIOS 0.00198

OXIGENO (10 0.00198

PINTURA (Gl 0.0975

SOILVENTE (g 0.097500

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2056.131 SUELDO ARM 0.2

187.92435 94.5021875 229.505313 135.003125 3738.50 SUELDO SOLD 0.2

132.24435 66.5021875 161.505313 95.003125 2630.82 SUELDO PINT 0.2

104.40435 52.5021875 127.505313 75.003125 2076.98 SUELDO AYU 0.2

10502.42
TOTAL MENSUAL
132.24435 66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2056.13 SUELDO INGE 0.2

103.356 51.975 126.225 74.25 2056.13 CONTADOR G 0.2

72.732 36.575 88.825 52.25 1446.91 SUELDO ADM 0.2

72.732 36.575 88.825 52.25 1446.91 SUELDO SEC 0.2


TOTAL MENSUAL7006.08
MANO DE OBRA INDIRECTA

13.398 6.7375 16.3625 9.625 235.74 ENCARGADO 0.2

66.99 33.6875 81.8125 48.125 1332.68 JEFE DE TALL 0.2

13.398 6.7375 16.3625 9.625 235.74 DIBUJANTE Y 0.2

66.99 33.6875 81.8125 48.125 1332.68 INGENIERIO 0.25


TOTAL MENSUAL3136.83

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
424 20 %TOLVA
M2/MES VOLUMEN AREA
65.00 213M3 260 M2
213 65.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
19.27
0.02 0.396 7.50 2.97

0.02 0.396 7.50 2.97

0.02 0.40 12.00 4.75


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 1.00 0.00 S/. 480.76

S/. 494.76 1.00 0.80 S/. 494.76

S/. 494.76 1.00 0.60 S/. 494.76

S/. 18.00 2.60 0.00 S/. 46.80


S/. 2.50 2.00 0.80 S/. 2.00
0.02 0.40 12.00 4.75

0.02 0.40 210.00 83.16

0.02 0.40 80.00 31.68

0.02 0.40 110.00 43.56

0.30 6.50 210.00 1365.00

0.30 6.50 18.00 117.00


TOTAL 3174.9255

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188.00 126.225 126.225 66.825 118.8 74.25

5400 5400.2 2160.04 229.505313 229.505313 121.502813 216.005 135.003125

3800 3800.2 1520.04 161.505313 161.505313 85.5028125 152.005 95.003125

3000 3000.2 1200.04 127.505313 127.505313 67.5028125 120.005 75.003125

3800 3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188 126.225 126.225 66.825 118.8 74.25

5400 540 1188 126.225 126.225 66.825 118.8 74.25


0
3800 380 836 88.825 88.825 47.025 83.6 52.25
0
3800 380 836 88.825 88.825 47.025 83.6 52.25
0
0
0
560 56 123.2 16.3625 16.3625 8.6625 15.4 9.625
0
3500 350 770 81.8125 81.8125 43.3125 77 48.125
0
560 56 123.2 16.3625 16.3625 8.6625 15.4 9.625

3500 350 962.5 81.8125 81.8125 43.3125 77 48.125

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 65.00 780

25 65.00 1625.00
TOTAL MENSUAL2405.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 38099.11 3174.93 15.87 151.19
MANO DE OBR 126029.05 10502.42 52.51 500.12
TRANSPORTE M 90240.00 7520.00 37.60 358.10
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 2.50 23.81
IMPUESTOS 450.00 37.5 0.19 1.79
DEPRECIACION 1600.00 133.33 0.67 6.35
WPQR WPQS 2800.00 233.33 1.17 11.11
SEGUROS 900.00 75.00 0.38 3.57
ADMINISTRACI 84072.91 7006.08 35.03 333.62
MANO DE OBRA 39951.91 3329.33 16.65 158.54
FORMADO 1920.00 160.00 0.80 7.62
REMOCION 6480.00 540.00 2.70 25.71
UNIR 43200.00 3600.00 18.00 171.43
SUPERFICIES 28860.00 2405.00 12.03 114.52
VEHICULOS 12000.00 1000.00 5.00 47.62
EQUIPOS 11500.00 958.33 4.79 45.63
LOCAL INMUEB 10000.00 833.33 4.17 39.68
10% MO 25005.39 2083.78226125 10.42 99.23
COSTO DI ### 0.00 0.00
Sub Total 44092.36 220.46 2099.64
GF 3% 1322.77 6.61 62.99
UTIL 15% 6613.85 33.07 314.95
0.00 0.00
TOTAL 52028.99 260.14 2477.57

TOTAL POR 3MESES 156086.97 780.43 7432.71

S//KG:
S/M2
COSTOS ANUALES FABRIC

COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso127
tolva

RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG

DISCOS DE C 0.00198

DISCOS DE D 0.00198

DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198

ARGON -CO2 0.00198

ACCESORIOS 0.00198

OXIGENO (10 0.00198

PINTURA (Gl 0.1905

SOILVENTE (g 0.190500

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL MANO DE OBTRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2056.131 SUELDO ARM 0.15

187.92435 94.5021875 229.505313 135.003125 3738.50 SUELDO SOLD 0.15

132.24435 66.5021875 161.505313 95.003125 2630.82 SUELDO PINT 0.15

104.40435 52.5021875 127.505313 75.003125 2076.98 SUELDO AYU 0.15

10502.42
TOTAL MENSUAL
132.24435 66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8

COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1

IMPUESTOS DIMPUESTO PR 1

DEPRECIACIO SOLDADORA 2
CORTADORAS 2

WPS -WPQR Certificacion 1


Prueba destru 1
Prueba no des 1
SEGUROS SEGURO CON 1

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL ADMINISTRATRABAJADOR CTD
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 2056.13 SUELDO INGE 0.15

103.356 51.975 126.225 74.25 2056.13 CONTADOR G 0.15

72.732 36.575 88.825 52.25 1446.91 SUELDO ADM 0.15

72.732 36.575 88.825 52.25 1446.91 SUELDO SEC 0.15


TOTAL MENSUAL7006.08
MANO DE OBRA INDIRECTA

13.398 6.7375 16.3625 9.625 235.74 ENCARGADO 0.15

66.99 33.6875 81.8125 48.125 1332.68 JEFE DE TALL 0.15

13.398 6.7375 16.3625 9.625 235.74 DIBUJANTE Y 0.15

66.99 33.6875 81.8125 48.125 1525.18 INGENIERIO 0.15


TOTAL MENSUAL3329.33

PROCESOS DE MANUFACTURA EN METAL

PROCESO DE FORMADO Y MODELADO


PROCESO
DOBLADO

PROCESO DE REMOCION DE MATERIAL


PROCESO
CORTE/TALA

ESMERILADO

PROCESO DE PROCESO
PRE ENSAMB

PRECALENTA

SOLDADURA

PROCESO DE SUPERFICIES
PROCESO
ARENADO /G

PINTURA

DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2

RESUMEN

COSTOS DIRECTOS

COSTOS INDIRECTOS

PROCESOS DE

DEPRECIACION

OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA

KG/MES
829 20 %TOLVA
M2/MES VOLUMEN AREA
127.00 213M3 260 M2
213 127.00 1

0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
37.68
0.02 0.396 7.50 2.97

0.02 0.396 7.50 2.97

0.02 0.40 12.00 4.75


UNITARIO CANTIDAD MERMA 80% TOTAL
S/. 480.76 1.00 0.00 S/. 480.76

S/. 494.76 1.00 0.80 S/. 494.76

S/. 494.76 1.00 0.60 S/. 494.76

S/. 18.00 5.08 0.00 S/. 91.44


S/. 2.50 2.00 0.80 S/. 2.00
0.02 0.40 12.00 4.75

0.02 0.40 210.00 83.16

0.02 0.40 80.00 31.68

0.02 0.40 110.00 43.56

0.58 12.70 210.00 2667.00

0.58 12.70 18.00 228.60


TOTAL 4633.1655

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 891.00 126.225 126.225 66.825 118.8 74.25

5400 5400.15 1620.02 229.505313 229.505313 121.502813 216.005 135.003125

3800 3800.15 1140.02 161.505313 161.505313 85.5028125 152.005 95.003125

3000 3000.15 900.02 127.505313 127.505313 67.5028125 120.005 75.003125

3800 3800.25 1900.06 161.505313 161.505313 85.5028125 152.005 95.003125


ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520

COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0

450 37.5 0

1200 100 0
800 66.67 0.00

400 33.33 0.00


1200 100 0
1200 100 0
900 75 0
TOTAL 1012.50 0.00

SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 891 126.225 126.225 66.825 118.8 74.25

5400 540 891 126.225 126.225 66.825 118.8 74.25


0
3800 380 627 88.825 88.825 47.025 83.6 52.25
0
3800 380 627 88.825 88.825 47.025 83.6 52.25
0
0
0
420 42 69.3 16.3625 16.3625 8.6625 15.4 9.625
0
3500 350 577.5 81.8125 81.8125 43.3125 77 48.125
0
420 42 69.3 16.3625 16.3625 8.6625 15.4 9.625

3500 350 577.5 81.8125 81.8125 43.3125 77 48.125

NUFACTURA EN METAL (TERCERIZADO)

ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500

2 20 40
TOTAL MENSUAL 540.00

COSTO UNIT UNID /MES TOTAL


50 12 600

50 12 600

200 12 2400
TOTAL MENSUAL3600.00

UPERFICIES
COSTO M2 UNID /MES TOTAL
12 127.00 1524

25 127.00 3175.00
TOTAL MENSUAL4699.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67

OSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2


CONSUMIBLES 55597.99 4633.17 23.17 220.63
MANO DE OBR 107824.42 8985.37 44.93 427.87
TRANSPORTE M 90240.00 7520.00 37.60 358.10
OSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 2.50 23.81
IMPUESTOS 450.00 37.5 0.19 1.79
DEPRECIACION 1600.00 133.33 0.67 6.35
WPQR WPQS 2800.00 233.33 1.17 11.11
SEGUROS 900.00 75.00 0.38 3.57
ADMINISTRACI 71928.91 5994.08 29.97 285.43
MANO DE OBRA 31728.31 2644.03 13.22 125.91
FORMADO 1920.00 160.00 0.80 7.62
REMOCION 6480.00 540.00 2.70 25.71
UNIR 43200.00 3600.00 18.00 171.43
SUPERFICIES 56388.00 4699.00 23.50 223.76
VEHICULOS 12000.00 1000.00 5.00 47.62
EQUIPOS 11500.00 958.33 4.79 45.63
LOCAL INMUEB 10000.00 833.33 4.17 39.68
10% MO 21148.16 1762.34701125 8.81 83.92
COSTO DI ### 0.00 0.00
Sub Total 44308.82 221.54 2109.94
GF 3% 1329.26 6.65 63.30
UTIL 15% 6646.32 33.23 316.49
0.00 0.00
TOTAL 52284.40 261.42 2489.73

TOTAL POR 3MESES 156853.21 784.27 7469.20

S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 1759.131

187.92435 94.5021875 229.505313 135.003125 3198.48

132.24435 66.5021875 161.505313 95.003125 2250.80

104.40435 52.5021875 127.505313 75.003125 1776.96

TOTAL MENSUAL8985.37
132.24435 66.5021875 161.505313 95.003125 3010.84

SEGUROS EPP VACACIONES SALUD


APORTES TOTAL
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 1759.13

103.356 51.975 126.225 74.25 1759.13

72.732 36.575 88.825 52.25 1237.91

72.732 36.575 88.825 52.25 1237.91


TOTAL MENSUAL5994.08

13.398 6.7375 16.3625 9.625 181.84

66.99 33.6875 81.8125 48.125 1140.18

13.398 6.7375 16.3625 9.625 181.84

66.99 33.6875 81.8125 48.125 1140.18


TOTAL MENSUAL2644.03
SERVICIO MANTENIMIENTO DE TOLVAS MINERAS DE ACARREO PESAD
CAMBIO DE PLANCHAS + PINTADO + ARENADO
CATALOGO DE PRECIOS X M2
NO INCLUYE MATERIAL
MATERIAL PLANCHA WELDOX STRENX 700 E
FLOOR SHEET Piso 3/4"
ESPESOR 3/4"
AREA M2 212 127
PORCENTAJE 100.00% 59.90%
PRECIO M2 1802.05 1694.91

FRONT SHEET Frente 3/4"


ESPESOR 3/4"
AREA M2 33.3 16.65
PORCENTAJE 13.53% 6.70%
PRECIO M2 1600.24 1583.41

FLOOR SHEET Piso 5/8"


ESPESOR 5/8"
AREA M2 212 127
PORCENTAJE 100.00% 59.90%
PRECIO M2 2635.97 2550.08

FRONT SHEET Frente 5/8"


ESPESOR 5/8"
AREA M2 28.7 14.35
PORCENTAJE 100.00% 59.90%
PRECIO M2 2635.97 2450.74

SIDE SHEET Laterales 1/2"


ESPESOR 1/2" 2L 1L
AREA M2 127 65 33 16
PORCENTAJE 60.00% 30.60% 15.50% 7.54%
PRECIO M2 3742.43 2487.42 2550.08 2450.74

SIDE SHEET Laterales 3/8"


ESPESOR 3/8"
AREA M2 72 35 17 144
PORCENTAJE 34.00% 16.50% 8.00% 63.00%
PRECIO M2 3962.79 3852.70 3115.41 3629.90
CANOPY SHEET Campana 1/4"
ESPESOR 1/4"
AREA M2 21 10 42 65
PORCENTAJE 10.00% 4.70% 20.00% 30.66%
PRECIO M2 7514.18 7401.96 7162.37 7432.71
1 CAMPANA 1/2 CAMP 2 CAMPA 3 CAMP
E ACARREO PESADO SERVICIO MANTENIMIENTO DE TOLVAS MINERAS D
NADO ARENADO
CATALOGO DE PRECIOS X M2

MATERIAL PLANCHA WELDOX STRENX 70


Piso 3/4" TIPO DE ARENADO
SSPC SP 6

PRECIO M2 89.32 0.00

AREA M2 212
Frente 3/4"

Piso 5/8"

Frente 5/8"

Laterales 1/2"

212
100.00%
3474.14

Laterales 3/8"

212
100.00%
3832.24
Campana 1/4"

127
60.00%
7469.20
4 CAMPA
OLVAS MINERAS DE ACARREO PESADO SERVICIO MANTENIMIENTO DE TOLV
DO PINTADO
CATALOGO DE PRECIOS X M2
PINTURA
WELDOX STRENX 70 PRIMERA CAPA
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANIC
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4

PRECIO M2

AREA M2
ENIMIENTO DE TOLVAS MINERAS DE ACARREO PESADO
PINTADO
DE PRECIOS X M2

COAT DIMETCOTE 9 ZINC INORGANICO 65 MICRONES /2.5 MIL (EQUIV JET ZINC I -860)

ON AMERLOCK 400 125 MICRONES /4.5 MILS (EQUIV JET MP 85 )

183.97

212