Costos Anuales Rev 03
Costos Anuales Rev 03
MANO DE OBRA DIRE TRABAJADOR CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
SUELDO ARMADOR CALIFICADO 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25
SUELDO SOLDADOR CALIFICADO 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25
SUELDO PINTOR CALIFICADO 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77
SUELDO AYUDANTES/PRACTICANTES 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03
SUELDO PINTOR CALIFICADO 0.0500011793 3800 380 209.00 17.765419 1.51 0.80 1.42 0.89
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA COSTO POR HORA COSTO POR DIA COSTO MENSUAL COSTO MENSUAL
CAMION DE 2 TON 8 12 96 1920 96.0022642
MONTACARGAS DE 4 TON 8 8 64 1280 64.00150947
GRUA DE 6 TON 8 12 96 1920 96.0022642
CAMIONETA 4X4 8 10 80 1600 80.00188684
AUTOMOVIL 8 5 40 800 40.00094342
TOTAL 7520 376.00887
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL COSTO MENSUAL COSTO MENSUAL
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA ACTIVA 1 6000 500 25.00058964
0
IMPUESTOS DE LOCALIMPUESTO PREDIAL MUNICIPAL 1 450 37.5 1.875044223
0
DEPRECIACION DE AC SOLDADORAS (VIDA UTIL 10 AÑOS) 2 1200 200 10.00023585
CORTADORAS DE PLASMA/OXICORTE (VU. 10A) 2 800 133.33 6.666823903
0
WPS -WPQR (PROBETCertificacion de probetas 1 400 33.33 1.666705976
Prueba destructiva 1 1200 100 5.000117927
Prueba no destructiva 1 1200 100 5.000117927
SEGUROS SEGURO CONTRA TODO RIESGO 1 900 75 3.750088445
TOTAL 1179.17 58.96
ADMINISTRACION GE TRABAJADOR CTD SUELDO PACTADO MOVILIDAD SUB TOTAL CESANTIA AGUINALDO VACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
SUELDO INGENIERIO SUPERVISION GENERAL 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25
CONTADOR GENERAL 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25
SUELDO ADMINISTRADOR 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77
SUELDO SECRETARIA/RECURSOS HUMANOS 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77
ENCARGADO DE ALMANCEN/COMPRAS 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
JEFE DE TALLER/CAPATAZ 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36
DIBUJANTE Y PRESUPUESTOS 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
INGENIERIO DE OBRA 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36
Mano de obra administracion pintura 0.0500011793 3500 350 192.5045402014 16.36288592 1.39 0.74 1.31 0.82
PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTAMIENTO 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /GRANALLADO 18 212.00 3816 3816.00
S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLES CONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
19.79
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625
35.14 17.67 42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25
24.73 12.44 30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77
19.52 9.82 23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03
SEGUROS EPP VACACIONES SALUD APORTES TOTAL ADMINISTRACION GETRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
6.96% 3.50% 8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
35.14 17.67 42.92 25.25 6697.15 SUELDO INGE 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25
35.14 17.67 42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25
24.73 12.44 30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77
24.73 12.44 30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77
TOTAL MENSUAL 22819.91 1141.0225029081
MANO DE OBRA INDIRECTA
18.22 9.16 22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
22.78 11.45 27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36
18.22 9.16 22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09
22.78 11.45 27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36
TOTAL MENSUAL 15626.68 781.3523661218
1.14 0.57 1.39 0.82 217.04
PROCESOS DE MANUFACTURA EN METAL (TERCERIZADO)
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 33.32 399.84
RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 152495.82 12707.99 5.08 48.88
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 14794.08 1232.84 0.49 4.74
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
arenado pintura arenado OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
s/KG s/M2 s/M2 COSTO DI ###
2.62 51.97 25.23 Sub Total 95833.42 38.33 368.59
0.08 1.56 0.76 GF 3% 2875.00 1.15 11.06
0.39 7.80 3.78 UTIL 15% 14375.01 5.75 55.29
S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
65.09
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625
35.14 17.67 42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67
24.73 12.44 30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77 24.73 12.44
19.52 9.82 23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03 19.52 9.82
21827.74
TOTAL MENSUAL
1.24 0.62 1.51 0.89 4544.18 SUELDO PINT 1 3800 380 4180.00 355.3 1.51 0.80 1.42 0.89 1.24 0.62
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0
35.14 17.67 42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67
24.73 12.44 30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44
24.73 12.44 30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44
22819.91
TOTAL MENSUAL
MANO DE OBRA INDIRECTA
18.22 9.16 22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16
22.78 11.45 27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45
18.22 9.16 22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16
22.78 11.45 27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45
15626.68
TOTAL MENSUAL
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 127.00 1524
RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 178936.07 14911.34 5.96 57.35
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 56388.00 4699.00 1.88 18.07
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
COSTO DI ###
Sub Total 101502.94 40.60 390.40
GF 3% 3045.09 1.22 11.71
UTIL 15% 15225.44 6.09 58.56
S//KG:
S/M2
COSTOS ANUALES FABRICACION METAL MECANICA PESADA
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000095
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
14.82
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625
VACACIONES SALUD
APORTES TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES
8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
42.92 25.25 6697.15 SUELDO ARM 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25
42.92 25.25 6697.15 SUELDO SOLD 1 5400 540 5940.00 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25
30.20 17.77 4712.81 SUELDO PINT 1 3800 380 4180.00 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77
23.84 14.03 3720.64 SUELDO AYU 1 3000 300 3300.00 280.5 23.84 12.62 22.44 14.03 19.52 9.82 23.84 14.03
21827.74
TOTAL MENSUAL TOTAL MENSUAL
1.51 0.89 4544.18 SUELDO PINT 1 3800 380 4180.00 355.3 1.51 0.80 1.42 0.89 1.24 0.62 1.51 0.89
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0
VACACIONES SALUD
APORTES TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES
8.50% 5% 100% 10% 8.50% 8.50% 4.50% 8.00% 5.00% 6.96% 3.50% 8.50% 5%
42.92 25.25 6697.15 SUELDO INGE 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25
42.92 25.25 6697.15 CONTADOR G 1 5400 540 5940 504.9 42.92 22.72 40.39 25.25 35.14 17.67 42.92 25.25
30.20 17.77 4712.81 SUELDO ADM 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77
30.20 17.77 4712.81 SUELDO SEC 1 3800 380 4180 355.3 30.20 15.99 28.42 17.77 24.73 12.44 30.20 17.77
22819.91
TOTAL MENSUAL TOTAL MENSUAL
MANO DE OBRA INDIRECTA
22.25 13.09 3472.60 ENCARGADO 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16 22.25 13.09
27.82 16.36 4340.74 JEFE DE TALL 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45 27.82 16.36
22.25 13.09 3472.60 DIBUJANTE Y 1 2800 280 3080 261.8 22.25 11.78 20.94 13.09 18.22 9.16 22.25 13.09
27.82 16.36 4340.74 INGENIERIO 1 3500 350 3850 327.25 27.82 14.73 26.18 16.36 22.78 11.45 27.82 16.36
15626.68
TOTAL MENSUAL TOTAL MENSUAL
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 16.67 200.04
RESUMEN
COSTOS DIRECTOS TOTAL ANUALTOTAL MENSUAL POR KG POR M2
CONSUMIBLES 147796.53 12316.38 4.93 47.37
MANO DE OBR 261932.90 21827.74 8.73 83.95
TRANSPORTE M 90240.00 7520.00 3.01 28.92
COSTOS INDIRECTOS 0.00 0.00
ENERGIA ELEC 6000.00 500 0.20 1.92
IMPUESTOS 450.00 37.5 0.02 0.14
DEPRECIACION 1600.00 133.33 0.05 0.51
WPQR WPQS 2800.00 233.33 0.09 0.90
SEGUROS 900.00 75.00 0.03 0.29
ADMINISTRACI 273838.94 22819.91 9.13 87.77
MANO DE OBRA 187520.15 15626.68 6.25 60.10
PROCESOS DEFORMADO 1920.00 160.00 0.06 0.62
REMOCION 6480.00 540.00 0.22 2.08
UNIR 43200.00 3600.00 1.44 13.85
SUPERFICIES 7401.48 616.79 0.25 2.37
DEPRECIACIONVEHICULOS 12000.00 1000.00 0.40 3.85
EQUIPOS 11500.00 958.33 0.38 3.69
LOCAL INMUEB 10000.00 833.33 0.33 3.21
OTROS GASTO10% MO 72329.20 6027.433236 2.41 23.18
COSTO DI ###
Sub Total 94825.77 37.93 364.71
GF 3% 2844.77 1.14 10.94
UTIL 15% 14223.86 5.69 54.71
S//KG:
S/M2
TOTAL
6697.15
6697.15
4712.81
3720.64
21827.74
4544.18
TOTAL
6697.15
6697.15
4712.81
4712.81
22819.91
3472.60
4340.74
3472.60
4340.74
15626.68
COSTOS ANUALES FABRICACION METAL MEC
COSTOS DIRECTOS
RENDIMIENTO
MATERIALES total Kg de material 60% peso tolva
RENDIMIENTO
total Kg de material 60% peso tolva
RENDIMIENTO DE CONSUMIBLES
CONSUMIBLES CONSUMIBLE
DISCOS DE CORTE
DISCOS DE DESBASTE
DISCO DE ESMERIL
PRIMERA CAPA:
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANICO 65 M
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4.5 MIL
RETOQUE
PINTURA AMERON AMERLOCK 400 (EQUIV JET MP 85 )
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA (KG)
PINTURA (Gln)
SOILVENTE (gln)
SUELDO AYUDANTES/PRACTICANTES
COSTOS INDIRECTOS
TIPO
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA ACTIVA
CONTADOR GENERAL
SUELDO ADMINISTRADOR
JEFE DE TALLER/CAPATAZ
DIBUJANTE Y PRESUPUESTOS
INGENIERIO DE OBRA
PROCESO DE UNIR
PROCESO DE SUPERFICIES
DEPRECIACION
VEHICULOS (VIDA UTIL 10 AÑOS)
RESUMEN
ABRICACION METAL MECANICA PESADA
KG/MES
KG/OBRA 2500 50 %TOLVA
24600 M2/MES VOLUMEN AREA
M2/OBRA 212.00 213M3 260 M2
212 127 212.00 1
UNID/KG 0.000099
CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
113.64
0.02475 2.81 61.875 7.50 464.0625
CTD HRAS DIA COSTO POR HORA COSTO POR DCOSTO MENSUAL
8 12 96 1920
8 8 64 1280
8 12 96 1920
8 10 80 1600
8 5 40 800
TOTAL 7520
1 450 37.5 0
2 1200 100 0
2 800 66.67 0.00
1 400 33.33 0.00
1 1200 100 0
1 1200 100 0
1 900 75 0
TOTAL 1012.50 0.00
CERIZADO)
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTAMIENTO 50 12 600
S//KG:
S/M2
SALUD PENSION SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
8.00% 5.00% 6.96% 3.50% 8.50% 5%
356.4 222.75 310.068 155.925 378.675 222.75 7059.393
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
34.09
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 65.00 780
RESUMEN
S//KG:
S/M2
ETAL MECANICA PESADA
TOTAL MENSUAL
2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09 1624820.64
STO MENSUAL
0.00
702.66
21.08
105.40
7.15
2487.42
COSTOS ANUALES FABRICACION METAL MECANICA PE
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT COSTO MES
92.86
DISCOS DE C 0.02475 2.81 61.875 7.50 464.0625
36060.25
### SUELDO PINT 0.75 3800 3800.75 5700.56 2762195.09
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500 0
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 127.00 1524
RESUMEN
S//KG:
S/M2
ETAL MECANICA PESADA
TOTAL MENSUAL
2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09 1624820.64
STO MENSUAL
0.00
720.36
21.61
108.05
7.33
2550.08
COSTOS ANUALES FABRICACION METAL MECAN
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA CTD MES COSTO UNIT
21.23
DISCOS DE C 0.02475 2.81 61.875 7.50
36060.25
19003103.49 SUELDO PINT 0.75 3800 3800.75 5700.56
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
CAMION DE 8 12 96 1920
MONTACARGAS 8 8 64 1280
GRUA DE 6 8 12 96 1920
CAMIONETA 8 10 80 1600
AUTOMOVIL 8 5 40 800
TOTAL 7520
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
ENERGIA ELETRFASICA , 1 6000 500
ESMERILADO 2 20 40
TOTAL MENSUAL 540.00
PRECALENTA 50 12 600
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES TOTAL
ARENADO /G 12 28.70 344.4
RESUMEN
TOTAL 173185.44
S//KG:
S/M2
ION METAL MECANICA PESADA
50 %TOLVA
AREA
260 M2
28.70 1
COSTO MES
464.0625
464.06
742.50
TOTAL
S/. 4,853.37
S/. 4,994.74
S/. 4,994.74
S/. 20.66
S/. 2.00
742.50
12993.75
4950.00
6806.25
602.70
51.66
42682.991
TOTAL MENSUAL
2762195.09 2762195.09 1462338.58 2599713.03 1624820.64 2261750.33 1137374.45 2762195.09
OSTO MENSUAL
COSTO MENSUAL
0
0
0.00
0.00
0
0
0
0.00
RCERIZADO)
STO MENSUAL
POR KG POR M2
17.07 201.33
14.42 170.10
3.01 35.47
0.00 0.00
0.20 2.36
0.02 0.18
0.07 0.79
0.09 1.10
0.03 0.35
9.91 116.90
7.44 87.78
0.06 0.75
0.22 2.55
1.44 16.98
0.42 5.01
0.40 4.72
0.38 4.52
0.33 3.93
3.18 37.48
0.00 0.00
58.71 692.30
1.76 20.77
8.81 103.84
69.27 7.04
207.82 2450.74
APORTES TOTAL
5%
222.75 7059.393
405.028125 12836.15
285.028125 9033.11
225.028125 7131.59
TOTAL MENSUAL36060.25
1624820.64 ###
APORTES TOTAL
5%
229.5 7273.31
229.5 7273.31
161.5 5118.26
161.5 5118.26
24783.14
TOTAL MENSUAL
148.75 3524.19
148.75 4714.19
89.25 2828.51
148.75 4714.19
89.25 2828.51
18609.58
TOTAL MENSUAL
COSTOS ANUALES FABRICACION METAL MEC
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELECTRICA TRFASICA , CONTRATO POTENCIA AC 1 6000
ESMERILADO 2
PRECALENTA 50
SOLDADURA 200
PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12
PINTURA 25
DEPRECIACION
TIPO COSTO
VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000
CAMION 80000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000
MONTACARGA 35000
INMUEBLES (VIDA UTILS 30 AÑOS) TALLER 600M2 300000
RESUMEN
COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBR
TRANSPORTE M
COSTOS INDIRECTOS
ENERGIA ELEC
IMPUESTOS
DEPRECIACION
WPQR WPQS
SEGUROS
ADMINISTRACI
MANO DE OBRA
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEB
OTROS GASTO10% MO
COSTO DI
40 %TOLVA
VOLUMEN AREA
213M3 260 M2
106 106.00 1
37.5 0
100 0
66.67 0.00
33.33 0.00
100 0
100 0
75 0
1012.50 0.00
20 40
TOTAL MENSUAL 540.00
12 600
12 2400
TOTAL MENSUAL 3600.00
106.00 2650.00
TOTAL MENSUAL 3922.00
COSTO ANUALCOSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL 2791.67
S//KG:
S/M2
COSTOS ANUALES FABR
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso212
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.01188
DISCOS DE D 0.01188
DISCO DE ES 0.01188
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.01188
ACCESORIOS 0.01188
SOILVENTE (g 0.318000
EPP VACACIONES SALUD APORTES TOTAL MANO DE OBTRABAJADOR CTD
3.50% 8.50% 5%
145.53 353.43 207.9 6588.7668 SUELDO ARM 0.5
|
264.61715 642.64165 378.0245 11980.35 SUELDO SOLD 0.5
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
2769 40 %TOLVA
M2/MES VOLUMEN AREA
212.00 213M3 260 M2
106 212.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
125.86
0.65 14.256 7.50 106.92
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 2970 353.43 353.43 187.11 332.64 207.9
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 212.00 2544
25 212.00 5300.00
TOTAL MENSUAL7844.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
289.3968 145.53 353.43 207.9 5400.7668
TOTAL MENSUAL27587.34
1970209.92 990766.484 2406147.18 1415380.69 ###
ESMERILADO 2 20
TOTAL MENSUAL
PRECALENTA 50 12
SOLDADURA 200 12
TOTAL MENSUAL
PROCESO DE SUPERFICIES
PROCESO COSTO M2 UNID /MES
ARENADO /G 12 72.00
PINTURA 25 72.00
TOTAL MENSUAL
DEPRECIACION
TIPO COSTO COSTO ANUAL
VEHICULOS (VIDA UTIL 10 AÑOSCAMIONETA 40000 4000
CAMION 80000 8000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000 8000
MONTACARGA 35000 3500
INMUEBLES (VIDA UTILS 30 AÑO
TALLER 600M2 300000 10000
TOTAL MENSUAL
RESUMEN
TOTAL
S//KG:
S/M2
L MECANICA PESADA
30 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 72.00 1
7.50 36.3825
7.50 36.38
12.00 58.21
MERMA 80% TOTAL
0.00 S/. 1,648.31
210.00 1018.71
80.00 388.08
110.00 533.61
210.00 1512.00
18.00 129.60
TOTAL 8865.9941
COSTO MENSUAL
1920
1280
1920
1600
800
7520
COSTO MENSUAL
0
0
0.00
0.00
0
0
0
0.00
TOTAL
160
160.00
TOTAL
500
40
540.00
TOTAL
600
600
2400
3600.00
TOTAL
864
1800.00
2664.00
COSTO MENSUAL
333.33
666.67
666.67
291.67
833.33
2791.67
0.00 0.00
80599.22 115.14 1119.43
2417.98 3.45 33.58
12089.88 17.27 167.92
0.00 0.00
95107.07 135.87 1320.93
RENDIMIENTO DE CONSUMIBLES
UNID/KG 0.000099
CONSUMIBLECONSUMIBLE CTD/ KG CTD DIA
15.91
DISCOS DE C 0.00693 0.22
VACACIONES SALUD
APORTES TOTAL MANO DE OBTRABAJADOR CTD SUELDO PACTADO
8.50% 5% 100%
252.45 148.5 4706.262 SUELDO ARM 0.5 5400
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELETRFASICA , 1 6000
VACACIONES SALUD
APORTES TOTAL ADMINISTRATRABAJADOR CTD SUELDO PACTADO
8.50% 5% 100%
252.45 148.5 4706.26 SUELDO INGE 0.5 5400
ESMERILADO 2
TOTAL MENSUA
PRECALENTA 50
SOLDADURA 200
TOTAL MENSUA
PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12
PINTURA 25
TOTAL MENSUA
DEPRECIACION
TIPO COSTO
VEHICULOS (VCAMIONETA 40000
CAMION 80000
EQUIPOS (VID GRUA 80000
MONTACARGA 35000
INMUEBLESTALLER
(V 600M2 300000
TOTAL MENSUA
RESUMEN
COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBR
TRANSPORTE M
COSTOS INDIRECTOS
ENERGIA ELEC
IMPUESTOS
DEPRECIACION
WPQR WPQS
SEGUROS
ADMINISTRACI
MANO DE OBRA
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEB
OTROS GASTO10% MO
COSTO DI
30 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 35.00 1
37.5 0
100 0
66.67 0.00
33.33 0.00
100 0
100 0
75 0
1012.50 0.00
RA EN METAL (TERCERIZADO)
MODELADO
UNID /MES TOTAL
20 160
TOTAL MENSUAL 160.00
E MATERIAL
UNID /MES TOTAL
20 500
20 40
TOTAL MENSUAL 540.00
12 600
12 2400
TOTAL MENSUAL3600.00
35.00 875.00
TOTAL MENSUAL1295.00
COSTO ANUAL
COSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso17
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00693
DISCOS DE D 0.00693
DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693
ACCESORIOS 0.00693
SOILVENTE (g 0.025500
24039.57
TOTAL MENSUAL
SUELDO PINT 0.5
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
175 30 %TOLVA
M2/MES VOLUMEN AREA
17.00 213M3 260 M2
213 17.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
7.95
0.22 4.851 7.50 36.3825
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 17.00 204
25 17.00 425.00
TOTAL MENSUAL 629.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso212
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00693
DISCOS DE D 0.00693
DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693
ACCESORIOS 0.00693
SOILVENTE (g 0.318000
17971.09
TOTAL MENSUAL
264.4974 133.00875 323.02125 190.0125 6021.88
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
2215 30 %TOLVA
M2/MES VOLUMEN AREA
212.00 213M3 260 M2
213 212.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
100.68
0.22 4.851 7.50 36.3825
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5
ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 212.00 2544
25 212.00 5300.00
TOTAL MENSUAL7844.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso144
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00693
DISCOS DE D 0.00693
DISCO DE ES 0.00693
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00693
ACCESORIOS 0.00693
SOILVENTE (g 0.216000
17971.09
TOTAL MENSUAL
SUELDO PINT 0.5
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
1504 30 %TOLVA
M2/MES VOLUMEN AREA
144.00 213M3 260 M2
213 144.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
68.36
0.22 4.851 7.50 36.3825
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782.00 252.45 252.45 133.65 237.6 148.5
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1782 252.45 252.45 133.65 237.6 148.5
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 144.00 1728
25 144.00 3600.00
TOTAL MENSUAL5328.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
206.712 103.95 252.45 148.5 3518.262
17971.09
TOTAL MENSUAL
264.4974 133.00875 323.02125 190.0125 6021.88
COSTOS INDIRECTOS
TIPO CTD COSTO ANUAL
ENERGIA ELETRFASICA , CONTRATO POTENCIA ACTIVA 1 6000
ESMERILADO 2
PRECALENTA 50
SOLDADURA 200
PROCESO DE SUPERFICIES
PROCESO COSTO M2
ARENADO /G 12
PINTURA 25
DEPRECIACION
TIPO COSTO
VEHICULOS (VIDA UTIL 10 AÑOS) CAMIONETA 40000
CAMION 80000
EQUIPOS (VIDAD UTIL 10 AÑOS) GRUA 80000
MONTACARGA 35000
INMUEBLES (VIDA UTILS 30 AÑOS) TALLER 600M2 300000
RESUMEN
COSTOS DIRECTOS
CONSUMIBLES
MANO DE OBRA
TRANSPORTE MATERIAL
COSTOS INDIRECTOS
ENERGIA ELECTRICA
IMPUESTOS
DEPRECIACION EQUIPO
WPQR WPQS PROBETA
SEGUROS
ADMINISTRACION
MANO DE OBRA INDIREC
PROCESOS DEFORMADO
REMOCION
UNIR
SUPERFICIES
DEPRECIACIONVEHICULOS
EQUIPOS
LOCAL INMUEBLE
OTROS GASTO10% MO
COSTO DIRECTO
20 %TOLVA
VOLUMEN AREA
213M3 260 M2
213 21.00 1
37.5 0
100 0
66.67 0.00
33.33 0.00
100 0
100 0
75 0
1012.50 0.00
20 40
TOTAL MENSUAL 540.00
12 600
12 2400
TOTAL MENSUAL 3600.00
21.00 525.00
TOTAL MENSUAL 777.00
COSTO ANUAL COSTO MENSUAL
4000 333.33
8000 666.67
8000 666.67
3500 291.67
10000 833.33
TOTAL MENSUAL 2791.67
S//KG:
S/M2
COSTOS ANUALES FABRICA
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso10
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00198
DISCOS DE D 0.00198
DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198
ACCESORIOS 0.00198
SOILVENTE (g 0.015000
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
100 20 %TOLVA
M2/MES VOLUMEN AREA
10.00 213M3 260 M2
213 10.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
4.55
0.02 0.396 7.50 2.97
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1485.00 126.225 126.225 66.825 118.8 74.25
5400
ES /EQUIPOS DE IZJE
COSTO POR HORA
COSTO POR DCOSTO MENSUAL
12 96 1920
8 64 1280
12 96 1920
10 80 1600
5 40 800
TOTAL 7520
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1485 126.225 126.225 66.825 118.8 74.25
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 10.00 120
25 10.00 250.00
TOTAL MENSUAL 370.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso42
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00198
DISCOS DE D 0.00198
DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198
ACCESORIOS 0.00198
SOILVENTE (g 0.063000
12019.49
TOTAL MENSUAL
SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
274 20 %TOLVA
M2/MES VOLUMEN AREA
42.00 213M3 260 M2
213 42.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
12.45
0.02 0.396 7.50 2.97
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188.00 126.225 126.225 66.825 118.8 74.25
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188 126.225 126.225 66.825 118.8 74.25
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 42.00 504
25 42.00 1050.00
TOTAL MENSUAL1554.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso65
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00198
DISCOS DE D 0.00198
DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198
ACCESORIOS 0.00198
SOILVENTE (g 0.097500
10502.42
TOTAL MENSUAL
132.24435 66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
424 20 %TOLVA
M2/MES VOLUMEN AREA
65.00 213M3 260 M2
213 65.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
19.27
0.02 0.396 7.50 2.97
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188.00 126.225 126.225 66.825 118.8 74.25
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 1188 126.225 126.225 66.825 118.8 74.25
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 65.00 780
25 65.00 1625.00
TOTAL MENSUAL2405.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
COSTOS ANUALES FABRIC
COSTOS DIRECTOS
RENDIMIENTO KG/OBRA
MATERIALES
total Kg de material 60% peso
24600
tolva
RENDIMIENTO M2/OBRA
total Kg de material 60% peso127
tolva
RENDIMIENTO DE CONSUMIBLES
UNID/KG
CONSUMIBLECONSUMIBLE CTD/ KG
DISCOS DE C 0.00198
DISCOS DE D 0.00198
DISCO DE ES 0.00198
PRIMERA CAPA:
PINTURA AMERC $143.51
ACABADO
PINTURA AMERO $147.69
RETOQUE
PINTURA AMERO $147.69
OTROS INSUMOS
THINER STD
TRAPO
SOLDADURA ( 0.00198
ACCESORIOS 0.00198
SOILVENTE (g 0.190500
10502.42
TOTAL MENSUAL
132.24435 66.5021875 161.505313 95.003125 3010.84 SUELDO PINT 0.25
TRANSPORTE DE MATERIALES /EQUIPOS DE IZJE
UNIDAD CTD HRAS DIA
CAMION DE 8
MONTACARGAS 8
GRUA DE 6 8
CAMIONETA 8
AUTOMOVIL 8
COSTOS INDIRECTOS
TIPO CTD
ENERGIA ELETRFASICA , 1
IMPUESTOS DIMPUESTO PR 1
DEPRECIACIO SOLDADORA 2
CORTADORAS 2
ESMERILADO
PROCESO DE PROCESO
PRE ENSAMB
PRECALENTA
SOLDADURA
PROCESO DE SUPERFICIES
PROCESO
ARENADO /G
PINTURA
DEPRECIACION
TIPO
VEHICULOS (VCAMIONETA
CAMION
EQUIPOS (VID GRUA
MONTACARGA
INMUEBLESTALLER
(V 600M2
RESUMEN
COSTOS DIRECTOS
COSTOS INDIRECTOS
PROCESOS DE
DEPRECIACION
OTROS GASTO
ANUALES FABRICACION METAL MECANICA PESADA
KG/MES
829 20 %TOLVA
M2/MES VOLUMEN AREA
127.00 213M3 260 M2
213 127.00 1
0.000099
CTD DIA CTD MES COSTO UNIT COSTO MES
37.68
0.02 0.396 7.50 2.97
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 891.00 126.225 126.225 66.825 118.8 74.25
COSTO ANUAL
COSTO MENSUAL COSTO MENSUAL
6000 500 0
450 37.5 0
1200 100 0
800 66.67 0.00
SUELDO PACTADO
MOVILIDAD SUB TOTAL CESANTIA AGUINALDOVACACIONES SALUD PENSION
100% 10% 8.50% 8.50% 4.50% 8.00% 5.00%
5400 540 891 126.225 126.225 66.825 118.8 74.25
ORMADO Y MODELADO
COSTO UNIDADUNID /MES TOTAL
8 20 160
TOTAL MENSUAL 160.00
REMOCION DE MATERIAL
COSTO UNIDADUNID /MES TOTAL
25 20 500
2 20 40
TOTAL MENSUAL 540.00
50 12 600
200 12 2400
TOTAL MENSUAL3600.00
UPERFICIES
COSTO M2 UNID /MES TOTAL
12 127.00 1524
25 127.00 3175.00
TOTAL MENSUAL4699.00
COSTO COSTO ANUAL
COSTO MENSUAL
40000 4000 333.33
80000 8000 666.67
80000 8000 666.67
35000 3500 291.67
300000 10000 833.33
TOTAL MENSUAL2791.67
S//KG:
S/M2
SEGUROS EPP VACACIONES SALUD
APORTES TOTAL
6.96% 3.50% 8.50% 5%
103.356 51.975 126.225 74.25 1759.131
TOTAL MENSUAL8985.37
132.24435 66.5021875 161.505313 95.003125 3010.84
AREA M2 212
Frente 3/4"
Piso 5/8"
Frente 5/8"
Laterales 1/2"
212
100.00%
3474.14
Laterales 3/8"
212
100.00%
3832.24
Campana 1/4"
127
60.00%
7469.20
4 CAMPA
OLVAS MINERAS DE ACARREO PESADO SERVICIO MANTENIMIENTO DE TOLV
DO PINTADO
CATALOGO DE PRECIOS X M2
PINTURA
WELDOX STRENX 70 PRIMERA CAPA
PINTURA AMERCOAT DIMETCOTE 9 ZINC INORGANIC
ACABADO
PINTURA AMERON AMERLOCK 400 125 MICRONES /4
PRECIO M2
AREA M2
ENIMIENTO DE TOLVAS MINERAS DE ACARREO PESADO
PINTADO
DE PRECIOS X M2
COAT DIMETCOTE 9 ZINC INORGANICO 65 MICRONES /2.5 MIL (EQUIV JET ZINC I -860)
183.97
212