Está en la página 1de 5

VERIFICACION POR PUNZONAMIENTO :

C1 C2 C3

COLUMNA 1 :
Pu1= 191

d1= 40.00 cm
d1= 65.00 cm
d1= 0.65 m
bo1= 196.80 cm
bo1= 19680.00
m
Ao1= 0.88 m2
𝜎 =22.5 tn/m2

Vu1= 171.23 tn

Vc1= 253675.39 kg
Vc1= 769475.21 kg
Vc1= 253675.39 kg

Vc1= 253675.39 kg

𝑉𝑢 ≤ ∅ 𝑉𝑐
171.23 ≤216 tn

CUMPLE

COLUMNA 2 :
Pu2= 295

d2= 47.36 cm
d2= 65.00 cm
d2= 0.65 m
bo2= 440.00 cm
bo2= 4.40 m
Ao2= 1.19 m2

𝜎 = 23.75 𝑡𝑛/𝑚2

Vu2= 266.80 tn

Vc2= 1417901.07
kg
Vc2= 1142589.92
kg
Vc2= 567160.43 kg

Vc2= 567160.43 kg

𝑉𝑢 ≤ ∅ 𝑉𝑐
266.8 tn ≤ 482 tn

CUMPLE
COLUMNA 3 :

Pu3= 469

d3= 47.06 cm
d3= 65.00 cm
d3= 0.65 m
bo3= 645.00 cm
bo3= 6.45 m
Ao3= 2.09 m2

𝜎 = 24.58 𝑡𝑛

Vu3= 417.56tn

Vc3= 519628.52 kg
Vc3= 1063790.61
kg
Vc3= 831405.63 kg

Vc3= 519628.52 kg
𝑉𝑢 ≤ ∅ 𝑉𝑐
417.56 tn ≤ 442 tn

CUMPLE