METRADO DE CONCRETO

DESCRIPCION UND CANTIDAD LARGO ANCHO ALTO


CONCRETO SIMPLE
SOLADO (e=10CM)
ZAPATAS M2
Z1 4 1.5 1.2
Z2 4 1.8 1.2
Z3 5 1.8 1.8
Z4 5 2.3 2.3
VIGAS DE CIMENTACION m2
VC-1 (EJES A Y C) 2 28.39 0.25
VC-1 (DEL EJE1 AL EJE 9) 9 6.6 0.25
CONCRETO ARMADO f´c =210
KG/CM2
ZAPATAS m3
Z1 4 1.5 1.2 0.5
Z2 4 1.8 1.2 0.5
Z3 5 1.8 1.8 0.5
Z4 5 2.3 2.3 0.5
VIGAS DE CIMENTACION m3
VC-1 (ENTRE EJES A Y C) 2 28.39 0.25 0.6
VC-1 (DEL EJE1 AL EJE 9) 9 6.6 0.25 0.6
CONCRETO ARMADO f´c =175
KG/CM2
SOBRECIMIENTO m3
EJE C-C(ENTRE EJE 1 AL 8) 6 3.05 0.15 0.9
EJE C-C(ENTRE EJE 8 Y 9) 1 3.15 0.15 0.9
EJE 1-1,2-2 Y 5-5 3 5.4 0.15 0.9
EJE 7-7 1 4.17 0.15 0.9
EJE 8-8 1 4.42 0.15 0.9
EJE A-A(ENTRE EJE 1 Y 2,3 Y 4 ,
6 Y 7) 3 1.87 0.15 0.9
EJE 9-9 1 5.4 0.15 0.9
ENTRE EJES 8 Y 9 1 9.58 0.4 0.5
1 9.58 0.15 0.9
1 3.3 0.4 0.5
1 3.3 0.15 0.725

METRADO DE CONCRETO
DESCRIPCION UND CANTIDAD LARGO ANCHO ALTO
CONCRETO ARMADO f´c =210
KG/CM2
VIGAS PERIMETRALLES M3
VAH-2(EJE A YEJE C) 2 28.39 0.25 0.55
VH-1(EJES 1,3,6,7,8,9) 6 6.6 0.25 0.4
VAH-3(EJE B) 1 26.64 0.25 0.4
VAI-1(EJES 2,4,5) 3 6.1 0.25 0.4
PARCIAL SUB-TOTAL

87.54
58.49
7.2
8.64
16.2
26.45
29.05
14.195
14.85

29.25
3.6
4.32
8.1
13.225
17.43
8.517
8.91

11.96
2.4705
0.42525
2.187
0.56295
0.5967

0.75735
0.729
1.916
1.2933
0.66
0.358875

PARCIAL SUB-TOTAL
16.261
7.80725
3.96
2.664
1.83