Está en la página 1de 2

PERSONAL DETAIL EDUCATION

2005 – 2010 POLITEKNIK ELEKRONIK NEGERI SURABAYA (PENS-ITS)


Majoring Electrical Industry. GPA 3.24
Final Project “ Pengaturan Kecepatan Motor DC Pada Arus Jangkar
dengan Menggunakan Fuzzy Logic Controller’

2005 – 2010 SMAN 1 MOJOSARI


Majoring Science. NEM 27.34

PROFESIONAL EXPERIENCES
BASIC INFORMATION July 2017 – PT.BERKAH KAWASAN MANYAR SEJAHTERA (BKMS-JIIPE)
Present Manyar – Gresik
Nationality : Indonesia ELECTRICAL ENGINEER SUPERVISOR FOR POWER PLANT
KTP No. : 3516060701870004 AND DITRIBUTION 20 KV
Birthplace : Sidoarjo  Made all document Checklist Preventive and corrective Maintenance for
Electrical (Transformer, Cubicle, Panel Power and Control, Motor)
Living in : Sidoarjo
 Design for setting of protection Relay in Distribution System 20 KV.
Birth Date : 07.01.1987
 Made all list of Electrical Spare part (Consumable and emergency Spre
Gender : Male part) and Monitor inventory of spare parts as required to ensure zero
Civil Status : Married down time due to routine spare part stock
 Collect project proposal and prepare project planning and weekly update
CONTACT INFORMATION to ensure project tracked targeted scedule and budget
 Direct and oversee vendor for Instalation Cubicle and Transformer on
Mob. +62 81252340456 Medium Voltage and all electrical system on Power Plant Gas Engine
W34DF (Wartsila) to ensure quality with make report and Punchlist
 Responsible for all aspects of underground work including cable pulling,
installing instruments & threaded rod; install trunking, tray, ladder rack,
Harisjauhari787@gmail.com confine space entry, small power and lighting for Building and PJU, and
terminating
 Trained and managed five employees, ensuring adherence to safety
procedures and maintenance of high quality service standards expected
Perum Krian Sejahtera Indah by management
Blok B2/27, Krian  Improve Function and reliabilty of Electrical and automation Equipment
Sidoarjo and associated equipment by studying performance result, identifying,
reccomending and implementing change, expansion, and addition

ORGANIZATION August 2014 –


Juli 2017
PT.LAUTAN NATURAL KRIMERINDO
Mojosari – Mojokerto

DETAIL
MAINTENANCE AND ELECTRICAL PROCESS TECHNOLOGY
SUPERVISOR
1. Kadiv Kemahasiswaan BEM  Collect project proposal and prepare project planning and weekly update
PENS-ITS (2008-2009) to ensure project tracked targeted scedule and budget
 Prepare conceptual design for Automation (PLC and Scada) and
2. Vice Chairman of the Karang Electrical Power Plant (Cable, diesel engine, gas engine, Trafo,
Taruna desa Bangun, Grounding, Earthing, Panel, Pump, Lift, Fire Alarm etc)
Mojokerto (2009 – 2011)  Maintain Function and reliabilty of Electrical and Automation System as
well as associated equipment by implementing a preventive and
corrective maintenance program, operating and testingsystem and
equipment, restoring, repairing, or replacing faulty or inoperative
component and part
 Meets maintenance operational Standard by contributing maintenance
information strategic plan and reviews, implementing production, quality
and resolving problem based TPM (Total Productive Maintenance)
tandard
PERSONAL SKILL My experience in Handle Project at PT.LNK as following below :
- Project All Electrical (Cubicle Schneider, Transformer 2500 KVA,
 Mother tongue (s) Lamp, Panel, Grounding System) and Electronic (Fire Alarm, Paging
system)
Javanesse, Indonesia (Bahasa)
- Project Gas Engine MWM TCG 2020 V16K
- Project Instalation Genset MAN 1000 KVA
 Other Language (s) - Project for Syncronize Gas Engine, Diesel Engine and PLN with
Engglish : Syncronize in 20 KV
Writing - Project UPS Eaton 1650 KVA
Oral - Project Instalation Elevator/ lift in Building Plant 2 LNK
- Project for Robot Palletizer
Listening
- Project for make Power Managemet System with Win CC
- Project for Supervise all PLC and Scada of Powder System
 Communicationcopy Skill (Wetmix,Dryer,Powder Handling and Packaging)
Excellent verbal and written
communication
- Good ability to adapt to multicultural January 2011 – PT.SANTOS JAYA ABADI (KAPAL API)
enviroments July 2014 Karawang – Jawa Barat
PROJECT ENGINEER SUPERVISOR
- Capable work as team and individual
 Collect project proposal and prepare project planning and weekly
update to ensure project tracked targeted scedule and budget
 Operation / Managerial Skill  Prepare conceptual design for new pocess or new machine also
Excellent organisational and prioritisation modification of existing process/instalation
skills  Manage contractor/vendor by selecting ,supervise during project and
- Experience as leader in team evaluate after project completion fulfill legal/QHSE requirement and
Maintenace and Engineer Project. certification
 Collect project documentation to ensure traceability of project
- Experience as Supervise for Handle
document & design
Project Electrical and Mechanical
 Conduct start up process,trial,& Comisioning for Project Related
- Experience for manage contractor /
vendor and ensuring that their packages
My experience in Handle Project at PT.LNK as following below :
are completed on time, within budget - The Project for Powder Handling system in Kapal Api Karawang
and Work Safety The project of making a new engine plant for the job includes building
construction, Electrical installations (Electrical, Motor, PLC, SCADA,
 Computer Skill etc.), Mechanical (Installation packing machine, pipe transfer, dozing
- MS Office (Word, Excel, Power Point, machine, frying machine, pneumatic, etc)
- Project for Installation Genset 1000 KVA and Transformer 2000 KVA
Acces, Outlook, Ms Project, Ms Visio)
- Project for Improvement Electrical system for syncronize Genset and
- Drawing (Autocad, Sketchup) Grid with add Control Panel and Modul Deep Sea 7660
- PLC (Simatic S7 TIA Portal, CX - Project make PLC Program for Improvement Packaging and Transfer
Programmer, RS Logic, PLC LS, Vijeo Machine
Designer)
- Scada (Wonderware, Win CC)
- Programmer Language (C++, Visual
Basic)
- Electrical Design Software (Etap,
TRAINING AND WORKSHOP
Ecodial, Dialux, ABB Doc)
A. Training&Workshop of PLC & SCADA : F. Training and Workshop Load cell
1. PLC Omron / PENS-ITS / 2010 Calibration from Mettler Toledo, 2016
 Technical Skill
2. PLC Siemens / Siemens / 2014 G. Training for maintenace and Operation
- Management Project (Curve S, BOQ,
3. PLC AllenBradley / Transavia / 2015 Fire Alarm, Hochiki, 2017
and Time Schedule)
4. Wonderware/ Indoserako /2016 H. Product Knowledge Engine MWM TCG
- TPM (Total Productive Maintenace)
5. PLC LS/Sarana Tripamca /2016 2020 V16K, 2017
System for Cubicle, Genset, Gas
B. Training Total Productive Maintenace I. Certificate Product Knowledge Engine
engine, Transformer, Chiller, Powder
(TPM) From Neville Clarke, 2016 Wartsila W34DF, 2017.
System (Wetmix,Dryer,Powder
C. Training for Programming Robot Palletezer J. Training for Test of MV Cable (HIPOT
Handling and Packaging)
from Fanuc, 2016 Test, Megger test) From PLN
- Design and Installation Control and
D. Training for maintenace and operation K. Training for Setting Reyroll Siemens
Power Panel
Cubicle Schneider, 2016 protection with Reydisp Software from
- Design Electrical (Protection relay,
E. Training for Setting Sepam protection from Siemens, 2017
Voltage Drop Cable, power factor of
Schneider,2016
Capacitor bank, Short circuit,etc)

También podría gustarte