Valorizacion - Adicional Nro 01 - jUNIO - Yaruri - 2015
Valorizacion - Adicional Nro 01 - jUNIO - Yaruri - 2015
1 ADICIONAL
2 RED COLECTOR SECTOR I
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE DE TERRENO m 628.56 3.03 1,904.54 628.56 1,904.54 100.00 0.00 0.00 0.00 628.56 1,904.54
02.01.02 TRAZO Y REPLANTEO KM 1.26 1,185.61 1,493.87 1.26 1,493.87 100.00 0.00 0.00 0.00 1.26 1,493.87
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 1.26 2,163.86 2,726.46 1.26 2,726.46 100.00 0.00 0.00 0.00 1.26 2,726.46
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 285.42 3.99 1,138.83 285.42 1,138.83 100.00 0.00 0.00 0.00 285.42 1,138.83
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 58.99 4.81 283.74 58.99 283.74 100.00 0.00 0.00 0.00 58.99 283.74
02.02.03 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 87.82 4.86 426.81 87.82 426.81 100.00 0.00 0.00 0.00 87.82 426.81
02.02.04 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 18.15 5.6 101.64 18.15 101.64 100.00 0.00 0.00 0.00 18.15 101.64
02.02.05 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 43.91 6.95 305.17 43.91 305.17 100.00 0.00 0.00 0.00 43.91 305.17
02.02.06 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 9.08 7.91 71.82 9.08 71.82 100.00 0.00 0.00 0.00 9.08 71.82
02.02.07 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 21.96 8.73 191.71 21.96 191.71 100.00 0.00 0.00 0.00 21.96 191.71
02.02.08 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 4.54 11.61 52.71 4.54 52.71 100.00 0.00 0.00 0.00 4.54 52.71
02.02.09 ENTIBADO DE ZANJAS m 11.26 26.09 293.77 11.26 293.77 100.00 0.00 0.00 0.00 11.26 293.77
02.02.10 REFINE Y NIVELACION DE FONDO DE ZANJA m 628.56 3.42 2,149.68 628.56 2,149.68 100.00 0.00 0.00 0.00 628.56 2,149.68
02.02.11 CAMA DE APOYO E=0.10M PARA TUBERIA m 628.56 2.48 1,558.83 628.56 1,558.83 100.00 0.00 0.00 0.00 628.56 1,558.83
02.02.12 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 628.56 6.52 4,098.21 628.56 4,098.21 100.00 0.00 0.00 0.00 628.56 4,098.21
02.02.13 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 292.74 11.85 3,468.97 292.74 3,468.97 100.00 0.00 0.00 0.00 292.74 3,468.97
02.02.14 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.0M m3 40.63 14.81 601.73 40.63 601.73 100.00 0.00 0.00 0.00 40.63 601.73
02.02.15 ELIMINACION DE MATERIAL EXCEDENTE m3 374 4.46 1,668.04 374.00 1,668.04 100.00 0.00 0.00 0.00 374.00 1,668.04
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 Ø 160mm m 628.56 21.71 13,646.04 628.56 13,646.04 100.00 0.00 0.00 0.00 628.56 13,646.04
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 628.56 1.3 817.13 628.56 817.13 100.00 0.00 0.00 0.00 628.56 817.13
03 CONSTRUCCION DE BUZONES SECTOR I
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 107.11 249.57 100.00 0.00 0.00 0.00 107.11 249.57
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 4.58 121.29 555.51 4.58 555.51 100.00 0.00 0.00 0.00 4.58 555.51
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 111.95 17.32 1,938.97 111.95 1,938.97 100.00 0.00 0.00 0.00 111.95 1,938.97
03.02.02 REFINE Y NIVELACION Y COMPACTADO PISO PARED m2 84.12 6.76 568.65 84.12 568.65 100.00 0.00 0.00 0.00 84.12 568.65
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 139.83 4.46 623.64 139.83 623.64 100.00 0.00 0.00 0.00 139.83 623.64
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M und 23 1,556.16 35,791.68 23.00 35,791.68 100.00 0.00 0.00 0.00 23.00 35,791.68
03.03.02 BUZON TIPO V H=1.75M und 1 1,931.13 1,931.13 1.00 1,931.13 100.00 0.00 0.00 0.00 1.00 1,931.13
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA, 1:5) m2 48.77 18.79 916.39 48.77 916.39 100.00 0.00 0.00 0.00 48.77 916.39
04 RED EMISOR SECTOR I
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE DE TERRENO m 333.98 3.03 1,011.96 333.98 1,011.96 100.00 0.00 0.00 0.00 333.98 1,011.96
04.01.02 TRAZO Y REPLANTEO KM 0.33 1,185.61 391.25 0.33 391.25 100.00 0.00 0.00 0.00 0.33 391.25
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 0.33 2,163.86 714.07 0.33 714.07 100.00 0.00 0.00 0.00 0.33 714.07
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 71.41 3.99 284.93 71.41 284.93 100.00 0.00 0.00 0.00 71.41 284.93
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 21.97 4.86 106.77 21.97 106.77 100.00 0.00 0.00 0.00 21.97 106.77
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 10.99 6.95 76.38 10.99 76.38 100.00 0.00 0.00 0.00 10.99 76.38
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 5.49 8.73 47.93 5.49 47.93 100.00 0.00 0.00 0.00 5.49 47.93
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 140.35 3.42 480.00 140.35 480.00 100.00 0.00 0.00 0.00 140.35 480.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 333.98 2.48 828.27 333.98 828.27 100.00 0.00 0.00 0.00 333.98 828.27
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 333.98 6.52 2,177.55 333.98 2,177.55 100.00 0.00 0.00 0.00 333.98 2,177.55
04.02.08 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 95.08 11.85 1,126.70 95.08 1,126.70 100.00 0.00 0.00 0.00 95.08 1,126.70
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 17.74 4.46 79.12 17.74 79.12 100.00 0.00 0.00 0.00 17.74 79.12
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC ISO 4435 KM S-20 DN 200MM m 333.98 27.23 9,094.28 333.98 9,094.28 100.00 0.00 0.00 0.00 333.98 9,094.28
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 333.98 1.3 434.17 333.98 434.17 100.00 0.00 0.00 0.00 333.98 434.17
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR I
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.8 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05
06 CAMARA DE REJAS (4.56X0.77 M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 10.1 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93
06.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65
06.04 REVOQUES, ENLUCIDOS Y MOLDURAS
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
06.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85
07 DESARENADOR (5.90X1.50 M) SECTOR I
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20
07.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16
07.06 PINTURA EN ACCESOROS
07.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51
07.07 SUMINISTRO Y COLOCACION COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08
07.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.9 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66
08 TANQUE IMHOFF (2.5mX2.5m) SECTOR I
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15
08.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01
08.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.5 4.11 4,075.07 991.5 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13
08.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS
08.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.5 573.40 100.00 0.00 0.00 0.00 0.50 573.40
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.1 27.23 111.64 4.1 111.64 100.00 0.00 0.00 0.00 4.10 111.64
08.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.5 180.96 90.48 0.5 90.48 100.00 0.00 0.00 0.00 0.50 90.48
09 LECHO DE SECADO (5.20mx6.20m) SECTOR I
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29
09.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27
09.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.2 322.87 387.44 1.2 387.44 100.00 0.00 0.00 0.00 1.20 387.44
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.3 33.77 10.13 0.3 10.13 100.00 0.00 0.00 0.00 0.30 10.13
09.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 14.58 70.44 1,027.02 14.58 1,027.02 100.00 0.00 0.00 0.00 14.58 1,027.02
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2 85.93 18.79 1,614.62 85.93 1,614.62 100.00 0.00 0.00 0.00 85.93 1,614.62
09.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2 15.36 38.07 584.76 15.36 584.76 100.00 0.00 0.00 0.00 15.36 584.76
09.07 PISO
09.07.01 CAPA DE ARCILLA H=.10M m3 4.65 19.9 92.54 4.65 92.54 100.00 0.00 0.00 0.00 4.65 92.54
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
09.08 CANLETA DE DRENAJE
09.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 1.26 27.57 34.74 1.26 34.74 100.00 0.00 0.00 0.00 1.26 34.74
09.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.04 311.07 323.51 1.04 323.51 100.00 0.00 0.00 0.00 1.04 323.51
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 15.72 33.77 530.86 15.72 530.86 100.00 0.00 0.00 0.00 15.72 530.86
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I und 2 428.68 857.36 2.00 857.36 100.00 0.00 0.00 0.00 2.00 857.36
09.09.02 TIJERAL TIPO II und 2 392.4 784.80 2.00 784.80 100.00 0.00 0.00 0.00 2.00 784.80
09.09.03 LARGUEROS DE 6"X4" m 40.2 25.42 1,021.88 40.20 1,021.88 100.00 0.00 0.00 0.00 40.20 1,021.88
09.09.04 CORREAS 2"X2" m 113.9 5.46 621.89 113.90 621.89 100.00 0.00 0.00 0.00 113.90 621.89
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 83.55 20.08 1,677.68 83.55 1,677.68 100.00 0.00 0.00 0.00 83.55 1,677.68
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1" m3 17.51 67.22 1,177.02 17.51 1,177.02 100.00 0.00 0.00 0.00 17.51 1,177.02
09.10.02 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.31 67.22 289.72 4.31 289.72 100.00 0.00 0.00 0.00 4.31 289.72
09.10.03 LECHO DE ARENA m3 17.24 67.22 1,158.87 17.24 1,158.87 100.00 0.00 0.00 0.00 17.24 1,158.87
09.11 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 3.9 27.23 106.20 3.90 106.20 100.00 0.00 0.00 0.00 3.90 106.20
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 25.7 21.93 563.60 25.70 563.60 100.00 0.00 0.00 0.00 25.70 563.60
09.11.03 COLOCACION DE ACCESORIOS EN LECHO DE SECADO GLB 0.5 462.82 231.41 0.50 231.41 100.00 0.00 0.00 0.00 0.50 231.41
10 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR I
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 28.52 2.33 66.45 28.52 66.45 100.00 0.00 0.00 0.00 28.52 66.45
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION EN TERRENO NORMAL m3 57.56 17.32 996.94 57.56 996.94 100.00 0.00 0.00 0.00 57.56 996.94
10.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 28.52 5.03 143.46 28.52 143.46 100.00 0.00 0.00 0.00 28.52 143.46
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 69.07 4.46 308.05 69.07 308.05 100.00 0.00 0.00 0.00 69.07 308.05
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 11.82 213.72 2,526.17 11.82 2,526.17 100.00 0.00 0.00 0.00 0.00 2,526.17
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 40.94 33.77 1,382.54 40.94 1,382.54 100.00 0.00 0.00 0.00 0.00 1,382.54
10.04 FILTROS DE PIEDRA
10.04.01 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4 67.22 268.88 4.00 268.88 100.00 0.00 0.00 0.00 4.00 268.88
10.04.02 LECHO DE GRAVA DE 1" m3 6 67.22 403.32 6.00 403.32 100.00 0.00 0.00 0.00 6.00 403.32
10.04.03 LECHO DE PIEDRA DE 3.5" m3 8 29.18 233.44 8.00 233.44 100.00 0.00 0.00 0.00 8.00 233.44
10.04.04 LECHO DE PIEDRA MAX. 6" m3 4 29.18 116.72 4.00 116.72 100.00 0.00 0.00 0.00 4.00 116.72
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 16.5 27.23 449.30 16.50 449.30 100.00 0.00 0.00 0.00 16.50 449.30
10.05.02 TUBERIA PVC ø 110 MM ISO 4435 m 18.9 12.37 233.79 18.90 233.79 100.00 0.00 0.00 0.00 18.90 233.79
10.05.03 COLOCACION DE ACCESORIOS GLB 0.5 630.42 315.21 0.50 315.21 100.00 0.00 0.00 0.00 0.50 315.21
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
10.05.04 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40
10.06 CERCO PERIMETRICO PLANTA TRATAMIENTO
10.06.01 TRAZO Y REPLANTEO KM 0.07 1,185.61 82.99 0.07 82.99 100.00 0.00 0.00 0.00 0.07 82.99
10.06.02 EXCAVACION EN TERRENO NORMAL m3 1.09 17.32 18.88 1.09 18.88 100.00 0.00 0.00 0.00 1.09 18.88
10.06.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.4 322.87 129.15 0.40 129.15 100.00 0.00 0.00 0.00 0.40 129.15
10.06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.26 20.32 66.24 3.26 66.24 100.00 0.00 0.00 0.00 3.26 66.24
10.06.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.31 4.11 116.35 28.31 116.35 100.00 0.00 0.00 0.00 28.31 116.35
10.06.06 CERCO PERIMETRICO m 65.5 9.29 608.50 65.50 608.50 100.00 0.00 0.00 0.00 65.50 608.50
10.06.07 ROLLIZO DE EUCALIPTO DE 4"X2.00M und 17 28.4 482.80 17.00 482.80 100.00 0.00 0.00 0.00 17.00 482.80
10.06.08 PUERTA METALICA DE 3X2.5M und 0.50 1,024.83 512.42 0.50 512.42 100.00 0.00 0.00 0.00 0.50 512.42
11 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR II
11.01 EXPLANACION
11.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324.00 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96
11.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.80 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05
12 CAMARA DE REJAS (4.56X0.77 M) SAECTOR II
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION EN TERRENO NORMAL m3 10.10 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93
12.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38
12.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78
12.03 OBRAS DE CONCRETO ARMADO
12.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15
12.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25
12.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65
12.04 REVOQUES, ENLUCIDOS Y MOLDURAS
12.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40
12.05 COLOCACION DE REJAS
12.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1.00 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99
12.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1.00 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85
13 DESARENADOR (5.90X1.50 M) SECTOR II
13.01 TRAZO Y REPLANTEO
13.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20
13.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48
13.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
13.03 OBRAS DE CONCRETO SIMPLE
13.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54
13.04 OBRAS DE CONCRETO ARMADO
13.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85
13.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46
13.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55
13.05 REVOQUES ENLUCIDOS Y MOLDURAS
13.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16.00 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16
13.06 PINTURA EN ACCESOROS
13.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51
13.07 SUMINISTRO Y COLOCACION COMPUERTA
13.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1.00 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08
13.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.90 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66
14 TANQUE IMHOFF (2.5mX2.5m) SECTOR II
14.01 TRABAJOS PRELIMINARES
14.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15
14.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36
14.02 MOVIMIENTO DE TIERRAS
14.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01
14.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17
14.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48
14.03 OBRAS DE CONCRETO SIMPLE
14.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13
14.04 OBRAS DE CONCRETO ARMADO
14.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30
14.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67
14.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.50 4.11 4,075.07 991.50 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07
14.05 REVOQUES ENLUCIDOS Y MOLDURAS
14.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13
14.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS
14.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.50 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40
14.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.10 27.23 111.64 4.10 111.64 100.00 0.00 0.00 0.00 4.10 111.64
14.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.50 180.96 90.48 0.50 90.48 100.00 0.00 0.00 0.00 0.50 90.48
15 LECHO DE SECADO (5.20mx6.20m) SECTOR II
15.01 TRABAJOS PRELIMINARES
15.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82
15.02 MOVIMIENTO DE TIERRAS
VALORIZACION DE ADICIONAL OBRA N° 01
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDAR
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
15.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89
15.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01
15.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19
15.03 OBRAS DE CONCRETO SIMPLE
15.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29
15.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27
15.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11
15.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61
15.04 OBRAS DE CONCRETO ARMADO
15.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91
15.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.20 322.87 387.44 1.20 387.44 100.00 0.00 0.00 0.00 1.20 387.44
15.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63
15.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36
15.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.30 33.77 10.13 0.30 10.13 100.00 0.00 0.00 0.00 0.30 10.13
15.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35
15.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74
15.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70
15.05 ALBAÑILERIA
ADICIONAL OBRA N° 01
AL MES DE MAYO DE 2015
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
APROBACIONES
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
ENTIDAD
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
APROBACIONES
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
(INC. IGV.)
: 120 DIAS CALENDARIOS
ENTIDAD
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE
EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1.00 100.00
01.02 ALQUILER DE ALMACEN DE OBRA mes 1.00 22.22
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 0.50 50.00
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 0.75 75.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 189.05 10.00
02.01.02 TRAZO Y REPLANTEO Km 0.19 10.00
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.19 10.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 49.44 10.00
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 6.98 10.00
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 189.05 10.00
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 189.05 10.00
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 189.05 10.00
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 50.71 10.00
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 55.63 10.00
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 189.05 10.00
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 0.00 0.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 1,296.00 50.00
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1,555.20 50.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.48 50.01
08.01.02 TRAZO Y REPLANTEO m2 17.48 50.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 80.14 50.00
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 84.36 50.00
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.17 50.00
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 2.06 50.00
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 25.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 25.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 1,983.01 50.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 140.61 50.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 160.39 50.00
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 107.37 50.00
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 192.47 50.00
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 13.97 50.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 0.00 0.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 5.12 25.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 25.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 3.08 50.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 37.63 50.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 247.55 50.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 0.00 0.00
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 57.04 50.00
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 115.12 50.00
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 57.04 50.00
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 138.15 50.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 0.00 0.00
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 0.00 0.00
16.03 DISEÑO DE MEZCLA Und. 3.00 50.00
16.04 ENSAYOS CBR Und. 0.00 0.00
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %