Está en la página 1de 134

VALORIZACION DE ADICIONAL OBRA N° 02

CORRESPONDIENTE AL MES DE JULIO DE 2015


Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
1 ADICIONAL
2 RED COLECTOR SECTOR I
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE DE TERRENO m 628.56 3.03 1,904.54 628.56 1,904.54 100.00 0.00 0.00 0.00 628.56 1,904.54
02.01.02 TRAZO Y REPLANTEO KM 1.26 1,185.61 1,493.87 1.26 1,493.87 100.00 0.00 0.00 0.00 1.26 1,493.87
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 1.26 2,163.86 2,726.46 1.26 2,726.46 100.00 0.00 0.00 0.00 1.26 2,726.46
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 285.42 3.99 1,138.83 285.42 1,138.83 100.00 0.00 0.00 0.00 285.42 1,138.83
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 58.99 4.81 283.74 58.99 283.74 100.00 0.00 0.00 0.00 58.99 283.74
02.02.03 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 87.82 4.86 426.81 87.82 426.81 100.00 0.00 0.00 0.00 87.82 426.81
02.02.04 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 18.15 5.6 101.64 18.15 101.64 100.00 0.00 0.00 0.00 18.15 101.64
02.02.05 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 43.91 6.95 305.17 43.91 305.17 100.00 0.00 0.00 0.00 43.91 305.17
02.02.06 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 9.08 7.91 71.82 9.08 71.82 100.00 0.00 0.00 0.00 9.08 71.82
02.02.07 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 21.96 8.73 191.71 21.96 191.71 100.00 0.00 0.00 0.00 21.96 191.71
02.02.08 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 4.54 11.61 52.71 4.54 52.71 100.00 0.00 0.00 0.00 4.54 52.71
02.02.09 ENTIBADO DE ZANJAS m 11.26 26.09 293.77 11.26 293.77 100.00 0.00 0.00 0.00 11.26 293.77
02.02.10 REFINE Y NIVELACION DE FONDO DE ZANJA m 628.56 3.42 2,149.68 628.56 2,149.68 100.00 0.00 0.00 0.00 628.56 2,149.68
02.02.11 CAMA DE APOYO E=0.10M PARA TUBERIA m 628.56 2.48 1,558.83 628.56 1,558.83 100.00 0.00 0.00 0.00 628.56 1,558.83
02.02.12 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 628.56 6.52 4,098.21 628.56 4,098.21 100.00 0.00 0.00 0.00 628.56 4,098.21
02.02.13 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 292.74 11.85 3,468.97 292.74 3,468.97 100.00 0.00 0.00 0.00 292.74 3,468.97
02.02.14 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.0M m3 40.63 14.81 601.73 40.63 601.73 100.00 0.00 0.00 0.00 40.63 601.73
02.02.15 ELIMINACION DE MATERIAL EXCEDENTE m3 374 4.46 1,668.04 374.00 1,668.04 100.00 0.00 0.00 0.00 374.00 1,668.04
02.03 SUMINISTRO E INSTALACION TUBERIAS 0.00
02.03.01 TUBERIA PVC KM ISO 4435 Ø 160mm m 628.56 21.71 13,646.04 628.56 13,646.04 100.00 0.00 0.00 0.00 628.56 13,646.04
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 628.56 1.3 817.13 628.56 817.13 100.00 0.00 0.00 0.00 628.56 817.13
03 CONSTRUCCION DE BUZONES SECTOR I 0.00
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 107.11 249.57 100.00 0.00 0.00 0.00 107.11 249.57
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 4.58 121.29 555.51 4.58 555.51 100.00 0.00 0.00 0.00 4.58 555.51
03.02 MOVIMIENTO DE TIERRAS 0.00
03.02.01 EXCAVACION EN TERRENO NORMAL m3 111.95 17.32 1,938.97 111.95 1,938.97 100.00 0.00 0.00 0.00 111.95 1,938.97
03.02.02 REFINE Y NIVELACION Y COMPACTADO PISO PARED m2 84.12 6.76 568.65 84.12 568.65 100.00 0.00 0.00 0.00 84.12 568.65
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 139.83 4.46 623.64 139.83 623.64 100.00 0.00 0.00 0.00 139.83 623.64
03.03 OBRAS DE CONCRETO ARMADO 0.00
03.03.01 BUZON TIPO III H=1.20M und 23 1,556.16 35,791.68 23.00 35,791.68 100.00 0.00 0.00 0.00 23.00 35,791.68
03.03.02 BUZON TIPO V H=1.75M und 1 1,931.13 1,931.13 1.00 1,931.13 100.00 0.00 0.00 0.00 1.00 1,931.13

Página 1
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
03.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA, 1:5) m2 48.77 18.79 916.39 48.77 916.39 100.00 0.00 0.00 0.00 48.77 916.39
04 RED EMISOR SECTOR I 0.00
04.01 TRABAJOS PRELIMINARES 0.00
04.01.01 LIMPIEZA DE DE TERRENO m 333.98 3.03 1,011.96 333.98 1,011.96 100.00 0.00 0.00 0.00 333.98 1,011.96
04.01.02 TRAZO Y REPLANTEO KM 0.33 1,185.61 391.25 0.33 391.25 100.00 0.00 0.00 0.00 0.33 391.25
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 0.33 2,163.86 714.07 0.33 714.07 100.00 0.00 0.00 0.00 0.33 714.07
04.02 MOVIMIENTO DE TIERRAS 0.00
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 71.41 3.99 284.93 71.41 284.93 100.00 0.00 0.00 0.00 71.41 284.93
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 21.97 4.86 106.77 21.97 106.77 100.00 0.00 0.00 0.00 21.97 106.77
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 10.99 6.95 76.38 10.99 76.38 100.00 0.00 0.00 0.00 10.99 76.38
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 5.49 8.73 47.93 5.49 47.93 100.00 0.00 0.00 0.00 5.49 47.93
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 140.35 3.42 480.00 140.35 480.00 100.00 0.00 0.00 0.00 140.35 480.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 333.98 2.48 828.27 333.98 828.27 100.00 0.00 0.00 0.00 333.98 828.27
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 333.98 6.52 2,177.55 333.98 2,177.55 100.00 0.00 0.00 0.00 333.98 2,177.55
04.02.08 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 95.08 11.85 1,126.70 95.08 1,126.70 100.00 0.00 0.00 0.00 95.08 1,126.70
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 17.74 4.46 79.12 17.74 79.12 100.00 0.00 0.00 0.00 17.74 79.12
04.03 SUMINISTRO E INSTALACION TUBERIAS 0.00
04.03.01 TUBERIA PVC ISO 4435 KM S-20 DN 200MM m 333.98 27.23 9,094.28 333.98 9,094.28 100.00 0.00 0.00 0.00 333.98 9,094.28
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 333.98 1.3 434.17 333.98 434.17 100.00 0.00 0.00 0.00 333.98 434.17
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR I 0.00
05.01 EXPLANACION 0.00
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.8 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05
06 CAMARA DE REJAS (4.56X0.77 M) 0.00
06.01 TRABAJOS PRELIMINARES 0.00
06.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61
06.02 MOVIMIENTO DE TIERRAS 0.00
06.02.01 EXCAVACION EN TERRENO NORMAL m3 10.1 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93
06.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78
06.03 OBRAS DE CONCRETO ARMADO 0.00
06.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65
06.04 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00

Página 2
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
06.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40
06.05 COLOCACION DE REJAS 0.00
06.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85
07 DESARENADOR (5.90X1.50 M) SECTOR I 0.00
07.01 TRAZO Y REPLANTEO 0.00
07.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62
07.02 MOVIMIENTO DE TIERRAS 0.00
07.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20
07.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93
07.03 OBRAS DE CONCRETO SIMPLE 0.00
07.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54
07.04 OBRAS DE CONCRETO ARMADO 0.00
07.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55
07.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
07.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16
07.06 PINTURA EN ACCESOROS 0.00
07.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51
07.07 SUMINISTRO Y COLOCACION COMPUERTA 0.00
07.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08
07.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.9 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66
08 TANQUE IMHOFF (2.5mX2.5m) SECTOR I 0.00
08.01 TRABAJOS PRELIMINARES 0.00
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15
08.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36
08.02 MOVIMIENTO DE TIERRAS 0.00
08.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01
08.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48
08.03 OBRAS DE CONCRETO SIMPLE 0.00
08.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13
08.04 OBRAS DE CONCRETO ARMADO 0.00
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30

Página 3
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.5 4.11 4,075.07 991.5 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07
08.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13
08.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS 0.00
08.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.5 573.40 100.00 0.00 0.00 0.00 0.50 573.40
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.1 27.23 111.64 4.1 111.64 100.00 0.00 0.00 0.00 4.10 111.64
08.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.5 180.96 90.48 0.5 90.48 100.00 0.00 0.00 0.00 0.50 90.48
09 LECHO DE SECADO (5.20mx6.20m) SECTOR I 0.00
09.01 TRABAJOS PRELIMINARES 0.00
09.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82
09.02 MOVIMIENTO DE TIERRAS 0.00
09.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19
09.03 OBRAS DE CONCRETO SIMPLE 0.00
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29
09.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27
09.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61
09.04 OBRAS DE CONCRETO ARMADO 0.00
09.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.2 322.87 387.44 1.2 387.44 100.00 0.00 0.00 0.00 1.20 387.44
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.3 33.77 10.13 0.3 10.13 100.00 0.00 0.00 0.00 0.30 10.13
09.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70
09.05 ALBAÑILERIA 0.00
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 14.58 70.44 1,027.02 14.58 1,027.02 100.00 0.00 0.00 0.00 14.58 1,027.02
09.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2 85.93 18.79 1,614.62 85.93 1,614.62 100.00 0.00 0.00 0.00 85.93 1,614.62
09.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2 15.36 38.07 584.76 15.36 584.76 100.00 0.00 0.00 0.00 15.36 584.76
09.07 PISO 0.00
09.07.01 CAPA DE ARCILLA H=.10M m3 4.65 19.9 92.54 4.65 92.54 100.00 0.00 0.00 0.00 4.65 92.54

Página 4
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
09.08 CANLETA DE DRENAJE 0.00
09.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 1.26 27.57 34.74 1.26 34.74 100.00 0.00 0.00 0.00 1.26 34.74
09.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.04 311.07 323.51 1.04 323.51 100.00 0.00 0.00 0.00 1.04 323.51
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 15.72 33.77 530.86 15.72 530.86 100.00 0.00 0.00 0.00 15.72 530.86
09.09 CUBIERTAS 0.00
09.09.01 TIJERAL TIPO I und 2 428.68 857.36 0.00 0.00 0.00 2.00 857.36 100.00 2.00 857.36
09.09.02 TIJERAL TIPO II und 2 392.4 784.80 0.00 0.00 0.00 2.00 784.80 100.00 2.00 784.80
09.09.03 LARGUEROS DE 6"X4" m 40.2 25.42 1,021.88 0.00 0.00 0.00 40.20 1,021.88 100.00 40.20 1,021.88
09.09.04 CORREAS 2"X2" m 113.9 5.46 621.89 0.00 0.00 0.00 113.90 621.89 100.00 113.90 621.89
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 83.55 20.08 1,677.68 0.00 0.00 0.00 83.55 1,677.68 100.00 83.55 1,677.68
09.10 FILTRO DE PIEDRA 0.00
09.10.01 LECHO DE GRAVA DE 1" m3 17.51 67.22 1,177.02 17.51 1,177.02 100.00 0.00 0.00 0.00 17.51 1,177.02
09.10.02 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.31 67.22 289.72 4.31 289.72 100.00 0.00 0.00 0.00 4.31 289.72
09.10.03 LECHO DE ARENA m3 17.24 67.22 1,158.87 17.24 1,158.87 100.00 0.00 0.00 0.00 17.24 1,158.87
09.11 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 3.9 27.23 106.20 3.90 106.20 100.00 0.00 0.00 0.00 3.90 106.20
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 25.7 21.93 563.60 25.70 563.60 100.00 0.00 0.00 0.00 25.70 563.60
09.11.03 COLOCACION DE ACCESORIOS EN LECHO DE SECADO GLB 0.5 462.82 231.41 0.50 231.41 100.00 0.00 0.00 0.00 0.50 231.41
10 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR I 0.00
10.01 TRABAJOS PRELIMINARES 0.00
10.01.01 TRAZO Y REPLANTEO m2 28.52 2.33 66.45 28.52 66.45 100.00 0.00 0.00 0.00 28.52 66.45
10.02 MOVIMIENTO DE TIERRAS 0.00
10.02.01 EXCAVACION EN TERRENO NORMAL m3 57.56 17.32 996.94 57.56 996.94 100.00 0.00 0.00 0.00 57.56 996.94
10.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 28.52 5.03 143.46 28.52 143.46 100.00 0.00 0.00 0.00 28.52 143.46
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 69.07 4.46 308.05 69.07 308.05 100.00 0.00 0.00 0.00 69.07 308.05
10.03 OBRAS DE CONCRETO SIMPLE 0.00
10.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 11.82 213.72 2,526.17 11.82 2,526.17 100.00 0.00 0.00 0.00 11.82 2,526.17
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 40.94 33.77 1,382.54 40.94 1,382.54 100.00 0.00 0.00 0.00 40.94 1,382.54
10.04 FILTROS DE PIEDRA 0.00
10.04.01 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4 67.22 268.88 4.00 268.88 100.00 0.00 0.00 0.00 4.00 268.88
10.04.02 LECHO DE GRAVA DE 1" m3 6 67.22 403.32 6.00 403.32 100.00 0.00 0.00 0.00 6.00 403.32
10.04.03 LECHO DE PIEDRA DE 3.5" m3 8 29.18 233.44 8.00 233.44 100.00 0.00 0.00 0.00 8.00 233.44
10.04.04 LECHO DE PIEDRA MAX. 6" m3 4 29.18 116.72 4.00 116.72 100.00 0.00 0.00 0.00 4.00 116.72
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 16.5 27.23 449.30 16.50 449.30 100.00 0.00 0.00 0.00 16.50 449.30
10.05.02 TUBERIA PVC ø 110 MM ISO 4435 m 18.9 12.37 233.79 18.90 233.79 100.00 0.00 0.00 0.00 18.90 233.79
10.05.03 COLOCACION DE ACCESORIOS GLB 0.5 630.42 315.21 0.50 315.21 100.00 0.00 0.00 0.00 0.50 315.21

Página 5
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
10.05.04 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40
10.06 CERCO PERIMETRICO PLANTA TRATAMIENTO 0.00
10.06.01 TRAZO Y REPLANTEO KM 0.07 1,185.61 82.99 0.07 82.99 100.00 0.00 0.00 0.00 0.07 82.99
10.06.02 EXCAVACION EN TERRENO NORMAL m3 1.09 17.32 18.88 1.09 18.88 100.00 0.00 0.00 0.00 1.09 18.88
10.06.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.4 322.87 129.15 0.40 129.15 100.00 0.00 0.00 0.00 0.40 129.15
10.06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.26 20.32 66.24 3.26 66.24 100.00 0.00 0.00 0.00 3.26 66.24
10.06.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.31 4.11 116.35 28.31 116.35 100.00 0.00 0.00 0.00 28.31 116.35
10.06.06 CERCO PERIMETRICO m 65.5 9.29 608.50 65.50 608.50 100.00 0.00 0.00 0.00 65.50 608.50
10.06.07 ROLLIZO DE EUCALIPTO DE 4"X2.00M und 17 28.4 482.80 17.00 482.80 100.00 0.00 0.00 0.00 17.00 482.80
10.06.08 PUERTA METALICA DE 3X2.5M und 0.50 1,024.83 512.42 0.50 512.42 100.00 0.00 0.00 0.00 0.50 512.42
11 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR II 0.00
11.01 EXPLANACION 0.00
11.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324.00 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96
11.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.80 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05
12 CAMARA DE REJAS (4.56X0.77 M) SAECTOR II 0.00
12.01 TRABAJOS PRELIMINARES 0.00
12.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61
12.02 MOVIMIENTO DE TIERRAS 0.00
12.02.01 EXCAVACION EN TERRENO NORMAL m3 10.10 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93
12.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38
12.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78
12.03 OBRAS DE CONCRETO ARMADO 0.00
12.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15
12.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25
12.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65
12.04 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00
12.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40
12.05 COLOCACION DE REJAS 0.00
12.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1.00 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99
12.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1.00 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85
13 DESARENADOR (5.90X1.50 M) SECTOR II 0.00
13.01 TRAZO Y REPLANTEO 0.00
13.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62
13.02 MOVIMIENTO DE TIERRAS 0.00
13.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20
13.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48
13.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93

Página 6
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
13.03 OBRAS DE CONCRETO SIMPLE 0.00
13.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54
13.04 OBRAS DE CONCRETO ARMADO 0.00
13.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85
13.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46
13.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55
13.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
13.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16.00 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16
13.06 PINTURA EN ACCESOROS 0.00
13.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51
13.07 SUMINISTRO Y COLOCACION COMPUERTA 0.00
13.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1.00 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08
13.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.90 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66
14 TANQUE IMHOFF (2.5mX2.5m) SECTOR II 0.00
14.01 TRABAJOS PRELIMINARES 0.00
14.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15
14.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36
14.02 MOVIMIENTO DE TIERRAS 0.00
14.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01
14.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17
14.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48
14.03 OBRAS DE CONCRETO SIMPLE 0.00
14.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13
14.04 OBRAS DE CONCRETO ARMADO 0.00
14.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30
14.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67
14.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.50 4.11 4,075.07 991.50 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07
14.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
14.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13
14.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS 0.00
14.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.50 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40
14.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.10 27.23 111.64 4.10 111.64 100.00 0.00 0.00 0.00 4.10 111.64
14.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.50 180.96 90.48 0.50 90.48 100.00 0.00 0.00 0.00 0.50 90.48
15 LECHO DE SECADO (5.20mx6.20m) SECTOR II 0.00
15.01 TRABAJOS PRELIMINARES 0.00
15.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82
15.02 MOVIMIENTO DE TIERRAS 0.00

Página 7
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
15.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89
15.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01
15.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19
15.03 OBRAS DE CONCRETO SIMPLE 0.00
15.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29
15.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27
15.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11
15.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61
15.04 OBRAS DE CONCRETO ARMADO 0.00
15.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91
15.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.20 322.87 387.44 1.20 387.44 100.00 0.00 0.00 0.00 1.20 387.44
15.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63
15.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36
15.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.30 33.77 10.13 0.30 10.13 100.00 0.00 0.00 0.00 0.30 10.13
15.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35
15.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74
15.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70
15.05 ALBAÑILERIA 0.00
15.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 14.58 70.44 1,027.02 14.58 1,027.02 100.00 0.00 0.00 0.00 14.58 1,027.02
15.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
15.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2 85.93 18.79 1,614.62 85.93 1,614.62 100.00 0.00 0.00 0.00 85.93 1,614.62
15.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2 15.36 38.07 584.76 15.36 584.76 100.00 0.00 0.00 0.00 15.36 584.76
15.07 PISO 0.00
15.07.01 CAPA DE ARCILLA H=.10M m3 4.65 19.9 92.54 4.65 92.54 100.00 0.00 0.00 0.00 4.65 92.54
15.08 CANLETA DE DRENAJE 0.00
15.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 1.26 27.57 34.74 1.26 34.74 100.00 0.00 0.00 0.00 1.26 34.74
15.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.04 311.07 323.51 1.04 323.51 100.00 0.00 0.00 0.00 1.04 323.51
15.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 15.72 33.77 530.86 15.72 530.86 100.00 0.00 0.00 0.00 15.72 530.86
15.09 CUBIERTAS 0.00
15.09.01 TIJERAL TIPO I und 2.00 428.68 857.36 0.00 0.00 0.00 2.00 857.36 100.00 2.00 857.36
15.09.02 TIJERAL TIPO II und 2.00 392.4 784.80 0.00 0.00 0.00 2.00 784.80 100.00 2.00 784.80
15.09.03 LARGUEROS DE 6"X4" m 40.20 25.42 1,021.88 0.00 0.00 0.00 40.20 1,021.88 100.00 40.20 1,021.88
15.09.04 CORREAS 2"X2" m 113.90 5.46 621.89 0.00 0.00 0.00 113.90 621.89 100.00 113.90 621.89
15.09.05 TECHO DE CALAMINA E=0.33 MM m2 83.55 20.08 1,677.68 0.00 0.00 0.00 83.55 1,677.68 100.00 83.55 1,677.68
15.1 FILTRO DE PIEDRA 0.00
15.10.01 LECHO DE GRAVA DE 1" m3 17.51 67.22 1,177.02 17.51 1,177.02 100.00 0.00 0.00 0.00 17.51 1,177.02
15.10.02 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.31 67.22 289.72 4.31 289.72 100.00 0.00 0.00 0.00 4.31 289.72
15.10.03 LECHO DE ARENA m3 17.24 67.22 1,158.87 17.24 1,158.87 100.00 0.00 0.00 0.00 17.24 1,158.87

Página 8
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
15.11 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
15.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 3.90 27.23 106.20 3.90 106.20 100.00 0.00 0.00 0.00 3.90 106.20
15.11.02 TUBERIA PVC ISO 4435 D 160 MM m 25.70 21.93 563.60 25.70 563.60 100.00 0.00 0.00 0.00 25.70 563.60
15.11.03 COLOCACION DE ACCESORIOS EN LECHO DE SECADO GLB 0.50 462.82 231.41 0.50 231.41 100.00 0.00 0.00 0.00 0.50 231.41
16 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR II 0.00
16.01 TRABAJOS PRELIMINARES 0.00
16.01.01 TRAZO Y REPLANTEO m2 28.52 2.33 66.45 28.52 66.45 100.00 0.00 0.00 0.00 28.52 66.45
16.02 MOVIMIENTO DE TIERRAS
16.02.01 EXCAVACION EN TERRENO NORMAL m3 57.56 17.32 996.94 57.56 996.94 100.00 0.00 0.00 0.00 57.56 996.94
16.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 28.52 5.03 143.46 28.52 143.46 100.00 0.00 0.00 0.00 28.52 143.46
16.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 69.07 4.46 308.05 69.07 308.05 100.00 0.00 0.00 0.00 69.07 308.05
16.03 OBRAS DE CONCRETO SIMPLE
16.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 11.82 213.72 2,526.17 11.82 2,526.17 100.00 0.00 0.00 0.00 11.82 2,526.17
16.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 40.94 33.77 1,382.54 40.94 1,382.54 100.00 0.00 0.00 0.00 40.94 1,382.54
16.04 FILTROS DE PIEDRA
16.04.01 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.00 67.22 268.88 4.00 268.88 100.00 0.00 0.00 0.00 4.00 268.88
16.04.02 LECHO DE GRAVA DE 1" m3 6.00 67.22 403.32 6.00 403.32 100.00 0.00 0.00 0.00 6.00 403.32
16.04.03 LECHO DE PIEDRA DE 3.5" m3 8.00 29.18 233.44 8.00 233.44 100.00 0.00 0.00 0.00 8.00 233.44
16.04.04 LECHO DE PIEDRA MAX. 6" m3 4.00 29.18 116.72 4.00 116.72 100.00 0.00 0.00 0.00 4.00 116.72
16.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
16.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 16.50 27.23 449.30 16.50 449.30 100.00 0.00 0.00 0.00 16.50 449.30
16.05.02 TUBERIA PVC ø 110 MM ISO 4435 m 18.90 12.37 233.79 18.90 233.79 100.00 0.00 0.00 0.00 18.90 233.79
16.05.03 COLOCACION DE ACCESORIOS GLB 0.50 630.42 315.21 0.50 315.21 100.00 0.00 0.00 0.00 0.50 315.21
16.05.04 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.50 1146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40
16.06 CERCO PERIMETRICO PLANTA TRATAMIENTO
16.06.01 TRAZO Y REPLANTEO KM 0.07 1185.61 82.99 0.07 82.99 100.00 0.00 0.00 0.00 0.07 82.99
16.06.02 EXCAVACION EN TERRENO NORMAL m3 1.09 17.32 18.88 1.09 18.88 100.00 0.00 0.00 0.00 1.09 18.88
16.06.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.40 322.87 129.15 0.40 129.15 100.00 0.00 0.00 0.00 0.40 129.15
16.06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.26 20.32 66.24 3.26 66.24 100.00 0.00 0.00 0.00 3.26 66.24
16.06.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.31 4.11 116.35 28.31 116.35 100.00 0.00 0.00 0.00 28.31 116.35
16.06.06 CERCO PERIMETRICO m 65.50 9.29 608.50 65.50 608.50 100.00 0.00 0.00 0.00 65.50 608.50
16.06.07 ROLLIZO DE EUCALIPTO DE 4"X2.00M und 17.00 28.4 482.80 17.00 482.80 100.00 0.00 0.00 0.00 17.00 482.80
16.06.08 PUERTA METALICA DE 3X2.5M und 0.20 1024.83 204.97 0.20 204.97 100.00 0.00 0.00 0.00 0.20 204.97
17 PUENTE AEREO SECTOR II Lon=22.00m
17.01 TRABAJOS PRELIMINARES
17.01.01 LIMPIEZA DE DE TERRENO m 14.39 3.03 43.60 0.00 0.00 0.00 14.39 43.60 100.00 14.39 43.60
17.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 0.00 0.00 0.00 14.39 33.53 100.00 14.39 33.53
17.02 MOVIMIENTO DE TIERRAS
17.02.01 EXCAVACION DE TERRENO PARA ZAPATA m3 4.32 27.57 119.10 0.00 0.00 0.00 4.32 119.10 100.00 4.32 119.10

Página 9
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
17.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.10 0.00 0.00 0.00 5.18 23.10 100.00 5.18 23.10
17.03 OBRAS DE CONCRETO ARMADO
17.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1,479.77 0.00 0.00 0.00 4.32 1,479.77 100.00 4.32 1,479.77
17.03.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS Y COLUMNAS m2 17.99 33.77 607.52 0.00 0.00 0.00 17.99 607.52 100.00 17.99 607.52
17.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 215.20 4.11 884.47 0.00 0.00 0.00 215.20 884.47 100.00 215.20 884.47
17.03.04 CONCRETO EN ZAPATAS Y COLUMNAS- F'C=210 KG/CM2 m3 11.76 426.98 5,021.28 0.00 0.00 0.00 11.76 5,021.28 100.00 11.76 5,021.28
17.03.05 CURADO DE CONCRETO m2 3.60 0.62 2.23 0.00 0.00 0.00 3.60 2.23 100.00 3.60 2.23
17.03.06 COLOCACION DE ACCESORIOS GLB 1.00 630.42 630.42 0.00 0.00 0.00 1.00 630.42 100.00 1.00 630.42
COSTO DIRECTO 216244.13 197,471.87 91.32 18772.24 8.68 216,244.11
GASTOS GENERALES (15.00%) 32436.62 29620.78 2815.84 32436.62
UTILIDAD (8,00%) 17299.53 15797.75 1501.78 17299.53
SUB TOTAL 265980.28 242890.4 23089.86 265980.26
FACTOR DE RELACION FR = 0,9790183675859 260399.58 237794.1629 22605.397 260399.56
I.G.V. (18,00%) 46871.92 42802.95 4068.97 46871.92
PRESUPUESTO TOTAL S/, 307271.5 280597.11 26674.367 307271.48

Página 10
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
1 ADICIONAL
2 RED COLECTOR SECTOR I
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE DE TERRENO m 628.56 3.03 1,904.54 628.56 1,904.54 100.00 0.00 0.00 0.00 628.56 1,904.54 100.00
02.01.02 TRAZO Y REPLANTEO KM 1.26 1,185.61 1,493.87 1.26 1,493.87 100.00 0.00 0.00 0.00 1.26 1,493.87 100.00
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 1.26 2,163.86 2,726.46 1.26 2,726.46 100.00 0.00 0.00 0.00 1.26 2,726.46 100.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 285.42 3.99 1,138.83 285.42 1,138.83 100.00 0.00 0.00 0.00 285.42 1,138.83 100.00
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 58.99 4.81 283.74 58.99 283.74 100.00 0.00 0.00 0.00 58.99 283.74 100.00
02.02.03 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 87.82 4.86 426.81 87.82 426.81 100.00 0.00 0.00 0.00 87.82 426.81 100.00
02.02.04 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 18.15 5.6 101.64 18.15 101.64 100.00 0.00 0.00 0.00 18.15 101.64 100.00
02.02.05 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 43.91 6.95 305.17 43.91 305.17 100.00 0.00 0.00 0.00 43.91 305.17 100.00
02.02.06 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 9.08 7.91 71.82 9.08 71.82 100.00 0.00 0.00 0.00 9.08 71.82 100.00
02.02.07 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 21.96 8.73 191.71 21.96 191.71 100.00 0.00 0.00 0.00 21.96 191.71 100.00
02.02.08 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 4.54 11.61 52.71 4.54 52.71 100.00 0.00 0.00 0.00 4.54 52.71 100.00
02.02.09 ENTIBADO DE ZANJAS m 11.26 26.09 293.77 11.26 293.77 100.00 0.00 0.00 0.00 11.26 293.77 100.00
02.02.10 REFINE Y NIVELACION DE FONDO DE ZANJA m 628.56 3.42 2,149.68 628.56 2,149.68 100.00 0.00 0.00 0.00 628.56 2,149.68 100.00
02.02.11 CAMA DE APOYO E=0.10M PARA TUBERIA m 628.56 2.48 1,558.83 628.56 1,558.83 100.00 0.00 0.00 0.00 628.56 1,558.83 100.00
02.02.12 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 628.56 6.52 4,098.21 628.56 4,098.21 100.00 0.00 0.00 0.00 628.56 4,098.21 100.00
02.02.13 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 292.74 11.85 3,468.97 292.74 3,468.97 100.00 0.00 0.00 0.00 292.74 3,468.97 100.00
02.02.14 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.0M m3 40.63 14.81 601.73 40.63 601.73 100.00 0.00 0.00 0.00 40.63 601.73 100.00
02.02.15 ELIMINACION DE MATERIAL EXCEDENTE m3 374 4.46 1,668.04 374.00 1,668.04 100.00 0.00 0.00 0.00 374.00 1,668.04 100.00
02.03 SUMINISTRO E INSTALACION TUBERIAS 0.00
02.03.01 TUBERIA PVC KM ISO 4435 Ø 160mm m 628.56 21.71 13,646.04 628.56 13,646.04 100.00 0.00 0.00 0.00 628.56 13,646.04 100.00
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 628.56 1.3 817.13 628.56 817.13 100.00 0.00 0.00 0.00 628.56 817.13 100.00
03 CONSTRUCCION DE BUZONES SECTOR I 0.00
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 107.11 249.57 100.00 0.00 0.00 0.00 107.11 249.57 100.00
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 4.58 121.29 555.51 4.58 555.51 100.00 0.00 0.00 0.00 4.58 555.51 100.00
03.02 MOVIMIENTO DE TIERRAS 0.00
03.02.01 EXCAVACION EN TERRENO NORMAL m3 111.95 17.32 1,938.97 111.95 1,938.97 100.00 0.00 0.00 0.00 111.95 1,938.97 100.00
03.02.02 REFINE Y NIVELACION Y COMPACTADO PISO PARED m2 84.12 6.76 568.65 84.12 568.65 100.00 0.00 0.00 0.00 84.12 568.65 100.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 139.83 4.46 623.64 139.83 623.64 100.00 0.00 0.00 0.00 139.83 623.64 100.00
03.03 OBRAS DE CONCRETO ARMADO 0.00
03.03.01 BUZON TIPO III H=1.20M und 23 1,556.16 35,791.68 23.00 35,791.68 100.00 0.00 0.00 0.00 23.00 35,791.68 100.00
03.03.02 BUZON TIPO V H=1.75M und 1 1,931.13 1,931.13 1.00 1,931.13 100.00 0.00 0.00 0.00 1.00 1,931.13 100.00

Página 11
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
03.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA, 1:5) m2 48.77 18.79 916.39 48.77 916.39 100.00 0.00 0.00 0.00 48.77 916.39 100.00
04 RED EMISOR SECTOR I 0.00
04.01 TRABAJOS PRELIMINARES 0.00
04.01.01 LIMPIEZA DE DE TERRENO m 333.98 3.03 1,011.96 333.98 1,011.96 100.00 0.00 0.00 0.00 333.98 1,011.96 100.00
04.01.02 TRAZO Y REPLANTEO KM 0.33 1,185.61 391.25 0.33 391.25 100.00 0.00 0.00 0.00 0.33 391.25 100.00
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM 0.33 2,163.86 714.07 0.33 714.07 100.00 0.00 0.00 0.00 0.33 714.07 100.00
04.02 MOVIMIENTO DE TIERRAS 0.00
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 71.41 3.99 284.93 71.41 284.93 100.00 0.00 0.00 0.00 71.41 284.93 100.00
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 21.97 4.86 106.77 21.97 106.77 100.00 0.00 0.00 0.00 21.97 106.77 100.00
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 10.99 6.95 76.38 10.99 76.38 100.00 0.00 0.00 0.00 10.99 76.38 100.00
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 5.49 8.73 47.93 5.49 47.93 100.00 0.00 0.00 0.00 5.49 47.93 100.00
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 140.35 3.42 480.00 140.35 480.00 100.00 0.00 0.00 0.00 140.35 480.00 100.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 333.98 2.48 828.27 333.98 828.27 100.00 0.00 0.00 0.00 333.98 828.27 100.00
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 333.98 6.52 2,177.55 333.98 2,177.55 100.00 0.00 0.00 0.00 333.98 2,177.55 100.00
04.02.08 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 95.08 11.85 1,126.70 95.08 1,126.70 100.00 0.00 0.00 0.00 95.08 1,126.70 100.00
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 17.74 4.46 79.12 17.74 79.12 100.00 0.00 0.00 0.00 17.74 79.12 100.00
04.03 SUMINISTRO E INSTALACION TUBERIAS 0.00
04.03.01 TUBERIA PVC ISO 4435 KM S-20 DN 200MM m 333.98 27.23 9,094.28 333.98 9,094.28 100.00 0.00 0.00 0.00 333.98 9,094.28 100.00
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 333.98 1.3 434.17 333.98 434.17 100.00 0.00 0.00 0.00 333.98 434.17 100.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR I 0.00
05.01 EXPLANACION 0.00
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96 100.00
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.8 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05 100.00
06 CAMARA DE REJAS (4.56X0.77 M) 0.00
06.01 TRABAJOS PRELIMINARES 0.00
06.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61 100.00
06.02 MOVIMIENTO DE TIERRAS 0.00
06.02.01 EXCAVACION EN TERRENO NORMAL m3 10.1 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93 100.00
06.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38 100.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78 100.00
06.03 OBRAS DE CONCRETO ARMADO 0.00
06.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15 100.00
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25 100.00
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65 100.00
06.04 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00

Página 12
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
06.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40 100.00
06.05 COLOCACION DE REJAS 0.00
06.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99 100.00
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85 100.00
07 DESARENADOR (5.90X1.50 M) SECTOR I 0.00
07.01 TRAZO Y REPLANTEO 0.00
07.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62 100.00
07.02 MOVIMIENTO DE TIERRAS 0.00
07.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20 100.00
07.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48 100.00
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93 100.00
07.03 OBRAS DE CONCRETO SIMPLE 0.00
07.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54 100.00
07.04 OBRAS DE CONCRETO ARMADO 0.00
07.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85 100.00
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46 100.00
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55 100.00
07.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
07.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16 100.00
07.06 PINTURA EN ACCESOROS 0.00
07.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51 100.00
07.07 SUMINISTRO Y COLOCACION COMPUERTA 0.00
07.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08 100.00
07.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.9 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66 100.00
08 TANQUE IMHOFF (2.5mX2.5m) SECTOR I 0.00
08.01 TRABAJOS PRELIMINARES 0.00
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15 100.00
08.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36 100.00
08.02 MOVIMIENTO DE TIERRAS 0.00
08.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01 100.00
08.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17 100.00
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48 100.00
08.03 OBRAS DE CONCRETO SIMPLE 0.00
08.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13 100.00
08.04 OBRAS DE CONCRETO ARMADO 0.00
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30 100.00

Página 13
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67 100.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.5 4.11 4,075.07 991.5 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07 100.00
08.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13 100.00
08.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS 0.00
08.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.5 573.40 100.00 0.00 0.00 0.00 0.50 573.40 100.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.1 27.23 111.64 4.1 111.64 100.00 0.00 0.00 0.00 4.10 111.64 100.00
08.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.5 180.96 90.48 0.5 90.48 100.00 0.00 0.00 0.00 0.50 90.48 100.00
09 LECHO DE SECADO (5.20mx6.20m) SECTOR I 0.00
09.01 TRABAJOS PRELIMINARES 0.00
09.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82 100.00
09.02 MOVIMIENTO DE TIERRAS 0.00
09.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89 100.00
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01 100.00
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19 100.00
09.03 OBRAS DE CONCRETO SIMPLE 0.00
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29 100.00
09.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27 100.00
09.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11 100.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61 100.00
09.04 OBRAS DE CONCRETO ARMADO 0.00
09.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91 100.00
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.2 322.87 387.44 1.2 387.44 100.00 0.00 0.00 0.00 1.20 387.44 100.00
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63 100.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36 100.00
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.3 33.77 10.13 0.3 10.13 100.00 0.00 0.00 0.00 0.30 10.13 100.00
09.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35 100.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74 100.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70 100.00
09.05 ALBAÑILERIA 0.00
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 14.58 70.44 1,027.02 14.58 1,027.02 100.00 0.00 0.00 0.00 14.58 1,027.02 100.00
09.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2 85.93 18.79 1,614.62 85.93 1,614.62 100.00 0.00 0.00 0.00 85.93 1,614.62 100.00
09.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2 15.36 38.07 584.76 15.36 584.76 100.00 0.00 0.00 0.00 15.36 584.76 100.00
09.07 PISO 0.00
09.07.01 CAPA DE ARCILLA H=.10M m3 4.65 19.9 92.54 4.65 92.54 100.00 0.00 0.00 0.00 4.65 92.54 100.00

Página 14
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
09.08 CANLETA DE DRENAJE 0.00
09.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 1.26 27.57 34.74 1.26 34.74 100.00 0.00 0.00 0.00 1.26 34.74 100.00
09.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.04 311.07 323.51 1.04 323.51 100.00 0.00 0.00 0.00 1.04 323.51 100.00
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 15.72 33.77 530.86 15.72 530.86 100.00 0.00 0.00 0.00 15.72 530.86 100.00
09.09 CUBIERTAS 0.00
09.09.01 TIJERAL TIPO I und 2 428.68 857.36 0.00 0.00 0.00 2.00 857.36 100.00 2.00 857.36 100.00
09.09.02 TIJERAL TIPO II und 2 392.4 784.80 0.00 0.00 0.00 2.00 784.80 100.00 2.00 784.80 100.00
09.09.03 LARGUEROS DE 6"X4" m 40.2 25.42 1,021.88 0.00 0.00 0.00 40.20 1,021.88 100.00 40.20 1,021.88 100.00
09.09.04 CORREAS 2"X2" m 113.9 5.46 621.89 0.00 0.00 0.00 113.90 621.89 100.00 113.90 621.89 100.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 83.55 20.08 1,677.68 0.00 0.00 0.00 83.55 1,677.68 100.00 83.55 1,677.68 100.00
09.10 FILTRO DE PIEDRA 0.00
09.10.01 LECHO DE GRAVA DE 1" m3 17.51 67.22 1,177.02 17.51 1,177.02 100.00 0.00 0.00 0.00 17.51 1,177.02 100.00
09.10.02 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.31 67.22 289.72 4.31 289.72 100.00 0.00 0.00 0.00 4.31 289.72 100.00
09.10.03 LECHO DE ARENA m3 17.24 67.22 1,158.87 17.24 1,158.87 100.00 0.00 0.00 0.00 17.24 1,158.87 100.00
09.11 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 3.9 27.23 106.20 3.90 106.20 100.00 0.00 0.00 0.00 3.90 106.20 100.00
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 25.7 21.93 563.60 25.70 563.60 100.00 0.00 0.00 0.00 25.70 563.60 100.00
09.11.03 COLOCACION DE ACCESORIOS EN LECHO DE SECADO GLB 0.5 462.82 231.41 0.50 231.41 100.00 0.00 0.00 0.00 0.50 231.41 100.00
10 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR I 0.00
10.01 TRABAJOS PRELIMINARES 0.00
10.01.01 TRAZO Y REPLANTEO m2 28.52 2.33 66.45 28.52 66.45 100.00 0.00 0.00 0.00 28.52 66.45 100.00
10.02 MOVIMIENTO DE TIERRAS 0.00
10.02.01 EXCAVACION EN TERRENO NORMAL m3 57.56 17.32 996.94 57.56 996.94 100.00 0.00 0.00 0.00 57.56 996.94 100.00
10.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 28.52 5.03 143.46 28.52 143.46 100.00 0.00 0.00 0.00 28.52 143.46 100.00
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 69.07 4.46 308.05 69.07 308.05 100.00 0.00 0.00 0.00 69.07 308.05 100.00
10.03 OBRAS DE CONCRETO SIMPLE 0.00
10.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 11.82 213.72 2,526.17 11.82 2,526.17 100.00 0.00 0.00 0.00 11.82 2,526.17 100.00
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 40.94 33.77 1,382.54 40.94 1,382.54 100.00 0.00 0.00 0.00 40.94 1,382.54 100.00
10.04 FILTROS DE PIEDRA 0.00
10.04.01 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4 67.22 268.88 4.00 268.88 100.00 0.00 0.00 0.00 4.00 268.88 100.00
10.04.02 LECHO DE GRAVA DE 1" m3 6 67.22 403.32 6.00 403.32 100.00 0.00 0.00 0.00 6.00 403.32 100.00
10.04.03 LECHO DE PIEDRA DE 3.5" m3 8 29.18 233.44 8.00 233.44 100.00 0.00 0.00 0.00 8.00 233.44 100.00
10.04.04 LECHO DE PIEDRA MAX. 6" m3 4 29.18 116.72 4.00 116.72 100.00 0.00 0.00 0.00 4.00 116.72 100.00
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 16.5 27.23 449.30 16.50 449.30 100.00 0.00 0.00 0.00 16.50 449.30 100.00
10.05.02 TUBERIA PVC ø 110 MM ISO 4435 m 18.9 12.37 233.79 18.90 233.79 100.00 0.00 0.00 0.00 18.90 233.79 100.00
10.05.03 COLOCACION DE ACCESORIOS GLB 0.5 630.42 315.21 0.50 315.21 100.00 0.00 0.00 0.00 0.50 315.21 100.00

Página 15
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
10.05.04 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.5 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40 100.00
10.06 CERCO PERIMETRICO PLANTA TRATAMIENTO 0.00
10.06.01 TRAZO Y REPLANTEO KM 0.07 1,185.61 82.99 0.07 82.99 100.00 0.00 0.00 0.00 0.07 82.99 100.00
10.06.02 EXCAVACION EN TERRENO NORMAL m3 1.09 17.32 18.88 1.09 18.88 100.00 0.00 0.00 0.00 1.09 18.88 100.00
10.06.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.4 322.87 129.15 0.40 129.15 100.00 0.00 0.00 0.00 0.40 129.15 100.00
10.06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.26 20.32 66.24 3.26 66.24 100.00 0.00 0.00 0.00 3.26 66.24 100.00
10.06.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.31 4.11 116.35 28.31 116.35 100.00 0.00 0.00 0.00 28.31 116.35 100.00
10.06.06 CERCO PERIMETRICO m 65.5 9.29 608.50 65.50 608.50 100.00 0.00 0.00 0.00 65.50 608.50 100.00
10.06.07 ROLLIZO DE EUCALIPTO DE 4"X2.00M und 17 28.4 482.80 17.00 482.80 100.00 0.00 0.00 0.00 17.00 482.80 100.00
10.06.08 PUERTA METALICA DE 3X2.5M und 0.50 1,024.83 512.42 0.50 512.42 100.00 0.00 0.00 0.00 0.50 512.42 100.00
11 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR II 0.00
11.01 EXPLANACION 0.00
11.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 324.00 4.29 1,389.96 324.00 1,389.96 100.00 0.00 0.00 0.00 324.00 1,389.96 100.00
11.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 388.80 4.46 1,734.05 388.80 1,734.05 100.00 0.00 0.00 0.00 388.80 1,734.05 100.00
12 CAMARA DE REJAS (4.56X0.77 M) SAECTOR II 0.00
12.01 TRABAJOS PRELIMINARES 0.00
12.01.01 TRAZO Y REPLANTEO m2 5.84 2.33 13.61 5.84 13.61 100.00 0.00 0.00 0.00 5.84 13.61 100.00
12.02 MOVIMIENTO DE TIERRAS 0.00
12.02.01 EXCAVACION EN TERRENO NORMAL m3 10.10 17.32 174.93 10.10 174.93 100.00 0.00 0.00 0.00 10.10 174.93 100.00
12.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 5.84 5.03 29.38 5.84 29.38 100.00 0.00 0.00 0.00 5.84 29.38 100.00
12.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 11.61 4.46 51.78 11.61 51.78 100.00 0.00 0.00 0.00 11.61 51.78 100.00
12.03 OBRAS DE CONCRETO ARMADO 0.00
12.03.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.82 311.07 566.15 1.82 566.15 100.00 0.00 0.00 0.00 1.82 566.15 100.00
12.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 8.98 33.77 303.25 8.98 303.25 100.00 0.00 0.00 0.00 8.98 303.25 100.00
12.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 70.23 4.11 288.65 70.23 288.65 100.00 0.00 0.00 0.00 70.23 288.65 100.00
12.04 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00
12.04.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 8.99 18.51 166.40 8.99 166.40 100.00 0.00 0.00 0.00 8.99 166.40 100.00
12.05 COLOCACION DE REJAS 0.00
12.05.01 REJILLA DE LIMPIA 0.45X0.60 m und 1.00 79.99 79.99 1.00 79.99 100.00 0.00 0.00 0.00 1.00 79.99 100.00
12.05.02 PLANCHA METALICA DE 1/4" ESPESOR UND 1.00 21.85 21.85 1.00 21.85 100.00 0.00 0.00 0.00 1.00 21.85 100.00
13 DESARENADOR (5.90X1.50 M) SECTOR II 0.00
13.01 TRAZO Y REPLANTEO 0.00
13.01.01 TRAZO Y REPLANTEO m2 8.85 2.33 20.62 8.85 20.62 100.00 0.00 0.00 0.00 8.85 20.62 100.00
13.02 MOVIMIENTO DE TIERRAS 0.00
13.02.01 EXCAVACION EN TERRENO NORMAL m3 13.06 17.32 226.20 13.06 226.20 100.00 0.00 0.00 0.00 13.06 226.20 100.00
13.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 7.65 5.03 38.48 7.65 38.48 100.00 0.00 0.00 0.00 7.65 38.48 100.00
13.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 15.68 4.46 69.93 15.68 69.93 100.00 0.00 0.00 0.00 15.68 69.93 100.00

Página 16
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
13.03 OBRAS DE CONCRETO SIMPLE 0.00
13.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 0.67 212.75 142.54 0.67 142.54 100.00 0.00 0.00 0.00 0.67 142.54 100.00
13.04 OBRAS DE CONCRETO ARMADO 0.00
13.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 3.6 311.07 1,119.85 3.60 1,119.85 100.00 0.00 0.00 0.00 3.60 1,119.85 100.00
13.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 94.76 4.11 389.46 94.76 389.46 100.00 0.00 0.00 0.00 94.76 389.46 100.00
13.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.59 33.77 661.55 19.59 661.55 100.00 0.00 0.00 0.00 19.59 661.55 100.00
13.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
13.05.01 TARRAJEO EN INTERIORES 1:3 CEMENTO ARENA m2 16.00 18.51 296.16 16.00 296.16 100.00 0.00 0.00 0.00 16.00 296.16 100.00
13.06 PINTURA EN ACCESOROS 0.00
13.06.01 PINTURAS EN ACCESORIOS m2 0.32 10.98 3.51 0.32 3.51 100.00 0.00 0.00 0.00 0.32 3.51 100.00
13.07 SUMINISTRO Y COLOCACION COMPUERTA 0.00
13.07.01 COMPUERTA TIPO IZAJE 12"X12" und 1.00 267.08 267.08 1.00 267.08 100.00 0.00 0.00 0.00 1.00 267.08 100.00
13.07.02 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 5.90 27.23 160.66 5.90 160.66 100.00 0.00 0.00 0.00 5.90 160.66 100.00
14 TANQUE IMHOFF (2.5mX2.5m) SECTOR II 0.00
14.01 TRABAJOS PRELIMINARES 0.00
14.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.74 1.39 12.15 8.74 12.15 100.00 0.00 0.00 0.00 8.74 12.15 100.00
14.01.02 TRAZO Y REPLANTEO m2 8.74 2.33 20.36 8.74 20.36 100.00 0.00 0.00 0.00 8.74 20.36 100.00
14.02 MOVIMIENTO DE TIERRAS 0.00
14.02.01 EXCAVACION EN TERRENO NORMAL m3 40.07 17.32 694.01 40.07 694.01 100.00 0.00 0.00 0.00 40.07 694.01 100.00
14.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 42.18 5.03 212.17 42.18 212.17 100.00 0.00 0.00 0.00 42.18 212.17 100.00
14.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 48.09 4.46 214.48 48.09 214.48 100.00 0.00 0.00 0.00 48.09 214.48 100.00
14.03 OBRAS DE CONCRETO SIMPLE 0.00
14.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3 1.03 212.75 219.13 1.03 219.13 100.00 0.00 0.00 0.00 1.03 219.13 100.00
14.04 OBRAS DE CONCRETO ARMADO 0.00
14.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 311.07 5,291.30 17.01 5,291.30 100.00 0.00 0.00 0.00 17.01 5,291.30 100.00
14.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 33.77 3,067.67 90.84 3,067.67 100.00 0.00 0.00 0.00 90.84 3,067.67 100.00
14.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.50 4.11 4,075.07 991.50 4,075.07 100.00 0.00 0.00 0.00 991.50 4,075.07 100.00
14.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
14.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 18.79 1,206.13 64.19 1,206.13 100.00 0.00 0.00 0.00 64.19 1,206.13 100.00
14.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS 0.00
14.06.01 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.50 1,146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40 100.00
14.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 4.10 27.23 111.64 4.10 111.64 100.00 0.00 0.00 0.00 4.10 111.64 100.00
14.06.03 COLOCACION DE ACCESORIOS EN TANQUE IMHOFF GLB 0.50 180.96 90.48 0.50 90.48 100.00 0.00 0.00 0.00 0.50 90.48 100.00
15 LECHO DE SECADO (5.20mx6.20m) SECTOR II 0.00
15.01 TRABAJOS PRELIMINARES 0.00
15.01.01 TRAZO Y REPLANTEO m2 70.31 2.33 163.82 70.31 163.82 100.00 0.00 0.00 0.00 70.31 163.82 100.00
15.02 MOVIMIENTO DE TIERRAS 0.00

Página 17
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
15.02.01 EXCAVACION EN TERRENO NORMAL m3 80.19 17.32 1,388.89 80.19 1,388.89 100.00 0.00 0.00 0.00 80.19 1,388.89 100.00
15.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 53.68 5.03 270.01 53.68 270.01 100.00 0.00 0.00 0.00 53.68 270.01 100.00
15.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.23 4.46 429.19 96.23 429.19 100.00 0.00 0.00 0.00 96.23 429.19 100.00
15.03 OBRAS DE CONCRETO SIMPLE 0.00
15.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 174.54 1,218.29 6.98 1,218.29 100.00 0.00 0.00 0.00 6.98 1,218.29 100.00
15.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3 0.62 187.54 116.27 0.62 116.27 100.00 0.00 0.00 0.00 0.62 116.27 100.00
15.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3 5.12 221.31 1,133.11 5.12 1,133.11 100.00 0.00 0.00 0.00 5.12 1,133.11 100.00
15.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 33.77 2,006.61 59.42 2,006.61 100.00 0.00 0.00 0.00 59.42 2,006.61 100.00
15.04 OBRAS DE CONCRETO ARMADO 0.00
15.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 1.54 321.37 494.91 1.54 494.91 100.00 0.00 0.00 0.00 1.54 494.91 100.00
15.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.20 322.87 387.44 1.20 387.44 100.00 0.00 0.00 0.00 1.20 387.44 100.00
15.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.12 338.55 40.63 0.12 40.63 100.00 0.00 0.00 0.00 0.12 40.63 100.00
15.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 33.77 646.36 19.14 646.36 100.00 0.00 0.00 0.00 19.14 646.36 100.00
15.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 0.30 33.77 10.13 0.30 10.13 100.00 0.00 0.00 0.00 0.30 10.13 100.00
15.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg 18.82 4.11 77.35 18.82 77.35 100.00 0.00 0.00 0.00 18.82 77.35 100.00
15.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 4.11 508.74 123.78 508.74 100.00 0.00 0.00 0.00 123.78 508.74 100.00
15.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 2.36 4.11 9.70 2.36 9.70 100.00 0.00 0.00 0.00 2.36 9.70 100.00
15.05 ALBAÑILERIA 0.00
15.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 14.58 70.44 1,027.02 14.58 1,027.02 100.00 0.00 0.00 0.00 14.58 1,027.02 100.00
15.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
15.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2 85.93 18.79 1,614.62 85.93 1,614.62 100.00 0.00 0.00 0.00 85.93 1,614.62 100.00
15.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2 15.36 38.07 584.76 15.36 584.76 100.00 0.00 0.00 0.00 15.36 584.76 100.00
15.07 PISO 0.00
15.07.01 CAPA DE ARCILLA H=.10M m3 4.65 19.9 92.54 4.65 92.54 100.00 0.00 0.00 0.00 4.65 92.54 100.00
15.08 CANLETA DE DRENAJE 0.00
15.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 1.26 27.57 34.74 1.26 34.74 100.00 0.00 0.00 0.00 1.26 34.74 100.00
15.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 1.04 311.07 323.51 1.04 323.51 100.00 0.00 0.00 0.00 1.04 323.51 100.00
15.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 15.72 33.77 530.86 15.72 530.86 100.00 0.00 0.00 0.00 15.72 530.86 100.00
15.09 CUBIERTAS 0.00
15.09.01 TIJERAL TIPO I und 2.00 428.68 857.36 0.00 0.00 0.00 2.00 857.36 100.00 2.00 857.36 100.00
15.09.02 TIJERAL TIPO II und 2.00 392.4 784.80 0.00 0.00 0.00 2.00 784.80 100.00 2.00 784.80 100.00
15.09.03 LARGUEROS DE 6"X4" m 40.20 25.42 1,021.88 0.00 0.00 0.00 40.20 1,021.88 100.00 40.20 1,021.88 100.00
15.09.04 CORREAS 2"X2" m 113.90 5.46 621.89 0.00 0.00 0.00 113.90 621.89 100.00 113.90 621.89 100.00
15.09.05 TECHO DE CALAMINA E=0.33 MM m2 83.55 20.08 1,677.68 0.00 0.00 0.00 83.55 1,677.68 100.00 83.55 1,677.68 100.00
15.1 FILTRO DE PIEDRA 0.00
15.10.01 LECHO DE GRAVA DE 1" m3 17.51 67.22 1,177.02 17.51 1,177.02 100.00 0.00 0.00 0.00 17.51 1,177.02 100.00
15.10.02 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.31 67.22 289.72 4.31 289.72 100.00 0.00 0.00 0.00 4.31 289.72 100.00
15.10.03 LECHO DE ARENA m3 17.24 67.22 1,158.87 17.24 1,158.87 100.00 0.00 0.00 0.00 17.24 1,158.87 100.00

Página 18
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
15.11 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
15.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200MM m 3.90 27.23 106.20 3.90 106.20 100.00 0.00 0.00 0.00 3.90 106.20 100.00
15.11.02 TUBERIA PVC ISO 4435 D 160 MM m 25.70 21.93 563.60 25.70 563.60 100.00 0.00 0.00 0.00 25.70 563.60 100.00
15.11.03 COLOCACION DE ACCESORIOS EN LECHO DE SECADO GLB 0.50 462.82 231.41 0.50 231.41 100.00 0.00 0.00 0.00 0.50 231.41 100.00
16 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR II 0.00
16.01 TRABAJOS PRELIMINARES 0.00
16.01.01 TRAZO Y REPLANTEO m2 28.52 2.33 66.45 28.52 66.45 100.00 0.00 0.00 0.00 28.52 66.45 100.00
16.02 MOVIMIENTO DE TIERRAS
16.02.01 EXCAVACION EN TERRENO NORMAL m3 57.56 17.32 996.94 57.56 996.94 100.00 0.00 0.00 0.00 57.56 996.94 100.00
16.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 28.52 5.03 143.46 28.52 143.46 100.00 0.00 0.00 0.00 28.52 143.46 100.00
16.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 69.07 4.46 308.05 69.07 308.05 100.00 0.00 0.00 0.00 69.07 308.05 100.00
16.03 OBRAS DE CONCRETO SIMPLE
16.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3 11.82 213.72 2,526.17 11.82 2,526.17 100.00 0.00 0.00 0.00 11.82 2,526.17 100.00
16.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 40.94 33.77 1,382.54 40.94 1,382.54 100.00 0.00 0.00 0.00 40.94 1,382.54 100.00
16.04 FILTROS DE PIEDRA
16.04.01 LECHO FILTRANTE MATERIAL SELECIONADO GRAVA DE 0.50" m3 4.00 67.22 268.88 4.00 268.88 100.00 0.00 0.00 0.00 4.00 268.88 100.00
16.04.02 LECHO DE GRAVA DE 1" m3 6.00 67.22 403.32 6.00 403.32 100.00 0.00 0.00 0.00 6.00 403.32 100.00
16.04.03 LECHO DE PIEDRA DE 3.5" m3 8.00 29.18 233.44 8.00 233.44 100.00 0.00 0.00 0.00 8.00 233.44 100.00
16.04.04 LECHO DE PIEDRA MAX. 6" m3 4.00 29.18 116.72 4.00 116.72 100.00 0.00 0.00 0.00 4.00 116.72 100.00
16.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
16.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 16.50 27.23 449.30 16.50 449.30 100.00 0.00 0.00 0.00 16.50 449.30 100.00
16.05.02 TUBERIA PVC ø 110 MM ISO 4435 m 18.90 12.37 233.79 18.90 233.79 100.00 0.00 0.00 0.00 18.90 233.79 100.00
16.05.03 COLOCACION DE ACCESORIOS GLB 0.50 630.42 315.21 0.50 315.21 100.00 0.00 0.00 0.00 0.50 315.21 100.00
16.05.04 VALVULA DECOMPUERTA DE FIERRO FUNDIDO BB DE 8" und 0.50 1146.79 573.40 0.50 573.40 100.00 0.00 0.00 0.00 0.50 573.40 100.00
16.06 CERCO PERIMETRICO PLANTA TRATAMIENTO
16.06.01 TRAZO Y REPLANTEO KM 0.07 1185.61 82.99 0.07 82.99 100.00 0.00 0.00 0.00 0.07 82.99 100.00
16.06.02 EXCAVACION EN TERRENO NORMAL m3 1.09 17.32 18.88 1.09 18.88 100.00 0.00 0.00 0.00 1.09 18.88 100.00
16.06.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.40 322.87 129.15 0.40 129.15 100.00 0.00 0.00 0.00 0.40 129.15 100.00
16.06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.26 20.32 66.24 3.26 66.24 100.00 0.00 0.00 0.00 3.26 66.24 100.00
16.06.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.31 4.11 116.35 28.31 116.35 100.00 0.00 0.00 0.00 28.31 116.35 100.00
16.06.06 CERCO PERIMETRICO m 65.50 9.29 608.50 65.50 608.50 100.00 0.00 0.00 0.00 65.50 608.50 100.00
16.06.07 ROLLIZO DE EUCALIPTO DE 4"X2.00M und 17.00 28.4 482.80 17.00 482.80 100.00 0.00 0.00 0.00 17.00 482.80 100.00
16.06.08 PUERTA METALICA DE 3X2.5M und 0.20 1024.83 204.97 0.20 204.97 100.00 0.00 0.00 0.00 0.20 204.97 100.00
17 PUENTE AEREO SECTOR II Lon=22.00m
17.01 TRABAJOS PRELIMINARES
17.01.01 LIMPIEZA DE DE TERRENO m 14.39 3.03 43.60 0.00 0.00 0.00 14.39 43.60 100.00 14.39 43.60 100.00
17.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 0.00 0.00 0.00 14.39 33.53 100.00 14.39 33.53 100.00
17.02 MOVIMIENTO DE TIERRAS
17.02.01 EXCAVACION DE TERRENO PARA ZAPATA m3 4.32 27.57 119.10 0.00 0.00 0.00 4.32 119.10 100.00 4.32 119.10 100.00

Página 19
VALORIZACION DE ADICIONAL OBRA N° 02
CORRESPONDIENTE AL MES DE JULIO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 494.91 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervision: CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % M
17.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.10 0.00 0.00 0.00 5.18 23.10 100.00 5.18 23.10 100.00
17.03 OBRAS DE CONCRETO ARMADO
17.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1,479.77 0.00 0.00 0.00 4.32 1,479.77 100.00 4.32 1,479.77 100.00
17.03.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS Y COLUMNAS m2 17.99 33.77 607.52 0.00 0.00 0.00 17.99 607.52 100.00 17.99 607.52 100.00
17.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 215.20 4.11 884.47 0.00 0.00 0.00 215.20 884.47 100.00 215.20 884.47 100.00
17.03.04 CONCRETO EN ZAPATAS Y COLUMNAS- F'C=210 KG/CM2 m3 11.76 426.98 5,021.28 0.00 0.00 0.00 11.76 5,021.28 100.00 11.76 5,021.28 100.00
17.03.05 CURADO DE CONCRETO m2 3.60 0.62 2.23 0.00 0.00 0.00 3.60 2.23 100.00 3.60 2.23 100.00
17.03.06 COLOCACION DE ACCESORIOS GLB 1.00 630.42 630.42 0.00 0.00 0.00 1.00 630.42 100.00 1.00 630.42 100.00
COSTO DIRECTO 216244.13 197,471.87 91.32 18772.24 8.68 216,244.11 100
GASTOS GENERALES (15.00%) 32436.62 29620.78 2815.84 32436.62
UTILIDAD (8,00%) 17299.53 15797.75 1501.78 17299.53
SUB TOTAL 265980.28 242890.4 23089.86 265980.26
FACTOR DE RELACION FR = 0,9790183675859 260399.58 237794.1629 22605.397 260399.56
I.G.V. (18,00%) 46871.92 42802.95 4068.97 46871.92
PRESUPUESTO TOTAL S/, 307271.5 280597.11 26674.367 307271.48

Página 20
RESUMEN DE VALORIZACION Nº 04
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2014

CONTRATISTA: CONSORCIO PACIFICO


SUPERVISION: CONSORCIO CONSULTORES AYACUCHO
OBRA : MEJORAMIENTOE INSTALACION DEL SISTEMA DE
DESAGUE EN LA LOCALIDAD DE YARURI
PPTO. CONTRATADO: S/. 936,743,63
CONCEPTO SIMBOLO MONTO (S/.)
Valorización Nº 4 (V) 77,371.71
Reajuste (K ) (R) 0.00
Deducciones por Adelanto Directo (Dad) 0.00
Deducciones por Adelanto de Materiales (Dam) #REF!
Valorización Bruta (VB=V+R) #REF!

AMORTIZACIONES (AM) 0.00


Adelanto Directo 0.00
Adelanto de Materiales 0.00

REGULARIZACIÓN DE PAGOS AL MES ANT. (PA) 0.00


Por Errores en Montos 0.00
Deducción por Adelanto Directo Pagado 0.00
Deducción por Adelanto Directo Real 0.00
Por Reajuste de Precios 0.00
Reajuste Valorización Nº 01 Realizado 0.00
Reajuste Valorización Nº 0 Real al mes 0.00

Valorización Neta (VN=VB-AM-PA) #REF!


Mora por atraso de obra 0.00

Monto Total del Compromiso (MT) #REF!


Por Valorización (V=VN-M) #REF!
Por I.G.V. (V x 0.18) #REF!

MONTO FACTURABLE (inc. IGV) S/. #REF!

SON: NOVENTA Y OCIENTOS NOVENTA Y OCHO CON 62/100 NUEVOS SOLES


VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1.00 667.17 667.17 0.00 0.00 0.00 1.00 667.17 100.00 1.00 667.17 100.00
01.02 ALQUILER DE ALMACEN DE OBRA mes 4.50 254.24 1144.08 0.50 127.12 11.11 4.00 1,016.96 88.89 4.50 1,144.08 100.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 1.00 27897.49 27897.49 0.15 4,184.62 15.00 0.85 23,712.87 85.00 1.00 27,897.49 100.00
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 1.00 26673.73 26673.73 0.10 2,667.37 10.00 0.90 24,006.36 90.00 1.00 26,673.73 100.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 1890.46 3.03 5728.09 0.00 0.00 0.00 680.28 2,061.24 35.98 680.28 2,061.24 35.98
02.01.02 TRAZO Y REPLANTEO Km 1.89 1185.61 2240.8 0.00 0.00 0.00 0.68 805.03 35.93 0.68 805.03 35.93
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 1.89 2163.86 4089.7 0.00 0.00 0.00 0.68 1,469.26 35.93 0.68 1,469.26 35.93
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 494.4 3.99 1972.66 0.00 0.00 0.00 172.12 686.76 34.81 172.12 686.76 34.81
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 69.83 4.81 335.88 0.00 0.00 0.00 28.47 136.96 40.77 28.47 136.96 40.77
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M m3 497.15 5.76 2863.58 0.00 0.00 0.00 86.32 497.20 17.36 86.32 497.20 17.36
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 201.63 7.19 1449.72 0.00 0.00 0.00 126.42 908.96 62.70 126.42 908.96 62.70
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 152.12 4.86 739.3 0.00 0.00 0.00 29.61 143.90 19.46 29.61 143.90 19.46
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 21.49 5.6 120.34 16.12 90.27 75.01 0.00 0.00 0.00 16.12 90.27 75.01
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M m3 152.97 7.26 1110.56 0.00 0.00 0.00 26.56 192.83 17.36 26.56 192.83 17.36
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 62.04 9.68 600.55 0.00 0.00 0.00 38.90 376.55 62.70 38.90 376.55 62.70
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 76.06 6.95 528.62 0.00 0.00 0.00 14.80 102.86 19.46 14.80 102.86 19.46
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 10.74 7.91 84.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M m3 76.49 11.57 884.99 0.00 0.00 0.00 6.64 76.82 8.68 6.64 76.82 8.68
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 31.02 17.38 539.13 0.00 0.00 0.00 19.45 338.04 62.70 19.45 338.04 62.70
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 38.03 8.73 332 0.00 0.00 0.00 7.40 64.60 19.46 7.40 64.60 19.46
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 5.37 11.61 62.35 2.68 31.11 49.90 0.00 0.00 0.00 2.68 31.11 49.90
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M m3 38.24 17.44 666.91 0.00 0.00 0.00 6.64 115.80 17.36 6.64 115.80 17.36
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 15.51 29.07 450.88 0.00 0.00 0.00 9.72 282.56 62.67 9.72 282.56 62.67
02.02.17 ENTIBADO DE ZANJAS m3 722.14 26.09 18840.63 0.00 0.00 0.00 516.34 13,471.21 71.50 516.34 13,471.21 71.50
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 1890.46 3.42 6465.37 0.00 0.00 0.00 680.28 2,326.54 35.98 680.28 2,326.54 35.98
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 1890.46 2.48 4688.34 0.00 0.00 0.00 680.28 1,687.08 35.98 680.28 1,687.08 35.98
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 1890.46 6.52 12325.8 0.00 0.00 0.00 650.89 4,243.78 34.43 650.89 4,243.78 34.43
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 507.08 11.85 6008.9 0.00 0.00 0.00 301.52 3,573.04 59.46 301.52 3,573.04 59.46
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M m3 80.57 14.81 1193.24 40.28 596.55 49.99 0.00 0.00 0.00 40.28 596.55 49.99
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M m3 621.27 17.77 11039.97 0.00 0.00 0.00 107.93 1,917.92 17.37 107.93 1,917.92 17.37
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 270.56 29.57 8000.46 0.00 0.00 0.00 167.19 4,943.81 61.79 167.19 4,943.81 61.79
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 556.34 4.46 2481.28 0.00 0.00 0.00 183.27 817.40 32.94 183.27 817.40 32.94
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 1890.46 21.71 41041.89 0.00 0.00 0.00 680.28 14,768.79 35.98 680.28 14,768.79 35.98
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 1890.46 1.3 2457.6 0.00 0.00 0.00 491.23 638.60 25.98 491.23 638.60 25.98
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 0.00 0.00 0.00 29.25 68.15 27.31 29.25 68.15 27.31
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 18.29 121.29 2218.39 9.14 1,108.59 49.97 0.00 0.00 0.00 9.14 1,108.59 49.97
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 159.88 17.32 2769.12 0.00 0.00 0.00 96.84 1,677.27 60.57 96.84 1,677.27 60.57
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 502.51 6.76 3396.97 0.00 0.00 0.00 313.02 2,116.02 62.29 313.02 2,116.02 62.29
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 213.81 4.46 953.59 0.00 0.00 0.00 165.32 737.34 77.32 165.32 737.34 77.32
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 38 1556.16 59134.08 0.00 0.00 0.00 26.00 40,460.16 68.42 26.00 40,460.16 68.42
03.03.02 BUZON TIPO V H=1.75M Und. 1 1931.13 1931.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.03 BUZON TIPO VI H=2.00M Und. 1 2004.61 2004.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.04 BUZON TIPO VI H=2.50M Und. 2 2169.52 4339.04 0.00 0.00 0.00 1.00 2,169.52 50.00 1.00 2,169.52 50.00
03.03.05 BUZON TIPO VIII H=3.00M Und. 4 2315.86 9263.44 0.00 0.00 0.00 2.00 4,631.72 50.00 2.00 4,631.72 50.00
03.03.06 BUZON TIPO XVI H=4.50M Und. 1 3998.1 3998.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) m2 94.29 18.79 1771.71 0.00 0.00 0.00 51.46 966.93 54.58 51.46 966.93 54.58
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO m 237.57 3.03 719.84 0.00 0.00 0.00 163.92 496.68 69.00 163.92 496.68 69.00
04.01.02 TRAZO Y REPLANTEO Km 0.24 1185.61 284.55 0.00 0.00 0.00 0.17 201.55 70.83 0.17 201.55 70.83
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.24 2163.86 519.33 0.00 0.00 0.00 0.17 367.86 70.83 0.17 367.86 70.83
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 111.18 3.99 443.61 0.00 0.00 0.00 76.71 306.07 69.00 76.71 306.07 69.00
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 34.21 4.86 166.26 0.00 0.00 0.00 23.60 114.70 68.99 23.60 114.70 68.99
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 17.1 6.95 118.85 0.00 0.00 0.00 11.80 82.01 69.01 11.80 82.01 69.01
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 8.55 8.73 74.64 0.00 0.00 0.00 5.90 51.51 69.01 5.90 51.51 69.01
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 237.57 3.42 812.49 0.00 0.00 0.00 163.92 560.61 69.00 163.92 560.61 69.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 237.57 2.48 589.17 0.00 0.00 0.00 163.92 406.52 69.00 163.92 406.52 69.00
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 237.57 6.52 1548.96 0.00 0.00 0.00 163.92 1,068.76 69.00 163.92 1,068.76 69.00
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 114.03 11.85 1351.26 0.00 0.00 0.00 70.63 836.97 61.94 70.63 836.97 61.94
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 68.42 4.46 305.15 0.00 0.00 0.00 56.83 253.46 83.06 56.83 253.46 83.06
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM m 237.57 27.23 6469.03 0.00 0.00 0.00 163.92 4,463.54 69.00 163.92 4,463.54 69.00
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 237.57 1.3 308.84 0.00 0.00 0.00 163.92 213.10 69.00 163.92 213.10 69.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 2592.00 4.29 11119.68 0.00 0.00 0.00 1,846.00 7,919.34 71.22 1,846.00 7,919.34 71.22
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 3110.40 4.46 13872.38 0.00 0.00 0.00 2,305.33 10,281.77 74.12 2,305.33 10,281.77 74.12
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 11.67 2.33 27.19 0.00 0.00 0.00 5.84 13.60 50.00 5.84 13.60 50.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 20.19 17.32 349.69 0.00 0.00 0.00 15.94 275.99 78.93 15.94 275.99 78.93
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 11.67 5.03 58.7 0.00 0.00 0.00 5.84 29.35 50.00 5.84 29.35 50.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 23.22 4.46 103.56 0.00 0.00 0.00 17.42 77.69 75.02 17.42 77.69 75.02
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 3.65 311.07 1135.41 0.00 0.00 0.00 3.64 1,132.29 99.73 3.64 1,132.29 99.73
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 17.97 33.77 606.85 0.00 0.00 0.00 8.98 303.25 49.97 8.98 303.25 49.97
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 140.46 4.11 577.29 0.00 0.00 0.00 70.23 288.65 50.00 70.23 288.65 50.00
06.04 REVOQUES ENLUCIDOS Y MOLDURAS
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 17.98 18.51 332.81 0.00 0.00 0.00 8.99 166.40 50.00 8.99 166.40 50.00
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m Und. 2 79.99 159.98 0.00 0.00 0.00 1.00 79.99 50.00 1.00 79.99 50.00
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR Und. 2 21.85 43.7 0.00 0.00 0.00 1.00 21.85 50.00 1.00 21.85 50.00
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO m2 17.7 2.33 41.24 0.00 0.00 0.00 8.85 20.62 50.00 8.85 20.62 50.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL m3 26.13 17.32 452.57 0.00 0.00 0.00 13.06 226.20 49.98 13.06 226.20 49.98
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 15.31 5.03 77.01 0.00 0.00 0.00 7.65 38.48 49.97 7.65 38.48 49.97
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 31.35 4.46 139.82 0.00 0.00 0.00 15.68 69.93 50.02 15.68 69.93 50.02
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS m3 1.33 212.75 282.96 0.00 0.00 0.00 0.67 142.54 50.38 0.67 142.54 50.38
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 7.2 311.07 2239.7 0.00 0.00 0.00 3.60 1,119.85 50.00 3.60 1,119.85 50.00
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 189.51 4.11 778.89 0.00 0.00 94.76 389.46 50.00 94.76 389.46 50.00
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.18 33.77 1323.11 0.00 0.00 0.00 19.59 661.55 50.00 19.59 661.55 50.00
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 32 18.51 592.32 0.00 0.00 0.00 16.00 296.16 50.00 16.00 296.16 50.00
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS m2 0.64 10.98 7.03 0.32 3.51 49.93 0.00 0.00 0.00 0.32 3.51 49.93
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' Und. 2 267.08 534.16 1.00 267.08 50.00 0.00 0.00 0.00 1.00 267.08 50.00
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM m 11.8 27.23 321.31 5.90 160.66 50.00 0.00 0.00 0.00 5.90 160.66 50.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.96 1.39 48.59 0.00 0.00 0.00 26.22 36.45 75.00 26.22 36.45 75.00
08.01.02 TRAZO Y REPLANTEO m2 34.96 2.33 81.46 0.00 0.00 0.00 26.22 61.09 75.00 26.22 61.09 75.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 160.28 17.32 2776.05 0.00 0.00 0.00 100.14 1,734.42 62.48 100.14 1,734.42 62.48
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 168.72 5.03 848.66 0.00 0.00 0.00 105.45 530.41 62.50 105.45 530.41 62.50
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 192.34 4.46 857.84 0.00 0.00 0.00 120.21 536.14 62.50 120.21 536.14 62.50
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 4.11 212.75 874.4 0.00 0.00 0.00 2.56 543.58 62.17 2.56 543.58 62.17
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 68.04 311.07 21165.2 0.00 0.00 0.00 51.03 15,873.90 75.00 51.03 15,873.90 75.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 363.34 33.77 12269.99 0.00 0.00 0.00 272.51 9,202.49 75.00 272.51 9,202.49 75.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 3966.01 4.11 16300.3 0.00 0.00 0.00 2,974.51 12,225.23 75.00 2,974.51 12,225.23 75.00
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 256.75 18.79 4824.33 0.00 0.00 0.00 128.38 2,412.17 50.00 128.38 2,412.17 50.00
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2 1146.79 2293.58 1.00 1,146.79 50.00 0.00 0.00 0.00 1.00 1,146.79 50.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 16.4 27.23 446.57 8.20 223.29 50.00 0.00 0.00 0.00 8.20 223.29 50.00
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF glb 2 180.96 361.92 1.00 180.96 50.00 0.00 0.00 0.00 1.00 180.96 50.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 281.22 2.33 655.24 0.00 0.00 0.00 175.76 409.52 62.50 175.76 409.52 62.50
09.02 MOVIMIENTO DE TIERRAS
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 320.77 17.32 5555.74 0.00 0.00 0.00 200.49 3,472.40 62.50 200.49 3,472.40 62.50
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 214.73 5.03 1080.09 0.00 0.00 0.00 134.21 675.05 62.50 134.21 675.05 62.50
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 384.93 4.46 1716.79 0.00 0.00 0.00 240.59 1,073.01 62.50 240.59 1,073.01 62.50
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 27.93 174.54 4874.9 0.00 0.00 0.00 20.95 3,656.18 75.00 20.95 3,656.18 75.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 2.48 187.54 465.1 0.00 0.00 0.00 1.86 348.82 75.00 1.86 348.82 75.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 20.47 221.31 4530.22 0.00 0.00 0.00 15.35 3,397.66 75.00 15.35 3,397.66 75.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 237.66 33.77 8025.78 0.00 0.00 0.00 178.25 6,019.33 75.00 178.25 6,019.33 75.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 6.16 321.37 1979.64 0.00 0.00 0.00 4.62 1,484.73 75.00 4.62 1,484.73 75.00
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 4.8 322.87 1549.78 0.00 0.00 0.00 3.60 1,162.33 75.00 3.60 1,162.33 75.00
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.47 338.55 159.12 0.23 77.87 48.94 0.00 0.00 0.00 0.23 77.87 48.94
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 76.56 33.77 2585.43 0.00 0.00 0.00 57.42 1,939.07 75.00 57.42 1,939.07 75.00
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 1.2 33.77 40.52 0.60 20.26 50.00 0.00 0.00 0.00 0.60 20.26 50.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 75.26 4.11 309.32 0.00 0.00 0.00 56.45 231.99 75.00 56.45 231.99 75.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 495.1 4.11 2034.86 0.00 0.00 0.00 371.33 1,526.15 75.00 371.33 1,526.15 75.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 9.45 4.11 38.84 4.72 19.40 49.95 0.00 0.00 0.00 4.72 19.40 49.95
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 58.32 70.44 4108.06 0.00 0.00 0.00 29.16 2,054.03 50.00 29.16 2,054.03 50.00
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) m2 343.73 18.79 6458.69 0.00 0.00 0.00 171.87 3,229.34 50.00 171.87 3,229.34 50.00
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM m2 61.44 38.07 2339.02 0.00 0.00 0.00 30.72 1,169.51 50.00 30.72 1,169.51 50.00
09.07 PISO 0.00
09.07.01 CAPA DE ARCILLA H=10M m3 18.6 19.9 370.14 0.00 0.00 0.00 9.30 185.07 50.00 9.30 185.07 50.00
09.08 CANALETA DE DRENAJE 0.00
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 5.04 27.57 138.95 0.00 0.00 0.00 2.52 69.48 50.00 2.52 69.48 50.00
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS m3 4.18 311.07 1300.27 0.00 0.00 0.00 2.09 650.14 50.00 2.09 650.14 50.00
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 62.88 33.77 2123.46 0.00 0.00 0.00 31.44 1,061.73 50.00 31.44 1,061.73 50.00
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 8 428.68 3429.44 0.00 0.00 0.00 4.00 1,714.72 50.00 4.00 1,714.72 50.00
09.09.02 TIJERAL TIPO II Und. 8 392.4 3139.2 0.00 0.00 0.00 4.00 1,569.60 50.00 4.00 1,569.60 50.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 160.8 25.42 4087.54 0.00 0.00 0.00 80.40 2,043.77 50.00 80.40 2,043.77 50.00
09.09.04 CORREAS 2''X2'' m 455.6 5.46 2487.58 227.80 1,243.79 50.00 0.00 0.00 0.00 227.80 1,243.79 50.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 334.2 20.08 6710.74 167.10 3,355.37 50.00 0.00 0.00 0.00 167.10 3,355.37 50.00
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' m3 70.02 67.22 4706.74 35.01 2,353.37 50.00 0.00 0.00 0.00 35.01 2,353.37 50.00
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 17.24 67.22 1158.87 8.62 579.44 50.00 0.00 0.00 0.00 8.62 579.44 50.00
09.10.03 LECHO DE ARENA m3 68.97 67.22 4636.16 34.48 2,317.75 49.99 0.00 0.00 0.00 34.48 2,317.75 49.99
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM m 15.6 27.23 424.79 7.80 212.39 50.00 0.00 0.00 0.00 7.80 212.39 50.00
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 102.8 21.93 2254.4 51.40 1,127.20 50.00 0.00 0.00 0.00 51.40 1,127.20 50.00
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO glb 2 462.82 925.64 1.00 462.82 50.00 0.00 0.00 0.00 1.00 462.82 50.00
10 FILTROS PERCOLADORES (5.0mX8.0m)
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 114.08 2.33 265.81 0.00 0.00 0.00 85.56 199.35 75.00 85.56 199.35 75.00
10.02 MOVIMIENTO DE TIERRAS 0.00
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 230.24 17.32 3987.76 0.00 0.00 0.00 143.64 2,487.84 62.39 143.64 2,487.84 62.39
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 114.08 5.03 573.82 0.00 0.00 0.00 85.56 430.37 75.00 85.56 430.37 75.00
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 276.29 4.46 1232.25 0.00 0.00 0.00 172.69 770.18 62.50 172.69 770.18 62.50
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM m3 47.30 213.72 10108.96 0.00 0.00 0.00 23.65 5,054.48 50.00 23.65 5,054.48 50.00
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 163.77 33.77 5530.51 0.00 0.00 0.00 81.89 2,765.26 50.00 81.89 2,765.26 50.00
10.04 FILTROS DE PIEDRA 0.00
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 16.00 67.22 1075.52 8.00 537.76 50.00 0.00 0.00 0.00 8.00 537.76 50.00
10.04.02 LECHO DE GRAVA DE 1'' m3 24.00 67.22 1613.28 12.00 806.64 50.00 0.00 0.00 0.00 12.00 806.64 50.00
10.04.03 LECHO DE PIEDRA DE 3.5'' m3 32.00 29.18 933.76 0.00 0.00 0.00 2.00 58.36 6.25 2.00 58.36 6.25
10.04.04 LECHO DE PIEDRA MAX.6'' m3 16.00 29.18 466.88 0.00 0.00 0.00 4.00 116.72 25.00 4.00 116.72 25.00
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 66.00 27.23 1797.18 33.00 898.59 50.00 0.00 0.00 0.00 33.00 898.59 50.00
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 m 75.60 12.37 935.17 37.80 467.59 50.00 0.00 0.00 0.00 37.80 467.59 50.00
10.05.03 COLOCACIÓN DE ACCESORIOS glb 2.00 630.42 1260.84 1.00 630.42 50.00 0.00 0.00 0.00 1.00 630.42 50.00
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2.00 1146.79 2293.58 1.00 1,146.79 50.00 0.00 0.00 0.00 1.00 1,146.79 50.00
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO m 100.00 3.03 303 0.00 0.00 0.00 50.00 151.50 50.00 50.00 151.50 50.00
11.01.02 TRAZO Y REPLANTEO km 0.10 1185.61 118.56 0.00 0.00 0.00 0.05 59.28 50.00 0.05 59.28 50.00
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 90.00 27.57 2481.3 0.00 0.00 0.00 45.00 1,240.65 50.00 45.00 1,240.65 50.00
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL m 100.00 4.85 485 0.00 0.00 0.00 50.00 242.50 50.00 50.00 242.50 50.00
11.01.05 CAMA DE APOYO m 100.00 2.48 248 0.00 0.00 0.00 50.00 124.00 50.00 50.00 124.00 50.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM m 100.00 27.23 2723 0.00 0.00 0.00 50.00 1,361.50 50.00 50.00 1,361.50 50.00
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA m3 63.00 11.16 703.08 0.00 0.00 0.00 31.50 351.54 50.00 31.50 351.54 50.00
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 27.00 4.46 120.42 0.00 0.00 0.00 13.50 60.21 50.00 13.50 60.21 50.00
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO m2 4.50 2.33 10.49 2.25 5.24 49.95 0.00 0.00 0.00 2.25 5.24 49.95
11.02.02 EXCAVACIÓN EN TERRENO NORMAL m3 6.02 17.32 104.27 3.01 52.13 50.00 0.00 0.00 0.00 3.01 52.13 50.00
11.02.03 BUZÓN TIPO III H=1.20M Und. 4.00 1556.16 6224.64 0.00 0.00 0.00 2.00 3,112.32 50.00 2.00 3,112.32 50.00
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 20.00 27.23 544.6 0.00 0.00 0.00 10.00 272.30 50.00 10.00 272.30 50.00
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO km 0.26 1185.61 308.26 0.13 154.13 50.00 0.00 0.00 0.00 0.13 154.13 50.00
11.03.02 EXCAVACIÓN EN TERRENO NORMAL m3 4.35 17.32 75.34 2.17 37.58 49.88 0.00 0.00 0.00 2.17 37.58 49.88
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.58 322.87 510.13 0.79 255.07 50.00 0.00 0.00 0.00 0.79 255.07 50.00
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.04 20.32 264.97 6.54 132.89 50.15 0.00 0.00 0.00 6.54 132.89 50.15
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 113.25 4.11 465.46 56.62 232.71 50.00 0.00 0.00 0.00 56.62 232.71 50.00
11.03.06 CERCO PERIMETRICO m 262.00 9.29 2433.98 131.00 1,216.99 50.00 0.00 0.00 0.00 131.00 1,216.99 50.00
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M Und. 68.00 28.4 1931.2 34.00 965.60 50.00 0.00 0.00 0.00 34.00 965.60 50.00
11.03.08 PUERTA METALICA DE 3X2.5M Und. 2.00 1024.83 2049.66 1.00 1,024.83 50.00 0.00 0.00 0.00 1.00 1,024.83 50.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 1026.00 14.13 14497.38 906.00 12,801.78 88.30 120.00 1,695.60 11.70 1,026.00 14,497.38 100.00
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 183.28 31340.88 151.00 27,675.28 88.30 20.00 3,665.60 11.70 171.00 31,340.88 100.00
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 1026.00 6.52 6689.52 906.00 5,907.12 88.30 120.00 782.40 11.70 1,026.00 6,689.52 100.00
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 235.7 40304.7 151.00 35,590.70 88.30 20.00 4,714.00 11.70 171.00 40,304.70 100.00
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO m 14.39 3.03 43.6 0.00 0.00 0.00 14.39 43.60 100.00 14.39 43.60 100.00
13.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 0.00 0.00 0.00 14.39 33.53 100.00 14.39 33.53 100.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA m3 4.32 27.57 119.1 0.00 0.00 0.00 4.32 119.10 100.00 4.32 119.10 100.00
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.1 0.00 0.00 0.00 5.18 23.10 100.00 5.18 23.10 100.00
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1479.77 4.32 1,479.77 100.00 0.00 0.00 0.00 4.32 1,479.77 100.00
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 kg 92.41 4.11 379.81 92.41 379.81 100.00 0.00 0.00 0.00 92.41 379.81 100.00
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 33.77 607.52 0.00 0.00 0.00 17.99 607.52 100.00 17.99 607.52 100.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 4.11 753.16 0.00 0.00 0.00 183.25 753.16 100.00 183.25 753.16 100.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.80 426.98 768.56 0.00 0.00 0.00 1.80 768.56 100.00 1.80 768.56 100.00
13.03.06 CURADO DE CONCRETO m2 3.60 0.62 2.23 0.00 0.00 0.00 3.60 2.23 100.00 3.60 2.23 100.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 1.00 4879.39 4879.39 0.10 487.94 10.00 0.90 4,391.45 90.00 1.00 4,879.39 100.00
VALORIZACION DE OBRA N° 05
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
14.02 SEGURIDAD Y SALUD EN OBRA glb 1.00 3432.21 3432.21 0.10 343.22 10.00 0.90 3,088.99 90.00 1.00 3,432.21 100.00
14.03 ACONDICIONAMIENTO DE BOTADERO m2 550.00 7.32 4026.00 155.00 1,134.60 28.18 395.00 2,891.40 71.82 550.00 4,026.00 100.00
15 CAPACITACIONES
15.01 CAPACITACION A JASS glb 1.00 3000 3000.00 1.00 3,000.00 100.00 0.00 0.00 0.00 1.00 3,000.00 100.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA glb 1.00 3000 3000.00 0.00 0.00 0.00 1.00 3,000.00 100.00 1.00 3,000.00 100.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 40.00 21.19 847.60 20.00 423.80 50.00 20.00 423.80 50.00 40.00 847.60 100.00
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 2.00 215.36 430.72 1.00 215.36 50.00 1.00 215.36 50.00 2.00 430.72 100.00
16.03 DISEÑO DE MEZCLA Und. 6.00 169.49 1016.94 0.00 0.00 0.00 6.00 1,016.94 100.00 6.00 1,016.94 100.00
16.04 ENSAYOS CBR Und. 4.00 296.61 1186.44 2.00 593.22 50.00 2.00 593.22 50.00 4.00 1,186.44 100.00
COSTO DIRECTO 659,238.84 121,155.14 18.38 321,843.75 48.82 442,998.88 67.20
GASTOS GENERALES (15.00%) 98,885.83 18,173.27 48,276.57 66,449.83
UTILIDAD (8,00%) 52,739.11 9,692.41 25,747.50 35,439.91
SUB TOTAL 810,863.78 149,020.82 395,867.82 544,888.62
FACTOR DE RELACION FR = 0,9790183675859 793,850.53 145,894.12 387,561.86 533,455.97
I.G.V. (18,00%) 142,893.10 26,260.94 69,761.13 96,022.07
PRESUPUESTO TOTAL S/, 936,743.63 172,155.06 457,322.99 629,478.04

APROBACIONES 473,593.83
16,270.84

INSPECTOR O SUPERVISOR CONTRATISTA ENTIDAD


ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

1,210.18 3,666.85 64.02


1.21 1,435.77 64.07
1.21 2,620.44 64.07

322.28 1,285.90 65.19


41.36 198.92 59.22
410.83 2,366.38 82.64
75.21 540.76 37.30
122.51 595.40 80.54
5.37 30.07 24.99
126.41 917.73 82.64
23.14 224.00 37.30
61.26 425.76 80.54
10.74 84.95 100.00
69.85 808.17 91.32
11.57 201.09 37.30
30.63 267.40 80.54
2.69 31.24 50.10
31.60 551.11 82.64
5.79 168.32 37.33
205.80 5,369.42 28.50
1,210.18 4,138.83 64.02
1,210.18 3,001.26 64.02
1,239.57 8,082.02 65.57
205.56 2,435.86 40.54
40.29 596.69 50.01
ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %
513.34 9,122.05 82.63
103.37 3,056.65 38.21
373.07 1,663.88 67.06

1,210.18 26,273.10 64.02


1,399.23 1,819.00 74.02

77.86 181.42 72.69


9.15 1,109.80 50.03

63.04 1,091.85 39.43


189.49 1,280.95 37.71
48.49 216.25 22.68

12.00 18,673.92 31.58


1.00 1,931.13 100.00
1.00 2,004.61 100.00
1.00 2,169.52 50.00
2.00 4,631.72 50.00
1.00 3,998.10 100.00

42.83 804.78 45.42

73.65 223.16 31.00


0.07 83.00 29.17
0.07 151.47 29.17

34.47 137.54 31.00


10.61 51.56 31.01
5.30 36.84 31.00
2.65 23.13 30.99
73.65 251.88 31.00
73.65 182.65 31.00
ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %
73.65 480.20 31.00
43.40 514.29 38.06
11.59 51.69 16.94

73.65 2,005.49 31.00


73.65 95.74 31.00

746.00 3,200.34 28.78


805.07 3,590.61 25.88

5.84 13.59 49.98

4.26 73.70 21.08


5.84 29.35 50.00
5.80 25.87 24.98

0.01 3.12 0.27


8.99 303.60 50.03
70.23 288.64 50.00

8.99 166.41 50.00

1.00 79.99 50.00


1.00 21.85 50.00

8.85 20.62 50.00

13.07 226.37 50.02


7.66 38.53 50.03
15.67 69.89 49.99

0.66 140.42 49.63


ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %

3.60 1,119.85 50.00


94.75 389.43 50.00
19.59 661.56 50.00

16.00 296.16 50.00

0.32 3.52 50.07

1.00 267.08 50.00


5.90 160.65 50.00

8.74 12.14 24.98


8.74 20.37 25.01

60.14 1,041.63 37.52


63.27 318.25 37.50
72.13 321.70 37.50

1.56 330.82 37.83

17.01 5,291.30 25.00


90.84 3,067.50 25.00
991.50 4,075.07 25.00

128.38 2,412.16 50.00

1.00 1,146.79 50.00


8.20 223.28 50.00
1.00 180.96 50.00

105.46 245.72 37.50


ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %
120.29 2,083.34 37.50
80.53 405.04 37.50
144.35 643.78 37.50

6.98 1,218.72 25.00


0.62 116.28 25.00
5.12 1,132.56 25.00
59.42 2,006.45 25.00

1.54 494.91 25.00


1.20 387.45 25.00
0.24 81.25 51.06
19.14 646.36 25.00
0.60 20.26 50.00
18.82 77.33 25.00
123.78 508.71 25.00
4.73 19.44 50.05

29.16 2,054.03 50.00

171.87 3,229.35 50.00


30.72 1,169.51 50.00

9.30 185.07 50.00

2.52 69.47 50.00


2.09 650.13 50.00
31.44 1,061.73 50.00

4.00 1,714.72 50.00


4.00 1,569.60 50.00
80.40 2,043.77 50.00
227.80 1,243.79 50.00
167.10 3,355.37 50.00

35.01 2,353.37 50.00


ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %
8.62 579.43 50.00
34.49 2,318.41 50.01

7.80 212.40 50.00


51.40 1,127.20 50.00
1.00 462.82 50.00

28.52 66.46 25.00

86.60 1,499.92 37.61


28.52 143.45 25.00
103.61 462.07 37.50

23.65 5,054.48 50.00


81.89 2,765.25 50.00

8.00 537.76 50.00


12.00 806.64 50.00
30.00 875.40 93.75
12.00 350.16 75.00

33.00 898.59 50.00


37.80 467.58 50.00
1.00 630.42 50.00
1.00 1,146.79 50.00

50.00 151.50 50.00


0.05 59.28 50.00
45.00 1,240.65 50.00
50.00 242.50 50.00
50.00 124.00 50.00
50.00 1,361.50 50.00
31.50 351.54 50.00
13.50 60.21 50.00
ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %

2.25 5.25 50.05


3.01 52.14 50.00
2.00 3,112.32 50.00
10.00 272.30 50.00

0.13 154.13 50.00


2.18 37.76 50.12
0.79 255.06 50.00
6.50 132.08 49.85
56.63 232.75 50.00
131.00 1,216.99 50.00
34.00 965.60 50.00
1.00 1,024.83 50.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


ON DE OBRA N° 05
TE AL MES DE MAYO DE 2015

SALDO A VALORIZAR
METRADO VALORIZ. %
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
216,244.12 32.80
32,436.62
17,299.53
265,980.27
260,399.57
46,871.92
307,271.49

ENTIDAD
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1.00 667.17 667.17 0.00 0.00 0.00 1.00 667.17 100.00 1.00 667.17 100.00
01.02 ALQUILER DE ALMACEN DE OBRA mes 4.50 254.24 1144.08 1.00 254.24 22.22 3.00 762.72 66.67 4.00 1,016.96 88.89
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 1.00 27897.49 27897.49 0.10 2,789.75 10.00 0.75 20,923.12 75.00 0.85 23,712.87 85.00
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 1.00 26673.73 26673.73 0.00 0.00 0.00 0.90 24,006.36 90.00 0.90 24,006.36 90.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 1890.46 3.03 5728.09 161.11 488.16 8.52 519.17 1,573.07 27.46 680.28 2,061.23 35.98
02.01.02 TRAZO Y REPLANTEO Km 1.89 1185.61 2240.8 0.16 189.70 8.47 0.52 615.33 27.46 0.68 805.03 35.93
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 1.89 2163.86 4089.7 0.16 346.22 8.47 0.52 1,123.04 27.46 0.68 1,469.26 35.93
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 494.4 3.99 1972.66 16.67 66.51 3.37 155.45 620.25 31.44 172.12 686.76 34.81
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 69.83 4.81 335.88 0.00 0.00 0.00 28.47 136.96 40.77 28.47 136.96 40.77
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M m3 497.15 5.76 2863.58 0.00 0.00 0.00 86.32 497.20 17.36 86.32 497.20 17.36
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 201.63 7.19 1449.72 126.42 908.96 62.70 0.00 0.00 0.00 126.42 908.96 62.70
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 152.12 4.86 739.3 5.13 24.93 3.37 24.48 118.97 16.09 29.61 143.90 19.46
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 21.49 5.6 120.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M m3 152.97 7.26 1110.56 0.00 0.00 0.00 26.56 192.83 17.36 26.56 192.83 17.36
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 62.04 9.68 600.55 38.90 376.55 62.70 0.00 0.00 0.00 38.90 376.55 62.70
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 76.06 6.95 528.62 2.56 17.79 3.37 12.24 85.07 16.09 14.80 102.86 19.46
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 10.74 7.91 84.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M m3 76.49 11.57 884.99 0.00 0.00 0.00 6.64 76.82 8.68 6.64 76.82 8.68
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 31.02 17.38 539.13 19.45 338.04 62.70 0.00 0.00 0.00 19.45 338.04 62.70
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 38.03 8.73 332 1.28 11.17 3.36 6.12 53.43 16.09 7.40 64.60 19.45
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 5.37 11.61 62.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M m3 38.24 17.44 666.91 0.00 0.00 0.00 6.64 115.80 17.36 6.64 115.80 17.36
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 15.51 29.07 450.88 9.72 282.56 62.67 0.00 0.00 0.00 9.72 282.56 62.67
02.02.17 ENTIBADO DE ZANJAS m3 722.14 26.09 18840.63 123.87 3,231.77 17.15 392.47 10,239.44 54.35 516.34 13,471.21 71.50
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 1890.46 3.42 6465.37 161.11 551.00 8.52 519.17 1,775.55 27.46 680.28 2,326.55 35.98
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 1890.46 2.48 4688.34 161.11 399.55 8.52 519.17 1,287.53 27.46 680.28 1,687.08 35.98
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 1890.46 6.52 12325.8 161.11 1,050.44 8.52 489.78 3,193.34 25.91 650.89 4,243.78 34.43
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 507.08 11.85 6008.9 17.10 202.64 3.37 284.42 3,370.40 56.09 301.52 3,573.04 59.46
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M m3 80.57 14.81 1193.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M m3 621.27 17.77 11039.97 0.00 0.00 0.00 107.93 1,917.92 17.37 107.93 1,917.92 17.37
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 270.56 29.57 8000.46 167.19 4,943.81 61.79 0.00 0.00 0.00 167.19 4,943.81 61.79
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 556.34 4.46 2481.28 17.10 76.27 3.07 166.17 741.14 29.87 183.27 817.41 32.94
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 1890.46 21.71 41041.89 161.11 3,497.70 8.52 519.17 11,271.09 27.46 680.28 14,768.79 35.98
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 1890.46 1.3 2457.6 161.11 209.44 8.52 330.12 429.16 17.46 491.23 638.60 25.98
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 11.25 26.21 10.50 18.00 41.94 16.81 29.25 68.15 27.31
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 18.29 121.29 2218.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 159.88 17.32 2769.12 13.70 237.28 8.57 83.14 1,439.98 52.00 96.84 1,677.26 60.57
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 502.51 6.76 3396.97 45.36 306.63 9.03 267.66 1,809.38 53.26 313.02 2,116.01 62.29
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 213.81 4.46 953.59 38.39 171.22 17.96 126.93 566.12 59.37 165.32 737.34 77.33
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 38 1556.16 59134.08 5.00 7,780.80 13.16 21.00 32,679.36 55.26 26.00 40,460.16 68.42
03.03.02 BUZON TIPO V H=1.75M Und. 1 1931.13 1931.13 0.00 0.00 0.00 1.00 1,931.13 100.00 1.00 1,931.13 100.00
03.03.03 BUZON TIPO VI H=2.00M Und. 1 2004.61 2004.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.04 BUZON TIPO VI H=2.50M Und. 2 2169.52 4339.04 0.00 0.00 0.00 2.00 4,339.04 100.00 2.00 4,339.04 100.00
03.03.05 BUZON TIPO VIII H=3.00M Und. 4 2315.86 9263.44 0.00 0.00 0.00 2.00 4,631.72 50.00 2.00 4,631.72 50.00
03.03.06 BUZON TIPO XVI H=4.50M Und. 1 3998.1 3998.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) m2 94.29 18.79 1771.71 0.00 0.00 0.00 51.46 966.93 54.58 51.46 966.93 54.58
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO m 237.57 3.03 719.84 0.00 0.00 0.00 163.92 496.68 69.00 163.92 496.68 69.00
04.01.02 TRAZO Y REPLANTEO Km 0.24 1185.61 284.55 0.00 0.00 0.00 0.17 201.55 70.83 0.17 201.55 70.83
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.24 2163.86 519.33 0.00 0.00 0.00 0.17 367.86 70.83 0.17 367.86 70.83
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 111.18 3.99 443.61 0.00 0.00 0.00 76.71 306.07 69.00 76.71 306.07 69.00
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 34.21 4.86 166.26 0.00 0.00 0.00 23.60 114.70 68.99 23.60 114.70 68.99
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 17.1 6.95 118.85 0.00 0.00 0.00 11.80 82.01 69.01 11.80 82.01 69.01
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 8.55 8.73 74.64 0.00 0.00 0.00 5.90 51.51 69.01 5.90 51.51 69.01
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 237.57 3.42 812.49 0.00 0.00 0.00 163.92 560.61 69.00 163.92 560.61 69.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 237.57 2.48 589.17 0.00 0.00 0.00 163.92 406.52 69.00 163.92 406.52 69.00
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 237.57 6.52 1548.96 0.00 0.00 0.00 163.92 1,068.76 69.00 163.92 1,068.76 69.00
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 114.03 11.85 1351.26 0.00 0.00 0.00 70.63 836.97 61.94 70.63 836.97 61.94
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 68.42 4.46 305.15 0.00 0.00 0.00 56.83 253.46 83.06 56.83 253.46 83.06
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM m 237.57 27.23 6469.03 0.00 0.00 0.00 163.92 4,463.54 69.00 163.92 4,463.54 69.00
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 237.57 1.3 308.84 0.00 0.00 0.00 163.92 213.10 69.00 163.92 213.10 69.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 2592.00 4.29 11119.68 0.00 0.00 0.00 1,846.00 7,919.34 71.22 1,846.00 7,919.34 71.22
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 3110.40 4.46 13872.38 0.00 0.00 0.00 2,305.33 10,281.77 74.12 2,305.33 10,281.77 74.12
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 11.67 2.33 27.19 0.00 0.00 0.00 5.84 13.60 50.00 5.84 13.60 50.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 20.19 17.32 349.69 5.84 101.15 28.93 10.10 174.85 50.00 15.94 276.00 78.93
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 11.67 5.03 58.7 0.00 0.00 0.00 5.84 29.35 50.00 5.84 29.35 50.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 23.22 4.46 103.56 5.81 25.91 25.02 11.61 51.78 50.00 17.42 77.69 75.02
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 3.65 311.07 1135.41 1.82 566.15 49.86 1.82 566.15 49.86 3.64 1,132.30 99.72
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 17.97 33.77 606.85 0.00 0.00 0.00 8.98 303.25 49.97 8.98 303.25 49.97
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 140.46 4.11 577.29 0.00 0.00 0.00 70.23 288.65 50.00 70.23 288.65 50.00
06.04 REVOQUES ENLUCIDOS Y MOLDURAS
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 17.98 18.51 332.81 0.00 0.00 0.00 8.99 166.40 50.00 8.99 166.40 50.00
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m Und. 2 79.99 159.98 0.00 0.00 0.00 1.00 79.99 50.00 1.00 79.99 50.00
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR Und. 2 21.85 43.7 0.00 0.00 0.00 1.00 21.85 50.00 1.00 21.85 50.00
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO m2 17.7 2.33 41.24 0.00 0.00 0.00 8.85 20.62 50.00 8.85 20.62 50.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL m3 26.13 17.32 452.57 0.00 0.00 0.00 13.06 226.20 49.98 13.06 226.20 49.98
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 15.31 5.03 77.01 0.00 0.00 0.00 7.65 38.48 49.97 7.65 38.48 49.97
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 31.35 4.46 139.82 0.00 0.00 0.00 15.68 69.93 50.02 15.68 69.93 50.02
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS m3 1.33 212.75 282.96 0.00 0.00 0.00 0.67 142.54 50.38 0.67 142.54 50.38
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 7.2 311.07 2239.7 0.00 0.00 0.00 3.60 1,119.85 50.00 3.60 1,119.85 50.00
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 189.51 4.11 778.89 0.00 0.00 94.76 389.46 50.00 94.76 389.46 50.00
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.18 33.77 1323.11 0.00 0.00 0.00 19.59 661.55 50.00 19.59 661.55 50.00
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 32 18.51 592.32 0.00 0.00 0.00 16.00 296.16 50.00 16.00 296.16 50.00
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS m2 0.64 10.98 7.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' Und. 2 267.08 534.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM m 11.8 27.23 321.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.96 1.39 48.59 0.00 0.00 0.00 26.22 36.45 75.00 26.22 36.45 75.00
08.01.02 TRAZO Y REPLANTEO m2 34.96 2.33 81.46 0.00 0.00 0.00 26.22 61.09 75.00 26.22 61.09 75.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 160.28 17.32 2776.05 0.00 0.00 0.00 100.14 1,734.42 62.48 100.14 1,734.42 62.48
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 168.72 5.03 848.66 0.00 0.00 0.00 105.45 530.41 62.50 105.45 530.41 62.50
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 192.34 4.46 857.84 0.00 0.00 0.00 120.21 536.14 62.50 120.21 536.14 62.50
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 4.11 212.75 874.4 0.00 0.00 0.00 2.56 543.58 62.17 2.56 543.58 62.17
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 68.04 311.07 21165.2 17.01 5,291.30 25.00 34.02 10,582.60 50.00 51.03 15,873.90 75.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 363.34 33.77 12269.99 90.84 3,067.50 25.00 181.67 6,135.00 50.00 272.51 9,202.50 75.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 3966.01 4.11 16300.3 991.50 4,075.08 25.00 1,983.01 8,150.15 50.00 2,974.51 12,225.23 75.00
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 256.75 18.79 4824.33 64.19 1,206.08 25.00 64.19 1,206.08 25.00 128.38 2,412.16 50.00
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 16.4 27.23 446.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF glb 2 180.96 361.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 281.22 2.33 655.24 0.00 0.00 0.00 175.76 409.52 62.50 175.76 409.52 62.50
09.02 MOVIMIENTO DE TIERRAS
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 320.77 17.32 5555.74 0.00 0.00 0.00 200.49 3,472.40 62.50 200.49 3,472.40 62.50
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 214.73 5.03 1080.09 0.00 0.00 0.00 134.21 675.05 62.50 134.21 675.05 62.50
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 384.93 4.46 1716.79 0.00 0.00 0.00 240.59 1,073.01 62.50 240.59 1,073.01 62.50
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 27.93 174.54 4874.9 6.98 1,218.73 25.00 13.97 2,437.45 50.00 20.95 3,656.18 75.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 2.48 187.54 465.1 0.62 116.27 25.00 1.24 232.55 50.00 1.86 348.82 75.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 20.47 221.31 4530.22 5.12 1,132.55 25.00 10.24 2,265.11 50.00 15.35 3,397.66 75.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 237.66 33.77 8025.78 59.42 2,006.44 25.00 118.83 4,012.89 50.00 178.25 6,019.33 75.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 6.16 321.37 1979.64 1.54 494.91 25.00 3.08 989.82 50.00 4.62 1,484.73 75.00
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 4.8 322.87 1549.78 1.20 387.44 25.00 2.40 774.89 50.00 3.60 1,162.33 75.00
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.47 338.55 159.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 76.56 33.77 2585.43 19.14 646.36 25.00 38.28 1,292.72 50.00 57.42 1,939.08 75.00
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 1.2 33.77 40.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 75.26 4.11 309.32 18.82 77.33 25.00 37.63 154.66 50.00 56.45 231.99 75.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 495.1 4.11 2034.86 123.78 508.72 25.00 247.55 1,017.43 50.00 371.33 1,526.15 75.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 9.45 4.11 38.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 58.32 70.44 4108.06 0.00 0.00 0.00 29.16 2,054.03 50.00 29.16 2,054.03 50.00
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) m2 343.73 18.79 6458.69 0.00 0.00 0.00 171.87 3,229.34 50.00 171.87 3,229.34 50.00
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM m2 61.44 38.07 2339.02 0.00 0.00 0.00 30.72 1,169.51 50.00 30.72 1,169.51 50.00
09.07 PISO 0.00
09.07.01 CAPA DE ARCILLA H=10M m3 18.6 19.9 370.14 0.00 0.00 0.00 9.30 185.07 50.00 9.30 185.07 50.00
09.08 CANALETA DE DRENAJE 0.00
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 5.04 27.57 138.95 0.00 0.00 0.00 2.52 69.48 50.00 2.52 69.48 50.00
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS m3 4.18 311.07 1300.27 0.00 0.00 0.00 2.09 650.14 50.00 2.09 650.14 50.00
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 62.88 33.77 2123.46 0.00 0.00 0.00 31.44 1,061.73 50.00 31.44 1,061.73 50.00
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 8 428.68 3429.44 4.00 1,714.72 50.00 0.00 0.00 0.00 4.00 1,714.72 50.00
09.09.02 TIJERAL TIPO II Und. 8 392.4 3139.2 4.00 1,569.60 50.00 0.00 0.00 0.00 4.00 1,569.60 50.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 160.8 25.42 4087.54 80.40 2,043.77 50.00 0.00 0.00 0.00 80.40 2,043.77 50.00
09.09.04 CORREAS 2''X2'' m 455.6 5.46 2487.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 334.2 20.08 6710.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' m3 70.02 67.22 4706.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 17.24 67.22 1158.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10.03 LECHO DE ARENA m3 68.97 67.22 4636.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM m 15.6 27.23 424.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 102.8 21.93 2254.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO glb 2 462.82 925.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 FILTROS PERCOLADORES (5.0mX8.0m)
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 114.08 2.33 265.81 0.00 0.00 0.00 85.56 199.35 75.00 85.56 199.35 75.00
10.02 MOVIMIENTO DE TIERRAS 0.00
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 230.24 17.32 3987.76 0.00 0.00 0.00 143.64 2,487.84 62.39 143.64 2,487.84 62.39
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 114.08 5.03 573.82 0.00 0.00 0.00 85.56 430.37 75.00 85.56 430.37 75.00
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 276.29 4.46 1232.25 0.00 0.00 0.00 172.69 770.18 62.50 172.69 770.18 62.50
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM m3 47.30 213.72 10108.96 0.00 0.00 0.00 23.65 5,054.48 50.00 23.65 5,054.48 50.00
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 163.77 33.77 5530.51 0.00 0.00 0.00 81.89 2,765.26 50.00 81.89 2,765.26 50.00
10.04 FILTROS DE PIEDRA 0.00
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 16.00 67.22 1075.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.02 LECHO DE GRAVA DE 1'' m3 24.00 67.22 1613.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.03 LECHO DE PIEDRA DE 3.5'' m3 32.00 29.18 933.76 0.00 0.00 0.00 2.00 58.36 6.25 2.00 58.36 6.25
10.04.04 LECHO DE PIEDRA MAX.6'' m3 16.00 29.18 466.88 0.00 0.00 0.00 4.00 116.72 25.00 4.00 116.72 25.00
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO 0.00
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 66.00 27.23 1797.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 m 75.60 12.37 935.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.03 COLOCACIÓN DE ACCESORIOS glb 2.00 630.42 1260.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2.00 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO m 100.00 3.03 303 0.00 0.00 0.00 50.00 151.50 50.00 50.00 151.50 50.00
11.01.02 TRAZO Y REPLANTEO km 0.10 1185.61 118.56 0.00 0.00 0.00 0.05 59.28 50.00 0.05 59.28 50.00
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 90.00 27.57 2481.3 0.00 0.00 0.00 45.00 1,240.65 50.00 45.00 1,240.65 50.00
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL m 100.00 4.85 485 0.00 0.00 0.00 50.00 242.50 50.00 50.00 242.50 50.00
11.01.05 CAMA DE APOYO m 100.00 2.48 248 0.00 0.00 0.00 50.00 124.00 50.00 50.00 124.00 50.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM m 100.00 27.23 2723 0.00 0.00 0.00 50.00 1,361.50 50.00 50.00 1,361.50 50.00
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA m3 63.00 11.16 703.08 0.00 0.00 0.00 31.50 351.54 50.00 31.50 351.54 50.00
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 27.00 4.46 120.42 0.00 0.00 0.00 13.50 60.21 50.00 13.50 60.21 50.00
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO m2 4.50 2.33 10.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.02 EXCAVACIÓN EN TERRENO NORMAL m3 6.02 17.32 104.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.03 BUZÓN TIPO III H=1.20M Und. 4.00 1556.16 6224.64 0.00 0.00 0.00 2.00 3,112.32 50.00 2.00 3,112.32 50.00
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 20.00 27.23 544.6 0.00 0.00 0.00 10.00 272.30 50.00 10.00 272.30 50.00
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO km 0.26 1185.61 308.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.02 EXCAVACIÓN EN TERRENO NORMAL m3 4.35 17.32 75.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.58 322.87 510.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.04 20.32 264.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 113.25 4.11 465.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.06 CERCO PERIMETRICO m 262.00 9.29 2433.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M Und. 68.00 28.4 1931.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.08 PUERTA METALICA DE 3X2.5M Und. 2.00 1024.83 2049.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 1026.00 14.13 14497.38 60.00 847.80 5.85 60.00 847.80 5.85 120.00 1,695.60 11.70
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 183.28 31340.88 10.00 1,832.80 5.85 10.00 1,832.80 5.85 20.00 3,665.60 11.70
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 1026.00 6.52 6689.52 60.00 391.20 5.85 60.00 391.20 5.85 120.00 782.40 11.70
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 235.7 40304.7 10.00 2,357.00 5.85 10.00 2,357.00 5.85 20.00 4,714.00 11.70
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO m 14.39 3.03 43.6 0.00 0.00 0.00 14.39 43.60 100.00 14.39 43.60 100.00
13.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 0.00 0.00 0.00 14.39 33.53 100.00 14.39 33.53 100.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA m3 4.32 27.57 119.1 0.00 0.00 0.00 4.32 119.10 100.00 4.32 119.10 100.00
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.1 0.00 0.00 0.00 5.18 23.10 100.00 5.18 23.10 100.00
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1479.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 kg 92.41 4.11 379.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 33.77 607.52 17.99 607.52 100.00 0.00 0.00 0.00 17.99 607.52 100.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 4.11 753.16 183.25 753.16 100.00 0.00 0.00 0.00 183.25 753.16 100.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.80 426.98 768.56 1.80 768.56 100.00 0.00 0.00 0.00 1.80 768.56 100.00
13.03.06 CURADO DE CONCRETO m2 3.60 0.62 2.23 3.60 2.23 100.00 0.00 0.00 0.00 3.60 2.23 100.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 1.00 4879.39 4879.39 0.20 975.88 20.00 0.70 3,415.57 70.00 0.90 4,391.45 90.00
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63 (INC. IGV.)
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %
14.02 SEGURIDAD Y SALUD EN OBRA glb 1.00 3432.21 3432.21 0.20 686.44 20.00 0.70 2,402.55 70.00 0.90 3,088.99 90.00
14.03 ACONDICIONAMIENTO DE BOTADERO m2 550.00 7.32 4026.00 0.00 0.00 0.00 395.00 2,891.40 71.82 395.00 2,891.40 71.82
15 CAPACITACIONES 0.00
15.01 CAPACITACION A JASS glb 1.00 3000 3000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA glb 1.00 3000 3000.00 0.00 0.00 0.00 1.00 3,000.00 100.00 1.00 3,000.00 100.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 40.00 21.19 847.60 0.00 0.00 0.00 20.00 423.80 50.00 20.00 423.80 50.00
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 2.00 215.36 430.72 0.00 0.00 0.00 1.00 215.36 50.00 1.00 215.36 50.00
16.03 DISEÑO DE MEZCLA Und. 6.00 169.49 1016.94 0.00 0.00 0.00 6.00 1,016.94 100.00 6.00 1,016.94 100.00
16.04 ENSAYOS CBR Und. 4.00 296.61 1186.44 0.00 0.00 0.00 2.00 593.22 50.00 2.00 593.22 50.00
COSTO DIRECTO 659,238.84 64,251.94 9.75 261,692.48 39.70 325,944.41 49.45
GASTOS GENERALES (15.00%) 98,885.83 9,637.79 39,253.88 48,891.66
UTILIDAD (8,00%) 52,739.11 5,140.16 20,935.40 26,075.55
SUB TOTAL 810,863.78 79,029.89 321,881.76 400,911.62
FACTOR DE RELACION FR = 0,9790183675859 793,850.53 77,371.71 315,128.15 392,499.84
I.G.V. (18,00%) 142,893.10 13,926.91 56,723.07 70,649.97
PRESUPUESTO TOTAL S/, 936,743.63 91,298.62 371,851.22 463,149.81

APROBACIONES

INSPECTOR O SUPERVISOR CONTRATISTA ENTIDAD


ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %

0.00 0.00 0.00


0.50 127.12 11.11
0.15 4,184.62 15.00
0.10 2,667.37 10.00

1,210.18 3,666.86 64.02


1.21 1,435.77 64.07
1.21 2,620.44 64.07

322.28 1,285.90 65.19


41.36 198.92 59.22
410.83 2,366.38 82.64
75.21 540.76 37.30
122.51 595.40 80.54
21.49 120.34 100.00
126.41 917.73 82.64
23.14 224.00 37.30
61.26 425.76 80.54
10.74 84.95 100.00
69.85 808.17 91.32
11.57 201.09 37.30
30.63 267.40 80.54
5.37 62.35 100.00
31.60 551.11 82.64
5.79 168.32 37.33
205.80 5,369.42 28.50
1,210.18 4,138.82 64.02
1,210.18 3,001.26 64.02
1,239.57 8,082.02 65.57
205.56 2,435.86 40.54
80.57 1,193.24 100.00
ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %
513.34 9,122.05 82.63
103.37 3,056.65 38.21
373.07 1,663.87 67.06

1,210.18 26,273.10 64.02


1,399.23 1,819.00 74.02

77.86 181.42 72.69


18.29 2,218.39 100.00

63.04 1,091.86 39.43


189.49 1,280.96 37.71
48.49 216.25 22.68

12.00 18,673.92 31.58


0.00 0.00 0.00
1.00 2,004.61 100.00
0.00 0.00 0.00
2.00 4,631.72 50.00
1.00 3,998.10 100.00

42.83 804.78 45.42

73.65 223.16 31.00


0.07 83.00 29.17
0.07 151.47 29.17

34.47 137.54 31.00


10.61 51.56 31.01
5.30 36.84 31.00
2.65 23.13 30.99
73.65 251.88 31.00
73.65 182.65 31.00
ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %
73.65 480.20 31.00
43.40 514.29 38.06
11.59 51.69 16.94

73.65 2,005.49 31.00


73.65 95.74 31.00

746.00 3,200.34 28.78


805.07 3,590.61 25.88

5.84 13.59 49.98

4.26 73.69 21.07


5.84 29.35 50.00
5.80 25.87 24.98

0.01 3.11 0.27


8.99 303.60 50.03
70.23 288.64 50.00

8.99 166.41 50.00

1.00 79.99 50.00


1.00 21.85 50.00

8.85 20.62 50.00

13.07 226.37 50.02


7.66 38.53 50.03
15.67 69.89 49.99

0.66 140.42 49.63


ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %

3.60 1,119.85 50.00


94.75 389.43 50.00
19.59 661.56 50.00

16.00 296.16 50.00

0.64 7.03 100.00

2.00 534.16 100.00


11.80 321.31 100.00

8.74 12.14 24.98


8.74 20.37 25.01

60.14 1,041.63 37.52


63.27 318.25 37.50
72.13 321.70 37.50

1.56 330.82 37.83

17.01 5,291.30 25.00


90.84 3,067.49 25.00
991.50 4,075.07 25.00

128.38 2,412.17 50.00

2.00 2,293.58 100.00


16.40 446.57 100.00
2.00 361.92 100.00

105.46 245.72 37.50


ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %
120.29 2,083.34 37.50
80.53 405.04 37.50
144.35 643.78 37.50

6.98 1,218.72 25.00


0.62 116.28 25.00
5.12 1,132.56 25.00
59.42 2,006.45 25.00

1.54 494.91 25.00


1.20 387.45 25.00
0.47 159.12 100.00
19.14 646.35 25.00
1.20 40.52 100.00
18.82 77.33 25.00
123.78 508.71 25.00
9.45 38.84 100.00

29.16 2,054.03 50.00

171.87 3,229.35 50.00


30.72 1,169.51 50.00

9.30 185.07 50.00

2.52 69.47 50.00


2.09 650.13 50.00
31.44 1,061.73 50.00

4.00 1,714.72 50.00


4.00 1,569.60 50.00
80.40 2,043.77 50.00
455.60 2,487.58 100.00
334.20 6,710.74 100.00

70.02 4,706.74 100.00


ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %
17.24 1,158.87 100.00
68.97 4,636.16 100.00

15.60 424.79 100.00


102.80 2,254.40 100.00
2.00 925.64 100.00

28.52 66.46 25.00

86.60 1,499.92 37.61


28.52 143.45 25.00
103.61 462.07 37.50

23.65 5,054.48 50.00


81.89 2,765.25 50.00

16.00 1,075.52 100.00


24.00 1,613.28 100.00
30.00 875.40 93.75
12.00 350.16 75.00

66.00 1,797.18 100.00


75.60 935.17 100.00
2.00 1,260.84 100.00
2.00 2,293.58 100.00

50.00 151.50 50.00


0.05 59.28 50.00
45.00 1,240.65 50.00
50.00 242.50 50.00
50.00 124.00 50.00
50.00 1,361.50 50.00
31.50 351.54 50.00
13.50 60.21 50.00
ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %

4.50 10.49 100.00


6.02 104.27 100.00
2.00 3,112.32 50.00
10.00 272.30 50.00

0.26 308.26 100.00


4.35 75.34 100.00
1.58 510.13 100.00
13.04 264.97 100.00
113.25 465.46 100.00
262.00 2,433.98 100.00
68.00 1,931.20 100.00
2.00 2,049.66 100.00

906.00 12,801.78 88.30


151.00 27,675.28 88.30
906.00 5,907.12 88.30
151.00 35,590.70 88.30

0.00 0.00 0.00


0.00 0.00 0.00

0.00 0.00 0.00


0.00 0.00 0.00

4.32 1,479.77 100.00


92.41 379.81 100.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.10 487.94 10.00


ON DE OBRA N° 04
AL MES DE DICIEMBRE DE 2014

SALDO A VALORIZAR
METRADO VALORIZ. %
0.10 343.22 10.00
155.00 1,134.60 28.18

1.00 3,000.00 100.00


0.00 0.00 0.00

20.00 423.80 50.00


1.00 215.36 50.00
0.00 0.00 0.00
2.00 593.22 50.00
333,294.44 50.55
49,994.17
26,663.56
409,952.17
401,350.70
72,243.13
473,593.83

ENTIDAD
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1.00 667.17 667.17 0.00 0.00 0.00 1.00 667.17 100.00 1.00 667.17
01.02 ALQUILER DE ALMACEN DE OBRA mes 4.50 254.24 1144.08 1.00 254.24 22.22 1.00 254.24 22.22 2.00 508.48
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 1.00 27897.49 27897.49 0.00 0.00 0.00 0.50 13,948.75 50.00 0.50 13,948.75
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 1.00 26673.73 26673.73 0.00 0.00 0.00 0.75 20,005.30 75.00 0.75 20,005.30
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 1890.46 3.03 5728.09 56.53 171.29 2.99 189.05 572.81 10.00 245.58 744.10
02.01.02 TRAZO Y REPLANTEO Km 1.89 1185.61 2240.8 0.06 71.14 3.17 0.19 224.08 10.00 0.25 295.22
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 1.89 2163.86 4089.7 0.06 129.83 3.17 0.19 408.97 10.00 0.25 538.80
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 494.4 3.99 1972.66 26.46 105.58 5.35 49.44 197.27 10.00 75.90 302.85
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 69.83 4.81 335.88 21.49 103.37 30.78 6.98 33.59 10.00 28.47 136.96
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M m3 497.15 5.76 2863.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 201.63 7.19 1449.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 152.12 4.86 739.3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 21.49 5.6 120.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M m3 152.97 7.26 1110.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 62.04 9.68 600.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 76.06 6.95 528.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 10.74 7.91 84.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M m3 76.49 11.57 884.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 31.02 17.38 539.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 38.03 8.73 332 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 5.37 11.61 62.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M m3 38.24 17.44 666.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 15.51 29.07 450.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.17 ENTIBADO DE ZANJAS m3 722.14 26.09 18840.63 216.64 5,652.19 30.00 72.21 1,884.06 10.00 288.86 7,536.25
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 1890.46 3.42 6465.37 56.53 193.33 2.99 189.05 646.54 10.00 245.58 839.87
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 1890.46 2.48 4688.34 56.53 140.19 2.99 189.05 468.83 10.00 245.58 609.02
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 1890.46 6.52 12325.8 27.14 176.95 1.44 189.05 1,232.58 10.00 216.19 1,409.53
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 507.08 11.85 6008.9 152.12 1,802.67 30.00 50.71 600.89 10.00 202.83 2,403.56
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M m3 80.57 14.81 1193.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M m3 621.27 17.77 11039.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 270.56 29.57 8000.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 556.34 4.46 2481.28 31.75 141.61 5.71 55.63 248.13 10.00 87.38 389.74
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 1890.46 21.71 41041.89 56.53 1,227.27 2.99 189.05 4,104.19 10.00 245.58 5,331.46
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 1890.46 1.3 2457.6 56.53 73.49 2.99 0.00 0.00 0.00 56.53 73.49
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 18.00 41.94 16.80 0.00 0.00 0.00 18.00 41.94
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 18.29 121.29 2218.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 159.88 17.32 2769.12 21.91 379.48 13.70 0.00 0.00 0.00 21.91 379.48
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 502.51 6.76 3396.97 72.57 490.57 14.44 0.00 0.00 0.00 72.57 490.57
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 213.81 4.46 953.59 53.45 238.40 25.00 0.00 0.00 0.00 53.45 238.40
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 38 1556.16 59134.08 8.00 12,449.28 21.05 0.00 0.00 0.00 8.00 12,449.28
03.03.02 BUZON TIPO V H=1.75M Und. 1 1931.13 1931.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.03 BUZON TIPO VI H=2.00M Und. 1 2004.61 2004.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.04 BUZON TIPO VI H=2.50M Und. 2 2169.52 4339.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.05 BUZON TIPO VIII H=3.00M Und. 4 2315.86 9263.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.06 BUZON TIPO XVI H=4.50M Und. 1 3998.1 3998.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) m2 94.29 18.79 1771.71 15.83 297.45 16.79 0.00 0.00 0.00 15.83 297.45
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO m 237.57 3.03 719.84 147.15 445.86 61.94 0.00 0.00 0.00 147.15 445.86
04.01.02 TRAZO Y REPLANTEO Km 0.24 1185.61 284.55 0.15 177.84 62.50 0.00 0.00 0.00 0.15 177.84
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.24 2163.86 519.33 0.15 324.58 62.50 0.00 0.00 0.00 0.15 324.58
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 111.18 3.99 443.61 76.71 306.07 69.00 0.00 0.00 0.00 76.71 306.07
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 34.21 4.86 166.26 23.60 114.70 68.99 0.00 0.00 0.00 23.60 114.70
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 17.1 6.95 118.85 11.80 82.01 69.00 0.00 0.00 0.00 11.80 82.01
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 8.55 8.73 74.64 5.90 51.51 69.01 0.00 0.00 0.00 5.90 51.51
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 237.57 3.42 812.49 163.92 560.61 69.00 0.00 0.00 0.00 163.92 560.61
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 237.57 2.48 589.17 163.92 406.52 69.00 0.00 0.00 0.00 163.92 406.52
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 237.57 6.52 1548.96 163.92 1,068.76 69.00 0.00 0.00 0.00 163.92 1,068.76
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 114.03 11.85 1351.26 70.63 836.97 61.94 0.00 0.00 0.00 70.63 836.97
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 68.42 4.46 305.15 56.83 253.46 83.06 0.00 0.00 0.00 56.83 253.46
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM m 237.57 27.23 6469.03 163.92 4,463.54 69.00 0.00 0.00 0.00 163.92 4,463.54
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 237.57 1.3 308.84 163.92 213.10 69.00 0.00 0.00 0.00 163.92 213.10
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 2592 4.29 11119.68 0.00 0.00 0.00 1,296.00 5,559.84 50.00 1,296.00 5,559.84
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 3110.4 4.46 13872.38 0.00 0.00 0.00 1,555.20 6,936.19 50.00 1,555.20 6,936.19
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 11.67 2.33 27.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 20.19 17.32 349.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 11.67 5.03 58.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 23.22 4.46 103.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 3.65 311.07 1135.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 17.97 33.77 606.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 140.46 4.11 577.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 17.98 18.51 332.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m Und. 2 79.99 159.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR Und. 2 21.85 43.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO m2 17.7 2.33 41.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL m3 26.13 17.32 452.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 15.31 5.03 77.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 31.35 4.46 139.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS m3 1.33 212.75 282.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 7.2 311.07 2239.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 189.51 4.11 778.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.18 33.77 1323.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 32 18.51 592.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS m2 0.64 10.98 7.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' Und. 2 267.08 534.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM m 11.8 27.23 321.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.96 1.39 48.59 0.00 0.00 0.00 17.48 24.30 50.00 17.48 24.30
08.01.02 TRAZO Y REPLANTEO m2 34.96 2.33 81.46 0.00 0.00 0.00 17.48 40.73 50.00 17.48 40.73
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 160.28 17.32 2776.05 0.00 0.00 0.00 80.14 1,388.02 50.00 80.14 1,388.02
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 168.72 5.03 848.66 0.00 0.00 0.00 84.36 424.33 50.00 84.36 424.33
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 192.34 4.46 857.84 0.00 0.00 0.00 96.17 428.92 50.00 96.17 428.92
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 4.11 212.75 874.4 0.00 0.00 0.00 2.06 437.20 50.00 2.06 437.20
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 68.04 311.07 21165.2 17.01 5,291.30 25.00 17.01 5,291.30 25.00 34.02 10,582.60
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 363.34 33.77 12269.99 90.84 3,067.50 25.00 90.84 3,067.50 25.00 181.67 6,135.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 3966.01 4.11 16300.3 0.00 0.00 0.00 1,983.01 8,150.15 50.00 1,983.01 8,150.15
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 256.75 18.79 4824.33 64.19 1,206.08 25.00 0.00 0.00 0.00 64.19 1,206.08
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 16.4 27.23 446.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF glb 2 180.96 361.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 281.22 2.33 655.24 0.00 0.00 0.00 140.61 327.62 50.00 140.61 327.62
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 320.77 17.32 5555.74 0.00 0.00 0.00 160.39 2,777.87 50.00 160.39 2,777.87
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 214.73 5.03 1080.09 0.00 0.00 0.00 107.37 540.05 50.00 107.37 540.05
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 384.93 4.46 1716.79 0.00 0.00 0.00 192.47 858.39 50.00 192.47 858.39
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 27.93 174.54 4874.9 0.00 0.00 0.00 13.97 2,437.45 50.00 13.97 2,437.45
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 2.48 187.54 465.1 1.24 232.55 50.00 0.00 0.00 0.00 1.24 232.55
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 20.47 221.31 4530.22 5.12 1,132.55 25.00 5.12 1,132.55 25.00 10.24 2,265.10
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 237.66 33.77 8025.78 59.42 2,006.44 25.00 59.42 2,006.44 25.00 118.83 4,012.88
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 6.16 321.37 1979.64 0.00 0.00 0.00 3.08 989.82 50.00 3.08 989.82
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 4.8 322.87 1549.78 2.40 774.89 50.00 0.00 0.00 0.00 2.40 774.89
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.47 338.55 159.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 76.56 33.77 2585.43 38.28 1,292.72 50.00 0.00 0.00 0.00 38.28 1,292.72
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 1.2 33.77 40.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 75.26 4.11 309.32 0.00 0.00 0.00 37.63 154.66 50.00 37.63 154.66
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 495.1 4.11 2034.86 0.00 0.00 0.00 247.55 1,017.43 50.00 247.55 1,017.43
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 9.45 4.11 38.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 58.32 70.44 4108.06 29.16 2,054.03 50.00 0.00 0.00 0.00 29.16 2,054.03
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) m2 343.73 18.79 6458.69 171.87 3,229.34 50.00 0.00 0.00 0.00 171.87 3,229.34
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM m2 61.44 38.07 2339.02 30.72 1,169.51 50.00 0.00 0.00 0.00 30.72 1,169.51
09.07 PISO
09.07.01 CAPA DE ARCILLA H=10M m3 18.6 19.9 370.14 9.30 185.07 50.00 0.00 0.00 0.00 9.30 185.07
09.08 CANALETA DE DRENAJE
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 5.04 27.57 138.95 2.52 69.48 50.00 0.00 0.00 0.00 2.52 69.48
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS m3 4.18 311.07 1300.27 2.09 650.14 50.00 0.00 0.00 0.00 2.09 650.14
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 62.88 33.77 2123.46 31.44 1,061.73 50.00 0.00 0.00 0.00 31.44 1,061.73
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 8 428.68 3429.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.02 TIJERAL TIPO II Und. 8 392.4 3139.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 160.8 25.42 4087.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.04 CORREAS 2''X2'' m 455.6 5.46 2487.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 334.2 20.08 6710.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' m3 70.02 67.22 4706.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 17.24 67.22 1158.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10.03 LECHO DE ARENA m3 68.97 67.22 4636.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM m 15.6 27.23 424.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 102.8 21.93 2254.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO glb 2 462.82 925.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 FILTROS PERCOLADORES (5.0mX8.0m) 0.00
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 114.08 2.33 265.81 0.00 0.00 0.00 57.04 132.90 50.00 57.04 132.90
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 230.24 17.32 3987.76 0.00 0.00 0.00 115.12 1,993.88 50.00 115.12 1,993.88
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 114.08 5.03 573.82 0.00 0.00 0.00 57.04 286.91 50.00 57.04 286.91
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 276.29 4.46 1232.25 0.00 0.00 0.00 138.15 616.13 50.00 138.15 616.13
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM m3 47.30 213.72 10108.96 23.65 5,054.48 50.00 0.00 0.00 0.00 23.65 5,054.48
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 163.77 33.77 5530.51 81.89 2,765.26 50.00 0.00 0.00 0.00 81.89 2,765.26
10.04 FILTROS DE PIEDRA
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 16.00 67.22 1075.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.02 LECHO DE GRAVA DE 1'' m3 24.00 67.22 1613.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.03 LECHO DE PIEDRA DE 3.5'' m3 32.00 29.18 933.76 2.00 58.36 6.25 0.00 0.00 0.00 2.00 58.36
10.04.04 LECHO DE PIEDRA MAX.6'' m3 16.00 29.18 466.88 4.00 116.72 25.00 0.00 0.00 0.00 4.00 116.72
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 66.00 27.23 1797.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 m 75.60 12.37 935.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.03 COLOCACIÓN DE ACCESORIOS glb 2.00 630.42 1260.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2.00 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO m 100.00 3.03 303 50.00 151.50 50.00 0.00 0.00 0.00 50.00 151.50
11.01.02 TRAZO Y REPLANTEO km 0.10 1185.61 118.56 0.05 59.28 50.00 0.00 0.00 0.00 0.05 59.28
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 90.00 27.57 2481.3 45.00 1,240.65 50.00 0.00 0.00 0.00 45.00 1,240.65
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL m 100.00 4.85 485 50.00 242.50 50.00 0.00 0.00 0.00 50.00 242.50
11.01.05 CAMA DE APOYO m 100.00 2.48 248 50.00 124.00 50.00 0.00 0.00 0.00 50.00 124.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM m 100.00 27.23 2723 50.00 1,361.50 50.00 0.00 0.00 0.00 50.00 1,361.50
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA m3 63.00 11.16 703.08 31.50 351.54 50.00 0.00 0.00 0.00 31.50 351.54
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 27.00 4.46 120.42 13.50 60.21 50.00 0.00 0.00 0.00 13.50 60.21
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO m2 4.50 2.33 10.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.02 EXCAVACIÓN EN TERRENO NORMAL m3 6.02 17.32 104.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.03 BUZÓN TIPO III H=1.20M Und. 4.00 1556.16 6224.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 20.00 27.23 544.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO km 0.26 1185.61 308.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.02 EXCAVACIÓN EN TERRENO NORMAL m3 4.35 17.32 75.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.58 322.87 510.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.04 20.32 264.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 113.25 4.11 465.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.06 CERCO PERIMETRICO m 262.00 9.29 2433.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M Und. 68.00 28.4 1931.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.08 PUERTA METALICA DE 3X2.5M Und. 2.00 1024.83 2049.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 1026.00 14.13 14497.38 60.00 847.80 5.85 0.00 0.00 0.00 60.00 847.80
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 183.28 31340.88 10.00 1,832.80 5.85 0.00 0.00 0.00 10.00 1,832.80
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 1026.00 6.52 6689.52 60.00 391.20 5.85 0.00 0.00 0.00 60.00 391.20
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 171.00 235.7 40304.7 10.00 2,357.00 5.85 0.00 0.00 0.00 10.00 2,357.00
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO m 14.39 3.03 43.6 14.39 43.60 100.00 0.00 0.00 0.00 14.39 43.60
13.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 14.39 33.53 100.00 0.00 0.00 0.00 14.39 33.53
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA m3 4.32 27.57 119.1 4.32 119.10 100.00 0.00 0.00 0.00 4.32 119.10
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.1 5.18 23.10 100.00 0.00 0.00 0.00 5.18 23.10
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1479.77 0.00 0.00 0.00 4.32 1,479.77 100.00 4.32 1,479.77
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 kg 92.41 4.11 379.81 0.00 0.00 0.00 92.41 379.81 100.00 92.41 379.81
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 33.77 607.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 4.11 753.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.80 426.98 768.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.06 CURADO DE CONCRETO m2 3.60 0.62 2.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 1.00 4879.39 4879.39 0.50 2,439.70 50.00 0.00 0.00 0.00 0.50 2,439.70
14.02 SEGURIDAD Y SALUD EN OBRA glb 1.00 3432.21 3432.21 0.50 1,716.11 50.00 0.00 0.00 0.00 0.50 1,716.11
14.03 ACONDICIONAMIENTO DE BOTADERO m2 550.00 7.32 4026.00 275.00 2,013.00 50.00 0.00 0.00 0.00 275.00 2,013.00
15 CAPACITACIONES
15.01 CAPACITACION A JASS glb 1.00 3000 3000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA glb 1.00 3000 3000.00 1.00 3,000.00 100.00 0.00 0.00 0.00 1.00 3,000.00
16 PRUEBAS Y ENSAYOS
VALORIZACION DE OBRA N° 02
CORRESPONDIENTE AL MES DE OCTUBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 40.00 21.19 847.60 10.00 211.90 25.00 0.00 0.00 0.00 10.00 211.90
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 2.00 215.36 430.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.03 DISEÑO DE MEZCLA Und. 6.00 169.49 1016.94 0.00 0.00 0.00 3.00 508.47 50.00 3.00 508.47
16.04 ENSAYOS CBR Und. 4.00 296.61 1186.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 659,238.84 83,483.97 12.66 94,886.03 14.39 178,370.00
GASTOS GENERALES (15.00%) 98,885.83 12,522.60 14,232.90 26,755.50
UTILIDAD (8,00%) 52,739.11 6,678.72 7,590.88 14,269.60
SUB TOTAL 810,863.78 102,685.29 116,709.81 219,395.10
FACTOR DE RELACION FR = 0,9790183675859 793,850.53 100,530.78 114,261.05 214,791.83
I.G.V. (18,00%) 142,893.10 18,095.54 20,566.99 38,662.53
PRESUPUESTO TOTAL S/, 936,743.63 118,626.32 134,828.04 253,454.36

APROBACIONES

INSPECTOR O SUPERVISOR CONTRATISTA ENTIDAD


CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.

100.00 0.00 0.00


44.44 2.50 635.60
50.00 0.50 13,948.74
75.00 0.25 6,668.43

12.99 1,644.88 4,983.99


13.17 1.64 1,945.58
13.17 1.64 3,550.90

15.35 418.50 1,669.81


40.78 41.36 198.92
0.00 497.15 2,863.58
0.00 201.63 1,449.72
0.00 152.12 739.30
0.00 21.49 120.34
0.00 152.97 1,110.56
0.00 62.04 600.55
0.00 76.06 528.62
0.00 10.74 84.95
0.00 76.49 884.99
0.00 31.02 539.13
0.00 38.03 332.00
0.00 5.37 62.35
0.00 38.24 666.91
0.00 15.51 450.88
40.00 433.28 11,304.38
12.99 1,644.88 5,625.50
12.99 1,644.88 4,079.32
11.44 1,674.27 10,916.27
40.00 304.25 3,605.34
0.00 80.57 1,193.24
CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.
0.00 621.27 11,039.97
0.00 270.56 8,000.46
15.71 468.96 2,091.54

12.99 1,644.88 35,710.43


2.99 1,833.93 2,384.11

16.80 89.11 207.63


0.00 18.29 2,218.39

13.70 137.97 2,389.64


14.44 429.94 2,906.40
25.00 160.36 715.19

21.05 30.00 46,684.80


0.00 1.00 1,931.13
0.00 1.00 2,004.61
0.00 2.00 4,339.04
0.00 4.00 9,263.44
0.00 1.00 3,998.10

16.79 78.46 1,474.26

61.94 90.42 273.98


62.50 0.09 106.71
62.50 0.09 194.75

69.00 34.47 137.54


68.99 10.61 51.56
69.00 5.30 36.84
69.01 2.65 23.13
69.00 73.65 251.88
69.00 73.65 182.65
69.00 73.65 480.20
CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.
61.94 43.40 514.29
83.06 11.59 51.69

69.00 73.65 2,005.49


69.00 73.65 95.74

50.00 1,296.00 5,559.84


50.00 1,555.20 6,936.19

0.00 11.67 27.19

0.00 20.19 349.69


0.00 11.67 58.70
0.00 23.22 103.56

0.00 3.65 1,135.41


0.00 17.97 606.85
0.00 140.46 577.29

0.00 17.98 332.81

0.00 2.00 159.98


0.00 2.00 43.70

0.00 17.70 41.24

0.00 26.13 452.57


0.00 15.31 77.01
0.00 31.35 139.82

0.00 1.33 282.96

0.00 7.20 2,239.70


CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.
0.00 189.51 778.89
0.00 39.18 1,323.11

0.00 32.00 592.32

0.00 0.64 7.03

0.00 2.00 534.16


0.00 11.80 321.31

50.00 17.48 24.29


50.00 17.48 40.73

50.00 80.14 1,388.03


50.00 84.36 424.33
50.00 96.17 428.92

50.00 2.06 437.20

50.00 34.02 10,582.60


50.00 181.67 6,134.99
50.00 1,983.01 8,150.15

25.00 192.56 3,618.25

0.00 2.00 2,293.58


0.00 16.40 446.57
0.00 2.00 361.92

50.00 140.61 327.62

50.00 160.39 2,777.87


50.00 107.37 540.04
50.00 192.47 858.40
CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.

50.00 13.97 2,437.45


50.00 1.24 232.55
50.00 10.24 2,265.12
50.00 118.83 4,012.90

50.00 3.08 989.82


50.00 2.40 774.89
0.00 0.47 159.12
50.00 38.28 1,292.71
0.00 1.20 40.52
50.00 37.63 154.66
50.00 247.55 1,017.43
0.00 9.45 38.84

50.00 29.16 2,054.03

50.00 171.87 3,229.35


50.00 30.72 1,169.51

50.00 9.30 185.07

50.00 2.52 69.47


50.00 2.09 650.13
50.00 31.44 1,061.73

0.00 8.00 3,429.44


0.00 8.00 3,139.20
0.00 160.80 4,087.54
0.00 455.60 2,487.58
0.00 334.20 6,710.74

0.00 70.02 4,706.74


0.00 17.24 1,158.87
0.00 68.97 4,636.16

0.00 15.60 424.79


CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.
0.00 102.80 2,254.40
0.00 2.00 925.64

50.00 57.04 132.91

50.00 115.12 1,993.88


50.00 57.04 286.91
50.00 138.15 616.12

50.00 23.65 5,054.48


50.00 81.89 2,765.25

0.00 16.00 1,075.52


0.00 24.00 1,613.28
6.25 30.00 875.40
25.00 12.00 350.16

0.00 66.00 1,797.18


0.00 75.60 935.17
0.00 2.00 1,260.84
0.00 2.00 2,293.58

50.00 50.00 151.50


50.00 0.05 59.28
50.00 45.00 1,240.65
50.00 50.00 242.50
50.00 50.00 124.00
50.00 50.00 1,361.50
50.00 31.50 351.54
50.00 13.50 60.21

0.00 4.50 10.49


0.00 6.02 104.27
0.00 4.00 6,224.64
0.00 20.00 544.60
CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.

0.00 0.26 308.26


0.00 4.35 75.34
0.00 1.58 510.13
0.00 13.04 264.97
0.00 113.25 465.46
0.00 262.00 2,433.98
0.00 68.00 1,931.20
0.00 2.00 2,049.66

5.85 966.00 13,649.58


5.85 161.00 29,508.08
5.85 966.00 6,298.32
5.85 161.00 37,947.70

100.00 0.00 0.00


100.00 0.00 0.00

100.00 0.00 0.00


100.00 0.00 0.00

100.00 0.00 0.00


100.00 0.00 0.00
0.00 17.99 607.52
0.00 183.25 753.16
0.00 1.80 768.56
0.00 3.60 2.23

50.00 0.50 2,439.69


50.00 0.50 1,716.10
50.00 275.00 2,013.00

0.00 1.00 3,000.00


100.00 0.00 0.00
CION DE OBRA N° 02
NTE AL MES DE OCTUBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ.
25.00 30.00 635.70
0.00 2.00 430.72
50.00 3.00 508.47
0.00 4.00 1,186.44
27.05 480,868.84
72,130.33
38,469.51
591,468.68
579,058.70
104,230.57
683,289.27

ENTIDAD
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1 667.17 667.17 1.00 667.17 100.00 0.00 0.00 0.00 1.00 667.17
01.02 ALQUILER DE ALMACEN DE OBRA mes 4.5 254.24 1144.08 1.00 254.24 22.22 0.00 0.00 0.00 1.00 254.24
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 1 27897.49 27897.49 0.50 13,948.75 50.00 0.00 0.00 0.00 0.50 13,948.75
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 1 26673.73 26673.73 0.75 20,005.30 75.00 0.00 0.00 0.00 0.75 20,005.30
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 1890.46 3.03 5728.09 189.05 572.81 10.00 0.00 0.00 0.00 189.05 572.81
02.01.02 TRAZO Y REPLANTEO Km 1.89 1185.61 2240.8 0.19 224.08 10.00 0.00 0.00 0.00 0.19 224.08
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 1.89 2163.86 4089.7 0.19 408.97 10.00 0.00 0.00 0.00 0.19 408.97
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 494.4 3.99 1972.66 49.44 197.27 10.00 0.00 0.00 0.00 49.44 197.27
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 69.83 4.81 335.88 6.98 33.59 10.00 0.00 0.00 0.00 6.98 33.59
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M m3 497.15 5.76 2863.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 201.63 7.19 1449.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 152.12 4.86 739.3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3 21.49 5.6 120.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M m3 152.97 7.26 1110.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 62.04 9.68 600.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 76.06 6.95 528.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3 10.74 7.91 84.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M m3 76.49 11.57 884.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 31.02 17.38 539.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 38.03 8.73 332 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3 5.37 11.61 62.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M m3 38.24 17.44 666.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 15.51 29.07 450.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.17 ENTIBADO DE ZANJAS m3 722.14 26.09 18840.63 72.21 1,884.06 10.00 0.00 0.00 0.00 72.21 1,884.06
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 1890.46 3.42 6465.37 189.05 646.54 10.00 0.00 0.00 0.00 189.05 646.54
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 1890.46 2.48 4688.34 189.05 468.83 10.00 0.00 0.00 0.00 189.05 468.83
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 1890.46 6.52 12325.8 189.05 1,232.58 10.00 0.00 0.00 0.00 189.05 1,232.58
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 507.08 11.85 6008.9 50.71 600.89 10.00 0.00 0.00 0.00 50.71 600.89
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M m3 80.57 14.81 1193.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M m3 621.27 17.77 11039.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 270.56 29.57 8000.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 556.34 4.46 2481.28 55.63 248.13 10.00 0.00 0.00 0.00 55.63 248.13
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 1890.46 21.71 41041.89 189.05 4,104.19 10.00 0.00 0.00 0.00 189.05 4,104.19
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 1890.46 1.3 2457.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO m2 107.11 2.33 249.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3 18.29 121.29 2218.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 159.88 17.32 2769.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 502.51 6.76 3396.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 213.81 4.46 953.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 38 1556.16 59134.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.02 BUZON TIPO V H=1.75M Und. 1 1931.13 1931.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.03 BUZON TIPO VI H=2.00M Und. 1 2004.61 2004.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.04 BUZON TIPO VI H=2.50M Und. 2 2169.52 4339.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.05 BUZON TIPO VIII H=3.00M Und. 4 2315.86 9263.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.06 BUZON TIPO XVI H=4.50M Und. 1 3998.1 3998.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) m2 94.29 18.79 1771.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO m 237.57 3.03 719.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02 TRAZO Y REPLANTEO Km 0.24 1185.61 284.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.24 2163.86 519.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 111.18 3.99 443.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 34.21 4.86 166.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 17.1 6.95 118.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 8.55 8.73 74.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m 237.57 3.42 812.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m 237.57 2.48 589.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m 237.57 6.52 1548.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 114.03 11.85 1351.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3 68.42 4.46 305.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM m 237.57 27.23 6469.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR m 237.57 1.3 308.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 2592 4.29 11119.68 1,296.00 5,559.84 50.00 0.00 0.00 0.00 1,296.00 5,559.84
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 3110.4 4.46 13872.38 1,555.20 6,936.19 50.00 0.00 0.00 0.00 1,555.20 6,936.19
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO m2 11.67 2.33 27.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 20.19 17.32 349.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 11.67 5.03 58.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 23.22 4.46 103.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 3.65 311.07 1135.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 17.97 33.77 606.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 140.46 4.11 577.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 17.98 18.51 332.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m Und. 2 79.99 159.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR Und. 2 21.85 43.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO m2 17.7 2.33 41.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL m3 26.13 17.32 452.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 15.31 5.03 77.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 31.35 4.46 139.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS m3 1.33 212.75 282.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 7.2 311.07 2239.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 189.51 4.11 778.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.18 33.77 1323.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA m2 32 18.51 592.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS m2 0.64 10.98 7.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' Und. 2 267.08 534.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM m 11.8 27.23 321.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 34.96 1.39 48.59 17.48 24.30 50.01 0.00 0.00 0.00 17.48 24.30
08.01.02 TRAZO Y REPLANTEO m2 34.96 2.33 81.46 17.48 40.73 50.00 0.00 0.00 0.00 17.48 40.73
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 160.28 17.32 2776.05 80.14 1,388.02 50.00 0.00 0.00 0.00 80.14 1,388.02
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 168.72 5.03 848.66 84.36 424.33 50.00 0.00 0.00 0.00 84.36 424.33
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 192.34 4.46 857.84 96.17 428.92 50.00 0.00 0.00 0.00 96.17 428.92
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 4.11 212.75 874.4 2.06 437.20 50.00 0.00 0.00 0.00 2.06 437.20
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 68.04 311.07 21165.2 17.01 5,291.30 25.00 0.00 0.00 0.00 17.01 5,291.30
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 363.34 33.77 12269.99 90.84 3,067.50 25.00 0.00 0.00 0.00 90.84 3,067.50
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 3966.01 4.11 16300.3 1,983.01 8,150.15 50.00 0.00 0.00 0.00 1,983.01 8,150.15
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 256.75 18.79 4824.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m 16.4 27.23 446.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF glb 2 180.96 361.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 281.22 2.33 655.24 140.61 327.62 50.00 0.00 0.00 0.00 140.61 327.62
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 320.77 17.32 5555.74 160.39 2,777.87 50.00 0.00 0.00 0.00 160.39 2,777.87
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 214.73 5.03 1080.09 107.37 540.05 50.00 0.00 0.00 0.00 107.37 540.05
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 384.93 4.46 1716.79 192.47 858.39 50.00 0.00 0.00 0.00 192.47 858.39
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 27.93 174.54 4874.9 13.97 2,437.45 50.00 0.00 0.00 0.00 13.97 2,437.45
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 2.48 187.54 465.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 20.47 221.31 4530.22 5.12 1,132.55 25.00 0.00 0.00 0.00 5.12 1,132.55
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 237.66 33.77 8025.78 59.42 2,006.44 25.00 0.00 0.00 0.00 59.42 2,006.44
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 6.16 321.37 1979.64 3.08 989.82 50.00 0.00 0.00 0.00 3.08 989.82
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 4.8 322.87 1549.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3 0.47 338.55 159.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 76.56 33.77 2585.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2 1.2 33.77 40.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 75.26 4.11 309.32 37.63 154.66 50.00 0.00 0.00 0.00 37.63 154.66
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 495.1 4.11 2034.86 247.55 1,017.43 50.00 0.00 0.00 0.00 247.55 1,017.43
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 9.45 4.11 38.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2 58.32 70.44 4108.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) m2 343.73 18.79 6458.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM m2 61.44 38.07 2339.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.07 PISO
09.07.01 CAPA DE ARCILLA H=10M m3 18.6 19.9 370.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.08 CANALETA DE DRENAJE
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 5.04 27.57 138.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS m3 4.18 311.07 1300.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2 62.88 33.77 2123.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 8 428.68 3429.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.02 TIJERAL TIPO II Und. 8 392.4 3139.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 160.8 25.42 4087.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.04 CORREAS 2''X2'' m 455.6 5.46 2487.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2 334.2 20.08 6710.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' m3 70.02 67.22 4706.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 17.24 67.22 1158.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.10.03 LECHO DE ARENA m3 68.97 67.22 4636.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM m 15.6 27.23 424.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m 102.8 21.93 2254.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO glb 2 462.82 925.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 FILTROS PERCOLADORES (5.0mX8.0m) 0.00
10.01 TRABAJOS PRELIMINARES
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
10.01.01 TRAZO Y REPLANTEO m2 114.08 2.33 265.81 57.04 132.90 50.00 0.00 0.00 0.00 57.04 132.90
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 230.24 17.32 3987.76 115.12 1,993.88 50.00 0.00 0.00 0.00 115.12 1,993.88
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 114.08 5.03 573.82 57.04 286.91 50.00 0.00 0.00 0.00 57.04 286.91
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 276.29 4.46 1232.25 138.15 616.13 50.00 0.00 0.00 0.00 138.15 616.13
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM m3 47.3 213.72 10108.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 163.77 33.77 5530.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04 FILTROS DE PIEDRA
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3 16 67.22 1075.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.02 LECHO DE GRAVA DE 1'' m3 24 67.22 1613.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.03 LECHO DE PIEDRA DE 3.5'' m3 32 29.18 933.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.04.04 LECHO DE PIEDRA MAX.6'' m3 16 29.18 466.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 66 27.23 1797.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 m 75.6 12.37 935.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.03 COLOCACIÓN DE ACCESORIOS glb 2 630.42 1260.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und. 2 1146.79 2293.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO m 100 3.03 303 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.02 TRAZO Y REPLANTEO km 0.1 1185.61 118.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL m3 90 27.57 2481.3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL m 100 4.85 485 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.05 CAMA DE APOYO m 100 2.48 248 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM m 100 27.23 2723 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA m3 63 11.16 703.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 27 4.46 120.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO m2 4.5 2.33 10.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.02 EXCAVACIÓN EN TERRENO NORMAL m3 6.02 17.32 104.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.03 BUZÓN TIPO III H=1.20M Und. 4 1556.16 6224.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m 20 27.23 544.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO km 0.26 1185.61 308.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.02 EXCAVACIÓN EN TERRENO NORMAL m3 4.35 17.32 75.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.58 322.87 510.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.04 20.32 264.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 113.25 4.11 465.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.06 CERCO PERIMETRICO m 262 9.29 2433.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M Und. 68 28.4 1931.2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.03.08 PUERTA METALICA DE 3X2.5M Und. 2 1024.83 2049.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 1026 14.13 14497.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 171 183.28 31340.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 1026 6.52 6689.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 171 235.7 40304.7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO m 14.39 3.03 43.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.01.02 TRAZO Y REPLANTEO m2 14.39 2.33 33.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA m3 4.32 27.57 119.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 4.46 23.1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 4.32 342.54 1479.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 kg 92.41 4.11 379.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 33.77 607.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 4.11 753.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.8 426.98 768.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03.06 CURADO DE CONCRETO m2 3.6 0.62 2.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 1 4879.39 4879.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.02 SEGURIDAD Y SALUD EN OBRA glb 1 3432.21 3432.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.03 ACONDICIONAMIENTO DE BOTADERO m2 550 7.32 4026 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 CAPACITACIONES
15.01 CAPACITACION A JASS glb 1 3000 3000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA glb 1 3000 3000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 40 21.19 847.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 2 215.36 430.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.03 DISEÑO DE MEZCLA Und. 6 169.49 1016.94 3.00 508.47 50.00 0.00 0.00 0.00 3.00 508.47
16.04 ENSAYOS CBR Und. 4 296.61 1186.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION DE OBRA N° 01
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA VALOR REFERENCIAL: : S/. 936,743.63 MONTO DE CONTRATO : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO FACTOR DE RELACION (FR): : 0.97902 PLAZO EJECUCION : 120 DIAS CALENDARIOS
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
PRESUPUESTO CONTRACTUAL AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT.
ITEM DESCRIPCION
UND. CANT. P.U. PARCIAL METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ.
COSTO DIRECTO 659,238.84 93,026.45 14.11 0.00 0.00 93,026.45
GASTOS GENERALES (15.00%) 98,885.83 13,953.97 0.00 13,953.97
UTILIDAD (8,00%) 52,739.11 7,442.12 0.00 7,442.12
SUB TOTAL 810,863.78 114,422.54 0.00 114,422.54
FACTOR DE RELACION FR = 0,9790183675859 793,850.53 112,021.77 0.00 112,021.77
I.G.V. (18,00%) 142,893.10 20,163.92 0.00 20,163.92
PRESUPUESTO TOTAL S/, 936,743.63 132,185.69 0.00 132,185.69

APROBACIONES

INSPECTOR O SUPERVISOR CONTRATISTA ENTIDAD


CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %

100.00 0.00 0.00 0.00


22.22 3.50 889.84 77.78
50.00 0.50 13,948.74 50.00
75.00 0.25 6,668.43 25.00

10.00 1,701.41 5,155.28 90.00


10.00 1.70 2,016.72 90.00
10.00 1.70 3,680.73 90.00

10.00 444.96 1,775.39 90.00


10.00 62.85 302.29 90.00
0.00 497.15 2,863.58 100.00
0.00 201.63 1,449.72 100.00
0.00 152.12 739.30 100.00
0.00 21.49 120.34 100.00
0.00 152.97 1,110.56 100.00
0.00 62.04 600.55 100.00
0.00 76.06 528.62 100.00
0.00 10.74 84.95 100.00
0.00 76.49 884.99 100.00
0.00 31.02 539.13 100.00
0.00 38.03 332.00 100.00
0.00 5.37 62.35 100.00
0.00 38.24 666.91 100.00
0.00 15.51 450.88 100.00
10.00 649.93 16,956.57 90.00
10.00 1,701.41 5,818.83 90.00
10.00 1,701.41 4,219.51 90.00
10.00 1,701.41 11,093.22 90.00
10.00 456.37 5,408.01 90.00
0.00 80.57 1,193.24 100.00
0.00 621.27 11,039.97 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
0.00 270.56 8,000.46 100.00
10.00 500.71 2,233.15 90.00

10.00 1,701.41 36,937.70 90.00


0.00 1,890.46 2,457.60 100.00

0.00 107.11 249.57 100.00


0.00 18.29 2,218.39 100.00

0.00 159.88 2,769.12 100.00


0.00 502.51 3,396.97 100.00
0.00 213.81 953.59 100.00

0.00 38.00 59,134.08 100.00


0.00 1.00 1,931.13 100.00
0.00 1.00 2,004.61 100.00
0.00 2.00 4,339.04 100.00
0.00 4.00 9,263.44 100.00
0.00 1.00 3,998.10 100.00

0.00 94.29 1,771.71 100.00

0.00 237.57 719.84 100.00


0.00 0.24 284.55 100.00
0.00 0.24 519.33 100.00

0.00 111.18 443.61 100.00


0.00 34.21 166.26 100.00
0.00 17.10 118.85 100.00
0.00 8.55 74.64 100.00
0.00 237.57 812.49 100.00
0.00 237.57 589.17 100.00
0.00 237.57 1,548.96 100.00
0.00 114.03 1,351.26 100.00
0.00 68.42 305.15 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %

0.00 237.57 6,469.03 100.00


0.00 237.57 308.84 100.00

50.00 1,296.00 5,559.84 50.00


50.00 1,555.20 6,936.19 50.00

0.00 11.67 27.19 100.00

0.00 20.19 349.69 100.00


0.00 11.67 58.70 100.00
0.00 23.22 103.56 100.00

0.00 3.65 1,135.41 100.00


0.00 17.97 606.85 100.00
0.00 140.46 577.29 100.00

0.00 17.98 332.81 100.00

0.00 2.00 159.98 100.00


0.00 2.00 43.70 100.00

0.00 17.70 41.24 100.00

0.00 26.13 452.57 100.00


0.00 15.31 77.01 100.00
0.00 31.35 139.82 100.00

0.00 1.33 282.96 100.00

0.00 7.20 2,239.70 100.00


0.00 189.51 778.89 100.00
0.00 39.18 1,323.11 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
0.00 32.00 592.32 100.00

0.00 0.64 7.03 100.00

0.00 2.00 534.16 100.00


0.00 11.80 321.31 100.00

50.01 17.48 24.29 49.99


50.00 17.48 40.73 50.00

50.00 80.14 1,388.03 50.00


50.00 84.36 424.33 50.00
50.00 96.17 428.92 50.00

50.00 2.06 437.20 50.00

25.00 51.03 15,873.90 75.00


25.00 272.51 9,202.49 75.00
50.00 1,983.01 8,150.15 50.00

0.00 256.75 4,824.33 100.00

0.00 2.00 2,293.58 100.00


0.00 16.40 446.57 100.00
0.00 2.00 361.92 100.00

50.00 140.61 327.62 50.00

50.00 160.39 2,777.87 50.00


50.00 107.37 540.04 50.00
50.00 192.47 858.40 50.00

50.00 13.97 2,437.45 50.00


0.00 2.48 465.10 100.00
25.00 15.35 3,397.67 75.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
25.00 178.25 6,019.34 75.00

50.00 3.08 989.82 50.00


0.00 4.80 1,549.78 100.00
0.00 0.47 159.12 100.00
0.00 76.56 2,585.43 100.00
0.00 1.20 40.52 100.00
50.00 37.63 154.66 50.00
50.00 247.55 1,017.43 50.00
0.00 9.45 38.84 100.00

0.00 58.32 4,108.06 100.00

0.00 343.73 6,458.69 100.00


0.00 61.44 2,339.02 100.00

0.00 18.60 370.14 100.00

0.00 5.04 138.95 100.00


0.00 4.18 1,300.27 100.00
0.00 62.88 2,123.46 100.00

0.00 8.00 3,429.44 100.00


0.00 8.00 3,139.20 100.00
0.00 160.80 4,087.54 100.00
0.00 455.60 2,487.58 100.00
0.00 334.20 6,710.74 100.00

0.00 70.02 4,706.74 100.00


0.00 17.24 1,158.87 100.00
0.00 68.97 4,636.16 100.00

0.00 15.60 424.79 100.00


0.00 102.80 2,254.40 100.00
0.00 2.00 925.64 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
50.00 57.04 132.91 50.00

50.00 115.12 1,993.88 50.00


50.00 57.04 286.91 50.00
50.00 138.15 616.12 50.00

0.00 47.30 10,108.96 100.00


0.00 163.77 5,530.51 100.00

0.00 16.00 1,075.52 100.00


0.00 24.00 1,613.28 100.00
0.00 32.00 933.76 100.00
0.00 16.00 466.88 100.00

0.00 66.00 1,797.18 100.00


0.00 75.60 935.17 100.00
0.00 2.00 1,260.84 100.00
0.00 2.00 2,293.58 100.00

0.00 100.00 303.00 100.00


0.00 0.10 118.56 100.00
0.00 90.00 2,481.30 100.00
0.00 100.00 485.00 100.00
0.00 100.00 248.00 100.00
0.00 100.00 2,723.00 100.00
0.00 63.00 703.08 100.00
0.00 27.00 120.42 100.00

0.00 4.50 10.49 100.00


0.00 6.02 104.27 100.00
0.00 4.00 6,224.64 100.00
0.00 20.00 544.60 100.00

0.00 0.26 308.26 100.00


0.00 4.35 75.34 100.00
0.00 1.58 510.13 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
0.00 13.04 264.97 100.00
0.00 113.25 465.46 100.00
0.00 262.00 2,433.98 100.00
0.00 68.00 1,931.20 100.00
0.00 2.00 2,049.66 100.00

0.00 1,026.00 14,497.38 100.00


0.00 171.00 31,340.88 100.00
0.00 1,026.00 6,689.52 100.00
0.00 171.00 40,304.70 100.00

0.00 14.39 43.60 100.00


0.00 14.39 33.53 100.00

0.00 4.32 119.10 100.00


0.00 5.18 23.10 100.00

0.00 4.32 1,479.77 100.00


0.00 92.41 379.81 100.00
0.00 17.99 607.52 100.00
0.00 183.25 753.16 100.00
0.00 1.80 768.56 100.00
0.00 3.60 2.23 100.00

0.00 1.00 4,879.39 100.00


0.00 1.00 3,432.21 100.00
0.00 550.00 4,026.00 100.00

0.00 1.00 3,000.00 100.00


0.00 1.00 3,000.00 100.00

0.00 40.00 847.60 100.00


0.00 2.00 430.72 100.00
50.00 3.00 508.47 50.00
0.00 4.00 1,186.44 100.00
CION DE OBRA N° 01
TE AL MES DE SETIEMBRE DE 2014

(INC. IGV.)
: 120 DIAS CALENDARIOS

AVANCE ACUMULADO ACT. SALDO A VALORIZAR


% METRADO VALORIZ. %
14.11 566,212.39 85.89
84,931.86
45,296.99
696,441.24
681,828.77
122,729.18
804,557.95

ENTIDAD
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE
EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M Und. 1.00 100.00
01.02 ALQUILER DE ALMACEN DE OBRA mes 1.00 22.22
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 0.50 50.00
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb 0.75 75.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 189.05 10.00
02.01.02 TRAZO Y REPLANTEO Km 0.19 10.00
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.19 10.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 49.44 10.00
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3 6.98 10.00
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 189.05 10.00
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 189.05 10.00
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 189.05 10.00
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 50.71 10.00
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 55.63 10.00
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 189.05 10.00
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 0.00 0.00
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3 1,296.00 50.00
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1,555.20 50.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.48 50.01
08.01.02 TRAZO Y REPLANTEO m2 17.48 50.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3 80.14 50.00
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA m2 84.36 50.00
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 96.17 50.00
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS m3 2.06 50.00
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 25.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 25.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 1,983.01 50.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m3 140.61 50.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL m3 160.39 50.00
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2 107.37 50.00
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 192.47 50.00
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 13.97 50.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 0.00 0.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 5.12 25.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 25.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 3.08 50.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 37.63 50.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 247.55 50.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg 0.00 0.00
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2 57.04 50.00
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL m3 115.12 50.00
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA m2 57.04 50.00
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 138.15 50.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) Und. 0.00 0.00
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) Und. 0.00 0.00
16.03 DISEÑO DE MEZCLA Und. 3.00 50.00
16.04 ENSAYOS CBR Und. 0.00 0.00
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE SETIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO %

INSPECTOR O SUPERVISOR CONTRATISTA


METRADOS
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO VALORIZ. %

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.02 ALQUILER DE ALMACEN DE OBRA mes 1.00 254.24 22.22
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 0.10 2,789.75 10.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 161.11 488.16 8.52
02.01.02 TRAZO Y REPLANTEO Km 0.16 189.70 8.47
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.16 346.22 8.47
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 16.67 66.51 3.37
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 126.42 908.96 62.70
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 5.13 24.93 3.37
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 38.90 376.55 62.70
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 2.56 17.79 3.37
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 19.45 338.04 62.70
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 1.28 11.17 3.36
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 9.72 282.56 62.67
02.02.17 ENTIBADO DE ZANJAS m3 123.87 3,231.77 17.15
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 161.11 551.00 8.52
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 161.11 399.55 8.52
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 161.11 1,050.44 8.52
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 17.10 202.64 3.37
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 167.19 4,943.81 61.79
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 17.10 76.27 3.07
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 161.11 3,497.70 8.52
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 161.11 209.44 8.52
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 11.25 26.21 10.50
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 13.70 237.28 8.57
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 45.36 306.63 9.03
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 38.39 171.22 17.96
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 5.00 7,780.80 13.16
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 5.84 101.15 28.93
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 5.81 25.91 25.02
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 1.82 566.15 49.86
08 TANQUE IMHOFF (3.80mX3.80m)
METRADOS
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO VALORIZ. %
08.01 TRABAJOS PRELIMINARES
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 5,291.30 25.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 3,067.50 25.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.50 4,075.08 25.00
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 1,206.08 25.00
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 1,218.73 25.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 0.62 116.27 25.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 5.12 1,132.55 25.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 2,006.44 25.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 1.54 494.91 25.00
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.20 387.44 25.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 646.36 25.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 18.82 77.33 25.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 508.72 25.00
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 4.00 1,714.72 50.00
09.09.02 TIJERAL TIPO II Und. 4.00 1,569.60 50.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 80.40 2,043.77 50.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 60.00 847.80 5.85
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 10.00 1,832.80 5.85
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 60.00 391.20 5.85
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 10.00 2,357.00 5.85
13 PUENTE AEREO
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 607.52 100.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 753.16 100.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.80 768.56 100.00
13.03.06 CURADO DE CONCRETO m2 3.60 2.23 100.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 0.20 975.88 20.00
14.02 SEGURIDAD Y SALUD EN OBRA glb 0.20 686.44 20.00
METRADOS
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO VALORIZ. %

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.02 ALQUILER DE ALMACEN DE OBRA mes 1.00 254.24 22.22
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb 0.10 2,789.75 10.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO m 161.11 488.16 8.52
02.01.02 TRAZO Y REPLANTEO Km 0.16 189.70 8.47
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION Km 0.16 346.22 8.47
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3 16.67 66.51 3.37
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M m3 126.42 908.96 62.70
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3 5.13 24.93 3.37
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M m3 38.90 376.55 62.70
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3 2.56 17.79 3.37
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M m3 19.45 338.04 62.70
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3 1.28 11.17 3.36
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M m3 9.72 282.56 62.67
02.02.17 ENTIBADO DE ZANJAS m3 123.87 3,231.77 17.15
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA m3 161.11 551.00 8.52
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA m3 161.11 399.55 8.52
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m3 161.11 1,050.44 8.52
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3 17.10 202.64 3.37
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M m3 167.19 4,943.81 61.79
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE m3 17.10 76.27 3.07
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm m 161.11 3,497.70 8.52
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m 161.11 209.44 8.52
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES 0.00
03.01.01 TRAZO Y REPLANTEO m2 11.25 26.21 10.50
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3 13.70 237.28 8.57
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED m2 45.36 306.63 9.03
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 38.39 171.22 17.96
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M Und. 5.00 7,780.80 13.16
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL m3 5.84 101.15 28.93
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 5.81 25.91 25.02
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS m3 1.82 566.15 49.86
08 TANQUE IMHOFF (3.80mX3.80m)
METRADOS
CORRESPONDIENTE AL MES DE DICIEMBRE DE 2014
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 936,743.63
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO
AVANCE ACTUAL
ITEM DESCRIPCION
UND. METRADO VALORIZ. %
08.01 TRABAJOS PRELIMINARES
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3 17.01 5,291.30 25.00
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 90.84 3,067.50 25.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.50 4,075.08 25.00
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2 64.19 1,206.08 25.00
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 6.98 1,218.73 25.00
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M m3 0.62 116.27 25.00
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS m3 5.12 1,132.55 25.00
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.42 2,006.44 25.00
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 m3 1.54 494.91 25.00
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.20 387.44 25.00
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.14 646.36 25.00
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 kg 18.82 77.33 25.00
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg 123.78 508.72 25.00
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I Und. 4.00 1,714.72 50.00
09.09.02 TIJERAL TIPO II Und. 4.00 1,569.60 50.00
09.09.03 0LARGUEROS DE 6'' X 4'' m 80.40 2,043.77 50.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m 60.00 847.80 5.85
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und. 10.00 1,832.80 5.85
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m 60.00 391.20 5.85
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und. 10.00 2,357.00 5.85
13 PUENTE AEREO
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 17.99 607.52 100.00
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 183.25 753.16 100.00
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.80 768.56 100.00
13.03.06 CURADO DE CONCRETO m2 3.60 2.23 100.00
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL glb 0.20 975.88 20.00
14.02 SEGURIDAD Y SALUD EN OBRA glb 0.20 686.44 20.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M 667.17 667.17
01.02 ALQUILER DE ALMACEN DE OBRA 1144.08 286.02 286.02 286.02
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI 27897.49 13,948.75
01.04 FLETE TERRESTRE LOCALIDAD YARURI 26673.73 10,669.49 5,334.75 5,334.75
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO 5728.09 2,864.05 2,864.05
02.01.02 TRAZO Y REPLANTEO 2240.8 2,240.80
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION 4089.7 1,022.43 1,022.43 1,022.43
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M 1972.66 986.33 986.33
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M 335.88 167.94 167.94
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M 2863.58 1,431.79 1,431.79
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M 1449.72 724.86 724.86
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M 739.3 369.65 369.65
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M 120.34 60.17 60.17
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M 1110.56 555.28 555.28
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M 600.55 300.28 300.28
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M 528.62 264.31 264.31
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M 84.95 42.48 42.48
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M 884.99 442.50 442.50
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M 539.13 269.57 269.57
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M 332 166.00 166.00
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M 62.35 31.18 31.18
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M 666.91 333.46 333.46
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M 450.88 225.44 225.44
02.02.17 ENTIBADO DE ZANJAS 18840.63 9420.315 9420.315
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA 6465.37 3232.685 3232.685
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA 4688.34 2344.17 2344.17
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE 12325.80 6162.90 6162.90
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M 6008.90 3004.45 3004.45
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M 1193.24 596.62 596.62
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M 11039.97 5,519.99 5,519.99
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M 8000.46 4,000.23 4,000.23
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE 2481.28 1,240.64 1,240.64
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm 41041.89 20,520.95 20,520.95
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR 2457.6 1,228.80 1,228.80
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO 249.57 249.57
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO 2218.39 2218.39
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL 2769.12 2,769.12
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED 3396.97 1,698.49 1,698.49
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE 953.59 953.59
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M 59134.08 17,740.22 23,653.63
03.03.02 BUZON TIPO V H=1.75M 1931.13 579.34 772.45
03.03.03 BUZON TIPO VI H=2.00M 2004.61 601.38 801.84
03.03.04 BUZON TIPO VI H=2.50M 4339.04 1,301.71 1,735.62
03.03.05 BUZON TIPO VIII H=3.00M 9263.44 2,779.03 3,705.38
03.03.06 BUZON TIPO XVI H=4.50M 3998.10 1,199.43 1,599.24
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) 1771.71 531.51 708.68
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO 719.84 719.84
04.01.02 TRAZO Y REPLANTEO 284.55 284.55
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION 519.33 129.83 129.83 129.83
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M 443.61 221.81 221.805
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M 166.26 83.13 83.13
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M 118.85 59.43 59.425
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M 74.64 22.39 29.86
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA 812.49 243.75 325.00
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA 589.17 176.75 235.67
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE 1548.96 464.69 619.58
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M 1351.26 405.38 540.50
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE 305.15 91.55 122.06
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM 6469.03 1,940.71 2,587.61
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR 308.84 92.65 123.54
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA 11119.68 5,559.84 5,559.84
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE 13872.38 6,936.19 6,936.19
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO 27.19 27.19
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL 349.69 349.69
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 58.7 58.7
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE 103.56 103.56
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS 1135.41 1135.41
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS 606.85 606.85
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 577.29 577.29
06.04 REVOQUES ENLUCIDOS Y MOLDURAS
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA 332.81 332.81
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m 159.98 159.98
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR 43.7 43.70
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO 41.24 41.24
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL 452.57 452.57
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 77.01 77.01
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE 139.82 139.82
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS 282.96 282.96
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS 2239.7 2,239.70
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 778.89 778.89
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL 1323.11 1,323.11
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA 592.32 592.32
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS 7.03 7.03
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' 534.16 534.16
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM 321.31 321.31
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL 48.59 48.59
08.01.02 TRAZO Y REPLANTEO 81.46 81.46
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL 2776.05 1388.025 1,388.03
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 848.66 424.33 424.33
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE 857.84 428.92 428.92
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS 874.4 874.4
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS 21165.2 10582.6 10,582.60
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL 12269.99 6134.995 6,135.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 16300.3 8150.15 8,150.15
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA 4824.33 4,824.33
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' 2293.58 2,293.58
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM 446.57 446.57
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF 361.92 361.92
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO 655.24 327.62 327.62
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL 5555.74 2777.87 2,777.87
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA 1080.09 540.045 540.05
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE 1716.79 858.395 858.40
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 4874.9 2437.45 2,437.45
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M 465.1 232.55 232.55
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS 4530.22 2265.11 2,265.11
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL 8025.78 4012.89 4,012.89
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 1979.64 989.82 989.82
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 1549.78 774.89 774.89
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR 159.12 79.56 79.56
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 2585.43 1292.715 1,292.72
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR 40.52 20.26 20.26
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 309.32 154.66 154.66
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 2034.86 1017.43 1,017.43
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 38.84 19.42 19.42
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 4108.06 2,054.03 2,054.03
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) 6458.69 3,229.35
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM 2339.02 1,169.51
09.07 PISO
09.07.01 CAPA DE ARCILLA H=10M 370.14 370.14
09.08 CANALETA DE DRENAJE
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL 138.95 69.48 69.48
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS 1300.27 650.14 650.14
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS 2123.46 1,061.73 1,061.73
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I 3429.44 1,714.72
09.09.02 TIJERAL TIPO II 3139.2 1,569.60
09.09.03 LARGUEROS DE 6'' X 4'' 4087.54 2,043.77
09.09.04 CORREAS 2''X2'' 2487.58 1,243.79
09.09.05 TECHO DE CALAMINA E=0.33 MM 6710.74
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' 4706.74 2,353.37 2,353.37
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' 1158.87 579.44 579.44
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
09.10.03 LECHO DE ARENA 4636.16 2,318.08 2,318.08
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM 424.79 212.40 212.40
09.11.02 TUBERIA PVC ISO 4435 D 160 MM 2254.4 1,127.20 1,127.20
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO 925.64 462.82 462.82
10 FILTROS PERCOLADORES (5.0mX8.0m)
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO 265.81 265.81
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL 3987.76 2392.656 1,595.10
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA 573.82 573.82
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE 1232.25 1,232.25
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM 10108.96 4,043.58 6,065.38
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL 5530.51 2,212.20 3,318.31
10.04 FILTROS DE PIEDRA
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' 1075.52 1,075.52
10.04.02 LECHO DE GRAVA DE 1'' 1613.28 1,613.28
10.04.03 LECHO DE PIEDRA DE 3.5'' 933.76 933.76
10.04.04 LECHO DE PIEDRA MAX.6'' 466.88 466.88
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM 1797.18 1,797.18
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 935.17 935.17
10.05.03 COLOCACIÓN DE ACCESORIOS 1260.84 1,260.84
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' 2293.58 2,293.58
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO 303 303.00
11.01.02 TRAZO Y REPLANTEO 118.56 118.56
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL 2481.3 2,481.30
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL 485 485.00
11.01.05 CAMA DE APOYO 248 248.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM 2723 2,723.00
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA 703.08 703.08
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE 120.42 120.42
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO 10.49 10.49
11.02.02 EXCAVACIÓN EN TERRENO NORMAL 104.27 104.27
11.02.03 BUZÓN TIPO III H=1.20M 6224.64 3,112.32
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM 544.6
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO 308.26 308.26
11.03.02 EXCAVACIÓN EN TERRENO NORMAL 75.34 75.34
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 510.13 510.13
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL 264.97 264.97
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 465.46 465.46
11.03.06 CERCO PERIMETRICO 2433.98 1,216.99
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M 1931.2 965.60
11.03.08 PUERTA METALICA DE 3X2.5M 2049.66 1,024.83
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO 14497.38 2,899.48 5,798.95
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO 31340.88 6,268.18 12,536.35
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N 6689.52 1,337.90 2,675.81
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO 40304.7 8,060.94 16,121.88
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO 43.6 43.60
13.01.02 TRAZO Y REPLANTEO 33.53 33.53
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA 119.1 119.10
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE 23.1 23.10
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 1479.77 1,479.77
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 379.81 379.81
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS 607.52 607.52
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 753.16 753.16
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 768.56 768.56
13.03.06 CURADO DE CONCRETO 2.23 2.23
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL 4879.39 2,439.70
14.02 SEGURIDAD Y SALUD EN OBRA 3432.21 1,716.11
14.03 ACONDICIONAMIENTO DE BOTADERO 4026 2,013.00
15 CAPACITACIONES
15.01 CAPACITACION A JASS 3000 1,500.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA 3000 1,500.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 847.6 211.90 211.90 211.90
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) 430.72 215.36 215.36
16.03 DISEÑO DE MEZCLA 1016.94 1,016.94
16.04 ENSAYOS CBR 1186.44 1,186.44
COSTO DIRECTO 659,238.84 93,658.38 205,172.18 240,456.50
GASTOS GENERALES 12% 98885.83 14,048.76 30,775.83 36,068.48
UTILIDAD 8% 52,739.11 7,492.67 16,413.77 19,236.52
SUB TOTAL 810,863.78 115,199.81 252,361.79 295,761.50
FR = 0,9790183675859 793,850.53 112,782.73 247,066.82 289,555.94
IGV 18% 142,893.10 20,300.89 44,472.03 52,120.07
COSTO TOTAL S/, 936,743.63 133,083.62 291,538.85 341,676.01
% DE AVANCE MENSUAL 14.21% 31.12% 36.47%
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE
% DE AVANCE MENSUAL ACUMULADO 14.21% 45.33% 81.80%
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40 M 667.17 667.17
01.02 ALQUILER DE ALMACEN DE OBRA 1144.08 286.02 286.02 286.02 286.02
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI 27897.49 13,948.75 13,948.75
01.04 FLETE TERRESTRE LOCALIDAD YARURI 26673.73 10,669.49 5,334.75 5,334.75 5,334.75
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO 5728.09 2,864.05 2,864.05
02.01.02 TRAZO Y REPLANTEO 2240.8 2,240.80
02.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION 4089.7 1,022.43 1,022.43 1,022.43 1,022.43
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M 1972.66 986.33 986.33
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M 335.88 167.94 167.94
02.02.03 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=3.0M 2863.58 1,431.79 1,431.79
02.02.04 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=5.0M 1449.72 724.86 724.86
02.02.05 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M 739.3 369.65 369.65
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M 120.34 60.17 60.17
02.02.07 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 3.0M 1110.56 555.28 555.28
02.02.08 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 5.0M 600.55 300.28 300.28
02.02.09 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M 528.62 264.31 264.31
02.02.10 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M 84.95 42.48 42.48
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
02.02.11 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 3.0M 884.99 442.50 442.50
02.02.12 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 5.0M 539.13 269.57 269.57
02.02.13 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M 332 166.00 166.00
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M 62.35 31.18 31.18
02.02.15 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 3.0M 666.91 333.46 333.46
02.02.16 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 5.0M 450.88 225.44 225.44
02.02.17 ENTIBADO DE ZANJAS 18840.63 9420.315 9420.315
02.02.18 REFINE Y NIVELACION DE FONDO DE ZANJA 6465.37 3232.685 3232.685
02.02.19 CAMA DE APOYO E=0.10M PARA TUBERIA 4688.34 2344.17 2344.17
02.02.20 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE 12325.80 6162.90 6162.90
02.02.21 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M 6008.90 3004.45 3004.45
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M 1193.24 596.62 596.62
02.02.23 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 3.0M 11039.97 5,519.99 5,519.99
02.02.24 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 5.0M 8000.46 4,000.23 4,000.23
02.02.25 ELIMINACION DE MATERIAL EXCEDENTE 2481.28 1,240.64 1,240.64
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 ǿ160mm 41041.89 20,520.95 20,520.95
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR 2457.6 1,228.80 1,228.80
03 CONTRUCCION DE BUZONES
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO 249.57 249.57
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO 2218.39 2218.39
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL 2769.12 2,769.12
03.02.02 REFINE Y NIVELACION Y COM`PACTADO PISO PARED 3396.97 1,698.49 1,698.49
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE 953.59 953.59
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M 59134.08 17,740.22 23,653.63 17,740.22
03.03.02 BUZON TIPO V H=1.75M 1931.13 579.34 772.45 579.34
03.03.03 BUZON TIPO VI H=2.00M 2004.61 601.38 801.84 601.38
03.03.04 BUZON TIPO VI H=2.50M 4339.04 1,301.71 1,735.62 1,301.71
03.03.05 BUZON TIPO VIII H=3.00M 9263.44 2,779.03 3,705.38 2,779.03
03.03.06 BUZON TIPO XVI H=4.50M 3998.10 1,199.43 1,599.24 1,199.43
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA 1.5) 1771.71 531.51 708.68 531.51
04 RED EMISOR
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO 719.84 719.84
04.01.02 TRAZO Y REPLANTEO 284.55 284.55
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION 519.33 129.83 129.83 129.83 129.83
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M 443.61 221.81 221.805
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M 166.26 83.13 83.13
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M 118.85 59.43 59.425
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M 74.64 22.39 29.86 22.39
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA 812.49 243.75 325.00 243.75
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA 589.17 176.75 235.67 176.75
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE 1548.96 464.69 619.58 464.69
04.02.08 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M 1351.26 405.38 540.50 405.38
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE 305.15 91.55 122.06 91.55
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC KM ISO 4435 S-20 DN 200MM 6469.03 1,940.71 2,587.61 1,940.71
04.03.02 DOBLE PRUEBA HIDRAULICA EN RED EMISOR 308.84 92.65 123.54 92.65
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA 11119.68 5,559.84 5,559.84
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE 13872.38 6,936.19 6,936.19
06 CAMARA DE REJAS (4.56X0.77M)
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO 27.19 27.19
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION EN TERRENO NORMAL 349.69 349.69
06.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 58.7 58.7
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE 103.56 103.56
06.03 OBRAS DE CONCRETO ARMADO
06.03.01 CONCRETO FC=175KG/CM2 PARA MUROS 1135.41 1135.41
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
06.03.02 ENCOFRADO Y DESENCOFRADO PARA MUROS 606.85 606.85
06.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 577.29 577.29
06.04 REVOQUES ENLUCIDOS Y MOLDURAS
06.04.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA 332.81 332.81
06.05 COLOCACION DE REJAS
06.05.01 REJILLA DE LIMPIA 0.45X0.60m 159.98 159.98
06.05.02 PLANCHA METALICA DE 1/4" ESPESOR 43.7 43.70
07 DESARENADOR (5.90X1.50M)
07.01 TRAZO Y REPLANTEO
07.01.01 TRAZO Y REPLANTEO 41.24 41.24
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION EN TERRENO NORMAL 452.57 452.57
07.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 77.01 77.01
07.02.03 ELIMINACION DE MATERIAL EXCEDENTE 139.82 139.82
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 CONCRETO FC=100KG/CM2 PARA SOLADO DE ZAPATAS 282.96 282.96
07.04 OBRAS DE CONCRETO ARMADO
07.04.01 CONCRETO FC=175KG/CM2 PARA MUROS 2239.7 2,239.70
07.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 778.89 778.89
07.04.03 ENCOFRADO Y DESENCOFRADO NORMAL 1323.11 1,323.11
07.05 REVOQUES ENLUCIDOS Y MOLDURAS
07.05.01 TARRAJEO EN INTERIORES 1.3 CEMENTO ARENA 592.32 592.32
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS 7.03 7.03
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' 534.16 534.16
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM 321.31 321.31
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL 48.59 48.59
08.01.02 TRAZO Y REPLANTEO 81.46 81.46
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL 2776.05 1388.025 1,388.03
08.02.02 NIVELACION Y APISONADO CON PLANCHA COMPACTADORA 848.66 424.33 424.33
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE 857.84 428.92 428.92
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=100 KG/GM2 PARA SOLADO DE ZAPATAS 874.4 874.4
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS 21165.2 10582.6 10,582.60
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL 12269.99 6134.995 6,135.00
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 16300.3 8150.15 8,150.15
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA 4824.33 4,824.33
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' 2293.58 2,293.58
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM 446.57 446.57
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF 361.92 361.92
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO 655.24 327.62 327.62
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACIÓN DE TERRENO NORMAL 5555.74 2777.87 2,777.87
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA 1080.09 540.045 540.05
09.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE 1716.79 858.395 858.40
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 4874.9 2437.45 2,437.45
09.03.02 CONCRETO SOBRE CIMIENTO DE 1:8 C:H 25% P.M ANCHO= 20M 465.1 232.55 232.55
09.03.03 CONCRETO F'C=140 KG/CM2 + 30% PM. PARA MUROS 4530.22 2265.11 2,265.11
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL 8025.78 4012.89 4,012.89
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C=175 KG/CM2 1979.64 989.82 989.82
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 1549.78 774.89 774.89
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR 159.12 79.56 79.56
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 2585.43 1292.715 1,292.72
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR 40.52 20.26 20.26
09.04.06 ACERO EN ZAPATA FY=4200 KG/CM2 309.32 154.66 154.66
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 2034.86 1017.43 1,017.43
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 38.84 19.42 19.42
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 4108.06 2,054.03 2,054.03
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO-ARENA) 6458.69 3,229.35 3,229.35
09.06.02 TARRAJEO DE COLUMNA C:A 1:5X 1.0 CM 2339.02 1,169.51 1,169.51
09.07 PISO
09.07.01 CAPA DE ARCILLA H=10M 370.14 370.14
09.08 CANALETA DE DRENAJE
09.08.01 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL 138.95 69.48 69.48
09.08.02 CONCRETO F'C=175 KG/CM2 PARA MUROS 1300.27 650.14 650.14
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS 2123.46 1,061.73 1,061.73
09.09 CUBIERTAS
09.09.01 TIJERAL TIPO I 3429.44 1,714.72 1,714.72
09.09.02 TIJERAL TIPO II 3139.2 1,569.60 1,569.60
09.09.03 LARGUEROS DE 6'' X 4'' 4087.54 2,043.77 2,043.77
09.09.04 CORREAS 2''X2'' 2487.58 1,243.79 1,243.79
09.09.05 TECHO DE CALAMINA E=0.33 MM 6710.74 6,710.74
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' 4706.74 2,353.37 2,353.37
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' 1158.87 579.44 579.44
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
09.10.03 LECHO DE ARENA 4636.16 2,318.08 2,318.08
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM 424.79 212.40 212.40
09.11.02 TUBERIA PVC ISO 4435 D 160 MM 2254.4 1,127.20 1,127.20
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO 925.64 462.82 462.82
10 FILTROS PERCOLADORES (5.0mX8.0m)
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO 265.81 265.81
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN EN TERRENO NORMAL 3987.76 2392.656 1,595.10
10.02.02 NIVELACIÓN INT. Y APISONADO CON PLANCHA COMPACTADORA 573.82 573.82
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE 1232.25 1,232.25
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO F'C=140KG/CM2 + 30% PM 10108.96 4,043.58 6,065.38
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL 5530.51 2,212.20 3,318.31
10.04 FILTROS DE PIEDRA
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' 1075.52 1,075.52
10.04.02 LECHO DE GRAVA DE 1'' 1613.28 1,613.28
10.04.03 LECHO DE PIEDRA DE 3.5'' 933.76 933.76
10.04.04 LECHO DE PIEDRA MAX.6'' 466.88 466.88
10.05 SUMINISTRO E INSTA. TUBERIA Y ACCESORIO
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM 1797.18 1,797.18
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 935.17 935.17
10.05.03 COLOCACIÓN DE ACCESORIOS 1260.84 1,260.84
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' 2293.58 2,293.58
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.01.01 LIMPIEZA DE TERRENO 303 303.00
11.01.02 TRAZO Y REPLANTEO 118.56 118.56
11.01.03 EXCAVACIÓN DE ZANJA EN TERRENO NORMAL 2481.3 2,481.30
11.01.04 REFINE DE ZANJA EN TERRENO NORMAL 485 485.00
11.01.05 CAMA DE APOYO 248 248.00
11.01.06 TUBERÍA PVC ISO 4435 KM-S-25 DN 200MM 2723 2,723.00
11.01.07 RELLENO Y COMP. MAT. PROPIO EN ZANJA 703.08 703.08
11.01.08 ELIMINACIÓN DE MATERIAL EXCEDENTE 120.42 120.42
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO 10.49 10.49
11.02.02 EXCAVACIÓN EN TERRENO NORMAL 104.27 104.27
11.02.03 BUZÓN TIPO III H=1.20M 6224.64 3,112.32 3,112.32
11.02.04 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM 544.6 544.60
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO 308.26 308.26
11.03.02 EXCAVACIÓN EN TERRENO NORMAL 75.34 75.34
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 510.13 510.13
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL 264.97 264.97
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 465.46 465.46
11.03.06 CERCO PERIMETRICO 2433.98 1,216.99 1,216.99
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M 1931.2 965.60 965.60
11.03.08 PUERTA METALICA DE 3X2.5M 2049.66 1,024.83 1,024.83
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO 14497.38 2,899.48 5,798.95 5,798.95
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO 31340.88 6,268.18 12,536.35 12,536.35
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N 6689.52 1,337.90 2,675.81 2,675.81
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO 40304.7 8,060.94 16,121.88 16,121.88
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO 43.6 43.60
13.01.02 TRAZO Y REPLANTEO 33.53 33.53
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACIÓN DE TERRENO PARA ZAPATA 119.1 119.10
13.02.02 ELIMINACION DE MATERIAL EXCEDENTE 23.1 23.10
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 1479.77 1,479.77
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 379.81 379.81
13.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS 607.52 607.52
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
13.03.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 753.16 753.16
13.03.05 CONCRETO EN VIGAS F'C=210 KG/CM2 768.56 768.56
13.03.06 CURADO DE CONCRETO 2.23 2.23
14 PLAN DE MANEJO AMBIENTAL
14.01 MONITOREO AMBIENTAL 4879.39 2,439.70 2,439.70
14.02 SEGURIDAD Y SALUD EN OBRA 3432.21 1,716.11 1,716.11
14.03 ACONDICIONAMIENTO DE BOTADERO 4026 2,013.00 2,013.00
15 CAPACITACIONES
15.01 CAPACITACION A JASS 3000 1,500.00 1,500.00
15.02 CAPACITACION A LA POBLACION EN EDUCACION SANITARIA 3000 1,500.00 1,500.00
16 PRUEBAS Y ENSAYOS
16.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 847.6 211.90 211.90 211.90 211.90
16.02 PRUEBA COMPACT. DE SUELOS (PROCTOR MODIFIC. DENSIDAD CAMPO) 430.72 215.36 215.36
16.03 DISEÑO DE MEZCLA 1016.94 1,016.94
16.04 ENSAYOS CBR 1186.44 1,186.44
COSTO DIRECTO 659,238.84 93,658.38 205,172.18 240,456.50 119,951.77
GASTOS GENERALES 12% 98885.83 14,048.76 30,775.83 36,068.48 17,992.77
UTILIDAD 8% 52,739.11 7,492.67 16,413.77 19,236.52 9,596.14
SUB TOTAL 810,863.78 115,199.81 252,361.79 295,761.50 147,540.68
FR = 0,9790183675859 793,850.53 112,782.73 247,066.82 289,555.94 144,445.03
IGV 18% 142,893.10 20,300.89 44,472.03 52,120.07 26,000.11
COSTO TOTAL S/, 936,743.63 133,083.62 291,538.85 341,676.01 170,445.14
% DE AVANCE MENSUAL 14.21% 31.12% 36.47% 18.20%
CALENDARIO DE AVANCE DE OBRA VALORIZADO
COMPONENTE: MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI
CONTRATISTA : CONSORCIO PACIFICO
SUPERVISION : CONSORCIO CONSULTORES AYACUCHO
FECHA : OCTUBRE DEL 2014
ITEM DESCRIPCION TOTAL SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
% DE AVANCE MENSUAL ACUMULADO 14.21% 45.33% 81.80% 100.00%
HOJA DE METRADOS
CORRESPONDIENTE AL MES DE MAYO DE 2015
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA

Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA : S/. 0.00


Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO : 0.97902
Supervisio : CONSORCIO CONSULTORES AYACUCHO
Contratista: CONSORCIO PACIFICO

PRESUPUESTO CONTRACTUAL
AVANCE ACTUAL
ITEM DESCRIPCION
UND.
CANT. METRADO
VALORIZ. %

MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE


EN LA LOCALIDAD DE YARURI
01 TRABAJOS PRELIMINARES
01.02 ALQUILER DE ALMACEN DE OBRA mes### 0.50
### 11.11
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS PESADOS YARURI Glb### 0.15
### 15.00
01.04 FLETE TERRESTRE LOCALIDAD YARURI Glb### 0.10
### 10.00
02 RED COLECTOR
02.01 TRABAJOS PRELIMINARES
02.02 MOVIMIENTO DE TIERRAS
02.02.06 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3### 16.12
### 75.01
02.02.14 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3### 2.68
### 49.90
02.02.22 RELLENO Y COMPAC. CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.50M m3### 40.28
### 49.99
03 CONTRUCCION DE BUZONES
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3### 9.14
### 49.97
03.02 MOVIMIENTO DE TIERRAS
07.06 PINTURA EN ACCESORIOS
07.06.01 PINTURAS EN ACCESORIOS m2### 0.32
### 49.93
07.07 SUMINISTRO Y COLOCACIÓN COMPUERTA
07.07.01 COMPUERTA TIPO IZAJE 12'' X 12'' Und.
### 1.00
### 50.00
07.07.02 TUBERÍA PVC ISO 4435 KM S-25 DN 200MM m### 5.90
### 50.00
08 TANQUE IMHOFF (3.80mX3.80m)
08.01 TRABAJOS PRELIMINARES
08.06 SUMINISTRO E INSTALACIÓN TUBERÍA Y ACCESORIOS
08.06.01 VALVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und.### 1.00
### 50.00
08.06.02 TUBERIA DE LODOS PVC ISO 4435 KM S-25 DN 200MM m### 8.20
### 50.00
08.06.03 COLOCACIÓN DE ACCESORIOS EN TANQUE IMHOFF glb### 1.00
### 50.00
09 LECHO DE SECADO (10.40mX12.40m)
09.01 TRABAJOS PRELIMINARES
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3### 0.23
### 48.94
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2### 0.60
### 50.00
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg### 4.72
### 49.95
09.05 ALBAÑILERIA
09.09.04 CORREAS 2''X2'' m### 227.80
### 50.00
09.09.05 TECHO DE CALAMINA E=0.33 MM m2### 167.10
### 50.00
09.10 FILTRO DE PIEDRA
09.10.01 LECHO DE GRAVA DE 1'' m3### 35.01
### 50.00
09.10.02 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3### 8.62
### 50.00
09.10.03 LECHO DE ARENA m3### 34.48
### 49.99
09.11 SUMINISTRO E INSTA. TUBERÌA Y ACCESORIO
09.11.01 TUBERIA PVC ISO 4435 KM S-25 DN 200 MM m### 7.80
### 50.00
09.11.02 TUBERIA PVC ISO 4435 D 160 MM m### 51.40
### 50.00
09.11.03 COLOCACIÓN DE ACCESORIOS EN LECHO DE SECADO glb### 1.00
### 50.00
10 FILTROS PERCOLADORES (5.0mX8.0m)
10.01 TRABAJOS PRELIMINARES
10.04.01 LECHO FILTRANTE MATERIAL SELECCIONADO GRAVA DE 0.50'' m3### 8.00
### 50.00
10.04.02 LECHO DE GRAVA DE 1'' m3### 12.00
### 50.00
10.05.01 TUBERIA DE PVC ISO 4435 KM S-20 DN 200MM m### 33.00
### 50.00
10.05.02 TUBERIA DE PVC o 110 MM ISO 4435 m### 37.80
### 50.00
10.05.03 COLOCACIÓN DE ACCESORIOS glb### 1.00
### 50.00
10.05.04 VÁLVULA DE COMPUERTA DE FIERRO FUNDIDO BB DE 8'' Und.### 1.00
### 50.00
11 OBRAS COMPLEMENTARIAS
11.01 TUBERIAS DE DESFOGUE
11.02 CONSTRUCCIÓN DE BUZONES (04 und.)
11.02.01 TRAZO Y REPLANTEO m2### 2.25
### 49.95
11.02.02 EXCAVACIÓN EN TERRENO NORMAL m3### 3.01
### 50.00
11.03 CERCO PERIMETRICO PLANTA TRATAMIENTO
11.03.01 TRAZO Y REPLANTEO km### 0.13
### 50.00
11.03.02 EXCAVACIÓN EN TERRENO NORMAL m3### 2.17
### 49.88
11.03.03 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3### 0.79
### 50.00
11.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2### 6.54
### 50.15
11.03.05 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg### 56.62
### 50.00
11.03.06 CERCO PERIMETRICO m### 131.00
### 50.00
11.03.07 ROLLIZO DE EUCALIPTO DE 4''x2.00M Und.
### 34.00
### 50.00
11.03.08 PUERTA METALICA DE 3X2.5M Und.
### 1.00
### 50.00
12 CONECCIONES DOMICILIARIAS
12.01 CONECCIONES DOMICILIARIAS
12.01.01 EXCAVACION DE ZANJA P/CONEX. DOM. ALCANTARILLADO m### 150.00
### 14.62
12.01.02 ACOMETIDA P/CONEXION DOMICILIARIA DE ALCANTARILLADO Und.
### 20.00
### 11.70
12.01.03 RELLENO DE ZANJA CONEX/DOM.T.N m### 150.00
### 14.62
12.01.04 INSTALACION DOMICILIARIA DE ALCANTARILLADO Und.
### 20.00
### 11.70
13 PUENTE AEREO
13.01 TRABAJOS PRELIMINARES
13.03 OBRAS DE CONCRETO ARMADO
13.03.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3### 4.32
### 100.00
13.03.02 ACERO EN ZAPATA FY=4200 KG/CM2 kg### 92.41
### 100.00
###
RADOS
DE MAYO DE 2015

AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT. SALDO A VALORIZAR


METRADO % METRADO % METRADO %

4.00 88.89 4.50 100.00 0.00 0.00


0.85 85.00 1.00 100.00 0.00 0.00
0.90 90.00 1.00 100.00 0.00 0.00

0.00 0.00 16.12 75.01 5.37 24.99


0.00 0.00 2.68 49.90 2.69 50.10
0.00 0.00 40.28 49.99 40.29 50.01

0.00 0.00 9.14 49.97 9.15 50.03

0.00 0.00 0.32 49.93 0.32 50.07

0.00 0.00 1.00 50.00 1.00 50.00


0.00 0.00 5.90 50.00 5.90 50.00

0.00 0.00 1.00 50.00 1.00 50.00


0.00 0.00 8.20 50.00 8.20 50.00
0.00 0.00 1.00 50.00 1.00 50.00

0.00 0.00 0.23 48.94 0.24 51.06


0.00 0.00 0.60 50.00 0.60 50.00
0.00 0.00 4.72 49.95 4.73 50.05

0.00 0.00 227.80 50.00 227.80 50.00


0.00 0.00 167.10 50.00 167.10 50.00

0.00 0.00 35.01 50.00 35.01 50.00


0.00 0.00 8.62 50.00 8.62 50.00
0.00 0.00 34.48 49.99 34.49 50.01

0.00 0.00 7.80 50.00 7.80 50.00


0.00 0.00 51.40 50.00 51.40 50.00
0.00 0.00 1.00 50.00 1.00 50.00

0.00 0.00 8.00 50.00 8.00 50.00


0.00 0.00 12.00 50.00 12.00 50.00
0.00 0.00 33.00 50.00 33.00 50.00
0.00 0.00 37.80 50.00 37.80 50.00
0.00 0.00 1.00 50.00 1.00 50.00
0.00 0.00 1.00 50.00 1.00 50.00

0.00 0.00 2.25 49.95 2.25 50.05


0.00 0.00 3.01 50.00 3.01 50.00

0.00 0.00 0.13 50.00 0.13 50.00


0.00 0.00 2.17 49.88 2.18 50.12
0.00 0.00 0.79 50.00 0.79 50.00
0.00 0.00 6.54 50.15 6.50 49.85
0.00 0.00 56.62 50.00 56.63 50.00
0.00 0.00 131.00 50.00 131.00 50.00
0.00 0.00 34.00 50.00 34.00 50.00
0.00 0.00 1.00 50.00 1.00 50.00

120.00 11.70 270.00 26.32 756.00 73.68


20.00 11.70 40.00 23.40 131.00 76.61
120.00 11.70 270.00 26.32 756.00 73.68
20.00 11.70 40.00 23.40 131.00 76.61

0.00 0.00 4.32 100.00 0.00 0.00


0.00 0.00 92.41 100.00 0.00 0.00
HOJA DE METRADOS ADICION
CORRESPONDIENTE AL MES DE MAYO DE 2
Obra : MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA
LOCALIDAD DE YARURI DEL DISTRITO DE LLOCHEGUA
Cliente : MUNICIPALIDAD DISTRITAL DE LLOCHEGUA
Ubicac. : LLOCHEGUA - HUANTA - AYACUCHO
Supervision : CONSORCIO CONSULTORES AYACUCHO
Contratista : CONSORCIO PACIFICO

PRESUPUESTO CONTRACTUAL
ITEM DESCRIPCION
UND.

1 ADICIONAL
2 RED COLECTOR SECTOR I
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE DE TERRENO m
02.01.02 TRAZO Y REPLANTEO KM
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3
02.02.02 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=2.0M m3
02.02.03 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3
02.02.04 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 2.0M m3
02.02.05 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3
02.02.06 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 2.0M m3
02.02.07 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3
02.02.08 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 2.0M m3
02.02.09 ENTIBADO DE ZANJAS m
02.02.10 REFINE Y NIVELACION DE FONDO DE ZANJA m
02.02.11 CAMA DE APOYO E=0.10M PARA TUBERIA m
02.02.12 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m
02.02.13 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3
02.02.14 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 2.0M m3
02.02.15 ELIMINACION DE MATERIAL EXCEDENTE m3
02.03 SUMINISTRO E INSTALACION TUBERIAS
02.03.01 TUBERIA PVC KM ISO 4435 Ø 160mm m
02.03.02 DOBLE PRUEBA HIDRAULICA EN RED COLECTOR m
03 CONSTRUCCION DE BUZONES SECTOR I
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO m2
03.01.02 DEMOLICION ESTRUCTURA DE CONCRETO m3
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION EN TERRENO NORMAL m3
03.02.02 REFINE Y NIVELACION Y COMPACTADO PISO PARED m2
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 BUZON TIPO III H=1.20M und
03.03.02 BUZON TIPO V H=1.75M und
03.04 REVOQUES ENLUCIDOS Y MOLDURAS
03.04.01 TARRAJEO ACABADO TAPA Y MEDIA CAÑA (CEMENTO-ARENA, 1:5) m2
04 RED EMISOR SECTOR I
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE DE TERRENO m
04.01.02 TRAZO Y REPLANTEO KM
04.01.03 CONTROL TOPOGRAFICO DURANTE EL PROCESO DE EJECUCION KM
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL HASTA H=1.5M m3
04.02.02 EXCAVACION DE ZANJA EN CONGLOMERADO HASTA 1.5M m3
04.02.03 EXCAVACION DE ZANJA EN ROCA SUELTA HASTA 1.5M m3
04.02.04 EXCAVACION DE ZANJA EN ROCA FIJA HASTA 1.5M m3
04.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA m
04.02.06 CAMA DE APOYO E=0.10M PARA TUBERIA m
04.02.07 ENCIMADO CON MATERIAL SELECCIONADO 30 CM SOBRE LA CLAVE m
04.02.08 RELLENO Y COMPAC CON MAT. EXCAVADO PROPIO EN ZANJA HASTA 1.50M m3
04.02.09 ELIMINACION DE MATERIAL EXCEDENTE m3
04.03 SUMINISTRO E INSTALACION TUBERIAS
04.03.01 TUBERIA PVC ISO 4435 KM S-20 DN 200MM m
05 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR I
05.01 EXPLANACION
05.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3
05.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3
06 CAMARA DE REJAS (4.56X0.77 M)
06.01 TRABAJOS PRELIMINARES
08 TANQUE IMHOFF (2.5mX2.5m) SECTOR I
08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2
08.01.02 TRAZO Y REPLANTEO m2
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION EN TERRENO NORMAL m3
08.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO FC=100 KG/CM2 PARA SOLADO DE ZAPATAS m3
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2
08.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg
08.05 REVOQUES ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5) CEMENTO-ARENA m2
08.06 SUMINISTRO E INSTALACION TUBERIA Y ACCESORIOS
09 LECHO DE SECADO (5.20mx6.20m) SECTOR I
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO m2
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION EN TERRENO NORMAL m3
09.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3
09.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H 25% P.M. ANCHO=.20M m3
09.03.03 CONCRETO F'C=140 KG/CM2 +30% PM. PARA MUROS m3
09.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3
09.04.02 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3
09.04.03 CONCRETO F'C=175 KG/CM2 EN SALPICADOR m3
09.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
09.04.05 ENCOFRADO Y DESENCOFRADO EN SALPICADOR m2
09.04.06 ACERO EN ZAPATA FY=4200GK/CM2 kg
09.04.07 ACERO EN COLUMNA FY=4200 KG/CM2 kg
09.04.08 ACERO EN SALPICADOR FY=4200 KG/CM2 kg
09.05 ALBAÑILERIA
09.05.01 MURO DE SOGA LADRILLO CORRIENTE CON C:A 1:5 m2
09.06 REVOQUES ENLUCIDOS Y MOLDURAS
09.06.01 TARRAJEO INTERIORES Y EXTERIORES (MORTERO 1:5 CEMENTO - ARENA) m2
09.06.02 TARRAJEO DE COLUMNA C.A 1:5X 1.0 CM m2
09.07 PISO
09.07.01 CAPA DE ARCILLA H=.10M m3
09.08 CANLETA DE DRENAJE
09.08.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3
09.08.02 CONCRETO F'C= 175 KG/CM2 PARA MUROS m3
09.08.03 ENCOFRADO Y DESENCOFRADO PARA MUROS m2
09.09 CUBIERTAS
10 FILTROS PERCOLADORES (2.5mx4.0m) SECTOR I
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO m2
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION EN TERRENO NORMAL m3
10.02.02 NIVELACION INT. Y APISONADO CON PLANCHA COMPACTADORA m2
10.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. m3
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2
10.04 FILTROS DE PIEDRA
11 MOVIMIENTO DE TIERRA EN PLANTA DE TRATAMIENTO SECTOR II
11.01 EXPLANACION
11.01.01 CORTE DE TERRENO NORMAL CON MAQUINARIA m3
11.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3
12 CAMARA DE REJAS (4.56X0.77 M) SAECTOR II
12.01 TRABAJOS PRELIMINARES
15.05 ALBAÑILERIA
TRADOS ADICIONALES
IENTE AL MES DE MAYO DE 2015

: S/. 0.00 MONTO DE CONTRATO (INC. IGV.)


: 0.97902 PLAZO EJECUCION

AVANCE ACTUAL AVANCE ACUMULADO ANT. AVANCE ACUMULADO ACT. SALDO A VALORIZAR
METRADO % METRADO
VALORIZ.% METRADO % METRADO %

300.00 47.73 0.00


### 0.00 300.00 47.73 328.56 52.27
1.00 79.37 0.00
### 0.00 1.00 79.37 0.26 20.63

85.63 30.00 0.00


### 0.00 85.63 30.00 199.79 70.00
17.70 30.00 0.00
### 0.00 17.70 30.00 41.29 70.00
26.35 30.00 0.00
### 0.00 26.35 30.00 61.47 70.00
5.45 30.00 0.00
### 0.00 5.45 30.00 12.71 70.00
13.17 30.00 0.00
### 0.00 13.17 30.00 30.74 70.00
2.72 30.01 0.00
### 0.00 2.72 30.01 6.36 69.99
6.59 30.00 0.00
### 0.00 6.59 30.00 15.37 70.00
1.36 29.99 0.00
### 0.00 1.36 29.99 3.18 70.01
3.38 30.00 0.00
### 0.00 3.38 30.00 7.88 70.00
188.57 30.00 0.00
### 0.00 188.57 30.00 439.99 70.00
188.57 30.00 0.00
### 0.00 188.57 30.00 439.99 70.00
188.57 30.00 0.00
### 0.00 188.57 30.00 439.99 70.00
87.82 30.00 0.00
### 0.00 87.82 30.00 204.92 70.00
12.19 30.00 0.00
### 0.00 12.19 30.00 28.44 70.00
112.20 30.00 0.00
### 0.00 112.20 30.00 261.80 70.00

200.00 31.82 0.00


### 0.00 200.00 31.82 428.56 68.18
200.00 31.82 0.00
### 0.00 200.00 31.82 428.56 68.18

35.00 32.68 0.00


### 0.00 35.00 32.68 72.11 67.32
3.00 65.50 0.00
### 0.00 3.00 65.50 1.58 34.50

35.00 31.26 0.00


### 0.00 35.00 31.26 76.95 68.74
25.00 29.72 0.00
### 0.00 25.00 29.72 59.12 70.28
70.00 50.06 0.00
### 0.00 70.00 50.06 69.83 49.94

5.00 21.74 0.00


### 0.00 5.00 21.74 18.00 78.26
1.00 100.00 0.00
### 0.00 1.00 100.00 0.00 0.00

20.00 41.01 0.00


### 0.00 20.00 41.01 28.77 58.99
100.00 29.94 0.00
### 0.00 100.00 29.94 233.98 70.06
0.10 30.30 0.00
### 0.00 0.10 30.30 0.23 69.70
0.10 30.30 0.00
### 0.00 0.10 30.30 0.23 69.70

20.00 28.01 0.00


### 0.00 20.00 28.01 51.41 71.99
10.00 45.52 0.00
### 0.00 10.00 45.52 11.97 54.48
5.00 45.50 0.00
### 0.00 5.00 45.50 5.99 54.50
3.00 54.64 0.00
### 0.00 3.00 54.64 2.49 45.36
50.00 35.63 0.00
### 0.00 50.00 35.63 90.35 64.38
150.00 44.91 0.00
### 0.00 150.00 44.91 183.98 55.09
100.00 29.94 0.00
### 0.00 100.00 29.94 233.98 70.06
25.00 26.29 0.00
### 0.00 25.00 26.29 70.08 73.71
7.00 39.46 0.00
### 0.00 7.00 39.46 10.74 60.54

100.00 29.94 0.00


### 0.00 100.00 29.94 233.98 70.06

100.00 30.86 0.00


### 0.00 100.00 30.86 224.00 69.14
120.00 30.86 0.00
### 0.00 120.00 30.86 268.80 69.14

8.74 100.00 0.00


### 0.00 8.74 100.00 0.00 0.00
8.74 100.00 0.00
### 0.00 8.74 100.00 0.00 0.00

40.07 100.00 0.00


### 0.00 40.07 100.00 0.00 0.00
42.18 100.00 0.00
### 0.00 42.18 100.00 0.00 0.00
48.09 100.00 0.00
### 0.00 48.09 100.00 0.00 0.00

1.03 100.00 0.00


### 0.00 1.03 100.00 0.00 0.00

17.01 100.00 0.00


### 0.00 17.01 100.00 0.00 0.00
90.84 100.00 0.00
### 0.00 90.84 100.00 0.00 0.00
991.5 100.00 0.00
### 0.00 991.50 100.00 0.00 0.00

64.19 100.00 0.00


### 0.00 64.19 100.00 0.00 0.00

70.31 100.00 0.00


### 0.00 70.31 100.00 0.00 0.00

80.19 100.00 0.00


### 0.00 80.19 100.00 0.00 0.00
53.68 100.00 0.00
### 0.00 53.68 100.00 0.00 0.00
96.23 100.00 0.00
### 0.00 96.23 100.00 0.00 0.00

6.98 100.00 0.00


### 0.00 6.98 100.00 0.00 0.00
0.62 100.00 0.00
### 0.00 0.62 100.00 0.00 0.00
5.12 100.00 0.00
### 0.00 5.12 100.00 0.00 0.00
59.42 100.00 0.00
### 0.00 59.42 100.00 0.00 0.00

1.54 100.00 0.00


### 0.00 1.54 100.00 0.00 0.00
1.2 100.00 0.00
### 0.00 1.20 100.00 0.00 0.00
0.12 100.00 0.00
### 0.00 0.12 100.00 0.00 0.00
19.14 100.00 0.00
### 0.00 19.14 100.00 0.00 0.00
0.3 100.00 0.00
### 0.00 0.30 100.00 0.00 0.00
18.82 100.00 0.00
### 0.00 18.82 100.00 0.00 0.00
123.78 100.00 0.00
### 0.00 123.78 100.00 0.00 0.00
2.36 100.00 0.00
### 0.00 2.36 100.00 0.00 0.00

14.58 100.00 0.00


### 0.00 14.58 100.00 0.00 0.00

85.93 100.00 0.00


### 0.00 85.93 100.00 0.00 0.00
15.36 100.00 0.00
### 0.00 15.36 100.00 0.00 0.00

4.65 100.00 0.00


### 0.00 4.65 100.00 0.00 0.00

1.26 100.00 0.00


### 0.00 1.26 100.00 0.00 0.00
1.04 100.00 0.00
### 0.00 1.04 100.00 0.00 0.00
15.72 100.00 0.00
### 0.00 15.72 100.00 0.00 0.00

28.52 100.00 0.00


### 0.00 28.52 100.00 0.00 0.00

57.56 100.00 0.00


### 0.00 57.56 100.00 0.00 0.00
28.52 100.00 0.00
### 0.00 28.52 100.00 0.00 0.00
69.07 100.00 0.00
### 0.00 69.07 100.00 0.00 0.00

11.82 100.00 0.00


### 0.00 0.00 100.00 11.82 0.00
40.94 100.00 0.00
### 0.00 0.00 100.00 40.94 0.00

324.00 100.00 0.00


### 0.00 324.00 100.00 0.00 0.00
388.80 100.00 0.00
### 0.00 388.80 100.00 0.00 0.00
RESUMEN DE PAGO AL CONTRATISTA DE VALORIZACIÓN N º 02 - Adicional Obra Nro01
(Del 01 al 15 de Julio del 2015)

OBRA:
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI,
DISTRITO DE LLOCHEGUA, PROVINCIA DE HUANTA-AYACUCHO"
VALOR REFERENCIAL:
ENTIDAD: MUNICIPALIDAD DISTRITAL DE LLOCHEGUA MONTO DE CONTRATO:
UBICACIÓN: LLOCHEGUA - HUANTA - AYACUCHO FACTOR RELACIÓN:
CONTRATISTA: CONSORCIO PACIFICO PROCESO DE SELECCIÓN: A.D.P N° 001-2014-MDLL/CE
RESIDENTE: ING. DEMETRIO TACAS CHECCNES SISTEMA DE CONTRATACIÓN: Suma Alzada
SUPERVISOR: ING. TEOFILO NAVARRO MUÑOS CONTRATO DE EJECUCION DE OBRA Nº 02-2014-MDLL/GM
PLAZO DE EJECUCION DE OBRA : 120 Dias Calendarios

AVANCE PARCIAL PROGRAMADO : AVANCE PARCIAL EJECUTADO:

CONCEPTO
A. MONTOS VALORIZADOS EN EL PRESENTE MES
Valorizacion Nº01 Junio - 2015
Adicional Vinculante N° 02 Junio - 2015

B. MONTOS POR REAJUSTE EN EL PRESENTE MES


Reajuste a la Valorizacion Nº 04 Diciembre - 2014

C. AMORTIZACIÓN DEL ADELANTO EN EFECTIVO EN EL PRESENTE MES


Del Adelanto Directo
Deduccion Que No Corresponde Del Adelanto Directo

D. AMORTIZACIÓN DEL ADELANTO DE MATERIALES EN EL PRESENTE MES


Por Adelanto de Materiales
Deduccion Que No Corresponde - Adelanto De Materiales

I. MONTO NETO DE VALORIZACION N º 08 (SIN I.G.V.) = A+B+C+D=

La Valorización al Contratista se Pagará de la Siguiente Manera:


II. MONTO NETO DE LA VALORIZACION

III. I.G.V. DEL MONTO NETO DE LA VALORIZACION

IV. MONTO A FACTURAR (II + III)

SON: Veinte Mil ochocientos cuarentiuno con 62/100 Nuevos Soles


icional Obra Nro01

S/. 936,743.63
S/. 936,743.63
1.0000000000000
CIÓN: A.D.P N° 001-2014-MDLL/CE
RATACIÓN: Suma Alzada
UCION DE OBRA Nº 02-2014-MDLL/GM
ON DE OBRA : 120 Dias Calendarios

AL EJECUTADO:

0.00
22605.4

-4943.01

0.00
0.00

0.00
0.00

17662.40

3179.23

20841.62
RESUMEN DE PAGO AL CONTRATISTA DE VALORIZACIÓN N º 01 - Adicional Obra Nro01
(Del 01 al 30 de Mayo del 2015)
OBRA:
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI,
DISTRITO DE LLOCHEGUA, PROVINCIA DE HUANTA-AYACUCHO"
VALOR REFERENCIAL:
ENTIDAD: MUNICIPALIDAD DISTRITAL DE LLOCHEGUA MONTO DE CONTRATO:
UBICACIÓN: LLOCHEGUA - HUANTA - AYACUCHO FACTOR RELACIÓN:
CONTRATISTA: CONSORCIO PACIFICO PROCESO DE SELECCIÓN: A.D.P N° 001-2014-MDLL/CE
RESIDENTE: ING. DEMETRIO TACAS CHECCNES SISTEMA DE CONTRATACIÓN: Suma Alzada
SUPERVISOR: ING. TEOFILO NAVARRO MUÑOS CONTRATO DE EJECUCION DE OBRA Nº 378-2014-MDLL/GM
PLAZO DE EJECUCION DE OBRA : 120 Dias Calendarios

AVANCE PARCIAL PROGRAMADO : 0.00%

CONCEPTO
A. MONTOS VALORIZADOS EN EL PRESENTE MES
Valorizacion Nº01 Mayo - 2015
Adicional Vinculante N° 01 Mayo - 2015

B. MONTOS POR REAJUSTE EN EL PRESENTE MES


Reajuste a la Valorizacion Nº 01 abril - 2015

C. AMORTIZACIÓN DEL ADELANTO EN EFECTIVO EN EL PRESENTE MES


Del Adelanto Directo
Deduccion Que No Corresponde Del Adelanto Directo

D. AMORTIZACIÓN DEL ADELANTO DE MATERIALES EN EL PRESENTE MES


Por Adelanto de Materiales
Deduccion Que No Corresponde - Adelanto De Materiales

I. MONTO NETO DE VALORIZACION N º 08 (SIN I.G.V.) = A+B+C+D=

La Valorización al Contratista se Pagará de la Siguiente Manera:


II. MONTO NETO DE LA VALORIZACION

III. I.G.V. DEL MONTO NETO DE LA VALORIZACION

IV. MONTO A FACTURAR (II + III)

SON: Doscientos Ochenta Mil Quinientos noventisiete con 11/100 Nuevos Soles
- Adicional Obra Nro01

S/. 936,743.63
S/. 917,089.22
0.9790183675859
CIÓN: A.D.P N° 001-2014-MDLL/CE
RATACIÓN: Suma Alzada
UCION DE OBRA Nº 378-2014-MDLL/GM
ON DE OBRA : 120 Dias Calendarios

VANCE PARCIAL EJECUTADO: 0.00%

0.00
237794.1629

0.00

0.00
0.00

0.00
0.00

237794.16

42802.95

280597.11
RESUMEN DE PAGO AL CONTRATISTA DE VALORIZACIÓN N º 05 - Contrato Principal
(Del 01 al 3 de Mayo del 2015)
OBRA:
MEJORAMIENTO E INSTALACION DEL SISTEMA DE DESAGUE EN LA LOCALIDAD DE YARURI,
DISTRITO DE LLOCHEGUA, PROVINCIA DE HUANTA-AYACUCHO"
VALOR REFERENCIAL:
ENTIDAD: MUNICIPALIDAD DISTRITAL DE LLOCHEGUA MONTO DE CONTRATO:
UBICACIÓN: LLOCHEGUA - HUANTA - AYACUCHO FACTOR RELACIÓN:
CONTRATISTA: CONSORCIO PACIFICO PROCESO DE SELECCIÓN: A.D.P N° 001-2014-MDLL/CE
RESIDENTE: ING. DEMETRIO TACAS CHECCNES SISTEMA DE CONTRATACIÓN: Suma Alzada
SUPERVISOR: ING. TEOFILO NAVARRO MUÑOS CONTRATO DE EJECUCION DE OBRA Nº 378-2014-MDLL/GM
PLAZO DE EJECUCION DE OBRA : 120 Dias Calendarios

AVANCE PARCIAL PROGRAMADO : 0.00%

CONCEPTO
A. MONTOS VALORIZADOS EN EL PRESENTE MES
Valorizacion Nº 05 Mayo - 2015
Adicional Vinculante N° 05 Mayo - 2015

B. MONTOS POR REAJUSTE EN EL PRESENTE MES


Reajuste a la Valorizacion Nº 05 agost - 2014

C. AMORTIZACIÓN DEL ADELANTO EN EFECTIVO EN EL PRESENTE MES


Del Adelanto Directo
Deduccion Que No Corresponde Del Adelanto Directo

D. AMORTIZACIÓN DEL ADELANTO DE MATERIALES EN EL PRESENTE MES


Por Adelanto de Materiales
Deduccion Que No Corresponde - Adelanto De Materiales

I. MONTO NETO DE VALORIZACION N º 05 (SIN I.G.V.) = A+B+C+D=

La Valorización al Contratista se Pagará de la Siguiente Manera:


II. MONTO NETO DE LA VALORIZACION

III. I.G.V. DEL MONTO NETO DE LA VALORIZACION

IV. MONTO A FACTURAR (II + III)

SON: Ciento setenta y dos Mil Ciento cincuentaicinco con 06/100 Nuevos Soles
05 - Contrato Principal

S/. 936,743.63
S/. 917,089.22
0.9790183675859
CIÓN: A.D.P N° 001-2014-MDLL/CE
RATACIÓN: Suma Alzada
UCION DE OBRA Nº 378-2014-MDLL/GM
ON DE OBRA : 120 Dias Calendarios

VANCE PARCIAL EJECUTADO: 0.00%

145,894.12
0.00

0.00

0.00
0.00

0.00
0.00

145,894.12

145,894.12

26260.9415878896

172,155.06