Summary Sheet for ITS/DSSS Works - Duct Works (Item G4/9M)

Achieved Achieved Amount Remarks


No. Section Percentag IPM Amount
e Previous This Period To Date

1 Section 1 0.00% 358,873.96


2 Section 2 0.00% 478,498.61
3 Section 3 0.00% 68,784.18
4 Section 4 0.00% 134,697.36
5 Section 5 0.00% 376,817.66
6 Section 6 0.00% 119,624.65
7 Section 7 0.00% 119,624.65
8 Section 8 0.00% 556,493.88
9 Section 9 0.00% 514,386.01
10 Section 10 0.00% 119,624.65
11 Section 10a 0.00% 378,811.40
12 Section 11 0.00% 450,984.94
13 Section 12 0.00% 155,512.05
14 Section 13 0.00% 359,472.08
15 Section 14 0.00% 281,117.93
16 Section 15 0.00% 257,193.00
17 Section 16

Total 4,730,517.01 - - -
Achieved Achieved Amount Remarks
No. Section IPM Amount
Percentage Previous This Period To Date

1 Section 1 0.00% 108,000.00


2 Section 2 0.00% 18,000.00
3 Section 3 0.00% 108,000.00
4 Section 4 0.00% 40,500.00
5 Section 5 0.00% 117,000.00
6 Section 6 0.00% 90,000.00
7 Section 7 0.00% 27,000.00
8 Section 8 0.00% 90,000.00
9 Section 9 0.00% 243,000.00
10 Section 10 0.00% 148,500.00
12 Section 11 0.00% 36,000.00
13 Section 12 0.00% 135,000.00
14 Section 13 0.00% 85,500.00
15 Section 14 0.00% 90,000.00
16 Section 15 0.00% 81,000.00
17 Section 16

Total 1,417,500.00 - - -
Contract No.: C2013/93
Project ID: IA/12-13/C/060/ST
Description: Design and Construct New Orbital Highway and Truck Route (P023) Contract 1-New Doha Port to Orbital Highway
Item :QP Works (Protection of QP Lines)

Summary Sheet for QP Works


Achieved Percentage IPM Amount
No. Description Items Break down IPM Amount for
Section 9 Section 13 Section 9 Section 13
Section 9 &13
QP Works
1 QP Foundation
A. Excavation 100.00% 100.00% 252,299.74 94,612.40 157,687.34
B. Reinforcement 100.00% 100.00% 741,111.95 277,916.98 463,194.97
C. Formwork 100.00% 100.00% 183,964.64 68,986.74 114,977.90
D. Concrete 100.00% 100.00% 469,514.59 176,067.97 293,446.62
E. Waterproofing 100.00% 100.00% 260,171.70 97,564.39 162,607.31

2 Retaining walls Foundation


F. Excavation 100.00% 100.00% 10,223.94 3,833.98 6,389.96
G. Reinforcement 100.00% 100.00% 50,303.68 18,863.88 31,439.80
H. Formwork 100.00% 100.00% 3,593.64 1,347.62 2,246.03
I. Concrete 100.00% 100.00% 72,356.70 27,133.76 45,222.94
J. Waterproofing 100.00% 100.00% 39,455.21 14,795.70 24,659.51

3 Retaining walls
K.Excavation 100.00% 100.00% 24,240.72 9,090.27 15,150.45
L. Reinforcement 100.00% 100.00% 119,268.82 44,725.81 74,543.02
M. Formwork 100.00% 100.00% 8,520.44 3,195.16 5,325.27
N. Concrete 100.00% 100.00% 171,556.02 64,333.51 107,222.51
O. Waterproofing 100.00% 100.00% 93,547.37 35,080.26 58,467.10

4 Pre Cast Arch P. Reinforecement 100.00% 100.00% 1,288,381.28 483,142.98 805,238.30


Q. Formwork 100.00% 100.00% 1,608,473.73 603,177.65 1,005,296.08
R. Back filling 100.00% 100.00% 620,842.32 232,815.87 388,026.45
S. Concrete 100.00% 100.00% 1,170,570.63 438,963.99 731,606.64
T. Waterproofing 100.00% 100.00% 539,984.93 202,494.35 337,490.58
U. Protection / Painting Works 100.00% 100.00% 221,911.95 83,216.98 138,694.97

5 Barriers V. Fencing or Barriers 100.00% 100.00% 80,306.00 30,114.75 50,191.25

3,011,475.00 5,019,125.00
BOQ Total
8,030,600.00

Prepared by : ULM. Nafris Checked by :

Stamp & Sign: Stamp & Sign:


IPC 36

orks
Achieved Amount Remaining Amount to be claimed
Remarks
Section 9 Section 13 TOTAL Section 9 Section 13 TOTAL

94,612.40 157,687.34 252,299.74 - - -


277,916.98 463,194.97 741,111.95 - - -
68,986.74 114,977.90 183,964.64 - - -
176,067.97 293,446.62 469,514.59 - - -
97,564.39 162,607.31 260,171.70 - - -

3,833.98 6,389.96 10,223.94 - - -


18,863.88 31,439.80 50,303.68 - - -
1,347.62 2,246.03 3,593.64 - - -
27,133.76 45,222.94 72,356.70 - - -
14,795.70 24,659.51 39,455.21 - - -

9,090.27 15,150.45 24,240.72 - - -


44,725.81 74,543.02 119,268.82 - - -
3,195.16 5,325.27 8,520.44 - - -
64,333.51 107,222.51 171,556.02 - - -
35,080.26 58,467.10 93,547.37 - - -

483,142.98 805,238.30 1,288,381.28 - - -


603,177.65 1,005,296.08 1,608,473.73 - - -
232,815.87 388,026.45 620,842.32 - - -
438,963.99 731,606.64 1,170,570.63 - - -
202,494.35 337,490.58 539,984.93 - - -
- 83,216.98 138,694.97 221,911.95

30,114.75 50,191.25 80,306.00 - - -

7,808,688.05 221,911.95

Work Done upto Date 97.24%


Previous period Qty. 97.24%
This period Qty. 0.00%
Junction 15 Junction 16
Work Break Down
Remaining
IPM AMOUNT % Exc. IPM AMOUNT % Exc.
Amount
A.Earthworks 1,893,200.00 100.00% - 550,600.00 100.00%

B.Ground Investigation 418,700.00 100.00% - 168,400.00 100.00%

C.Concrete 17,754,200.00 100.00% - 6,040,217.41 100.00%

D.Steel Reinforcement 19,222,700.00 100.00% - 6,271,392.20 100.00%

E.Formworks 13,991,200.00 100.00% - 4,267,000.01 100.00%

G.Post-Tensioning 12,404,300.00 100.00% - 5,594,800.00 100.00%

H.Concrete Accessories 1,544,075.31 79.60% 314,991.36 382,856.73 0.00%

J.Pipe Works 119,700.00 0.00% 119,700.00 27,700.00 0.00%

L.Waterproofing 2,900,377.38 62.08% 1,099,823.10 282,769.25 18.85%

M.Bridge bearings 1,672,100.00 100.00% - 475,600.00 100.00%

N.Joints 2,359,900.00 100.00% - 949,200.00 100.00%

P.Parapets Works 2,153,200.00 100.00% - 394,600.00 100.00%

Q.MSE Walls 40,016,177.00 100.00% - 11,708,876.95 100.00%

S.Pavings 521,230.33 53.94% 240,078.69 293,000.00 0.00%


116,971,060.02 1,774,593.16 37,407,012.55
Junction 16 Junction 17 Junction 18

Remaining Remaining Remaining


IPM AMOUNT % Exc. IPM AMOUNT % Exc.
Amount Amount Amount
- 4,468,000.00 100.00% - 2,184,300.00 100.00% -
-
- 1,141,700.00 100.00% - 474,000.00 100.00% -
-
- 36,727,299.99 100.00% - 20,214,717.04 100.00% -
-
- 43,527,400.04 100.00% - 21,844,700.01 100.00% -
-
- 30,506,400.01 100.00% - 15,382,900.00 100.00% -
-
- 17,901,700.00 100.00% - 13,363,400.00 100.00% -
-
382,856.73 4,095,611.56 76.84% 948,543.64 869,297.87 40.21% 519,753.20
-
27,700.00 256,000.00 0.00% 256,000.00 - 0.00% -
-
229,467.25 9,592,644.72 100.00% - 3,184,406.44 61.65% 1,221,219.87
-
- 4,020,900.00 100.00% - 1,896,600.00 100.00% -
-
- 3,779,700.00 100.00% - 2,474,900.00 100.00% -
-
- 5,476,400.00 100.00% - 2,304,100.00 100.00% -
-
- 70,411,878.00 100.00% - 33,077,188.58 100.00% -
-
293,000.00 2,030,286.15 100.00% - 555,519.13 52.82% 262,093.93
933,023.97 233,935,920.47 1,204,543.64 117,826,029.07 2,003,066.99