Documentos de Académico
Documentos de Profesional
Documentos de Cultura
(ASTM D 1557)
PROYECTO : SOLICITADO :
Capsula No No 1 2 3 4 5 6 7 8
Suelo Humedo + Capsula gr. 146.80 134.65 132.54 143.43 113.08 111.45 114.75 133.17
Peso del Suelo Seco + Capsula gr. 141.20 129.58 125.94 136.39 105.97 104.86 106.21 123.00
Peso del Agua gr. 5.60 5.07 6.60 7.04 7.11 6.59 8.54 10.17
Peso de la Capsula gr. 16.65 16.25 19.90 22.33 16.95 21.99 21.61 21.83
Peso del Suelo Seco gr. 124.55 113.33 106.04 114.06 89.02 82.87 84.60 101.17
% de Humedad % 4.50% 4.47% 6.22% 6.17% 7.99% 7.95% 10.09% 10.05%
Promedio de Humedad % 4.48% 6.20% 7.97% 10.07% 7.18%
Densidad del Suelo Seco % 1.917 2.066 2.057 2.002 2.010
2.150
2.100
2.050
2.000
1.950
1.900
1.850
1.800
1.750
0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 16.00% 18.00%
CONTENIDO DE HUMEDAD
RELACION HUMEDAD
ENSAYO- DE
DENSIDAD
CBR PROCTOR
PROYECTO : SOLICITANTE :
MOLDE No 1 2 3
No DE CAPAS 5 5 5
NUMERO DE GOLPES POR CAPA 12 25 56
CONDICIONES DE LA MUESTRA SIN SATURAR SATURADO SIN SATURAR SATURADO SIN SATURAR SATURADO
Capsula No No 1 2 3 4 5 6
Suelo Humedo + Capsula gr. 107.94 111.50 96.85 102.97 98.81 91.51
Peso del Suelo Seco + Capsula gr. 102.54 105.87 92.06 97.85 93.87 87.16
Peso del Agua gr. 5.40 5.63 4.79 5.12 4.94 4.35
Peso de la Capsula gr. 22.14 21.90 21.64 21.89 21.41 22.01
Peso del Suelo Seco gr. 80.40 83.97 70.42 75.96 72.46 65.15
% de Humedad % 6.72% 6.70% 6.80% 6.74% 6.82% 6.68%
EXPANSION
Expansion Expansion Expansion
Fecha Hora Tiempo Dial
mm %
Dial
mm %
Dial
mm %
10/21/2011 3:00 PM 0 h. 7.08 0 0 1.677 0 0 1.498 0 0
10/24/2011 3:45 PM 72h 7.253 0.173 0.1362 2.247 0.57 0.4488 1.693 0.195 0.1535
PENETRACION
Penetración MOLDE No 1 MOLDE No 2 MOLDE No 3
Tiempo Carga Est.
mm Dial Kg Kg/cm2 Correc. Dial Kg Kg/cm2 Correc. Dial Kg Kg/cm2 Correc.
0.63 0:30 1 70.34 3.56 2 196.74 9.95 4 397.57 20.10
1.27 1:00 1 94.80 4.79 2 235.48 11.90 6 620.81 31.38
1.91 1:30 1 117.23 5.93 3 309.90 15.66 8 791.05 39.99
2.54 2:00 70.31 1 134.56 6.80 9.67 4 357.81 18.09 25.72 9 920.52 46.53 66.18
3.81 3:00 2 168.20 8.50 5 460.77 23.29 11 1123.38 56.79
5.09 4:00 105.00 2 199.80 10.10 9.62 5 543.34 27.47 26.16 13 1305.85 66.01 62.87
6.35 5:00 2 232.42 11.75 6 608.58 30.76 14 1477.11 74.67
7.62 6:00 3 260.97 13.19 6 658.53 33.29 16 1664.68 84.15 ###
8.89 7:00 3 290.53 14.69 7 734.99 37.15 18 1834.92 92.75
10.16 8:00
METODO DE COMPACTACION ASTM D1557-91 C
PROYECTO
MAXIMA DENSIDAD SECA (gr/cc.) 2.08
HUMEDAD OPTIMA 6.85%
SOLICITADO
CBR AL 100% DE M.D.S. (%) 66
UBICACION : CBR AL 95% DE M.D.S. (%)
FECHA : RET MALLA 3/4"= --- 3/8" = --- N4 = ---
1.900 1.85
1.82
1.79
1.800 1.76
1.73
1.7
HUMEDAD % 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
C.B.R. (%)
6 80 84 88 92 Kg/cm2
15
8 40
96 100
14
30ESFUERZO
8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 7ESFUERZO
13
12
11
28
10
26
9
24
22
8
20
7
18
6
16
14
5
12
4
10
3
8
6
2
4
0
0
0 1 PENETRACION
2 3 4 5 mm
6 7 8 9 10 PENETRACION mm PENETRACION mm
0
2
4
6
8
0
2
4
6
8
28
30
10
12
14
16
18
20
22
24
26
28
30
10
12
14
16
18
20
22
24
26