REMFORCEY Eau. “
BAR <
H | owweter
2258880
30°
Place 300 dia. rock as
45°
SSesSss | SSSSSSE | SSBSSE8/0
B23828 33888
° to prevent spill—round
- of ill’ Set ‘the rock 300 nom.
below stream bed.
Too of fill Where no defined channel exists,
turn rock around toe of fi
shown (dashed).
BATTERS CULVERT ENDWALLS
3A RS FILL_RETAINING WORKS
GS BATTERS A FOR BATTERS FLATTER THAN 1.5:1
NOTE ; All dimension in metres | c 150
All reinforcement shall be continuous
between wing walls and apron slab
and shall be placed centrally.
There shall be at least two 10 dia. horiz.
bars over pipe in endwall and two sloping
bars in the top of all wingwalls.
Grade N25 concrete
NOT TO SCALE
SECTION
Te DRAFTING Teer DESIGN J DEPARTMENT OF INFRASTRUCTURE, ENERGY AND RESOURCES, TASMANIA
WP acts | Re Het os nese?
Fowce _e/iasif newt 20/12/)] RC. ENDWALL FOR SINGLE PIPE CULVERT [7
Time wranfemon w/e} (600-1500) SKEW FLOW CONDITIONS 5402-2/P 13-3)
RTS EATERS AOE Decl