Item Description Yes No Remark

Electrical

Update the plan


• Include the existing primary
1 Existing Primary Line not reflected in the plan
line for tapping point of
3-Phase Power Supply

Update load schedule


with the following parameters:
• SAVEMORE: 180 VA/sqm
Value Engineering of Transformer Size (Minimum Load 270kVA)
2
-From 1.5MVA to 750kVA • MCDO: 300VA/sqm
(Minimum Load 130kVA)
• TENANT F&B: 300 VA/sqm
• TENANT RETAIL: 150VA/sqm

Update load schedule


with the following parameters:
• SAVEMORE: 180 VA/sqm
Value Engineering of Generator Size
(Minimum Load 270kVA)
3 -From 750kVA to 500kVA
• MCDO: 300VA/sqm
-Transfer tapping point of MCDO from LVSG to MDP
(Minimum Load 130kVA)
• TENANT F&B: 300 VA/sqm
• TENANT RETAIL: 150VA/sqm

Update the plan


• Power Layout have some
missing panels and wrong label
4 EE Room missing panels and inconsistent (i.e. GPP2 additional, 2PP2 &
2PP3 missing)
• Power Feeder layout is more
updated than Power Layout

Prepared by: Checked by :


Engr. Hans Degay Engr. Nicolas Miguel
Electrical : Design - Review

Noted by : Noted by :
Engr. Vernie Briones Engr. Rafael Q. Catimpo III
Design - Head Construction - Head