SYSTEM (3.3mL*2mW*2.5mH)
(Quote Ref:)
CLIENT
HOOD
Conventional air hoods will be kept in each welding station at height of 2.2 metre from the height in
front of the weld point. The hood position will be placed in such a way that the air flow direction will
assist the natural air flow of fume with slight diversion from the operators face. Continuous air flow
makes sure that the total fume generated at weld point will be succeeding through the hood and
operator will get fresh air from the room.
(3.3mL*2mW*2.5mH)
EXTRACTION UNIT.
PAINT BOOTH & FUME EXTRACTION SYSTEM
Two Fume Extraction units will be mounted on roof to extract the fumes generated. Each Fume
Extraction System will have Axial Fans of 30,000 Cub. m /hr.
from the possible air intakes of the rooms such that intake air to the room will be contaminated by the
air emitted from the main filter box.
EXTRACTION DUCTS.
A Combination of Galvanized Steel Spiral Would and Fabricated Rectangular ducts of suitable sizes
are considered to connect all ducts to their respective Fume Extraction Filtration Boxes.
DELIVERY.
Delivery to the site is considered in this quote.
STORING.
Safe storing space for the equipment prior to the installation is to be provided by the client. For
equipment which needs to be stored under shelter to be stored in sheltered area of the client until
(3.3mL*2mW*2.5mH)
installation starts.
CONTROL PANELS.
Necessary control panels designed to use for indoor or roof sheltered place will be supplied. The shelter
for the control panels need to be constructed by the client.
PAINT BOOTH & FUME EXTRACTION SYSTEM
INSURANCE.
Insurance requirement to be covered under sub-contract agreement as per clients previous work order
has been considered this case for an expense of USD 8700 has been considered by us at cost. Any cost
comes in above that limit will be directly passed on to the client with 15% addition as over head cost.
This mode reduces the total power consumed by the fume handling system and the annual electricity
bill will be saved by at least 50%. In addition the filters use will be lesser contaminated and need less
frequent replacement.
In total the running cost of the system will be almost half by this principle and the additional capital
expense for incorporating the green concept control will be retrieved in just 15 months to 2 years
PAINT BOOTH & FUME EXTRACTION SYSTEM
d. All Lifting, scaffolding, any other Handling Equipment required during delivery during
downloading, storage and installation.
e. Power supply to the Electrical Control Panel to be provided by client, their shelter rooms, lighting
in the shelter room and air conditioning if necessary for the control panels.
f. Local office, water, electricity, compressed air, etc are to be arranged by the client for the
installation and commissioning.
g. Space for technicians to rest during summer months as per UAE labour law.
h. Any approvals required to be obtained from local Authorities prior to construction and after the
installation.
i. Any other third party inspections or material testing if applicable.
j. Prompt approval of Design drawings related with execution of project.
(3.3mL*2mW*2.5mH)