Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Area de Acero
Area de Acero
VISTA DE
MURO
TRANSV.
1.9 m
h= 18 cm
d= 12 cm
b= 30 cm
L= 1.9 m
CM 100 kg/m
a= As * fy
0.85 * f'c * b
As= Mn a=
fy * (d-a/2)
a= 0.2d
a= 2.4 cm
pmáx
p= As/bd
p= 0.09%
pb= 2.13%
max 0.75 pb= 1.59%
0.75 x pb
min 0.5 pb= 1.06%
pbmin 4.90
Q= 0.71 cm2
s= 1,069.63 cm
s= 10.70 m
0.38 a 0.13 m
VISTA DE
MURO 30 cm
TRANSV.
15 cm
14000
Mn
fy * (d-a/2)
0.192901235
As * fy
0.85 * f'c * b
0.29 cm
0.26 cm
cm2/cm 0.021272
0.26 cm
0.26 cm
10000 X= 0.000033
0.33
p pb
1.75 2.13
0.00417098 cm
2.1272 cm2*m
71 cm*m
LONGITUD DE MURO
VISTA DE
MURO
TRANSV.
1.9 m
h= 30 cm
d= 24 cm
b= 30 cm
L= 14 m
CM 100 kg/m
a= As * fy
0.85 * f'c * b
As= Mn a=
fy * (d-a/2)
a= 0.2d
a= 4.8 cm
pmáx
p= As/bd
p= 1.16%
pb= 2.13%
max 0.75 pb= 1.59%
0.75 x pb
min 0.5 pb= 1.06%
cuantia 0.8 (Ƴfc/Ƴfy)= 17.89%
pbmin 4.90
5(8
Q= 0.71 cm2 3(8 05/08--
s= 1.19 m
Q= 5.1 cm2
s= 8.54 m
0.38 a 0.20 m
VISTA DE
MURO 30 cm
TRANSV.
15 cm
14000
Mn
fy * (d-a/2)
0.192901235
As * fy
0.85 * f'c * b
6.29 cm
6.52 cm
cm2/cm 0.021272
6.55 cm
6.56 cm
10000 X= 0.000836
8.36
p pb
1.75 2.13
1.99 cm2
s= 3.33 cm}
0.00417098 cm
2.1272 cm2*m
71 cm*m
LONGITUD DE MURO
VISTA DE
MURO
TRANSV.
1.85 m
15 cm
h= 30 cm
d= 24 cm
b= 15 cm
L= 1.9 m
CM 100 kg/m
As= Mn a= As * fy
fy * (d-a/2) 0.85 * f'c * b
a= 0.2d
a= 4.8 cm
pmáx p pb
p= As/bd
p= 0.05%
pb= 1.57%
0.75 pb= 1.59%
0.75 x pb 1.75 2.13
Asmin= 4.39
Asmin= 4.90
As2= A's
As2= -5.49 cm2
p'= -1.52%
pmáx= -0.35%
p= 0.07%
30 cm