SCOPE OF WORK

CONDITION OF QUOTATION

PROJECT : LIME STONE & SILICA SAND SILO


SUBJECT : ERECTION
CLIENT : PT. PENTA OCEAN CONTRUCTION
DATE : CILEGON, 22 AGUSTUS 2017
NO DESCRIPTION POC AJM OTHER REMAKS
A. SCOPE OF WORK

I. MATERIAL PROCUREMENT
1 Stell Section 0
2 Bolt and Nut 0
3 Stell Painting : - Primer - Top Coat 0
4 Padding Plate & Chipping 0
5 Touch-up Painting 0

II. ENGINEERING
1 Basic Design 0
2 Conection Detail Design 0
3 Shop Drawing For Approval 0

III. FABRIKATION WORKS


1 Marking, Cutting, Welding, and Finishing 0

IV. ERECTION WORKS


1 Main Item Sreucture 0
(Column, Rafter, V-brace, Girder, Beam, Channal, 0
Purlin, Bolt and Nut) 0
2 Bolting 0
3 Inspection 0
4 Leveling 0
5 Centering 0
6 Touch-up 0

V. SAFETY EQUIPMENT AND HSE


1 PPE
(Safety Helmet, Safety Shoes, Safety Boddy Harnes, 0
Safety Glases, Ear Plug, Masker) 0
2

VI. HEAVY EQUIPMENT/TRANSPORTATION


1 Crane 45/50 ton (Include Fuell) 0
2 Forclift 10 ton 0
3 Mobil Trailer 0
4 Mobil Truck 0

VII. TOOLS
1 Scaffolding 0 BY: PENTA OCEAN CONTRUCTION
2 Power Electric 0 BY: PENTA OCEAN CONTRUCTION
3 Equipment Tools & Consumable 0
4 Container 2 Unit Office and Stroge Tools 0
5 Welding Machine 0
6 Teodolite 0
7 Auto Level 0
8 Impect/ Shear Wrench 0
9 Torqui Wrench 0

Cilegon, 22 Agustus 2017


AMANSYAH
Direktur Utama

SCOPE OF WORK
CONDITION OF QUOTATION

PROJECT : PIPE RACK - POWER PLANT


SUBJECT : ERECTION
CLIENT : PT. PENTA OCEAN CONTRUCTION
DATE : CILEGON, 08 APRIL 2017

NO DESCRIPTION POC AJM OTHER REMAKS


B CONDITION OF QUOTATION

I TERM OF PAYMENT
Payment Dp 30%
By Montthly Progress
II VALIDITY OF QUOTATION : 7 Days
Cilegon, 08 April 2017

Note : AMANSYAH
0 = Responsibility Direktur Utama