Está en la página 1de 31

ÁREA DE SÓTANO

ÁREA EN M2
ÁREA TOTAL 900.00 30X30
RAMPA 78.00 13X6
ESCALERA DE EMERGENCIA 12.40 2.8X4.43
ASCENSORES Y MONTACARGA 10.00 3.50X2 + (1.50X 2)
DUCTOS DE SERVICIO 6.00 2X1.50 X(2)
DUCTOS DE VENTILACIÓN 8.00 4X2
ÁREA SIN TECHAR 114.40 TOTAL
ÁREA TOTAL TECHADA 785.60 GARAJE

ASCENSORES 2
MONTACARGAS 1
MOTOBOMBAS 5

ÁREA DE PASADIZOS
1 PISO 200.90
2PISO 197.62
3 PISO 212.20
4 PISO 244.04
5 PISO 213.71
6 PISO (SIN TECHAR)
AREA TOTAL PASADIZOS 1068.4699

TOTAL WATS SOTANO Y SERVICIOS GENERA

1° NIVEL ÁREA(m2) ADICIONAL WATTS EN EQUI


BANCO 32.8727
RESTAURANT 187.3026
MINI MARKET 30.6527
LAVANDERIA 74.2268
FARMACIA 20.4499
EQUIPOS
CANTIDAD
COMPUTADORAS 4
FOTOCOPIADORAS 1
TELEVISORES 2
LAVADORAS 2
OTROS EQUIPOS 1

2° NIVEL ÁREA(m2)
OFICINAS 29.9476
CALL CENTER 88.1432
SUM 127.546
CAFETIN 63.2427

3° NIVEL
TOTAL 7 DPTOS 407.458

4° NIVEL
TOTAL 6 DPTS 423.772

5° NIVEL
TOTAL 4 DPTS 452.391

6° NIVEL
GYM: 110.270
SAUNA: 85.420
CAFETÍN: 83.577
PICINA 1.000
NORMA 0.50
ÁREA TECHADA 45 M2 1500W
SIGUIENTES 45 M2 1000W
SIGUIENTES 90 M2 1000W

TERMAS POTENCA W

1 DORMITIO UNA TERMA DE 35 LT


2 DORMITIO UNA TERMA DE 65 LT
(2-5) DORMITIO UNA TERMA DE 90 LT

1) MAYOR CARGA 100% 1 X 3500 =


2) 65% (3500 + 3500) =
3) 40% (3500 + 3500) =
4) 30% (7X3500 + 4X3500 =
5) 25% (3.5X 2500) =
TOTAL W

VIVIENDAS

TERCER PISO
DPTS 301 2500 MAYOR
DPTA 307

CUARTO PISO
DPTS 401 2500 MAYOR
DPTA 406

QUINTO PISO
DPTS 501 2500 MAYOR
DPTA 504

TOTAL 46037.5 W
10 0.00
0.00
1 4580 9160.00
1 9800 9800.00
4 746 14920.00
33880.00

10 10684.70
10684.70

Y SERVICIOS GENERALES 44564.70 CANTIDAD EN W

ADICIONAL WATTS EN EQUIPOS


7750 25 8571.82
2250 50 11615.13
4000 25 4766.32
500.00 10 1242.27
250.00 50 1272.50
26195.53

250 1000.00
250 250.00
250 500.00
250 500.00
66500 66500.00

TOTAL WATTS 26195.53

30 898.43
25 2203.58
25 3188.65
30 1897.28
8187.94
TOTAL WATTS 8187.94

TOTAL WATTS 46037.5

25 2756.74
25 2135.50
30 2507.30
746 746.00
8145.54

TOTAL WATTS 8145.54


PARA NUESTRO PROYECTO ES DE :
2500
3500

POTENCA W

750 W
1100W
1200W

3500
4550
4550
11550
2187.5
26337.5

65 LT 1100 7700

65 LT 1200 7200

65 LT 1200 4800

TOTAL 19700
RESUMEN DE MÁXIMA DEMANDA (WATTS)

SÓTANO = 44564.70
6
GYM SAU

110.2697 85.4
PRIMER PIO = 27468.04

SEGUNDO PISO = 8187.94 5 4 * VIVIE

TERCER A QUINTO PISO = 46037.5


4 6* VIVIE

SEXTO PISO = 8145.54 3 7* VIVIE

2
OFICINAS CALL CENTER
ASCENSORES 2 = 20000 29.9476 88.1432
MONTACARGAS 1 = 9800

1
BANC
MOTOBOMBAS 5 = 2980 RESTAURANT MINI MARKET

187.3026 30.6527 32.8727


167183.72

s T TA

T -G
G

ss
6
GYM SAUNA CAFETÍN

110.2697 85.4200 83.5765

5 4 * VIVIENDAS 452.3906

4 6* VIVIENDAS 423.7718

3 7* VIVIENDAS
407.4581

2
OFICINAS CALL CENTER SUM BANCO

29.9476 88.1432 127.5460 63.2427

LAVANDERIA

1
RESTAURANT MINI MARKET BANCO FARMACIA

187.3026 30.6527 32.8727 20.4499 74.2268

s
T-EM

T TA
G VA-A(ST-B)
M T -SG
T -G ST -SG-C

ss
CALCULO DE ELEVADORES PARA EDIFICIO MULTIFAMILIAR CALCULO DE MONTACARG

PISO 1 632.239 FORMULA


PISO 2 712.372
PISO 3 712.372
PISO 4 712.372 peso =1000kg
PISO 5 712.372
PISO 6 712.372

PT= POBLACION TOTAL

N. DE PISO = 6 PISOS

SUPERFICIE POR PISOS= 12

Pt 1 =( 632.239) (6) / 12 = 316.1

Pt 2 =(712.372) (6) / 12= 356.2

Pt 3 =(712.372) (6) / 12= 356.2

Pt 4 =(712.372) (6) / 12= 356.2

Pt 5 =(712.372) (6) / 12= 356.2

Pt 6 =(712.372) (6) / 12= 356.2

PT = 2097.0

N. DE PISOS = PT (%)/100

%=80% DEL TOTAL DE PERSONAS - CAPACIDAD

N. PERSONAS= (2097.049)(0.8)/100 16.776

ALTURA DE EDIFICIO
H = ( 6(2.50) 15 M

LA VELOCIDAD DETERMINADA PARA UN EDIFICIO CON UNA CANTIDA DE 6 A 10


PISO ES DE 45 A 60 m/min, LA CUAL TOMARE EN CUENTA 60m/min

V= 60 mXmin

T1= 15/60= 0.25 seg = 12.45 min= 13 minutos


CALCULO DE MONTACARGA PARA EDIFICIO MULTIFAMILIAR

P(kg)(v) 1000(0.6) 9.804


102x0.6 61.2

eso =1000kg
CÁLCULO PARA AIRE ACONDICIONADO SUM.

T T
T T T
T T
T T T

S
SS
S

C5
C5
T T T T
T T T T

Eq. A-A = Qint. + Qext.

Ql= PoT (w) (0.86)(1.25) = Kcal/h

Qint.= Qp= (# personas)(Qs_Ql)

Qe=Pot Eq(w)(0.86)(0.20)

Qt= K(At)(At)
Qext.=
Qr= ℓxAR

DATOS
Temperatura interna = 21ºc
Temperatura externa = 26ºc
Cantidad de personas = 32.00
Coeficiente ℓ del vidrio = 1.029Kcal/h/m2
Cantidad de fluorecentes = 32 →32X40= 1280
calor sensible Qs = 65
calor latente Ql = 32
constante K = 0.88 Kcal/h/m2

MEDIDAS
ÁREAS

ALTURA 3.00
ANCHO 6.15
LARGO 20.74
TOTAL 382.653 M2

ÁREA DE PAREDES
ALTO 3 ALTO 3
LARGO 20.74 LARGO 6.15
TOTAL 124.44 TOTAL 36.9

TOTAL ÁREA PAREDES = 416.442 M2

ÁREA VENTANAS DE VIDRIO

ALTO 1.8 ALTO 1.8


LARGO 3 LARGO 1.4
TOTAL 10.8 TOTAL 2.52

ÁREA TOTAL = 13.32 M2

ÁREA TOTAL = (ÁREA TOTAL - ÁREA VENTANAS) = (382.653-13.32) = 369.333

Ql = ( 1280)(0.86)(1.25) = 1376 Kcal/h

Qp = 32(68-32) = 1152.00 Kcal /h

Qeq = 2(250)(0.86)(0.20) = 86 Kcal /h

Qt = (0.88)(369.333)(26º-21º) = 1625.0652 Kcal /h

Qr = (1.209)(10) = 12.09 Kcal /h

4251.155 Kcal /h
UNIDADES

3413 BTU 860 Kcal

X 4251.155

x = 3413x4251.155 16871.2 BTU


860

EQUIPOS COMERCIALES

6000 BTU/H 600 W


12000 BTU/H 1200 W
18000 BTU/H 1800 W
24000 BTU/H 2400 W
36000 BTU/H 3600 W
48000 BTU/H 4800 W
60000 BTU/H 6000 W
ALTO 6.15
LARGO 20.74
TOTAL 255.102

M2
CALCULO DE DIAGRAMA UNIFILA (T-SG)

MONOFASICA TRIFASICA
MONOFASICA
Ø= MD (W)
220X Fc(cosØ) = 0.9

TRIFASICA

3Ø = MD (W)
1.73x380X Fc(cosØ) = 0.9

ID = CORRIENTE TE DISEÑO

ID = In X 1.25

Id < It < Ic

N2XOH = ALIMENTADOR PRINCIPAL

CALCULO TOTAL DE SOTANO TRIFASICA BANCO

In 44564.70 44564.70 75.32


1.73x3380x0.9 591.66

Id 75.32 1.25 94.15

94.15 < 110A< 125 A 25MM2

A = 3 - 1X16MM2 N2XOH + 1 - 1X16MM2 N2XOH(N) + 1 - 1X16MM2 N2XOH(T)

ACENSORES

EQUIPOS
In 9150.00 9150.00 15.46
1.73x3380x0.9 591.66

Id 15.46 1.25 19.33

19.33 < 20 A< 55 A 4 MM2


B= 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

MONTACARGAS

In 9800.00 9800.00 16.56


1.73x3380x0.9 591.66

Id 16.56 1.25 20.70

20.70 < 25A< 55 A 4 MM2 SOTANO

B = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

BOMBAS MONOFASCO

In 2980.00 2980.00 15.05


220x0.9 198

Id 15.05 1.25 18.8125

18.8125 < 20A< 55 A 4 MM2

VIVIENDA
B = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

SOTANO TRIFASICO W TOTAL


AREA TECHADA 785.6 10 7856

In 7856.00 7856.00 13.28


1.73x3380x0.9 591.66

Id 13.28 1.25 16.60

16.60 < 20A< 55 A 4 MM2


B= 3- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T) EQUIPOS

PASADISOS DEL 1 AL 6 PISO


PRIMER PISO
M2 W TOTAL
AREA 200.9 10 2009

In 2009.00 2009.00 10.15


220x0.9 198

Id 10.15 1.25 12.68

12.68 < 15 A< 55 A 4 MM2 GYM

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

SEGUNDO PISO

M2 W TOTAL
AREA 197.62 10 1976.2

In 1976.20 1976.20 9.98


220x0.9 198

Id 9.98 1.25 12.48


EQUIPOS

12.48 < 15A< 55 A 4 MM2

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

TERCER PISO

M2 W TOTAL
AREA 212.2 10 2122
In 2122.00 2122.00 10.72
220x0.9 198

Id 10.72 1.25 13.40

13.40 < 15A< 55 A 4 MM2

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

CUARO PISO

M2 W TOTAL
AREA 244.04 10 2440.4

In 2440.40 2440.40 12.33


220x0.9 198

Id 12.33 1.25 15.41

15.41 < 15A< 55 A 4 MM2

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

QUINO PISO

M2 W TOTAL
AREA 213.71 10 2137.1

In 2137.10 2137.10 10.79


220x0.9 198

Id 10.79 1.25 13.49

13.49 < 15A< 55 A 4 MM2

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


SEXTO PISO

M2 W TOTAL
AREA 280.66 10 2806.6

In 2806.60 2806.60 14.17


220x0.9 198

Id 14.17 1.25 17.72

17.72 < 20A< 55 A 4 MM2

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


CALCULO DE DIAGRAMA UNIFILA BANCO

MONOFASICA TRIFASICA
MONOFASICA
Ø= MD (W)
220X Fc(cosØ) = 0.9

TRIFASICA

3Ø = MD (W)
1.73x380X Fc(cosØ) = 0.9

ID = CORRIENTE TE DISEÑO

ID = In X 1.25

Id < It < Ic

N2XOH = ALIMENTADOR PRINCIPAL

MONOFASICO BANCO MONOFASICO


M2 W TOTAL M2 W
AREA 32.87 25 821.75 AREA 32.87 25

In 8571.75
In 821.75 821.75 4.15 1.73x3380x0.9
220x0.9 198
Id 14.49 1.25
Id 4.15 1.25 5.19

18.11 < 20A< 55 A


5.19 < 15 A< 55 A 4 MM2

B=3- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N)


C= 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

TRIFASICO CANTIDAD W TOTAL


COMPUTADORAS 4 250 1000
FOTOCOPIADORAS 1 250 250
TELEISORES 2 250 500
OTROS EUIPOS 6000
7750
In 7750.00 7750.00 13.10
1.73x3380x0.9 591.66

Id 13.10 1.25 16.37

16.37 < 20A< 55 A 4 MM2

B =3- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

CALCULO DE DIAGRAMA UNIFILAR CENTER CALCULO DE DIAGRAMA U

MONOFASIC W TOTAL EQUIPOS


AREA TECHADA 88.1432 25 2203.58

In 2203.58 2203.58 11.13


220x0.9 198 In 0.00
1.73x3380x0.9
Id 11.13 1.25 13.91
Id 2.53

13.91 < 15A< 55 A 4 MM2


3.16 < 15A< 55

C = 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T) C= 1- 1X4MM2 N2XOH + 1 - 1X4M

CALCULO DE DIAGRAMA UNIFILA VIVIENDA

MONOFASICO
AREA M2 W TOTAL TERCER PISO
62.25 10 622.5 DPTS 2500 MAY65 LT
DPTA 307
In 622.50 622.50 3.14
220x0.9 198

Id 3.14 1.25 3.93

3.93 < 15A< 55 A 4 MM2

C =1 - 1X4 MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


TRIFASICO CANTIDAD W TOTAL
TERMAS 1 1100 1100

In 1100.00 1100.00 5.56


220x0.9 198

Id 5.56 1.25 6.94

6.94 < 15A< 55 A 4 MM2

C=1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

CALCULO DE DIAGRAMA UNIFILAR GYM

AREA M2 W TOTAL
110.27 25 2756.75

In 2756.75 2756.75 13.92


220x0.9 198

Id 13.92 1.25 17.40

17.40 < 20A< 55 A 4 MM2

B =1 - 1X4 MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

TRIFASICO CANTIDAD W TOTAL


EQUIPOS 1 3000 3000

In 3000.00 3000.00 15.15


220x0.9 198

Id 15.15 1.25 18.94

18.94 < 20A< 55 A 4 MM2

B=1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


TOTAL EUIPOS TOTAL
25 7750 8571.75

8571.75 14.49
591.66

1.25 18.11

4MM2

H + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


ULO DE DIAGRAMA UNIFILA CENTER CALCULO DE DIAGRAMA UNIFILA CENTER

CANIDAD W TOTAL EQUIPOS


2 250 500

500.00 2.53 In 2703.58


1.73x3380x0.9 198 220x0.9

2.53 1.25 3.16 Id 13.65

< 15A< 55 A 4 MM2 17.07 < 20 A< 55 A

4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T) B= 1- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N

CALCULO DE DIAGRAMA UNIFILA VIVIENDA

VIVIENDA MONOFASICO
1100 7700 AREA TOTAL
622.5
EUIPOS 1100
1722.5

In 1722.50 1722.50 8.70


220x0.9 198

Id 8.70 1.25 10.87


10.87 < 15A< 55 A 4 MM2

C =1 - 1X4 MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

CALCULO DE DIAGRAMA UNIFILAR GYM

AREA M2 W TOTAL
110.27 25 2756.75
EQUIPOS 1 3000 3000
5756.75

In 5756.75 5756.75 9.73


1.73x3380x0.9 591.66

Id 9.73 1.25 12.16

12.16 < 20A< 55 A 4 MM2

B =3- 1X4MM2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)


MA UNIFILA CENTER

CANIDAD W TOTAL
1 2703.58 2703.58

2703.58 13.65
198

1.25 17.07

< 15A< 55 A 4 MM2

2 N2XOH + 1 - 1X4MM2 N2XOH(N) + 1 - 1X4MM2 N2XOH(T)

LA VIVIENDA
1 - 1X4MM2 N2XOH(T)
DIAGRAMA UNIFILAR

TIPOS DE CORRIENTE

MONOFASIO TRIFASICO

CORRIENTE NOMINAL MONOFASICA (Ø)

Ø = MD (W)
220Xfp(cosØ) =0.9

CORRIENTE NOMINAL TRIFASICA ( 3Ø)

3Ø = MD (W)
1.73X380XCOSØ

Id = CORRIENTE DE DISEÑO
Id = Inx1.25

Id < It < Ic
N2XOH = ALIMENTADRES PRINCIALES
CORRIENTE TOTAL DE MAXIA DEMANDA SOTANO TRIFASICA

3Ø = MD (W) 51897.66 51897.66 87.72 Amp.


1.73X380XCOSØ 1.73X380X0.9 591.66

Id = Inx1.25 87.72 1.25 109.65

Id < It < Ic 109.65 < 110 A < 125 A 16 MM2

A = 3-1 X 16 MM2 N2XOH + 1 - 1X16MM2 N2XOH (N) + 1 - 1X16MM2 N2XOH(T)

ASENSOR TRIFASICA

20 KV = 20000 (W)

3Ø = MD (W) 20000.00 20000.00 33.80 Amp.


1.73X380XCOSØ 1.73X380X0.9 591.66

Id = Inx1.25 33.8 1.25 42.25


Id < It < Ic 42.25 < 45 A < 55 A 4 MM2

A = 3-1 X 4 MM2 N2XOH + 1 - 1X4MM2 N2XOH (N) + 1 - 1X4MM2 N2XOH(T)

MONTACARGA TRIFASICA

10 KV = 10000 (W)

3Ø = MD (W) 10000.00 10000.00 16.90 Amp.


1.73X380XCOSØ 1.73X380X0.9 591.66

Id = Inx1.25 16.9 1.25 21.125

Id < It < Ic 21.125 < 25 A < 55 A 4 MM2

A = 3-1 X 4 MM2 N2XOH + 1 - 1X4MM2 N2XOH (N) + 1 - 1X4MM2 N2XOH(T)

BOMBAS MONOFASICA
4 X 746 HP 2980 W

Ø = MD (W) 29880.00 2980.00 15.05 Amp.


220XCOSØ 220X0.9 198

Id = Inx1.25 15.5 1.25 19.375

Id < It < Ic 19.375 < 220 A < 55 A 4 MM2

A = 1-1 X 4 MM2 N2XOH + 1 - 1X4MM2 N2XOH (N) + 1 - 1X4MM2 N2XOH(T)

SOTANO

AREA TECHADA =

También podría gustarte