Está en la página 1de 68

UNIVERSIDAD CATOLICA DE SANTA MARIA

FACULTAD DE ARQUITECTURA E INGENIERIA CIVIL Y DEL AMBIENTE

ESCUELA PROFESIONAL DE INGENIERIA CIVIL

Curso:
COSTOS EN LA CONSTRUCCION

DOCENTE:
Ing. PATRICIA CARPIO

Presentado por:
ARAGON QUICAÑO ALBERT NOE
CACERES RODRIGUEZ DAVID BERTING
MANRIQUE MALDONADO FABRIZZIO
PERDOMO MEDINA ALBERTO JESUS
SOSA SOTO RICARDO

AREQUIPA - PERÚ
2016
L Y DEL AMBIENTE
RESUMEN DE METRADOS

MODULO: MODULO 3 PISOS


UBICAC. AREQUIPA
ITEMS DESCRIPCION UND
ESTRUCTURAS

01 Trabajos Preliminares
01.01 TRAZO Y REPLANTEO PRELIMINAR

02 Movimiento de Tierras
02.01 EXCAV.ZANJAS Y ZAPATA RT<2KG/CM2 H=1.50M
02.02 RELLENO MANUAL CON MATERIAL PROPIO
02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES
02.04 ELIMINACION MATERIAL EXCEDENTE ACARREADO
02.07 ESCARIFICADO Y COMPACTADO
02.08 AFIRMADO DE " EN INTERIORES (AREAS TECHADAS)

03 Obras de Concreto Simple


03.01 SUBCIMIENTO/SUBZAPATAS/SUB-VIGA CIMENT. MEZCLA 1:12 + 30 % P.G.
03.02 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. M3
03.03 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2
03.04 FALSO PISO MEZCLA 1:8 e=4" M2

04 Obras de Concreto Armado


04.01 VIGA DE CIMENTACION.- CONCRETO 175 KG/CM2 CMT TIPO I
04.02 VIGA DE CIMENTACION..- ENCOFRADO Y DESENCOFRADO
04.03 VIGA DE CIMENTACION.- ACERO Fy=4200 kg/cm2
04.04 ZAPATAS.- CONCRETO 175 KG/CM2 CMT TIPO I
04.05 ZAPATAS..- ENCOFRADO Y DESENCOFRADO
04.06 ZAPATAS.- ACERO Fy=4200 kg/cm2
04.07 COLUMNAS.- CONCRETO 210 KG/CM2 M2
04.09 COLUMNAS.- ENCOFRADO Y DESENCOFRADO M3
04.10 COLUMNAS.- ACERO Fy=4200 kg/cm2 KG
04.11 PLACAS.- CONCRETO 210 KG/CM2 M2
04.12 PLACAS.- ENCOFRADO Y DESENCOFRADO M3
04.13 PLACAS.- ACERO Fy=4200 kg/cm2 KG
04.14 VIGAS.- CONCRETO 210 KG/CM2
04.16 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA
04.17 VIGAS.- ACERO Fy=4200 kg/cm2
04.18 GARGOLA DE CONCRETO SEGÚN DISEÑO
04.19 LOSA ALIGERADA - CONCRETO 210 KG/CM2
04.20 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
04.21 LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2
04.22 LOSA ALIGERADA.- LADR. HUECO 15X30X30

05 Muros y Tabiques de Albañilería


05.01 MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*)
05.02 MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*)
05.03 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS
ARQUITECTURA
06 Revoques, Enlucidos y Molduras
06.01 TARRAJEO EN MURO: INTERIOR YE XTERIOR
06.02 TARRAJEO EN MURO: INTERIOR YE XTERIOR A PARTIR DEL 2DO PISO
06.03 TARRAJEO DE COLUMNAS
06.04 TARRAJEO DE PLACAS
06.05 TARRAJEO DE VIGAS
06.06 VESTIDURA DE DERRAMES
06.07 CANALETA MEDIA CAÑA EN CIRCULACION
06.08 BRUÑAS SEGUN DETALLE

07 Cielo Raso
07.01 CIELO RASO CON MEZCLA C:A 1:5

08 Pisos y Pavimentos
08.01 PISO DE BALDOSA CERAMICA 30X30CM
08.02 SARDINEL H=50cm, CONCRETO 175 KG/CM2,TARRAJEADO
08.03 ENCOFRADO DE SARDINEL

09 Contrazócalos
09.01 CONTR.S/COLOREAR H=30 cm MZ 1:2 e=1.5 cm
09.02 CONTRAZOCALO DE BALDOSA CERAMICA H=30CM

10 Cubiertas
10.01 IMPERMEABILIZACION DE TECHO CON PINTURA ASFALTICA
10.02 CUBIERTA DE LADRILLO PASTELERO
10.03 JUNTA DE MORTERO ASFALTICO EN CUBIERTA DE LADRILLO PASTELERO
10.04 CANALETA Ø 3" PARA EVACUACION PLUVIAL

11 Carpintería Madera
11.01 PUERTA MACJHIHEMBRADA

12 Carpintería Metalica
12.01 BARANDA METALICA EN CIRCULACION SEGÚN DISEÑO

13 Cerrajería
13.01 CERRADURA DOS GOLPES EN PUERTA, CON TIRADOR
13.02 BISAGRA DE 31/2"31/2"

14 Vidrios, Cristales y Similares


14.01 VENTANA DE CRISTAL TEMPLADO 6MM INCLUYE ACCESORIOS

15 Pintura
15.01 PINTURA LATEX EN CIELO RASO Y VIGAS
15.02 PINTURA LATEX EN MUROS Y COLUMNAS
15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA
15.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=0.20

16 Varios, Limpieza y Jardinería


16.01 JUNTA DE DILATACION EN PISO CON MORTERO ASFALTICO
16.02 JUNTA DE ESPUMA PLASTICA+MATERIAL MICROPOROSO
METRADO

0.41
6.24
149.78

36.28
427.91
6554.46
22.13
177.03
1099.57
Nº PARTIDA DESCRIPCIÓN

01.00.00 TRABAJOS PRELIMINARES


CONSTRUCCIONES PROVICIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
OFICINA DE RESIDENCIA Y SUPERVISION
VESTIDORES Y SS.HH. PARA OBREROS
CERCO PRIMETRICO PROVISIONAL DE TELA ARPILLERA (Rafia) x 2.5
LIMPIEZA DE TERRENO MANUAL
01.01.00 TRAZO Y REPLANTEO
SEGURIDAD EN OBRA,EPP del personal
LIMPIEZA FINAL DE OBRA
ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
SEÑALIZACIÓN TEMPORAL DE SEGURIDAD
MEDIDAS

VECES
UNID.
PARCIAL TOTAL


LARGO ANCHO ALTO

m2 10.00 4.00 40.00 40.00


m2 4.00 4.00 16.00 16.00
m2 5.00 5.00 25.00 25.00
m 46.50 46.50
m2 7.70 11.70 90.1
7.70 11.70 90.09
GLB 1.00
m2 0.00
GLB 1.00
GLB 1.00
N° DE N° DE LARGO
DESCRIPCION UNIDAD
PARTIDA VECES (m)
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION DE ZANJAS Y ZAPATA RT<2KG/CM2 H=1.50M
EJE 8-8 (Entre eje A y C) M3 1 5.33
EJE 12-12 (Entre eje A y C) M3 1 4.38
EJE A-A (Entre eje 12 y 8) M3 1 18.13
EJE C-C (Entre eje 12 y 8) M3 1 18.63
EJE 12 (Eje A) M3 1 0.95
02.02.00 RELLENO MANUAL CON MATERIAL PROPIO
EJE A-A (Entre eje 12 y 8) M3 1 18.13
M3 1 15.27
M3 1 1.43
M3 1 0.63
EJE 8-8 (Entre Eje A y C) M3 2 5.33
EJE 12-12 (Entre Eje A y C) M3 2 0.95
M3 1 3.78
M3 1 3.78
EJE C-C (Entre eje 12 y 8) M3 1 18.13
M3 1 15.27
M3 1 1.43
M3 1 0.63

N° DE Volumen de
02.03.00 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES UNIDAD VECES Excavacion

Acarreo del Material Excedente procedente de Excavacion M3 1 148.53


EJE A-A (Entre eje 12 y 8)
N° DE Volumen de
02.04.00 ELIMINACION MATERIAL EXCEDENTE ACARREADO UNIDAD VECES Excavacion

Vol. Excavado-Vol. Rellenado por sus factores M3 1 148.53


C= (1/(1+E/100)) Arena Gravo-Arenosa E=10% y C=0.9
02.07.00 ESCARIFICADO Y COMPACTADO
EJE A -A 2 17.42
EJE C-C 2 15.91
EJE 8-8 (Entre los Ejes A y C) 2 5.33
EJE 12-12 (Entre los Ejes A y C) 2 0.95
Entre los Ejes A y C 2 6.63
ANCHO ALTURA Volumen Volumen
(m) (m) Parcial (m3) Total (m3)

2 1.5 15.99
2 1.5 13.14
2 1.5 54.39
2.25 1.5 62.87625
1.5 1.5 2.1375 148.53

0.775 0.6 8.43045


0.775 0.6 7.10055
0.775 0.6 0.66495
1.23 0.6 0.46494
0.73 0.6 4.66908
0.63 0.6 0.7182
0.93 0.6 2.10924
0.63 0.6 1.42884
0.9 0.6 9.7902
0.9 0.6 8.2458
0.9 0.6 0.7722
1.23 0.6 0.46494 44.86

Volumen Esponjamie Coeficiente Volumen


de Relleno nto % de Reduccion Eliminado

44.86 0.1 0.9 108.56

Volumen Esponjamie Coeficiente Volumen


de Relleno nto % de Reduccion Eliminado

44.86 0.1 0.9 108.56

0.83 - 28.917
0.95 - 30.229
0.78 - 8.315
0.68 - 1.292
0.78 - 10.343 79.096
HOJA DE METRADOS - CONCRETO SIMPLE

Nº DE UND Nº
PARTIDA
PARTIDA VECES LARGO ANCHO
SUBCIMIENTO/SUBZAPATAS/SUB-VIGA CIMENT. MEZCLA
1:12 + 30 % P.G.
M3
EJE A -A 1 17.42 2.1
EJE C-C 1 15.91 2.35
EJE 8 entre los Ejes A y C 1 5.33 2.1
EJE 12 entre los Ejes A y C 1 0.95 1.6
EJE 12 entre los Ejes A y C 1 6.63 2.1

ELEMENTO: CONCRETO SIMPLE SOBRECIMIENTO CONCRETO


Nº DE
MEDIDAS
PARTIDA DESCRIPCION Nº ELEM
l a h
MUROS

TRAMOS 8.00 0.94 0.13 0.20


EJE C TRAMO 12 - 8
TRAMOS 2.00 1.06 0.13 0.20
TRAMOS 2.00 1.10 0.13 0.20
TRAMOS 4.00 0.94 0.13 0.20

TOTAL

CONCRETO SOBRECIMENTO M3 0.41

ENCOFRADO SOBRECIMIENTO M2 6.24

ELEMENTO: FALSO PISO CONCRETO


Nº DE
MEDIDAS
PARTIDA DESCRIPCION Nº ELEM
l a h

NO
AREA 001 1.00 7.37 3.60 0.15
DETALLE MUROS 1.00 2.67 0.07 0.15
DETALLE VP 1.00 6.97 0.17 0.15
DETALLE PUERTA 1.00 2.67 0.28 0.15

AREA 002 1.00 7.37 3.57 0.15


DETALLE MUROS 1.00 2.67 0.07 0.15
DETALLE VP 2.00 6.97 0.17 0.15
DETALLE PUERTA 1.00 2.67 0.28 0.15

AREA 003 1.00 7.37 3.57 0.15


DETALLE MUROS 1.00 2.67 0.07 0.15
DETALLE VP 2.00 6.97 0.17 0.15
DETALLE PUERTA 1.00 2.67 0.28 0.15

AREA 004 1.00 7.37 3.60 0.15


DETALLE MUROS 1.00 2.67 0.07 0.15
DETALLE VP 1.00 6.97 0.17 0.15
DETALLE PUERTA 1.00 2.67 0.28 0.15
DESCUENT O POR DUCTO DE ELECTRICAS 1.00 -0.58 0.20 0.15

AREA 005 CIRCULACION 1.00 15.89 2.10 0.15

TOTAL M2
TOTAL M3

CONCRETO FALSO PISO M2 149.78


PARCIAL TOTAL
ALTURA

40.243
0.4 14.633
0.4 14.955
0.4 4.477
0.4 0.608
0.4 5.569

RETO ENCOFRADO
TOTAL MEDIDAS TOTAL
M3 l a(h) M2

0.20 0.94 0.20 3.01

0.06 1.06 0.20 0.85


0.06 1.10 0.20 0.88
0.10 0.94 0.20 1.50

0.41 6.24

RETO
TOTAL PERIMET AREA
M3

26.53
0.19
1.18
0.75

26.31
0.19
2.37
0.75

26.31
0.19
2.37
0.75

26.53
0.19
1.18
0.75
-0.12

33.36

149.78
22.47
N° DE DESCRIPCION UNIDAD
PARTIDA
04.00.00 OBRAS DE CONCRETO ARMADO
04.01.00 VIGA DE CIMENTACION.- CONCRETO 175 KG/CM2 CMT TIPO I
EJE A-A (Entre Eje 12 y 8) M3
EJE C-C (Entre Eje 12 y 8) M3
EJE 12-12 (Entre Eje A y C) M3
EJE 8-8 (Entre Eje A y C) M3
04.02.00 VIGA DE CIMENTACION.- ENCOFRADO Y DESENCOFRADO
EJE A-A (Entre Eje 12 y 8) M2
EJE C-C (Entre Eje 12 y 8) M2
EJE 12-12 (Entre Eje A y C) M2
EJE 8-8 (Entre Eje A y C) M2

N° DESCRIPCION UND
PARTIDA
4.03.00 VIGA DE CIMENTACION.- ACERO Fy=4200 kg/cm2

N° DE DESCRIPCION UNIDAD
PARTIDA
04.04.00 ZAPATAS.- CONCRETO 175 KG/CM2 CMT TIPO I
EJE A (ENTRE EJE 12 Y EJE 8) M3
M3
EJE C (ENTRE EJE 12 Y EJE 8) M3
M3
EJE 12 (ENTRE EJE 12 Y EJE 8) M3
M3
EJE 8 (ENTRE EJE 12 Y EJE 8) M3
04.05.00 ZAPATAS.- ENCOFRADO Y DESENCOFRADO
EJE A (ENTRE EJE 12 Y EJE 8) M2
M2
M2
M2
M2
M2
EJE C (ENTRE EJE 12 Y EJE 8) M2
M2
M2
M2
M2
M2
M2
EJE 12 (ENTRE EJE 12 Y EJE 8) M2
M2
M2
EJE 8 (ENTRE EJE 12 Y EJE 8) M2

N° DESCRIPCION UND
PARTIDA
04.06.00 ZAPATAS.- ACERO Fy=4200 kg/cm2
EJE A-A (ENTE 12Y8)
LONG. ZAP. 5/8
TRANS. ZAP. 1/2
LONG. ZAP. 3/4
LONG. ZAP. 1
LONG. ZAP. 1
LONG. ZAP. 1/2
LONG. ZAP. 3/4
ESTRIBO 3/8
EJE C-C (ENTE 12Y8) 5/8
TRANS. ZAP. 1/2
LONG. ZAP. 3/4
LONG. ZAP. 1
LONG. ZAP. 1
LONG. ZAP. 1/2
LONG. ZAP. 3/4
ESTRIBO 3/8
EJE A-C (ENTE 12Y8)
LONG. ZAP. 1/2
TRANS. ZAP. 1/2
EJE 8 1/2
LONG. ZAP. 1/2
TRANS. ZAP. 1/2

N° DESCRIPCION
PARTIDA
04.07 COLUMNAS.- CONCRETO 210 KG/CM2
04.08 COLUMNAS.- CONCRETO 175 KG/CM2
Las 4 partidas se
04.09 COLUMNAS.- ENCOFRADO Y DESENCOFRADO encuentran Integradas
04.10 COLUMNAS.- ACERO Fy=4200 kg/cm2 en el Siguiente Cuadro

Elemento : Columnas

PARTIDA Descripción Nº Elem.
1ER NIVEL
C1 3.00
3.00
3.00
ESTRIBO 1 3.00
ESTRIBO 2 3.00
ESTRIBO s 3.00

C2 6.00
6.00
ESTRIBO 1 6.00
ESTRIBO 2 6.00
ESTRIBO 3 6.00
ESTRIBO s 12.00

C3 1.00
1.00
detalle adicional 1.00
ESTRIBO 1 1.00
ESTRIBO 2 1.00
ESTRIBO 3 1.00
ESTRIBO 4 1.00
ESTRIBO s 1.00

CA 22.00
ESTRIBO 1 22.00

2 DO NIVEL
C1 3.00
3.00
3.00
ESTRIBO 1 3.00
ESTRIBO 2 3.00
ESTRIBO s 3.00

C2 6.00
6.00
ESTRIBO 1 6.00
ESTRIBO 2 6.00
ESTRIBO 3 6.00
ESTRIBO s 12.00
C3 1.00
1.00
detalle adicional 1.00
ESTRIBO 1 1.00
ESTRIBO 2 1.00
ESTRIBO 3 1.00
ESTRIBO 4 1.00
ESTRIBO s 1.00

CA 29.00
ESTRIBO 1 29.00

3 ER NIVEL
C1 3.00
3.00
3.00
ESTRIBO 1 3.00
ESTRIBO 2 3.00
ESTRIBO s 3.00

C2 6.00
6.00
ESTRIBO 1 6.00
ESTRIBO 2 6.00
ESTRIBO 3 6.00
ESTRIBO s 12.00

C3 1.00
1.00
detalle adicional 1.00
ESTRIBO 1 1.00
ESTRIBO 2 1.00
ESTRIBO 3 1.00
ESTRIBO 4 1.00
ESTRIBO s 1.00

CA 29.00
ESTRIBO 1 29.00
COLUMNAS CONCRETO M3
COLUMNAS ENCOFRADO M2
COLUMNAS FIERRO KG

N° DESCRIPCION
PARTIDA
04.11 PLACAS.- CONCRETO 210 KG/CM2
Las 3 partidas se
04.12 PLACAS.- ENCOFRADO Y DESENCOFRADO encuentran Integradas
04.13 PLACAS.- ACERO Fy=4200 kg/cm2 en el Siguiente Cuadro

Elemento : PLACAS

Descripción Nº Elem.

1ER NIVEL
PLACA 2.00
HORIZONTAL 4.00
VERTICAL 4.00

VIGA COLLARIN 4.00


4.00

2 DO NIVEL
PLACA 2.00
HORIZONTAL 4.00
VERTICAL 4.00

VIGA COLLARIN 2.00


2.00

3 ER NIVEL
PLACA 2.00
HORIZONTAL 4.00
VERTICAL 4.00

PLACAS CONCRETO M3
PLACAS ENCOFRADO M2
PLACAS FIERRO KG

N DE ESPECIFICACIONES Ø
PARTIDA
04.14.00 VIGAS.- CONCRETO 210 KG/CM2
piso 1
v-103
v-101
v-102
VA-1

PISO 2
V-203
v-201
v-202
VA-2

PISO 3
V-303
v-301
v-302
VA-3

04.16 VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA


piso 1
v-103
v-101
v-102
VA-1

PISO 2
V-203
v-201
v-202
VA-2

PISO 3
V-303
v-301
v-302
VA-3
04.17 VIGAS.- ACERO Fy=4200 kg/cm2
piso 1
v-103
ESTRIBOS 3/8"
5/8"
3/4"
3/4"
3/4"
3/8"
5/8"
3/4"

v-101 ESTRVOS 3/8"


3/4"
5/8"
v-102 ESTRIBOS 3/8"
5/8"
3/4"
3/8"
5/8"

VA-1 ESTRIBOS 3/8"


5/8"
5/8"
5/8"
3/8"

PISO 2
v-203
ESTRIBOS 3/8"
5/8"
3/4"
3/4"
3/4"
3/8"
5/8"
3/4"

v-201 ESTRVOS 3/8"


5/8"
3/4"
3/8"
5/8"
v-202 ESTRIBOS 3/8"
5/8"
3/4"
3/8"
5/8"

VA-2 ESTRIBOS 3/8"


5/8"
5/8"
5/8"
3/8"

PISO 3
v-303
ESTRIBOS 3/8"
5/8"
3/4"
3/4"
3/4"
3/8"
5/8"
3/4"

v-301 ESTRVOS 3/8"


5/8"
3/4"
3/8"
5/8"
v-302 ESTRIBOS 3/8"
5/8"
3/4"
3/8"
5/8"

VA-3 ESTRIBOS 3/8"


5/8"
5/8"
5/8"

N° DE DESCRIPCION UNIDAD
PARTIDA
04.19.00 LOSA ALIGERADA - CONCRETO 210 KG/CM2

PRIMER PISO
VOLUMEN DE CONCRETO EN LOSA (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION
VOLUMEN DE LADRILLO (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

AREA DE LOSA
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE A Y EJE C
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

VOLUMEN DE CONCRETO EN LOSA ALIGERADA 210 KG/CM2 M3

SEGUNDO PISO
VOLUMEN DE CONCRETO EN LOSA (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION
VOLUMEN DE LADRILLO (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

AREA DE LOSA
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE A Y EJE C

VOLUMEN DE CONCRETO EN LOSA ALIGERADA 210 KG/CM2 M3

SEGUNDO PISO
VOLUMEN DE CONCRETO EN LOSA (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION
VOLUMEN DE LADRILLO (EN UN METRO CUADRADO)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M3*M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

AREA DE LOSA
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE A Y EJE C

VOLUMEN DE CONCRETO EN LOSA ALIGERADA 210 KG/CM2 M3


04.20.00 LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE A Y EJE C
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

N° DE ESPECIFICACION UNIDAD
PARTIDA
04.21.00 LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2
PRIMER NIVEL
EJE 12, EJE 8 KG
EJE 10 KG
EJE 12, EJE 8 KG
EJE 11, EJE 10, EJE 9 KG
EJE 11, EJE 9 KG
ACERO DE TEMPERATURA KG

SEGUNDO Y TERCER NIVEL


EJE 12, EJE 8 KG
EJE 10 KG
EJE 12, EJE 8 KG
EJE 11, EJE 10, EJE 9 KG
ACERO DE TEMPERATURA KG
KG

N° DE DESCRIPCION UNIDAD
PARTIDA
04.22 LOSA ALIGERADA.- LADR. HUECO 15X30X30
ESPECIFICACION (AREA DE LOSA)
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE A Y EJE C
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 M2
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION

NUMERO DE LADRILLOS (EN UN METRO CUADRADO) UNIDAD


EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 U
ENTRE EJE A Y EJE C
EJE 12, EJE 11, EJE 10, EJE 9 , EJE 8 U
ENTRE EJE C Y SIN EJE GALERIA DE CIRCULACION
N° DE VECES LARGO (m) ANCHO ALTURA Volumen Volumen
(m) (m) Parcial (m3) Total (m3)

1 14.32 0.45 0.3 1.9332


1 14.32 0.45 0.3 1.9332
1 7 0.25 0.3 0.525
1 7 0.25 0.3 0.525 4.9164

2 14.32 0.35 10.024


2 14.32 0.35 10.024
2 7 0.35 4.9
2 7 0.35 4.9 29.848

1/4" 8mm 3/8" 1/2"


N° VECES Cant. Long Long. Total
0.25 0.4 0.56 0.994

N° DE VECES LARGO (m) ANCHO ALTURA Volumen Volumen


(m) (m) Parcial (m3) Total (m3)

1.00 17.40 2.00 0.50 17.40


1.00 15.80 0.45 0.70 4.98
1.00 17.70 2.25 0.50 19.91
1.00 15.80 0.45 0.70 4.98
1.00 3.80 1.80 0.50 3.42
1.00 1.55 1.50 0.50 1.16
1.00 5.35 2.00 0.50 5.35 57.20

1.00 17.40 0.50 8.70


1.00 13.90 0.50 6.95
1.00 2.00 0.50 1.00
1.00 15.80 0.70 11.06
1.00 15.30 0.70 10.71
2.00 0.45 0.70 0.63
1.00 17.70 0.50 8.85
1.00 13.90 0.50 6.95
1.00 0.90 0.50 0.45
1.00 0.75 0.50 0.38
1.00 15.80 0.70 11.06
1.00 15.30 0.70 10.71
2.00 0.45 0.70 0.63
1.00 5.30 0.50 2.65
1.00 0.95 0.50 0.48
1.00 3.80 0.50 1.90
2.00 5.30 0.50 5.30 88.40

1/4" 8mm 3/8" 1/2"


N° VECES Cant. Long Long. Total
0.25 0.4 0.56 0.994

6 1 17.33 103.98
71 1 1.86 132.06 131.27
3 1 15.66 46.98
4 1 5.13 20.52
4 1 5.13 20.52
2 1 15.66 31.32 31.13
3 1 15.66 46.98
4 14 3.17 177.52 99.41
8 1 17.63 141.04
71 1 2.11 149.81 148.91
3 1 15.66 46.98
4 1 5.13 20.52
4 1 5.13 20.52
2 1 15.66 31.32 31.13
3 1 15.66 46.98
4 14 3.17 177.52 99.41

6 1 9.44 56.64 56.30


6 1 1.36 8.16 8.11
22 1 1.66 36.52 36.30
10 1 9.44 94.4 93.83
28 1 1.86 52.08 51.77

Las 4 partidas se
encuentran Integradas
en el Siguiente Cuadro

Concreto Encofrado Fierro


Medidas Total Medidas Total
Diam
l a h (m3) l a(h) (m2)
0.000 0.00
0.45 0.25 3.45 1.164 2.36 3.45 24.43
0.48 0.25 3.45 1.242 0.00 6
5
3
3
0.000 0.00 0.00 0.00 2

0.000 0.00 0.00 0.00


1.20 0.25 3.45 6.210 3.30 3.45 68.31 6
0.20 0.30 3.45 1.242 0.00 5
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 2

0.60 0.25 3.45 0.518 3.55 3.45 12.23 6


0.73 0.25 3.45 0.625 0.00 5
0.20 0.15 3.45 0.104 0.00 4
0.000 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00
0.25 0.15 3.00 2.475 0.80 3.00 52.80 4
2

0.000 0.00
0.45 0.25 2.80 0.945 2.36 2.80 19.82
0.48 0.25 2.80 1.008 0.00 6
5
3
3
0.000 0.00 0.00 0.00 2

0.000 0.00 0.00 0.00


1.20 0.25 2.80 5.040 3.30 2.80 55.44 6
0.20 0.30 2.80 1.008 0.00 5
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 2
0.60 0.25 2.80 0.420 3.55 2.80 9.93 6
0.73 0.25 2.80 0.508 0.00 5
0.20 0.15 2.80 0.084 0.00 4
0.000 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00
0.25 0.15 2.15 2.338 0.80 2.15 49.88 4
2

0.000 0.00
0.45 0.25 2.80 0.945 2.36 2.80 19.82
0.48 0.25 2.80 1.008 0.00 6
5
3
3
0.000 0.00 0.00 0.00 2

0.000 0.00 0.00 0.00


1.20 0.25 2.80 5.040 3.30 2.80 55.44 6
0.20 0.30 2.80 1.008 0.00 5
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 0.00 0.00 3
0.000 2

0.60 0.25 2.80 0.420 3.55 2.80 9.93 6


0.73 0.25 2.80 0.508 0.00 5
0.20 0.15 2.80 0.084 0.00 4
0.000 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00 3
0.000 0.00 0.00 0.00 3
0.000 0.00
0.25 0.15 2.15 2.338 0.80 2.15 49.88 4
2
0.000 0.00 0.00
TOTAL 36.28 TOTAL 427.91
36.28
427.91
6,554.46

Las 3 partidas se
encuentran Integradas
en el Siguiente Cuadro

Concreto Encofrado Fierro


Medidas Total Medidas Total
Diam
l a h (m3) l a(h) (m2)
0.000 0.00
6.71 0.25 3.85 12.917 13.42 3.85 103.33
0.000 0.00 3
3

4
2

0.000 0.00
3.10 0.25 3.35 5.193 6.20 3.35 41.54
0.000 0.00 3
3

4
2

0.000 0.00
2.40 0.25 3.35 4.020 4.80 3.35 32.16
0.000 0.00 3
3
0.000 0.00 0.00
TOTAL 22.13 TOTAL 177.03

22.13
177.03
1,099.57

UND ancho alto longitud N° veces N°piesas peso especif subtotal


M3 0.3 0.7 7.02 3 1 2400 10614.24
M3 0.3 0.55 2.2 2 1 2400 1742.4
M3 0.3 0.55 2.2 3 1 2400 2613.6
M3 0.25 0.7 2.68 8 1 2400 9004.8

M3 0.3 0.7 7 3 1 2400 10584


M3 0.24 0.55 2.2 2 1 2400 1393.92
M3 0.3 0.55 2.2 3 1 2400 2613.6
M3 0.25 0.7 2.68 8 1 2400 9004.8

M3 0.3 0.7 7 3 1 2400 10584


M3 0.24 0.65 2.2 2 1 2400 1647.36
M3 0.3 0.65 2.2 3 1 2400 3088.8
M3 0.25 0.7 2.68 8 1 2400 9004.8

M2 0.3 1 7.02 3 1 27.378


M2 0.3 0.9 2.2 2 1 5.28
M2 0.3 0.7 2.2 3 1 6.6
M2 0.25 1.4 2.68 8 1 35.376

M2 0.3 1 7 3 1 27.3
M2 0.24 0.9 2.2 2 1 5.016
M2 0.3 0.7 2.2 3 1 6.6
M2 0.25 1.4 2.68 8 1 35.376

M2 0.3 1 7 3 1 27.3
M2 0.24 1.2 2.2 2 1 6.336
M2 0.3 1.2 2.2 3 1 9.9
M2 0.25 1.4 2.68 8 1 35.376

KG 0.3 0.7 2 3 41 0.56 137.76


KG 2.625 3 2 1.56 24.57
KG 2.025 3 1 1.12 6.804
KG 7.925 3 4 1.12 106.512
KG 2.5 3 2 1.12 16.8
KG 7.625 3 2 0.56 25.62
KG 0.825 3 2 1.56 7.722
KG 5.4 3 2 1.12 36.288

KG 0.3 0.9 2.4 2 15 0.56 40.32


KG 1.725 2 2 1.12 7.728
KG 2.375 2 4 1.56 29.64
KG 0.3 0.7 2 3 15 0.56 50.4
KG 2.025 3 2 1.56 18.954
KG 1.725 3 2 1.12 11.592
KG 0.525 3 2 0.56 1.764
KG 2.375 3 4 1.56 44.46

KG 0.25 1.4 3.3 8 23 0.56 340.032


KG 3.725 8 2 1.56 92.976
KG 1.925 8 2 1.56 48.048
KG 1.8 8 2 1.56 44.928
KG 4.025 8 2 0.56 36.064

KG 0.3 0.7 2 3 41 0.56 137.76


KG 2.625 3 2 1.56 24.57
KG 2.025 3 1 1.12 6.804
KG 7.925 3 4 1.12 106.512
KG 2.5 3 2 1.12 16.8
KG 7.625 3 2 0.56 25.62
KG 0.825 3 2 1.56 7.722
KG 5.4 3 2 1.12 36.288

KG 0.3 0.9 2.4 2 15 0.56 40.32


KG 2.025 2 2 1.56 12.636
KG 1.725 2 2 1.12 7.728
KG 0.525 2 2 0.56 1.176
KG 2.375 2 4 1.56 29.64
KG 0.3 0.7 2 3 15 0.56 50.4
KG 2.025 3 2 1.56 18.954
KG 1.725 3 2 1.12 11.592
KG 0.525 3 2 0.56 1.764
KG 2.375 3 4 1.56 44.46

KG 0.25 1.4 3.3 8 23 0.56 340.032


KG 3.725 8 2 1.56 92.976
KG 1.925 8 2 1.56 48.048
KG 1.8 8 2 1.56 44.928
KG 4.025 8 2 0.56 36.064

KG 0.3 0.7 2 3 41 0.56 137.76


KG 2.625 3 2 1.56 24.57
KG 2.025 3 1 1.12 6.804
KG 7.925 3 4 1.12 106.512
KG 2.5 3 2 1.12 16.8
KG 7.625 3 2 0.56 25.62
KG 0.825 3 2 1.56 7.722
KG 5.4 3 2 1.12 36.288

KG 0.3 0.9 2.4 2 15 0.56 40.32


KG 2.025 2 2 1.56 12.636
KG 1.725 2 2 1.12 7.728
KG 0.525 2 2 0.56 1.176
KG 2.375 2 4 1.56 29.64
KG 0.3 0.7 2 3 15 0.56 50.4
KG 2.025 3 2 1.56 18.954
KG 1.725 3 2 1.12 11.592
KG 0.525 3 2 0.56 1.764
KG 2.375 3 4 1.56 44.46

KG 0.25 1.4 3.3 8 23 0.56 340.032


KG 3.725 8 2 1.56 92.976
KG 1.925 8 2 1.56 48.048
KG 1.8 8 2 1.56 44.928

TOTAL ACERO

N° DE VECES LARGO ANCHO Volumen Volumen


ALTURA Y/O Parcial Total (m3)

1 1 1 0.2 0.2
8.33 0.3 0.3 0.15 0.112455

0.09

4 7.4 3.62 107.152

4 2 3.62 28.96

136.11

11.92

1 1 1 0.2 0.2

8.33 0.3 0.3 0.15 0.112455

0.09

4 7.4 3.62 107.152

9.4

1 1 1 0.2 0.2

8.33 0.3 0.3 0.15 0.112455

0.09

4 7.4 3.62 107.152

9.4 30.68

3 7.4 3.62 80.364

1 2 3.62 7.24
87.60

RADIO( EN N° de
PULGADAS N° de veces 1/4 3/8 1/2 5/8 1
piezas

1/2 24 2 4.06
1/2 24 1 7.96
3/8 24 2 1
3/8 24 3 2.3
3/8 24 2 1.8
14 2 2.3
14 2 7.5

3/8 24 2 2.3
3/8 24 2 0.9
1/2 18 2 3.9
1/2 18 2 4
1/4 28 2 2.295
1/4 28 2 7.75

N° DE VECES LARGO (m) ANCHO ALTURA Volumen Volumen


(m) (m) Parcial (m3) Total (m3)

8 7.4 3.62 214.304

4 2 3.62 28.96
243.26

8.33 LADRILLOS
1785 LADRILLOS

241 LADRILLOS
2026
5/8" 3/4" 1"
KG
1.552 2.235 3.973
5/8" 3/4" 1"
KG
1.552 2.235 3.973

161.38

105.00
81.53
81.53

105.00

218.89

105.00
81.53
81.53

105.00

1913.95462

Fierro Longitud Total


1/4" 3/8" 1/2" 5/8" 3/4" 1"
Cant. Long.
0.25 0.56 0.99 1.55 2.24 3.97
9.00 5.10 137.70
3.00 5.10 45.90
26.00 1.90 148.20
26.00 1.35 105.30
26.00 0.30 23.40

11.00 5.10 336.60


6.00 5.10 183.60
26.00 1.95 304.20
26.00 1.95 304.20
26.00 1.45 226.20
26.00 0.30 93.60

10.00 5.10 51.00


6.00 5.10 30.60
1.00 5.10 5.10
26.00 1.90 49.40
26.00 2.15 55.90
26.00 0.95 24.70
26.00 0.70 18.20
26.00 0.30 7.80

4.00 3.30 290.40


25.00 0.75 412.50

9.00 3.35 90.45


3.00 3.35 30.15
19.00 1.90 108.30
19.00 1.35 76.95
19.00 0.30 17.10

11.00 3.35 221.10


6.00 3.35 120.60
19.00 1.95 222.30
19.00 1.95 222.30
19.00 1.45 165.30
19.00 0.30 68.40
10.00 3.35 33.50
6.00 3.35 20.10
1.00 3.35 3.35
19.00 1.90 36.10
19.00 2.15 40.85
19.00 0.95 18.05
19.00 0.70 13.30
19.00 0.30 5.70

4.00 2.45 284.20


20.00 0.75 435.00

7.00 3.65 76.65


3.00 3.65 32.85
19.00 1.90 108.30
19.00 1.35 76.95
19.00 0.30 17.10

9.00 3.65 197.10


6.00 3.65 131.40
19.00 1.95 222.30
19.00 1.95 222.30
19.00 1.45 165.30
19.00 0.30 68.40

8.00 3.65 29.20


6.00 3.65 21.90
1.00 3.65 3.65
19.00 1.90 36.10
19.00 2.15 40.85
19.00 0.95 18.05
19.00 0.70 13.30
19.00 0.30 5.70

4.00 2.45 284.20


20.00 0.75 435.00

TOTAL mts 7,294.20 1,570.50 3,062.40 870.90 617.10 1,173.30 0.00


TOTAL Kg 6,554.46 392.63 1,714.94 862.19 956.51 2,628.19 0.00
TOTAL var 175 341 97 69

Fierro Longitud Total


1/4" 3/8" 1/2" 5/8" 3/4" 1"
Cant. Long.
0.25 0.56 0.99 1.55 2.24 3.97

16.00 7.11 455.04


27.00 4.85 523.80

4.00 7.21 115.36


27.00 0.95 102.60

14.00 3.50 196.00


13.00 3.35 174.20

4.00 3.60 28.80


13.00 0.95 24.70

14.00 2.80 156.80


10.00 3.65 146.00

TOTAL mts 1,923.30 127.30 1,651.84 144.16 0.00 0.00 0.00


TOTAL Kg 1,099.57 31.83 925.03 142.72 0.00 0.00 0.00
TOTAL var 15 184 17 0

total
71896.32

227.838
362.076

77.688

127.17

562.048

1128.982

362.076

91.5

127.17
562.048

1142.794

362.076

91.5

127.17

525.984

1106.73
3378.506
PESO
SUBTOTAL PESO TOTAL OBS.
PARCIAL

194.88 182.02 0.934


191.04 178.43 0.934
48.00 26.88 0.56
165.60 92.74 0.56
86.40 48.38 0.56
64.40 16.10 0.25
210.00 52.50 0.25

110.40 61.82 0.56


43.20 24.19 0.56
140.40 131.13 0.934
144.00 134.50 0.934
128.52 32.13 0.25
434.00 108.50 0.25
1089.32
Nº PARTIDA DESCRIPCIÓN UNID. Nº VECES

05.01 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM.


PRIMER PISO
eje 12 entre A y C m2 1
eje 8 entre A y C m2 1

SEGUNDO PISO
eje 12 entre A y C m2 1
eje 10 entre A y C m2 1
eje 9 entre A y C m2 1
eje 8 entre A y C m2 1

TERCER PISO
eje 12 entre A y C m2 1
eje 9 entre A y C m2 1
eje 8 entre A y C m2 1

05.02 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.


PRIMER PISO
eje A entre 12 y 11 m2 1
eje A entre 11 y 10 m2 1
eje A entre 10 y 9 m2 1
eje A entre 9 y 8 m2 1

eje C entre 12 y 11 m2 1
eje C entre 11 y 10 m2 1
eje C entre 10 y 9 m2 1
eje C entre 9 y 8 m2 1

SEGUNDO PISO
eje A entre 12 y 11 m2 1
eje A entre 11 y 10 m2 1
eje A entre 10 y 9 m2 1
eje A entre 9 y 8 m2 1

eje C entre 12 y 11 m2 1
eje C entre 11 y 10 m2 1
eje C entre 10 y 9 m2 1
eje C entre 9 y 8 m2 1

TERCER PISO
eje A entre 12 y 11 m2 1
eje A entre 11 y 10 m2 1
eje A entre 10 y 9 m2 1
eje A entre 9 y 8 m2 1

eje C entre 12 y 11 m2 1
eje C entre 11 y 10 m2 1
eje C entre 10 y 9 m2 1
eje C entre 9 y 8 m2 1

05.03 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS


EN MURO DE SOGA
PRIMER PISO
eje A entre 12 y 11 kg 6
eje A entre 11 y 10 kg 6
eje A entre 10 y 9 kg 6
eje A entre 9 y 8 kg 6

eje C entre 12 y 11 kg 6
eje C entre 11 y 10 kg 6
eje C entre 10 y 9 kg 6
eje C entre 9 y 8 kg 6

SEGUNDO PISO
eje 12 entre A y C kg 7
eje 10 entre A y C kg 7
eje 9 entre A y C kg 7
eje 8 entre A y C kg 7

eje C entre 12 y 11 kg 7
eje C entre 11 y 10 kg 7
eje C entre 10 y 9 kg 7
eje C entre 9 y 8 kg 7

TERCER PISO
eje A entre 12 y 11 kg 7
eje A entre 11 y 10 kg 7
eje A entre 10 y 9 kg 7
eje A entre 9 y 8 kg 7

eje C entre 12 y 11 kg 7
eje C entre 11 y 10 kg 7
eje C entre 10 y 9 kg 7
eje C entre 9 y 8 kg 7

EN MURO DE CABEZA
PRIMER PISO
eje 12 entre A y C kg 8
eje 8 entre A y C kg 8

SEGUNDO PISO
eje 12 entre A y C kg 8
eje 10 entre A y C kg 8
eje 9 entre A y C kg 8
eje 8 entre A y C kg 8

TERCER PISO
eje 12 entre A y C kg 8
eje 9 entre A y C kg 8
eje 8 entre A y C kg 8
06 Revoques, Enlucidos y Molduras
06.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR
PRIMER PISO
eje A entre 12 y 11 m2 2
descuento de ventana m2 1
eje A entre 11 y 10 m2 2
descuento de ventana m2 1
eje A entre 10 y 9 m2 2
descuento de ventana m2 1
eje A entre 9 y 8 m2 2
descuento de ventana m2 1

eje C entre 12 y 11 m2 2
descuento de ventana m2 1
descuento de puerta m2 1
eje C entre 11 y 10 m2 2
descuento de ventana m2 1
eje C entre 10 y 9 m2 2
descuento de ventana m2 1
eje C entre 9 y 8 m2 2
descuento de ventana m2 1
descuento de puerta m2 1

eje 12 entre A y C m2 2
eje 8 entre A y C m2 2

SEGUNDO PISO
eje A entre 12 y 11 m2 2
descuento de ventana m2 1
eje A entre 11 y 10 m2 2
descuento de ventana m2 1
eje A entre 10 y 9 m2 2
descuento de ventana m2 1
eje A entre 9 y 8 m2 2
descuento de ventana m2 1

eje C entre 12 y 11 m2 2
descuento de ventana m2 1
descuento de puerta m2 1
eje C entre 11 y 10 m2 2
descuento de ventana m2 1
eje C entre 10 y 9 m2 2
descuento de ventana m2 1
descuento de puerta m2 1
eje C entre 9 y 8 m2 2
descuento de ventana m2 1
descuento de puerta m2 1

eje 12 entre A y C m2 2
eje 10 entre A y C m2 2
eje 9 entre A y C m2 2
eje 8 entre A y C m2 2
TERCER PISO
eje A entre 12 y 11 m2 2
descuento de ventana m2 1
eje A entre 11 y 10 m2 2
descuento de ventana m2 1
eje A entre 10 y 9 m2 2
descuento de ventana m2 1
eje A entre 9 y 8 m2 2
descuento de ventana m2 1

eje C entre 12 y 11 m2 2
descuento de ventana m2 1
eje C entre 11 y 10 m2 2
descuento de ventana m2 1
eje C entre 10 y 9 m2 2
descuento de ventana m2 1
descuento de puerta m2 1
eje C entre 9 y 8 m2 2
descuento de ventana m2 1
descuento de puerta m2 1

eje 12 entre A y C m2 2
eje 9 entre A y C m2 2
eje 8 entre A y C m2 2

06.03 TARRAJEO DE COLUMNAS


PRIMER PISO
eje A entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje A entre 11 y 10
COLUMNA C-2 m2 2
eje A entre 10 y 9 m2
COLUMNA C-2 m2 2
eje A entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1

eje C entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje C entre 11 y 10
COLUMNA C-2 m2 2
eje C entre 10 y 9 m2
COLUMNA C-2 m2 2
eje C entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-3 m2 1

SEGUNDO PISO
eje A entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje A entre 11 y 10
COLUMNA C-2 m2 2
eje A entre 10 y 9 m2
COLUMNA C-2 m2 2
eje A entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1

eje C entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje C entre 11 y 10
COLUMNA C-2 m2 2
eje C entre 10 y 9 m2
COLUMNA C-2 m2 2
eje C entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-3 m2 1

TERCER PISO
eje A entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje A entre 11 y 10
COLUMNA C-2 m2 2
eje A entre 10 y 9 m2
COLUMNA C-2 m2 2
eje A entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1

eje C entre 12 y 11
COLUMNA C-1 m2 1
COLUMNA C-2 m2 1
eje C entre 11 y 10
COLUMNA C-2 m2 2
eje C entre 10 y 9 m2
COLUMNA C-2 m2 2
eje C entre 9 y 8 m2
COLUMNA C-1 m2 1
COLUMNA C-3 m2 1

06.04 TARRAJEO DE PLACAS


PRIMER PISO
eje 12 entre A y C m2 2
eje 8 entre A y C m2 2

SEGUNDO PISO
eje 12 entre A y C m2 2
eje 8 entre A y C m2 2

TERCER PISO
eje 12 entre A y C m2 2
eje 8 entre A y C m2 2

06.05 TARRAJEO DE VIGAS


PRIMER PISO
eje A entre 12 y 11
VIGA VA-1 m2 2
eje A entre 11 y 10
VIGA VA-1 m2 2
eje A entre 10 y 9
VIGA VA-1 m2 2
eje A entre 9 y 8
VIGA VA-1 m2 2
eje C entre 12 y 11
VIGA VA-1 m2 2
eje C entre 11 y 10
VIGA VA-1 m2 2
eje C entre 10 y 9
VIGA VA-1 m2 2
eje C entre 9 y 8
VIGA VA-1 m2 2
SEGUNDO PISO
eje A entre 12 y 11
VIGA VA-1 m2 2
eje A entre 11 y 10
VIGA VA-1 m2 2
eje A entre 10 y 9
VIGA VA-1 m2 2
eje A entre 9 y 8
VIGA VA-1 m2 2
eje C entre 12 y 11
VIGA VA-1 m2 2
eje C entre 11 y 10
VIGA VA-1 m2 2
eje C entre 10 y 9
VIGA VA-1 m2 2
eje C entre 9 y 8
VIGA VA-1 m2 2
TERCER PISO
eje A entre 12 y 11
VIGA VA-1 m2 2
eje A entre 11 y 10
VIGA VA-1 m2 2
eje A entre 10 y 9
VIGA VA-1 m2 2
eje A entre 9 y 8
VIGA VA-1 m2 2
eje C entre 12 y 11
VIGA VA-1 m2 2
eje C entre 11 y 10
VIGA VA-1 m2 2
eje C entre 10 y 9
VIGA VA-1 m2 2
eje C entre 9 y 8
VIGA VA-1 m2 2
MEDIDAS PARCIAL TOTAL
LARGO ANCHO ALTO

3.9 2.55 9.945


3.9 2.55 9.945

3.9 2.75 10.725


6 2.6 15.6
6 2.6 15.6
3.61 2.75 9.9275

3.9 2.75 10.725


6 2.6 15.6
3.61 2.75 9.9275
107.995

1.88 1.8 3.384


1.88 1.8 3.384
1.88 1.8 3.384
1.88 1.8 3.384

1.06 1.8 1.908


1.88 1.8 3.384
1.88 1.8 3.384
1.06 1.8 1.908

1.88 2 3.76
1.88 2 3.76
1.88 2 3.76
1.88 2 3.76

1.06 2 2.12
1.88 2 3.76
1.88 2 3.76
1.88 2 3.76

1.88 2 3.76
1.88 2 3.76
1.88 2 3.76
1.88 2 3.76

1.88 2 3.76
1.88 2 3.76
1.88 2 3.76
1.88 2 3.76
82.64

4.62 w#8=0.395 0.395 10.9494


4.62 w#8=0.395 0.395 10.9494
4.62 w#8=0.395 0.395 10.9494
4.62 w#8=0.398 0.395 10.9494

2.52 w#8=0.395 0.395 5.9724


4.62 w#8=0.395 0.395 10.9494
2.52 w#8=0.395 0.395 5.9724
2.52 w#8=0.395 0.395 5.9724

4.62 w#8=0.395 0.395 12.7743


4.62 w#8=0.395 0.395 12.7743
4.62 w#8=0.395 0.395 12.7743
4.62 w#8=0.398 0.395 12.7743

4.62 w#8=0.395 0.395 12.7743


4.62 w#8=0.395 0.395 12.7743
2.52 w#8=0.395 0.395 6.9678
2.52 w#8=0.395 0.395 6.9678

2.52 w#8=0.395 0.395 6.9678


2.52 w#8=0.396 0.395 6.9678
2.52 w#8=0.397 0.395 6.9678
2.52 w#8=0.398 0.395 6.9678

2.52 w#8=0.395 0.395 6.9678


2.52 w#8=0.396 0.395 6.9678
2.52 w#8=0.397 0.395 6.9678
2.52 w#8=0.398 0.395 6.9678

3.61 w#8=.395 0.395 11.4076


3.61 w#8=.395 0.395 11.4076

3.61 w#8=.395 0.395 11.4076


6.72 w#8=.395 0.395 21.2352
6.72 w#8=.395 0.395 21.2352
3.61 w#8=.395 0.395 11.4076

3.61 w#8=.395 0.395 11.4076


6.72 w#8=.395 0.395 21.2352
3.61 w#8=.395 0.395 11.4076
351.1392
2.67 2.75 14.685
1.57 -0.65 -1.0205
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
1.57 -0.65 -1.0205

2.67 2.75 14.685


1.57 -1.5 -2.355
1.1 -2.75 -3.025
2.67 2.75 14.685
2.67 -1.5 -4.005
2.67 2.75 14.685
2.67 -1.5 -4.005
2.67 2.75 14.685
1.57 -1.5 -2.355
1.1 -2.75 -3.025

7.37 2.55 37.587


7.37 2.55 37.587

2.67 2.75 14.685


1.57 -0.65 -1.0205
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
1.57 -0.65 -1.0205

2.67 2.75 14.685


1.57 -0.65 -1.0205
1.1 -2.75 -3.025
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
2.67 -0.65 -1.7355
1.1 -2.75 -3.025
2.67 2.75 14.685
1.57 -0.65 -1.0205
1.1 -2.75 -3.025

3.9 2.75 21.45


6 2.6 31.2
6 2.6 31.2
3.61 2.75 19.855
2.67 2.75 14.685
1.57 -0.65 -1.0205
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
1.57 -0.65 -1.0205

2.67 2.75 14.685


1.57 -0.65 -1.0205
2.67 2.75 14.685
2.67 -0.65 -1.7355
2.67 2.75 14.685
2.67 -0.65 -1.7355
1.1 -2.75 -3.025
2.67 2.75 14.685
1.57 -0.65 -1.0205
1.1 -2.75 -3.025

3.9 2.75 21.45


6 2.6 31.2
3.61 2.75 19.855
542.369

1.24 2.75 3.41


1.43 2.75 3.9325

1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.21 2.75 3.3275

1.24 2.75 3.41


1.43 2.75 3.9325
1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.21 2.75 3.3275

1.24 2.75 3.41


1.43 2.75 3.9325

1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.24 2.75 3.41


1.43 2.75 3.9325

1.43 2.75 3.9325

1.43 2.75 3.9325

1.24 2.75 3.41


1.21 2.75 3.3275 133.485

3.1 2.75 17.05


3.1 2.75 17.05

3.1 2.75 17.05


3.1 2.75 17.05

3.1 2.75 17.05


3.1 2.75 17.05 102.3

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73

3.9 0.35 2.73


3.9 0.35 2.73
65.52
PARTIDA DESRIPCION UND N° VECES ANCHO ALTO PARCIAL SUB TOTAL
6.0 REVOQUES, ENLUCIDOS Y MOLDURAS
6.08 BRUÑAS SEGÚN DETALLE ml
CORTE LONGITUDINAL A-A
PRIMER PISO
BRUÑA DE 1 CM 8 2.68 2.80 4.76 54.88
2.10
SEGUNDO PISO
BRUÑA DE 1 CM 8 2.65 2.80 4.7 54.4
2.10
TERCER PISO
BRUÑA DE 1 CM 8 2.70 2.80 4.80 55.2
2.10
CORTE LONGITUDINAL C-C
PRIMER PISO
BRUÑA DE 1 CM 2 1.60 2.45 2.60 7.08
0.94
BRUÑA DE 1 CM 2 2.70 2.45 2.40 4.80
BRUÑA DE 1 CM 2 1.76 2.75 2.50 5.00
2 1.13 2.75 2.50 5.00
BRUÑA DE 1 CM 16 0.48 0.35 0.34 5.38
BRUÑA DE 1 CM 16 0.48 0.35 0.34 5.38
BRUÑA DE 1 CM 2 2.42 0.30 1.45 2.90
BRUÑA DE 1 CM 2 2.65 0.30 1.59 3.18

SEGUNDO PISO
BRUÑA DE 1 CM 5 1.60 2.25 3.20 23.75
1.55
3 2.70 2.00 5.40 24.06
2.62
BRUÑA DE 1 CM 16 0.48 0.35 0.34 5.38
BRUÑA DE 1 CM 2 1.60 0.30 0.96 1.92
BRUÑA DE 1 CM 2 2.70 0.30 1.62 3.24
TERCER PISO
BRUÑA DE 1 CM 4 2.70 2.44 4.8 26.16
1.74
4 2.70 2.44 4.8 26.16
1.74
BRUÑA DE 1 CM 16 0.48 0.35 0.34 5.38
BRUÑA DE 1 CM 4 2.70 0.30 1.62 6.48
BRUÑA DE 1 CM 2 1.60 0.30 0.96 1.92
TOTAL

322.48

164.48

38.72

53.19
66.10
PARTIDA DESRIPCION UND N° VECES AREA EL. LARGO ANCHO

8.0 PISOS Y PAVIMENTOS


8.01 PISO DE BALDOSA CERAMICA 30X30CM m2
PRIMER PISO
Biblioteca
Piso Baldosa Ceramica 30 x 30 1 2.77 15.00 7.37
Sala de Internet
Piso Baldosa Ceramica 30 x 30 1 1.39 7.50 7.40
Sala de Historia
Piso Baldosa Ceramica 30 x 30 1 1.39 7.50 6.82
Galeria de Circulacion
Piso de Cemento Pulido 1 - 30.00 1.90

SEGUNDO PISO
Sala de Computo
Piso Baldosa Ceramica 30 x 30 1 1.39 7.5 7.37
Deposito
Piso Baldosa Ceramica 30 x 30 1 0.69 7.4 3.57
Deposito
Piso Baldosa Ceramica 30 x 30 1 0.69 7.4 3.57
Sala de Computo
Piso Baldosa Ceramica 30 x 30 1 1.39 7.40 7.50
Sala de Computo
Piso Baldosa Ceramica 30 x 30 1 1.39 7.4 7.5
Galeria de Circulacion
Piso de Cemento Pulido 1 - 30.00 1.90

TERCER PISO
C.R.T.
Piso Loseta Veneciana 30 x 30 Color Claro 1 2.08 11.41 7.39
C.C.
Piso Loseta Veneciana 30 x 30 Color Claro 1 0.69 7.40 3.61
C.R.T.
Piso Loseta Veneciana 30 x 30 Color Claro 1 2.08 11.41 7.39
Internet Profesores
Piso Loseta Veneciana 30 x 30 Color Claro 1 0.69 6.81 3.61
Galeria de Circulacion
Piso de Cemento Pulido 1 - 30.00 1.90

AREA ANCHO
PARTIDA DESRIPCION UND N° VECES LARGO SECCION

8.0 PISOS Y PAVIMENTOS


8.02 SARDINEL H=50cm, CONCRETO 175 m3
KG/CM2,TARRAJEADO
1 30 0.19 -
2 1.9 0.19 -

PARTIDA DESRIPCION UND N° VECES LARGO ALTO ANCHO


8.0 PISOS Y PAVIMENTOS
8.03 ENCOFRADO DE SARDINEL m2
1 30 0.4 -
2 1.9 0.4 -
UND.
SUB TOTAL TOTAL CERAMICA

671.35
222.09

112.924 112.92 1254.71

56.758 56.758 630.64

52.41 52.41 582.33


57.00
57.00 57.00 -

224.3

56.545 56.545 628.28

27.108 27.108 301.20

27.108 27.108 301.20

56.77 56.77 630.78

56.77 56.77 630.78


57.00
57.00 57.00 -

224.96

86.14 86.14 957.11

27.40 27.40 304.49

86.14 86.14 957.11

25.27 25.27 280.82


57.00
57.00 57.00 -

SUB TOTAL TOTAL

6.56
5.82
0.74

SUB TOTAL TOTAL

13.52
12
1.52

También podría gustarte