Materiales Por Módulos
Materiales Por Módulos
Pág. 1 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
17 PIEDRA BRUTA M3 0.23 56.00 12.77
18 PIEDRA MANZANA M3 0.44 100.00 44.40
19 PINTURA AL ACEITE CON BRILLO GAL 0.01 112.50 0.61
20 TUBERIA F.G. D=4" ML 6.00 158.64 951.84
21 TUBERIA F.G. D=6" ML 4.00 197.42 789.68
22 UNION UNIVERSAL F.G. D=4" PZA 1.00 480.50 480.50
23 UNION UNIVERSAL F.G. D=6" PZA 2.00 608.12 1,216.24
TOTAL (Bs.) 14,266.32
Pág. 2 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
40 TAPA SANITARIA METALICA DE 1/8" PZA 3.00 140.00 420.00
41 TAPON MACHO F.G. D=6" PZA 4.00 100.00 400.00
42 TEE F.G. D=3" PZA 2.00 127.30 254.60
43 TENSOR DE 1 3/4" PZA 1.00 300.00 300.00
44 TENSOR DE 1" PZA 1.00 5.68 5.68
45 TENSOR DE 7/8" PZA 2.00 12.88 25.76
46 TUB. POLITUBO HDPE D=6" (SUPERTUBO) ML 3,041.93 102.10 310,580.60
47 TUBERIA F.G. D=2½" ML 2.60 88.78 230.83
48 TUBERIA F.G. D=3" ML 5.00 122.88 614.40
49 TUBERIA F.G. D=6" ML 67.00 197.42 13,227.14
50 TUBERIA PVC D=2½" (SANITARIA) ML 3.00 9.00 27.00
51 UNION UNIVERSAL F.G. D=6" PZA 1.00 608.12 608.12
TOTAL (Bs.) 448,384.54
Pág. 3 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
TOTAL (Bs.) 37,788.41
Pág. 4 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
28 GUARDACABLE PARA D=3/4" PZA 2.00 90.00 180.00
29 GUARDACABLE PARA D=3/8" PZA 48.00 64.40 3,091.10
30 GUARDACABLE PARA D=5/8" PZA 10.00 18.00 180.00
31 GUIA BLANCA ML 135.35 2.25 304.54
32 HIPOCLORITO AL 70% KG 2.50 2.50 6.26
33 LIMPIADOR PVC GR 2,150.29 0.64 1,376.19
34 LLAVE DE PASO CORTINA D=2" PZA 1.00 300.00 300.00
35 LLAVE DE PASO CORTINA D=3" PZA 10.00 390.00 3,900.00
36 MADERA DE ENCOFRADO P2 1,278.15 7.50 9,586.13
37 MATERIAL FILTRANTE (D=3, 5, 10 CM) M3 0.03 50.00 1.50
38 MORDAZA MODIFICADA PARA D=3/4" PZA 7.00 22.50 157.50
39 MORDAZA MODIFICADA PARA D=3/8" PZA 6.00 13.50 81.00
40 MORDAZA MODIFICADA PARA D=5/8" PZA 27.00 15.00 405.00
41 MORDAZA PARA D=3/4" PZA 8.00 24.00 192.00
42 MORDAZA PARA D=3/8" PZA 108.00 11.97 1,292.22
43 MORDAZA PARA D=5/8" PZA 44.00 15.00 660.00
44 NIPLE F.G. D=3" PZA 10.00 67.00 669.98
45 NIPLE HEXAGONAL F.G. D=2" PZA 1.00 34.50 34.50
46 PEGAMENTO PARA PVC GR 4,519.57 0.65 2,951.28
47 PIEDRA BRUTA M3 0.74 56.00 41.44
48 PIEDRA MANZANA M3 28.66 100.00 2,866.20
49 PINTURA AL ACEITE MATE GAL 13.25 153.80 2,037.82
50 SOLDADURA DE ARCO KG 3.00 14.80 44.41
51 TAPA SANITARIA METALICA DE 1/8" PZA 2.00 140.00 280.00
52 TEE F.G. D=2½" PZA 2.00 88.60 177.20
53 TEE F.G. D=3" PZA 6.00 127.30 763.80
54 TENSOR DE 1" PZA 2.00 5.68 11.36
55 TENSOR DE 7/8" PZA 7.00 12.88 90.16
56 TRACARRO PVC 2" PZA 2.00 34.20 68.40
57 TUBERIA F.G. D=2" ML 2.00 70.22 140.44
58 TUBERIA F.G. D=2½" ML 11.20 88.78 994.34
59 TUBERIA F.G. D=3" ML 36.40 122.88 4,472.83
60 TUBERIA F.G. D=4" ML 64.48 158.64 10,228.95
61 TUBERIA F.G. D=6" ML 93.46 197.42 18,451.50
62 TUBERIA PVC 10" SDR-64 (U-A) ML 569.46 105.68 60,180.12
63 TUBERIA PVC D=2" - SDR-26 (E-C) ML 451.49 26.45 11,941.91
64 TUBERIA PVC D=2" ESQ. 40 (E-C) ML 4.00 19.70 78.80
65 TUBERIA PVC D=2½" (SANITARIA) ML 6.00 9.00 54.00
66 TUBERIA PVC D=4" - SDR-64 (U-A) ML 680.84 25.36 17,266.11
67 TUBERIA PVC D=6" - (SDR-64) ML 525.59 43.87 23,057.56
68 TUBERIA PVC D=8" - SDR 64 ML 259.16 66.80 17,311.78
69 UNION UNIVERSAL F.G. D=2" PZA 1.00 58.68 58.68
70 UNION UNIVERSAL F.G. D=3" PZA 10.00 205.18 2,051.80
TOTAL (Bs.) 266,076.73
Pág. 5 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
4 ACCESORIOS PURGA TIPO D=8" GLB 3.00 8,000.00 23,999.99
5 ACCESORIOS VENTOSA TIPO D=8" GLB 1.00 4,200.00 4,200.00
6 ACERO ESTRUCTURAL KG. 25.10 10.00 251.00
7 ACERO ESTRUCTURAL CORRUGADO KG. 14.52 16.40 238.13
8 AGUA LT 47,209.25 0.01 472.09
9 ALAMBRE DE AMARRE KG 35.54 15.00 533.02
10 ARENA M3 19.01 100.00 1,900.95
11 CABLE ACERADO D=3/8" ML 126.00 12.50 1,575.00
12 CABLE DE SUSPENSION D=3/8" ML 67.00 14.00 937.87
13 CABLE TIRANTE D=½" ML 64.00 15.00 959.94
14 CABLE TIRANTE D=5/8" ML 104.00 18.00 1,872.00
15 CADENA DE ACERO ML 1.00 10.00 10.00
16 CANDADO MEDIANO PZA 3.00 10.00 30.00
17 CEMENTO PORTLAND KG 9,451.65 1.16 10,963.92
18 CLAVOS KG 42.61 15.00 639.18
19 CODO 90º F.G. D=2" PZA 2.00 28.53 57.05
20 COPLA F.G. D=3" PZA 6.00 86.50 519.00
21 DINAMITA CAR 97.10 3.65 354.61
22 ESTACAS 2"*2"*30 CM PZA 75.53 1.80 135.96
23 FULMINANTE PZA 194.20 2.50 485.50
24 GRAVA M3 30.30 100.00 3,029.70
25 GUARDACABLE PARA D=3/8" PZA 65.00 64.40 4,185.87
26 GUARDACABLE PARA D=5/8" PZA 8.00 18.00 144.00
27 GUIA BLANCA ML 97.10 2.25 218.48
28 HIPOCLORITO AL 70% KG 1.89 2.50 4.72
29 LIMPIADOR PVC GR 2,344.71 0.64 1,500.62
30 LLAVE DE PASO CORTINA D=2" PZA 1.00 300.00 300.00
31 LLAVE DE PASO CORTINA D=3" PZA 6.00 390.00 2,340.00
32 MADERA DE ENCOFRADO P2 1,856.97 7.50 13,927.28
33 MATERIAL FILTRANTE (D=3, 5, 10 CM) M3 0.03 50.00 1.50
34 MORDAZA MODIFICADA PARA D=3/8" PZA 28.00 13.50 378.00
35 MORDAZA MODIFICADA PARA D=5/8" PZA 21.00 15.00 315.00
36 MORDAZA PARA D=3/8" PZA 158.00 11.97 1,890.47
37 MORDAZA PARA D=5/8" PZA 38.00 15.00 570.00
38 NIPLE F.G. D=3" PZA 6.00 67.00 401.99
39 NIPLE HEXAGONAL F.G. D=2" PZA 1.00 34.50 34.50
40 PEGAMENTO PARA PVC GR 4,959.56 0.65 3,238.59
41 PIEDRA BRUTA M3 0.74 56.00 41.44
42 PIEDRA MANZANA M3 42.44 100.00 4,244.20
43 PINTURA AL ACEITE MATE GAL 33.52 153.80 5,155.02
44 SOLDADURA DE ARCO KG 3.00 14.80 44.41
45 TAPA SANITARIA METALICA DE 1/8" PZA 1.00 140.00 140.00
46 TEE F.G. D=3" PZA 6.00 127.30 763.80
47 TEE F.G. D=4" PZA 6.00 275.41 1,652.46
48 TENSOR DE 1" PZA 1.00 5.68 5.68
49 TENSOR DE 7/8" PZA 10.00 12.88 128.80
50 TRACARRO PVC 2" PZA 2.00 34.20 68.40
51 TUBERIA F.G. D=2" ML 25.64 70.22 1,800.34
52 TUBERIA F.G. D=2½" ML 15.60 88.78 1,384.97
Pág. 6 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
53 TUBERIA F.G. D=3" ML 27.00 122.88 3,317.76
54 TUBERIA F.G. D=4" ML 79.61 158.64 12,629.73
55 TUBERIA F.G. D=6" ML 68.60 197.42 13,542.81
56 TUBERIA F.G. D=8" ML 60.86 350.00 21,301.95
57 TUBERIA PVC D=2" - SDR-26 (E-C) ML 213.61 26.45 5,650.03
58 TUBERIA PVC D=2" ESQ. 40 (E-C) ML 4.00 19.70 78.80
59 TUBERIA PVC D=4" - SDR-64 (U-A) ML 489.83 25.36 12,422.01
60 TUBERIA PVC D=6" - (SDR-64) ML 697.17 43.87 30,584.66
61 TUBERIA PVC D=8" - SDR 64 ML 400.59 66.80 26,759.25
62 UNION UNIVERSAL F.G. D=2" PZA 1.00 58.68 58.68
63 UNION UNIVERSAL F.G. D=3" PZA 6.00 205.18 1,231.08
TOTAL (Bs.) 238,812.04
Pág. 7 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
12 MADERA DE ENCOFRADO P2 163.64 7.50 1,227.30
13 PIEDRA BRUTA M3 0.48 56.00 26.88
14 PIEDRA MANZANA M3 1.63 100.00 162.60
15 PINTURA AL ACEITE CON BRILLO GAL 0.01 112.50 1.21
16 PINTURA AL ACEITE MATE GAL 3.98 153.80 612.74
17 SIKA 1 IMPERMEABILIZANTE KG 6.38 18.88 120.37
18 SOLDADURA DE ARCO KG 0.72 14.80 10.66
19 TUBERIA F.G. D=8" ML 9.89 350.00 3,460.80
20 UNIÓN UNIVERSAL D=8" PZA 2.00 1,340.00 2,680.00
TOTAL (Bs.) 23,714.86
Pág. 8 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
15 CEMENTO PORTLAND KG 6,432.46 1.16 7,461.65
16 CLAVOS KG 28.66 15.00 429.90
17 COPLA DE D=8" PZA 2.00 870.00 1,740.00
18 COPLA F.G. D=3" PZA 3.00 86.50 259.50
19 DINAMITA CAR 53.73 3.65 196.22
20 ESTACAS 2"*2"*30 CM PZA 36.39 1.80 65.50
21 FULMINANTE PZA 107.46 2.50 268.65
22 GRAVA M3 20.56 100.00 2,055.70
23 GUARDACABLE PARA D=3/8" PZA 39.00 64.40 2,511.52
24 GUARDACABLE PARA D=5/8" PZA 6.00 18.00 108.00
25 GUIA BLANCA ML 53.73 2.25 120.89
26 HIPOCLORITO AL 70% KG 0.91 2.50 2.27
27 LLAVE DE PASO CORTINA D=3" PZA 3.00 390.00 1,170.00
28 LLAVE DE PASO CORTINA D=8" PZA 1.00 1,947.23 1,947.23
29 MADERA DE ENCOFRADO P2 1,246.98 7.50 9,352.35
30 MORDAZA MODIFICADA PARA D=3/8" PZA 16.00 13.50 216.00
31 MORDAZA MODIFICADA PARA D=5/8" PZA 11.00 15.00 165.00
32 MORDAZA PARA D=3/8" PZA 96.00 11.97 1,148.64
33 MORDAZA PARA D=5/8" PZA 12.00 15.00 180.00
34 NIPLE F.G. D=3" PZA 3.00 67.00 200.99
35 NIPLE F.G. D=8" PZA 1.00 294.53 294.53
36 PIEDRA BRUTA M3 0.45 56.00 25.20
37 PIEDRA MANZANA M3 28.32 100.00 2,832.00
38 PINTURA AL ACEITE MATE GAL 34.52 153.80 5,308.49
39 TAPA SANITARIA METALICA DE 1/8" PZA 2.00 140.00 280.00
40 TEE F.G. D=3" PZA 6.00 127.30 763.80
41 TEE F.G. D=4" PZA 2.00 275.41 550.82
42 TENSOR DE 7/8" PZA 8.00 12.88 103.04
43 TUBERIA F.G. D=2½" ML 10.40 88.78 923.31
44 TUBERIA F.G. D=3" ML 21.00 122.88 2,580.48
45 TUBERIA F.G. D=4" ML 34.00 158.64 5,393.76
46 TUBERIA F.G. D=8" ML 85.67 350.00 29,982.79
47 TUBERIA PVC D=8" - SDR 64 ML 852.87 66.80 56,971.78
48 UNIÓN UNIVERSAL D=8" PZA 1.00 1,340.00 1,340.00
49 UNION UNIVERSAL F.G. D=3" PZA 3.00 205.18 615.54
TOTAL (Bs.) 173,351.70
Pág. 9 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
12 FIERRO ANGULAR 1"*3/16" ML 100.80 18.00 1,814.40
13 GRAVA M3 329.98 100.00 32,998.00
14 MADERA DE ENCOFRADO P2 9,526.02 7.50 71,445.15
15 PIEDRA BRUTA M3 2.81 56.00 157.08
16 PIEDRA MANZANA M3 491.18 100.00 49,117.81
17 PINTURA AL ACEITE CON BRILLO GAL 0.26 112.50 29.75
18 SELLO DE NEOPRENO ML 50.40 25.00 1,260.00
19 SIKA 1 IMPERMEABILIZANTE KG 32.14 18.88 606.88
20 TAPA METALICA PZA 2.00 650.00 1,300.00
21 TORNILLOS PZA 297.88 2.50 744.70
22 TUBERIA PVC D=3" ESQ. 40 (E-C) ML 30.00 41.40 1,242.00
TOTAL (Bs.) 375,608.19
Pág. 10 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
14 PERFIL U DE FIERRO 2"*2"*1/8" ML 3.60 20.10 72.36
15 PERNOS DE FIJACION DE ½"*4" PZA 8.00 2.80 22.40
16 PINTURA ANTICORROSIVA (BASE CROMATO DE Z GAL 0.18 158.80 28.58
17 PLANCHA DE ACERO 3/8" (10MM) M2 1.00 865.80 865.80
18 SOLDADURA DE ARCO KG 9.00 14.80 133.23
19 TUBERIA F.G. D=1½" ML 1.90 54.24 103.06
20 TUBERIA F.G. D=2" ML 30.00 70.22 2,106.60
21 TUBERIA F.G. D=3/4" ML 21.60 21.88 472.61
TOTAL (Bs.) 12,819.17
Pág. 11 de 12
Nº DESCRIPCIÓN UNIDAD CANTIDAD P UNIT. PARCIAL
(Bs.) (Bs.)
39 TUBERIA F.G. D=2½" ML 10.40 88.78 923.31
40 TUBERIA F.G. D=3" ML 16.00 122.88 1,966.08
41 TUBERIA F.G. D=4" ML 20.00 158.64 3,172.80
42 TUBERIA F.G. D=6" ML 65.14 197.42 12,860.85
43 TUBERIA PVC D=6" - (SDR-64) ML 1,319.97 43.87 57,906.89
44 UNION UNIVERSAL F.G. D=3" PZA 3.00 205.18 615.54
45 UNION UNIVERSAL F.G. D=6" PZA 1.00 608.12 608.12
TOTAL (Bs.) 134,564.44
Pág. 12 de 12