0.9
Pared - As Vertical 1 3/8" 1.75 9 15.75
0.7 0.15
losa
0.35 0.15
losa
0.35 0.15
losa
COMUNIDAD ATALAYA
HOJA DE METRADOS - ACERO CAMARA DE REJAS
UBICACIÓN: COMUNIDAD ATALAYA
0.75
1.0
1.5
losa
COMUNIDAD ATALAYA
HOJA DE METRADOS - ACERO CAMARA DE REJAS
UBICACIÓN: COMUNIDAD ATALAYA
0.15
0.8
muros Pared - As horizontal 0.15 1 3/8" 4.00 5 20.00
2.9
0.9
muros Pared - As Vertical 1 3/8" 0.90 32 28.80
0.56
0.55
by pass muro- As vertical 0.4 1 3/8" 1.66 10 16.60
0.15
1.74
by pass muros - As Horizontal 1 3/8" 1.74 9 15.66
COMUNIDAD ATALAYA
HOJA DE METRADOS - ACERO CAMARA DE REJAS
UBICACIÓN: COMUNIDAD ATALAYA
0.9
by pass parde venatana - horizontal 1 3/8" 0.90 3 2.70
0.6
by pass parde venatana - vertical 1 3/8" 1.22 5 6.10
SUB-TOTAL KG
Nº de ESTRUCT. TOTAL
TOTAL KG
UNIDAD ATALAYA
OS - ACERO CAMARA DE REJAS
2.26
-
-
74.10
1.00
74.10
COMUNIDAD ATALAYA
HOJA DE METRADOS - ACERO CAMARA DE ENTRADA Y SALIDA
UBICACIÓN: COMUNIDAD ATALAYA
0.15
0.15
.15
0.85
0.85
0.80
ENTRADA Piso - As Parrilla 2 3/8" 0.80 7 11.20
0.15
0.15
.15
SALIDA Pared - As Horizontal 0.85 1 3/8" 3.70 7 25.90
0.85
0.85
0.85
UBICACIÓN: COMUNIDAD ATALAYA
SUB-TOTAL KG
Nº de ESTRUCT. TOTAL
TOTAL KG
OMUNIDAD ATALAYA
OS - ACERO CAMARA DE ENTRADA Y SALIDA
5/8" 3/4"
LONGITUD POR DIAMETRO (ML)
5/8" 3/4"
1.60 2.26
- -
- -
SUB-TOTAL KG 33.21