Está en la página 1de 11
idee) East-West Gas Pipeline Project Pre-Construction Survey and Setting Out Procedure |s==——"" China Petroleum Pipeline Bureau(CPP) | Document No.: EWPLOO-CON- PR-0001 | Rev.:0 Pre-Construction Survey and Setting Out Procedure Document No.: EWPL00-CON-PR-0001 aaa ee lies ee eee ‘Zhu Hezhi Gao Jianguo MW Neko] - 8} 20080809 | "S849 for Cont sie ‘Zhu Hezhi ‘Xue Feng Gao Jianguo A | zo060e0s | S849 for Clnt ie eae [ess 2 ne ee e East-west Gas Pipeline Project cmp Pre-Construction Survey and Setting Out Procedure Seem China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev.: 0 Table of Contents 1.0 General..... on 2.0 Pre-Construction Survey. 3.0 Survey and Setting Out AO ReSOUrCes oo. 5.0 Environmental and Safety Measures. e East-west Gas Pipeline Project ea cmp Pre-Construction Survey and Setting Out Procedure eee China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev: 0 1.0 General East-West Gas Pipeline (EWPL) pipeline project comprises 48° dia (1219.2mm), 1386 km long main line. ‘The pipeline starts from Kakinada in the state of Andhra Pradesh, and ends near Bharuch in the state of Gujarat. 4.1 Scope This specification applies to ROU survey and setting out in spread 3 through 8 of the East to West Gas Pipeline in india, 4.2 Reference Document Ower's documents EWP100-PO5-J00-501 Environment Management Plan EWP100-P30-J00-516 Pipeline Marker Specification EWP100-P30-J00-506 Pipeline Construction Specification Project Documents Environment Protection Procedure Project HSE Plan 2. Pre-Construction Survey Prior to any site construction activity, CPP will take over and check from Reliance all the available {additional) information concerning route, topographical, soil, hydrological and cimatologically surveys. The CPP personnel shall familiarize themselves with the construction drawings, technical requirements and specifications. CPP shall locate and/or reestablish and mark the pipeline C/L, benchmarks, turning points & all buried facillies by field survey prior to commencing any construction related activity Any discrepancies discovered during or after the take over and study of the documents will be notified to the Engineer in Charge. For pipeline construction, Reliance will only provide free of charge to CPP a 30 meter (at restricted areas \ ™ y~ = East-west Gas Pipeline Project Qe crD Pre-Construction Survey and Setting Out Procedure ee China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev: 0 416 meter) wide Right of Use (ROU) working strip It will be essential o install the pipeline and HOPE cable ducts and associated works (draw pits) within the acquired ROU. In general, pipeline C/L will be at 5+25 m within ROU or as agreed by Reliance and CPP. ‘After checking the alignment sheets and site conditions CPP wil finalize the centre it intends to follow. In case they intend to change the centre line, same shall be requested with a “SER" (Site Engineering Request), which shall be approved by Spread Manager. Work shall proceed on approval “SER”. The changes shall be incorporated in “As Built Drawing’. Any land required for temporary works shall be arranged by CPP. A drawing/Field Sketch showing the requirement shall be submitted to Reliance for information/Record, CPP will only work or proceed with approved for construction drawings. All rerouting shall be approved by Owner prior to start of job. 3. Survey and Setting Out PP will take over and check the existing markers and reference points and will report any discrepancy to the Engineer in Charge. The survey team will peg out the centerline of the pipeline at maximum intervals of 100 meters. horizontal bends will be pegged out at maximum intervals of 10 meters (red pegs/stakeslags).. _ jn 10mm _| 7 Te : Wood Peg Ground 40mm, Where the terrain changes seriously or structures are found on ground, the posts shall be installed in ‘smaller intervals, if possible. The principles are to follow the drawings and instruct the construction. Edge post (blue) Eig eta lige ans \ Center post (red) Post Arrangement Edge post (blue) ne Set out the edge line of the ROU according to the above-mentioned method. The line can be set by lime ‘spay or other method which can mark the ROU 4. Resources Pre-construction survey is carried out by survey and grading crew, y 7 v = East-west Gas Pipeline Project Qa cr Pre-Construction Survey and Setting Out Procedure emma China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLO0-CON-PR-0001 | Rev.: 0 4.4 Equipment St_] Name of Equipment | Specification | Quantity Remark 7 | Pickuplieep 1 2_| Total Station 7 Per Spread 3 | interphone 2 a | GPS 7 Per Spread 4.2 Manpower ‘S| Position Nos Remark T_ [Surveyor 2 Diver 7 Helper 4 5. Environmental and Safety Measures -The work should not go outside of the acquired ROU to prevent impact on plants or other vegetations, protect the environment, - ‘atsaionsPSPmensument 4, Eve 2 LOM SI-CF O70 tmp CPnsuiton Teste ‘B.EWPLOPLOMEMT-SPOitorsoabhnoce Grounded: | inven | 41, EWPL2PL-OMFMT-CPO12Deegwethfoode-Sacsnsalaion | statavon of Construct 8: required to be signed off by the client inspector. ‘Manager or his designee. ThusOpencut 29. EWPL:2-PL-QM-FMT-MEHT.005- Evaluation TEGENDS OF INSPECTION REQUIREMENTS: H: Hold Point is mandatory inspection point and work shall not proceed without the presence of a representative ofthe cognizant organization. iw Witness Inspection Point: Designated witness points for the involved personnel, which are required to be signed of by Witnessed Personnel. All activities, which have W point, will require a written notification to Client Inspector. In the event the client inspector does not attend within an agreed period the work may proceed. In such cases the QMD inspector will ecord in appropriate signature space on the forms as “ Not Witnessed” and sign off 'W%: % Witness Inspection Point: Designated % witness points assigned by the client, which will require written notification from then QMD. In the event client inspector does not attend within agreed period the work may proceed. The percentage mean a minimum of 10% inspection overall. However this may be increased at the discretion Surveillance: Overseeing or monitoring of activities by visiting, Activities designated as surveillance shall be signed off by the QMD, such activities are not DR: Document review: This entails review of appropriate documentation and does not require signature of QMD personnel or client personnel, a 27/5/2006 IM DR/KSR/ALR SCOP, B 25/01/2006 IM A 18/01/2006 IM Revision ‘Date Prepared b; Reviewed by ‘Approved by o EAST WEST GAS PIPELINE PROJECT Q cmp oats. No. | Activity Description Specification! Frequency | Acceptance Extent of inspection Drawings oftesting _| Criteria ‘Verifying Forms Contractor | REAL 7 Preparation of ROU | EWPIOD-PS0I00- ‘EWOLZPL-OMFMT-L-O0T ES ‘Staking-survey of marker for Every 100 mtr 4a | Ilermedate points sttaightine, nls 40. mrs Hori bends Setting of reference marks 12 | outside ROU limit Ho] Ss Establishment of width with 1.3. | reference to existing pillars 4 8 ‘2s per alignment sheet 1.4 __| Width for turing points H W% ROU markers for limit of 18 | ROU, chainage, Pet ta 1.8 _| Waring signs H_ | we J

También podría gustarte