idee)
East-West Gas Pipeline Project
Pre-Construction Survey and Setting Out Procedure |s==——""
China Petroleum Pipeline Bureau(CPP) | Document No.: EWPLOO-CON- PR-0001 | Rev.:0
Pre-Construction Survey and Setting Out
Procedure
Document No.: EWPL00-CON-PR-0001
aaa
ee lies ee
eee ‘Zhu Hezhi Gao Jianguo MW Neko] -
8} 20080809 | "S849 for Cont
sie ‘Zhu Hezhi ‘Xue Feng Gao Jianguo
A | zo060e0s | S849 for Clnt
ie eae [ess
2 ne eee East-west Gas Pipeline Project
cmp Pre-Construction Survey and Setting Out Procedure Seem
China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev.: 0
Table of Contents
1.0 General..... on
2.0 Pre-Construction Survey.
3.0 Survey and Setting Out
AO ReSOUrCes oo.
5.0 Environmental and Safety Measures.e East-west Gas Pipeline Project ea
cmp Pre-Construction Survey and Setting Out Procedure eee
China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev: 0
1.0 General
East-West Gas Pipeline (EWPL) pipeline project comprises 48° dia (1219.2mm), 1386 km long main line.
‘The pipeline starts from Kakinada in the state of Andhra Pradesh, and ends near Bharuch in the state of
Gujarat.
4.1 Scope
This specification applies to ROU survey and setting out in spread 3 through 8 of the East to West Gas
Pipeline in india,
4.2 Reference Document
Ower's documents
EWP100-PO5-J00-501 Environment Management Plan
EWP100-P30-J00-516 Pipeline Marker Specification
EWP100-P30-J00-506 Pipeline Construction Specification
Project Documents
Environment Protection Procedure
Project HSE Plan
2. Pre-Construction Survey
Prior to any site construction activity, CPP will take over and check from Reliance all the available
{additional) information concerning route, topographical, soil, hydrological and cimatologically surveys.
The CPP personnel shall familiarize themselves with the construction drawings, technical requirements
and specifications.
CPP shall locate and/or reestablish and mark the pipeline C/L, benchmarks, turning points & all buried
facillies by field survey prior to commencing any construction related activity
Any discrepancies discovered during or after the take over and study of the documents will be notified to
the Engineer in Charge.
For pipeline construction, Reliance will only provide free of charge to CPP a 30 meter (at restricted areas
\ ™ y~= East-west Gas Pipeline Project Qe
crD Pre-Construction Survey and Setting Out Procedure ee
China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLOO-CON-PR-0001 | Rev: 0
416 meter) wide Right of Use (ROU) working strip
It will be essential o install the pipeline and HOPE cable ducts and associated works (draw pits) within
the acquired ROU.
In general, pipeline C/L will be at 5+25 m within ROU or as agreed by Reliance and CPP.
‘After checking the alignment sheets and site conditions CPP wil finalize the centre it intends to follow. In
case they intend to change the centre line, same shall be requested with a “SER" (Site Engineering
Request), which shall be approved by Spread Manager.
Work shall proceed on approval “SER”. The changes shall be incorporated in “As Built Drawing’. Any
land required for temporary works shall be arranged by CPP. A drawing/Field Sketch showing the
requirement shall be submitted to Reliance for information/Record,
CPP will only work or proceed with approved for construction drawings. All rerouting shall be approved
by Owner prior to start of job.
3. Survey and Setting Out
PP will take over and check the existing markers and reference points and will report any discrepancy
to the Engineer in Charge.
The survey team will peg out the centerline of the pipeline at maximum intervals of 100 meters.
horizontal bends will be pegged out at maximum intervals of 10 meters (red pegs/stakeslags)..
_ jn
10mm _| 7
Te
: Wood Peg
Ground
40mm,
Where the terrain changes seriously or structures are found on ground, the posts shall be installed in
‘smaller intervals, if possible. The principles are to follow the drawings and instruct the construction.
Edge post (blue)
Eig eta lige ans
\ Center post (red)
Post Arrangement
Edge post (blue)
ne
Set out the edge line of the ROU according to the above-mentioned method. The line can be set by lime
‘spay or other method which can mark the ROU
4. Resources
Pre-construction survey is carried out by survey and grading crew,
y 7 v= East-west Gas Pipeline Project Qa
cr Pre-Construction Survey and Setting Out Procedure emma
China Petroleum Pipeline Bureau (CPP) | Document No.:EWPLO0-CON-PR-0001 | Rev.: 0
4.4 Equipment
St_] Name of Equipment | Specification | Quantity Remark
7 | Pickuplieep 1
2_| Total Station 7 Per Spread
3 | interphone 2
a | GPS 7 Per Spread
4.2 Manpower
‘S| Position Nos Remark
T_ [Surveyor 2
Diver 7
Helper 4
5. Environmental and Safety Measures
-The work should not go outside of the acquired ROU to prevent impact on plants or other vegetations,
protect the environment,
-
‘atsaionsPSPmensument
4, Eve 2 LOM SI-CF O70 tmp CPnsuiton Teste
‘B.EWPLOPLOMEMT-SPOitorsoabhnoce Grounded: |
inven |
41, EWPL2PL-OMFMT-CPO12Deegwethfoode-Sacsnsalaion |
statavon
of Construct
8:
required to be signed off by the client inspector.
‘Manager or his designee.
ThusOpencut 29. EWPL:2-PL-QM-FMT-MEHT.005- Evaluation
TEGENDS OF INSPECTION REQUIREMENTS:
H: Hold Point is mandatory inspection point and work shall not proceed without the presence of a representative ofthe cognizant organization.
iw
Witness Inspection Point: Designated witness points for the involved personnel, which are required to be signed of by Witnessed Personnel. All activities, which
have W point, will require a written notification to Client Inspector. In the event the client inspector does not attend within an agreed period the work may proceed. In such
cases the QMD inspector will ecord in appropriate signature space on the forms as “ Not Witnessed” and sign off
'W%: % Witness Inspection Point: Designated % witness points assigned by the client, which will require written notification from then QMD. In the event client inspector
does not attend within agreed period the work may proceed. The percentage mean a minimum of 10% inspection overall. However this may be increased at the discretion
Surveillance: Overseeing or monitoring of activities by visiting, Activities designated as surveillance shall be signed off by the QMD, such activities are not
DR: Document review: This entails review of appropriate documentation and does not require signature of QMD personnel or client personnel,
a 27/5/2006 IM DR/KSR/ALR SCOP,
B 25/01/2006 IM
A 18/01/2006 IM
Revision ‘Date Prepared b; Reviewed by ‘Approved byo EAST WEST GAS PIPELINE PROJECT Q
cmp oats.
No. | Activity Description Specification! Frequency | Acceptance Extent of inspection
Drawings oftesting _| Criteria ‘Verifying Forms Contractor | REAL
7 Preparation of ROU | EWPIOD-PS0I00- ‘EWOLZPL-OMFMT-L-O0T
ES
‘Staking-survey of marker for Every 100 mtr
4a | Ilermedate points sttaightine, nls
40. mrs Hori
bends
Setting of reference marks
12 | outside ROU limit Ho] Ss
Establishment of width with
1.3. | reference to existing pillars 4 8
‘2s per alignment sheet
1.4 __| Width for turing points H W%
ROU markers for limit of
18 | ROU, chainage, Pet ta
1.8 _| Waring signs H_ | we