TRABAJO ENCARGADO N° 01

CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

MOVIMIENTO DE TIERRAS

DESCRIPCION N° de Veces Largo (m) Ancho (m) Altura (m) SUB - TOTAL TOTAL

EXCAVACION MANUAL DE ZANJAS (m3) m3


EJE 1 ENTRE A Y C 1 4.96 0.45 1.00 2.23
EJE 1 ENTRE C Y D 1 3.04 0.40 1.00 1.22
EJE A Y B ENTRE 1 Y 2 1 2.04 0.45 1.00 0.92
CISTERNA 1 AREA = 5.05 2.15 10.86
EJE A ENTRE 3 Y 4 1 0.90 0.40 1.00 0.36
EJE A ENTRE 4 Y 9 1 7.37 0.50 1.00 3.69
EJE A ENTRE 9 Y 10 1 1.08 0.40 1.00 0.43
EJE B ENTRE 3 Y 5 1 AREA = 1.92 1.00 1.92
EJE B ENTRE 5 Y 6 1 AREA = 0.74 1.00 0.74
EJE B ENTRE 7 Y 9 1 4.07 0.75 1.00 3.05
EJE D ENTRE 1 Y 2 1 1.94 0.40 1.00 0.78
EJE D ENTRE 2 Y 5 1 3.70 0.65 1.00 2.41
EJE D ENTRE 5 Y 8 1 5.72 0.55 1.00 3.15
EJE D ENTRE 8 Y 10 1 1.98 0.40 1.00 0.79
EJE 2 ENTRE B Y D 1 AREA = 2.14 1.00 2.14
EJE 4 ENTRE A Y B 1 3.00 0.45 1.00 1.35
EJE 6 ENTRE A YB 1 3.14 0.45 1.00 1.41
EJE 7 ENTRE A Y B 1 3.39 0.45 1.00 1.53
EJE 10 ENTRE A Y B 1 4.27 0.40 1.00 1.71
EJE 10 ENTRE B Y C 1 AREA = 1.12 1.00 1.12
EJE 10 ENTRE C Y D 1 1.97 0.40 1.00 0.79
EJE 8 ENTRE C Y D 1 3.94 0.45 1.00 1.77
EJE A' ENTRE 6 Y 7 1 0.70 0.45 1.00 0.32
VIGA DE CIMIENTACION -1 1 AREA = 0.09 0.50 0.05
VIGA DE CIMIENTACION -2 1 2.89 0.25 0.50 0.36
ZAPATA 1 1.15 1.15 1.10 1.45
SARDINEL 1 AREA = 1.06 0.60 0.64

TOTAL 47.16
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

RELLENO COMPACTADO CON MATERIAL PROPIO (m3) m3


EJE A ENTRE 1 Y 2 1 2.30 0.26 0.30 0.18
EJE B ENTRE 1 Y 2 2 2.30 0.15 0.30 0.21
EJE 1 ENTRE A Y B 1 2.09 0.26 0.30 0.16
EJE 1 ENTRE B Y C 1 2.01 0.26 0.30 0.16
EJE 1 ENTREC Y D 1 2.89 0.21 0.20 0.12
EJE D ENTRE 1 Y 2 1 2.94 0.21 0.20 0.12
EJE 2 ENTRE B Y D 1 4.90 0.15 0.30 0.22
EJE 2 ENTRE B Y D 1 4.39 0.15 0.30 0.20
EJE A ENTRE 3 Y 4 1 0.90 0.21 0.20 0.04
EJE 4 ENTRE A Y B 2 2.81 0.15 0.30 0.25
EJE B ENTRE 3,4, 5 Y 6 1 AREA= 2.64 0.30 0.79
EJE A ENTRE 4 Y 5 1 3.15 0.31 0.30 0.29
EJE 6 NTRE A Y B 1 2.95 0.15 0.30 0.13
EJE 6 ENTRE A Y B 1 2.83 0.15 0.30 0.13
EJE A ENTRE 6 Y 7 1 0.70 0.31 0.30 0.07
EJE 7 ENTRE A Y B 1 3.05 0.15 0.30 0.14
EJE 7 ENTRE A Y B 1 3.20 0.15 0.30 0.14
EJE A ENTRE 7 Y 9 1 3.52 0.31 0.30 0.33
EJE A ENTRE 9 Y 10 1 1.08 0.21 0.20 0.05
EJE B ENTRE 7 Y 9 1 3.27 0.30 0.30 0.29
EJE 10 ENTRE A Y B 1 3.45 0.40 0.20 0.28
EJE 10 ENTRE B Y C 1 AREA= 0.94 0.20 0.19
EJE 10 ENTRE C Y D 1 1.78 0.25 0.20 0.09
EJE D ENTRE 2 Y 5 1 3.70 0.46 0.30 0.51
EJE D ENTRE 5 Y 8 1 5.72 0.36 0.30 0.62
EJE D ENTRE 8 Y 10 1 1.93 0.21 0.20 0.08
EJE 8 ENTRE B Y D 1 3.75 0.15 0.30 0.17
EJE 8 ENTRE B Y D 1 3.45 0.15 0.30 0.16
EJE B ENTRE 3,4 Y 5 1 AREA= 4.55 0.30 1.37
PUERTAS 1 10.54 0.15 0.30 0.47
PUERTA' 1 AREA= 0.12 0.30 0.04
PERIMETRO 1 20.73 0.04 0.30 0.25
1 8.06 0.04 0.20 0.06
1 4.46 0.03 0.30 0.04
1 3.54 0.03 0.20 0.02
TOTAL 8.35

Sumatoria del Relleno Compactado = 8.35 m3


0.8 por Compactacion = 6.68 m3

Volumen de Material Excavado = 47.16 m3


Coef. 25% por Esponjamiento = 11.79 m3

V. ELIM. MAT. EXCEDENTE = V.EXC*(1+%ESPONJ)-V.RELL.*(1+%ESPONJ)/COEF.COMP.


ELIMINACION DE MATERIAL EXCEDENTE (m3) 45.90 m3
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

CONCRETO SIMPLE

DESCRIPCION N° de Veces Largo (m) Ancho (m) Altura (m) SUB - TOTAL TOTAL

CIMIENTOS CORRIDOS, Cº 1:10 + 30% de Piedra Grande (m3) m3

EJE A/1 Y 2 1 2.45 0.45 0.7 0.77


EJE A/ 3Y 4 1 0.9 0.4 0.7 0.25
EJE A/4,5,6,9 1 7.37 0.5 0.7 2.58
EJE A/9,10 1 1.08 0.4 0.7 0.30
EJE 1/ AY C 1 4.55 0.45 0.7 1.43
EJE 1/ CY D 1 2.68 0.4 0.7 0.75
EJE 2 / CY D 1 5.05 0.45 0.7 1.59
EJE 4/ AY B 1 3 0.45 0.7 0.95
EJE 6/ AY B 1 3.1 0.45 0.7 0.98
EJE 7/ AY B 1 3.35 0.45 0.7 1.06
EJE 10 / A Y B 1 4.23 0.4 0.7 1.18
EJE 8 / C Y D 1 3.9 0.45 0.7 1.23
EJE A' / 6 1 0.7 0.45 0.7 0.22
EJE D / 1Y 2 1 2.3 0.4 0.7 0.64
EJE D / 2 Y 5 1 3.7 0.65 0.7 1.68
EJE D / 5 Y 8 1 5.72 0.55 0.7 2.20
EJE D / 8 Y 10 1 2.38 0.4 0.7 0.67
EJE B / 1 Y2 1 2.04 0.45 0.7 0.64
EJE B / 7 Y 8 1 4.07 0.75 0.7 2.14
EJE 10 / CY D 1 AREA 1.75 0.7 1.23
EJE B / 3 Y 5 1 AREA 2.65 0.7 1.86
EJE 2 / C Y D 1 AREA 0.05 0.7 0.04
COLUMNAS 1 AREA 2.02 0.7 1.41
V-C 1 AREA 0.33 0.2 0.07

TOTAL 25.86

FALSO PISO, Concreto 1:10, Espesor = 0.10 m. (m2) m2

FALSO PISO m2
EJE A Y B ENTRE 1 2 1 2.45 2.50 6.13
EJE A Y C ENTRE 1 2 1 2.27 1.63 3.70
EJE A Y B ENTRE 2 4 1 2.20 3.06 6.73
EJE A Y B ENTRE 4 Y 6 1 AREA= 11.41 11.41
EJE A Y B ENTRE 6 Y 7 1 AREA= 3.33 3.33
EJE A Y B ENTRE 7 Y 10 1 5.15 3.45 17.77
EJE B Y D ENTRE 2 Y 8 1 AREA= 41.46 41.46
EJE B Y ENTRE 8 Y 10 1 AREA= 9.87 9.87
PUERTAS Y VANOS 1 9.35 0.15 1.40
1 0.80 0.25 0.20

TOTAL 102.00

SOLADO, Concreto 1:12, Espesor = 0.10 m. (m2) m2

Z-1 1 1.15 1.15 1.32


TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

TOTAL 1.32
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

CONCRETO ARMADO

DESCRIPCION N° de Veces Largo (m) Ancho (m) Altura (m) SUB - TOTAL TOTAL

ZATAPAS, Concreto f´c = 210 Kg/cm2 (m3) m3


Z-1 1 1.15 1.15 0.70 0.93

TOTAL 0.93

VIGA DE CIMENTACION, Concreto f´c = 210 Kg/cm2 (m3) m3


VIGA DE CIMENTACION - 1 1 AREA 1= 0.09 0.50 0.05
1 AREA 2= 0.19 0.19 0.04
VIGA DE CIMENTACION - 2 1 2.89 0.25 0.50 0.36
1 0.56 0.25 0.30 0.04

TOTAL 0.48

SOBRECIMIENTO, Concreto f´c = 175 Kg/cm2 (m3) m3


EJE A Y B ENTRE 1 Y 2 1 3.65 0.15 0.60 0.33
EJE 1 ENTRE A Y C 1 3.31 0.15 0.60 0.30
EJE 1 ENTRE C Y D 1 3.01 0.15 0.50 0.23
EJE D ENTRE 1-2 Y 8-10 1 4.02 0.15 0.50 0.30
EJE A ENTRE 3-4 Y 9-10 1 2.20 0.15 0.50 0.17
EJE A ENTRE 4 Y 8 1 6.42 0.15 0.60 0.58
EJE B ENTRE 3 Y 8 1 5.84 0.25 0.60 0.88
EJE D ENTRE 2 Y 8 1 7.77 0.15 0.60 0.70
EJE 2 ENTRE C Y D 1 0.80 0.15 0.60 0.07
EJE 4 ENTRE A Y B 1 1.95 0.15 0.60 0.18
EJE 6 1NTRE A Y B 1 1.88 0.15 0.60 0.17
EJE A' ENTRE 6 Y 7 1 0.30 0.15 0.60 0.03
EJE 7 ENTRE A Y B 1 2.55 0.15 0.60 0.23
EJE 10 ENTRE B Y D 1.00 2.66 0.15 0.50 0.20
TOTAL 4.34
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS MOV. TIERRAS Y CONCRETO

SOBRECIMIENTO, Encofrado y Desencofrado (m2) m2


EJE A ENTRE 1 Y 10 (EXT.) 2 10.82 0.60 12.98
EJE A ENTRE 3, 4, 8 Y 10 2 3.00 0.50 3.00
EJE D ENTRE 2 Y 8 (EXT.) 1 10.02 0.60 6.01
EJE D ENTRE 1-2, 8-10 (EXT) 1 4.98 0.50 2.49
EJE 1 ENTRE A Y C (EXT.) 1 4.46 0.60 2.68
EJE 1 ENTRE C Y D (EXT.) 1 3.54 0.50 1.77
EJE 10 ENTRE B Y D (EXT.) 1 4.57 0.50 2.29
EJE 1 ENTRE A Y C (INT.) 1 4.34 0.60 2.60
EJE 1 ENTRE C Y D (INT.) 1 3.39 0.50 1.70
EJE 10 ENTRE B Y D (INT.) 1 4.05 0.50 2.03
EJE A ENTRE 1 - 10 (INT.) 1 10.07 0.60 6.04
EJE D ENTRE 2 Y 8 (INT.) 1 9.72 0.60 5.83
EJE D ENTRE 1-2 Y 8-10 (INT.) 1 4.68 0.50 2.34
EJE 4 ENTRE A Y B 2 2.26 0.60 2.71
EJE 6 ENTRE A Y B 2 2.03 0.60 2.44
EJE 7 ENTRE A Y B 2 2.55 0.60 3.06
EJE B ENTRE 1 Y 2 2 1.50 0.60 1.80
EJE 2 ENTRE C Y D 2 1.15 0.60 1.38
EJE B ENTRE 3, 4, 5 Y 6 1 8.99 0.60 5.39
EJE B ENTRE 7 Y 8 2 3.07 0.60 3.68
COLUMNA EN EL EJE B 1 1.10 0.60 0.66
EJE A' ENTRE 6 Y 7 2 0.30 0.60 0.36
CIERRE CC-8 4 0.15 0.50 0.30
CIERRE CC-1 (2,3,4,5,6,7) 6 0.15 0.60 0.54
EJE D EN 8 1 0.55 0.60 0.33
EJE B ENTRE 2 Y 8 2 0.25 0.60 0.30

TOTAL 74.71
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS ACERO

DESCRIPCION DIAMETRO N° de LONGITUD 1/4" 3/8" 1/2" 5/8" 3/4" TOTAL


CANTIDAD
(Pulg.) VECES (ml.) 0.256 0.560 0.994 1.552 2.235 (Kg.)
Zapatas, Acero Grado 60° - f`y = 4,200 Kg/cm2.
Z-1 1/2'' 1.00 16.00 1.00 16.00 15.90

TOTAL DE ACERO EN METROS = 16.00 ml.


TOTAL DE ACERO EN KILOS = 15.90 Kilogramos

Viga de Cimentacion, Acero Grado 60° - f`y = 4,200 Kg/cm2.


Longitudinal

VC-1 5/8'' 1.00 4.00 1.74 6.96 10.79


VC-2 5/8'' 1.00 4.00 4.10 16.40 25.42
EJE A ENTRE 1 Y 10 3/8'' 1.00 4.00 13.00 52.00 29.12
EJE A ENTRE 2 Y 4 3/8'' 1.00 2.00 2.37 4.74 2.65
EJE A ENTRE 8 Y 10 3/8'' 1.00 2.00 2.19 4.38 2.45
EJE 1 ENTRE A Y C 3/8'' 1.00 4.00 4.96 19.84 11.11
EJE 1 ENTRE C Y D 3/8'' 1.00 2.00 3.76 7.52 4.21
EJE 2 ENTRE C Y D 3/8'' 1.00 4.00 1.55 6.20 3.47
EJE 5 ENTRE A Y B 3/8'' 1.00 4.00 2.92 11.68 6.54
EJE 6 NTRE A Y B 3/8'' 1.00 4.00 2.31 9.24 5.17
EJE A' ENTRE 6 Y 7 3/8'' 1.00 4.00 0.65 2.60 1.46
EJE 7 ENTRE A Y B 3/8'' 1.00 4.00 2.83 11.32 6.34
EJE 10 ENTRE C Y D 3/8'' 1.00 2.00 3.87 7.74 4.33
EJE B ENTRE 1 Y 2 3/8'' 1.00 4.00 1.70 6.80 3.81
EJE B ENTRE 3 Y 4 3/8'' 1.00 4.00 1.33 5.32 2.98
EJE B ENTRE 4 Y 5 3/8'' 1.00 4.00 0.93 3.72 2.08
EJE B ENTRE 5 Y 6 3/8'' 1.00 4.00 2.16 8.64 4.84
EJE B ENTRE 8 Y 7 3/8'' 1.00 4.00 3.32 13.28 7.44
EJE D ENTRE 1 Y 3 3/8'' 1.00 2.00 5.42 10.84 6.07
EJE D ENTRE 3 Y 8 3/8'' 1.00 4.00 11.85 47.40 26.54

37.33
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS ACERO

DESCRIPCION DIAMETRO N° de LONGITUD 1/4" 3/8" 1/2" 5/8" 3/4" TOTAL


CANTIDAD
(Pulg.) VECES (ml.) 0.256 0.560 0.994 1.552 2.235 (Kg.)

Transversal

VC-1 3/8'' 1.00 6.00 1.50 9.00 5.04


VC-2 3/8'' 1.00 18.00 1.50 27.00 15.12
EJE A ENTRE 1-2 Y 4-8 1/4'' 1.00 44.00 1.10 48.40 12.39
EJE A ENTRE 3-5 1/4'' 1.00 16.00 0.77 12.32 3.15
EJE 1 ENTRE A Y B 1/4'' 1.00 18.00 1.10 19.80 5.07
EJE 1 ENTRE C Y D 1/4'' 1.00 16.00 0.77 12.32 3.15
EJE 2 ENTRE C Y D 1/4'' 1.00 5.00 1.10 5.50 1.41
EJE 4 ENTRE A Y B 1/4'' 1.00 11.00 1.10 12.10 3.10
EJE 6 ENTRE A Y B 1/4'' 1.00 10.00 1.10 11.00 2.82
EJE A' ENTRE 6 Y 7 1/4'' 1.00 3.00 1.10 3.30 0.84
EJE 7 ENTREA Y B 1/4'' 1.00 14.00 1.10 15.40 3.94
EJE 10 ENTRE C Y D 1/4'' 1.00 15.00 0.77 11.55 2.96
EJE B ENTRE 1 Y 2 1/4'' 1.00 9.00 1.10 9.90 2.53
EJE B ENTRE 3 Y 4 1/4'' 1.00 6.00 1.30 7.80 2.00
EJE B ENTRE 4 Y 5 1/4'' 1.00 5.00 1.30 6.50 1.66
EJE B ENTRE 5 Y 6 1/4'' 1.00 9.00 1.30 11.70 3.00
EJE B ENTRE 7 Y 8 1/4'' 1.00 13.00 1.30 16.90 4.33
EJE D ENTRE 1-2 Y 8-10 1/4'' 1.00 21.00 0.77 16.17 4.14
EJE D ENTRE 3-8 1/4'' 1.00 40.00 1.10 44.00 11.26

TOTAL DE ACERO EN METROS = 300.66 ml.


TOTAL DE ACERO EN KILOS = 87.91 Kilogramos
TRABAJO ENCARGADO N° 01
CURSO: METRADOS
DOCENTE: L. ANTONIO APARICIO V. Ingeniero Civil
TEMA: METRADOS EN ESTRUCTURAS ACERO

DESCRIPCION DIAMETRO N° de LONGITUD 1/4" 3/8" 1/2" 5/8" 3/4" TOTAL


CANTIDAD
(Pulg.) VECES (ml.) 0.256 0.560 0.994 1.552 2.235 (Kg.)

Sobrecimientos, Acero Grado 60° - f`y = 4,200 Kg/cm2.


Longitudinal
UNIVERSIDAD “ALAS PERUANAS”
INGENIERIA CIVIL – "Costos y Presupuestos” EXAMEN

Alumno……..……………………………………………………………………………………..……………..…
(Apellidos y Nombres)

VALOR REFERENCIAL

OBRA : CONSTRUCCION DE "DOS AULAS" - PIURA.


PROPIETARIO : MINISTERIO DE EDUCACION
FECHA : OCTUBRE DEL 2,010.

PRECIO
ITEM PARTIDA UNIDAD CANTIDAD UNITARIO
( S/. )

3.00.00 MOVIMIENTO DE TIERRAS

3.01.00 Excavación manual de zanjas, h= 1.00 m. m3.

3.02.00 Relleno compactado con material Propio m3.

3.03.00 Eliminación de mat. excedente, a 5 Km. m3.

4.00.00 OBRAS DE CONCRETO SIMPLE

4.01.00 Cimientos corridos, concreto 1:10+30% P.G. m3.

4.02.00 Falso piso, concreto 1:10, espesor = 10 cm. m2.

4.02.00 Solado para zapatas, concreto 1:12, espesor = 10 cm. m2.

5.00.00 OBRAS DE CONCRETO ARMADO

5.01.01 Concreto en Zapatas, f`c= 210 Kg/cm2. m3.

5.01.02 Acero para Zapatas, fy= 4,200 Kg/cm2. kg.

5.02.01 Concreto en Vigas de Cimentación, f`c= 210 Kg/cm2. m3.

5.02.02 Encofrado y desencofrado de Vigas de Cimentación m2.

5.02.03 Acero para Vigas de Cimentación, fy= 4,200 Kg/cm2. kg.

5.03.01 Concreto en Sobrecimientos, f`c= 175 Kg/cm2. m3.

5.03.02 Encofrado y desencofrado de Sobrecimientos m2.

5.03.03 Acero para Sobrecimientos, fy= 4,200 Kg/cm2. kg.