As Congress considers how to fuel a post-Hurricane Harvey recovery, there are several projects already in the pipeline at various stages. This document assembled by the Corps after Harvey shows what is in the mix.
As Congress considers how to fuel a post-Hurricane Harvey recovery, there are several projects already in the pipeline at various stages. This document assembled by the Corps after Harvey shows what is in the mix.
As Congress considers how to fuel a post-Hurricane Harvey recovery, there are several projects already in the pipeline at various stages. This document assembled by the Corps after Harvey shows what is in the mix.
‘Status of Current Studies and Construction Projects, 13 SEP 2017
Ongoing Authorized and Funded Studies:
Coastal Texas Protection and Restoration Mega Study ($19.8 M, 5.5 yrs, complete FY 21; cs0/50)
Houston Ship Channel Expansion and Improvement Mega Study ($10 M, 4 yrs, complete FY 19; cs
50/50)
Brazos River Floodgates-Colorado River Locks Modernization Study ($6.5 M, 3 yrs, complete FY
19;100% Fed)
Matagorda Ship Channel Improvement Study ($3 M, 3 yrs, complete FY 19; ¢s50/50)
Jefferson County Ecosystem Restoration Study ($3 M, 3 yrs, complete FY 19; cs 50/50)
Brownsville Resacas Ecosystem Restoration Study($3 M, 3 yrs, complete FY 18; cs50/50)
Ongoing Authorized and Funded Construction Projects:
Addicks and Barker Reservoir Dam Safety Mega Project ($73 M, 4 yrs, complete FY 21; 100%Fed)
Greens Bayou Flood Risk Management Project ($26 M, 3 yrs, complete FY 19; cs75/25)
Brays Bayou Flood Risk Management Project ($506 M, balance to complete $74 M; cs75/25)
Authorized Studies Pursuing New Start Appropriations:
‘Addicks and Barker Reservoir Dam System Improvement Study ($3 M, 3 yrs, start TBD; 100% Fed)
Metropolitan Houston Regional Watershed Assessment ($3 M, 3 yrs, start TBD; cs75/25)
Fort Bend County Regional Watershed Assessment ($3 M, 3 yrs, start TBD; cs75/25)
LaQuinta Channel Extension ($3 M, 3 yrs, start TBD; ¢s50/50)
Gulf Intracoastal Waterway, Matagorda and Brazoria Counties, Coastal Resilience Study ($3 M, 3
yrs, start TBD; cs50/50)
Brazos River Erosion Management Study ($3 M, 3 yrs, start TBD; 0350/50)
Authorized Construction Projects Pursuing Appropriations:
Clear Creek Flood Risk Management Project ($284 M; 0885/35)
= $100K for Economic Update (cs50/50)
Cedar Bayou Channel Improvement Project ($52 M; cs65/35)
White Oak Bayou Flood Risk Management Project ($131 M; cs65/35)
Hunting Bayou Flood Risk Management Project ($171 M:; cs65/35)
Corpus Christi Ship Channel, Main Channel and Barge Lanes Improvement Project ($355 M; cs
varies)
Sabine Neches Waterway Channel Improvement Project ($1.3 B; cs75/25)
Brazos Island Harbor Channel Improvement Project ($231 M; cs varies)
Freeport Harbor Channel Improvement Project ($369 M; cs varies)
Completed Studies in Consideration for Future Authorization:
Sabine Pass to Galveston Bay Coastal Storm Risk Management Study ($3.28; cs65/35)
= Freeport ($593M; cs65/35)
= Port Arthur ($729M; 0865/35)
* Orange ($1.98; es65/35)
Galveston Channel Harbor Extension Study ($14 M; ¢s75/25)