‘Status of Current Studies and Construction Projects, 13 SEP 2017 Ongoing Authorized and Funded Studies: Coastal Texas Protection and Restoration Mega Study ($19.8 M, 5.5 yrs, complete FY 21; cs0/50) Houston Ship Channel Expansion and Improvement Mega Study ($10 M, 4 yrs, complete FY 19; cs 50/50) Brazos River Floodgates-Colorado River Locks Modernization Study ($6.5 M, 3 yrs, complete FY 19;100% Fed) Matagorda Ship Channel Improvement Study ($3 M, 3 yrs, complete FY 19; ¢s50/50) Jefferson County Ecosystem Restoration Study ($3 M, 3 yrs, complete FY 19; cs 50/50) Brownsville Resacas Ecosystem Restoration Study($3 M, 3 yrs, complete FY 18; cs50/50) Ongoing Authorized and Funded Construction Projects: Addicks and Barker Reservoir Dam Safety Mega Project ($73 M, 4 yrs, complete FY 21; 100%Fed) Greens Bayou Flood Risk Management Project ($26 M, 3 yrs, complete FY 19; cs75/25) Brays Bayou Flood Risk Management Project ($506 M, balance to complete $74 M; cs75/25) Authorized Studies Pursuing New Start Appropriations: ‘Addicks and Barker Reservoir Dam System Improvement Study ($3 M, 3 yrs, start TBD; 100% Fed) Metropolitan Houston Regional Watershed Assessment ($3 M, 3 yrs, start TBD; cs75/25) Fort Bend County Regional Watershed Assessment ($3 M, 3 yrs, start TBD; cs75/25) LaQuinta Channel Extension ($3 M, 3 yrs, start TBD; ¢s50/50) Gulf Intracoastal Waterway, Matagorda and Brazoria Counties, Coastal Resilience Study ($3 M, 3 yrs, start TBD; cs50/50) Brazos River Erosion Management Study ($3 M, 3 yrs, start TBD; 0350/50) Authorized Construction Projects Pursuing Appropriations: Clear Creek Flood Risk Management Project ($284 M; 0885/35) = $100K for Economic Update (cs50/50) Cedar Bayou Channel Improvement Project ($52 M; cs65/35) White Oak Bayou Flood Risk Management Project ($131 M; cs65/35) Hunting Bayou Flood Risk Management Project ($171 M:; cs65/35) Corpus Christi Ship Channel, Main Channel and Barge Lanes Improvement Project ($355 M; cs varies) Sabine Neches Waterway Channel Improvement Project ($1.3 B; cs75/25) Brazos Island Harbor Channel Improvement Project ($231 M; cs varies) Freeport Harbor Channel Improvement Project ($369 M; cs varies) Completed Studies in Consideration for Future Authorization: Sabine Pass to Galveston Bay Coastal Storm Risk Management Study ($3.28; cs65/35) = Freeport ($593M; cs65/35) = Port Arthur ($729M; 0865/35) * Orange ($1.98; es65/35) Galveston Channel Harbor Extension Study ($14 M; ¢s75/25)

También podría gustarte