DISEÑO DE LA CAMARA DE BOMBEO DE DESAGUES

t1 = 30.00 min t1= Periodo de Retencion Maximo (Por lo General 30 min)

t= 10.00 min t= Periodo de Retencion Mínimo (Por lo General 5 min)

Qp= 0.60 lps Qp = Caudal Promedio diario

Qmin = Caudal Minimo = (60% - 80%) Caudal promedio


%Qp = 80.00%

Qmin = 0.48 lps

Qms = Caudal Maximo Simultaneo = Qmh = K2 . Qp


K2 = 2.80 K2 = Coeficiente Maximo Horario

Qms = 1.68 lps

Q bombeo > Qms Se debe cumplir

a= t1/t= 3.00

K=Qms/Qmin = 3.50

A=(K-a) = 0.50

B = ( a - K2 ) = -9.25

C = K ( K-1)(1+a) = 35

Verificando :

B2 > 4 A C 85.5625 > 70 OK

Resolviendo la Ecuacion :

K1= 13.19493346

K1= 5.30506654

Caudal Bombeo = K1 x Qmin = 2.55 l.p.s

Volumen Util ( m3) = 0.56 m3

Diametro = 1.50 m

Altura = 0.31 m Adoptaremos h= 0.50 m


tmax = t1 = 30.00 min tmin = t = 10.00 min
Q min = 0.48 lps Q max = 1.68 lps
Q bombeo = 1.27 lps Q bombeo = 2.55 lps

V util = 0.54 V util = 0.34

M= 8
Tc=3600/M= 450
Qbombeo= 2.55 lps

Vutil = 0.29
CALCULO DEL DIAMETRO DE LA LINEA DE IMPULSION DESAGUES

Caudal de Bombeo : Qb = 2.55 l.p.s

Diametro Linea Impulsión :

D= 0.065601 m = 65.6008 mm

D= 0.046492 m = 46.4917 mm

Adoptamos : Dexterior = 90.00 mm Clase - C-7.5


Dinterior = 83.40 mm
Espesor = 3.30 mm
c = 302.7684 m/s

V = 0.466133 m/s

h = 14.39 m

L = 123 m

T = 0.81 seg.
Diam. Diametro C-7.5 C-10
pulg. Exterior (mm) Diam. Inter. Espesor Diam. Inter. Espesor
3" 90 83.40 3.30 81.40 4.30
4" 110 102.00 4.00 99.40 5.30
6" 160 148.40 5.80 144.60 7.70
8" 200 185.40 7.30 180.80 9.60
10" 250 231.80 9.10 226.20 11.90
12" 315 292.20 11.40 285.00 15.00
14" 355 329.20 12.90 321.20 16.90
16" 400 371.00 14.50 361.80 19.10
18" 450 417.40 16.30 407.00 21.50
Calculo de Potencia Requerida - CAMARA DE BOMBEO DESAGUES

Datos :

Caudal (Q)= 20.00 l.p.s


Diametro (d)= 83.4 mm
Longitud (L)= 123.00 m
Rugosidad absoluta (Ks) = 0.0015 mm
Viscosidad Cinematica(u ) = 1.14 x 10 -6 m2 /s
Desnivel (Z) = 14.91 m
Perfidas Menores (Km) = 20
Eficiencia Bomba (n) = 80 %
Densidad (r )= 999.1 kg/m3
Presion Salida (Ps) = 2.00 m

Calculos :
Area = 0.00546 m2
Velocidad (V) = 3.661 m/s
Perd. Menores Km V /2g =
2
13.663 m
Reynolds (Re) = 267836.16 (Nota si Re<=2200 Detenerse)
Ks / d = 1.799E-05

Calculo de f mediante el metodo de Newton :

f x g(x) f
Re = 267836.16
0.001 31.622777 7.0422592443 0.0201639672
0.0201639672 7.0422592 8.2992368133 0.0145185648
0.0145185648 8.2992368 8.1656566959 0.0149974618
0.0149974618 8.1656567 8.1789153497 0.0149488772
0.0149488772 8.1789153 8.1775902621 0.0149537222
0.0149537222 8.1775903 8.1777226022 0.0149532382
0.0149532382 8.1777226 8.1777093841 0.0149532865
0.0149532865 8.1777094 8.1777107043 0.0149532817
0.0149532817 8.1777107 8.1777105725 0.0149532822
0.0149532822 8.1777106 8.1777105857 0.0149532821
0.0149532821 8.1777106 8.1777105843 0.0149532821
0.0149532821 8.1777106 8.1777105845 0.0149532821
0.0149532821 8.1777106 8.1777105845 0.0149532821
0.0149532821 8.1777106 8.1777105845 0.0149532821

hf = 15.066 m
H= 45.639 m
Potencia = 11.18 KW
15.00 HP

CURVAS DEL SISTEMA - FUNCIONAMIENTO DE BOMBAS

Curva del Sistema Curva Funcion. las 02 Bombas Paralelo


Hf Caudal Hf Caudal
10.81 0.00 13.00 0.00
10.81 0.20 12.50 0.60
10.83 0.40 12.00 1.20
10.87 0.80 11.50 1.60
10.93 1.20 11.00 1.90
11.00 1.60 10.50 2.15
11.11 2.00 10.00 2.40
11.22 2.40
11.35 2.80 Curva de Funcionamiento de 01 Bomba
11.50 3.20
11.67 3.60 Hf Caudal
11.85 4.00 13.00 0.00
12.38 5.00 12.50 1.20
12.00 2.40
11.50 3.20
11.00 3.80
10.50 4.30
10.00 4.80
Altura Dinam ica Total (m )

CURVA SISTEMA - BOMBAS

13.50

13.00

12.50

12.00

11.50

11.00

10.50

10.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Caudal (l.p.s)

Curva Sistema Curva Operando 02 Bombas


Curva Operando 01 Bomba
Anexo N° 01 Anexo N° 02
Propiedades Fisicas del Agua
Rugosidad absoluta ( Ks) para
diferentes materiales utilizados en
Peso Viscosidad
la fabricación de tuberias
Temp. especif Densidad Viscocidad cinematica
Ks °C g r m x 10 - 3 u x 10 - 6
Material
(mm) N/m3 kg/m3 Pa . S m2 / s
Vidrio 0.0003 0 9806 999.9 1.792 1.792
PVC, CPVC 0.0015 5 9807 1000.0 1.519 1.519
Asbesto Cemento 0.03 10 9804 999.7 1.308 1.308
GRP 0.03 15 9798 999.1 1.140 1.141
Acero 0.046 20 9789 998.2 1.005 1.007
Hierro forjado 0.06 25 9778 997.1 0.894 0.897
CCP 0.12 30 9764 995.7 0.801 0.804
Hierro fundido asfaltado 0.12 35 9749 994.1 0.723 0.727
Hierro galvanizado 0.15 40 9730 992.2 0.656 0.661
Arcilla vitrificada 0.15 45 9711 990.2 0.599 0.605
Hierro fundido 0.15 50 9690 988.1 0.549 0.556
Hierro dúctil 0.25 55 9666 985.7 0.506 0.513
Madera cepillada 0.18 - 0.90 60 9642 983.2 0.469 0.477
Concreto 0.30-3.0 65 9616 980.6 0.436 0.444
Acero bridado 0.90-9.0 70 9589 977.8 0.406 0.415
75 9560 974.9 0.380 0.390
80 9530 971.8 0.357 0.367
85 9499 968.6 0.336 0.347
90 9466 965.3 0.317 0.328
95 9433 961.9 0.299 0.311
100 9399 958.4 0.284 0.296